+ All Categories
Home > Education > M si i-pro pictures 2011 part1

M si i-pro pictures 2011 part1

Date post: 08-May-2015
Category:
Upload: jim-wesberry
View: 473 times
Download: 3 times
Share this document with a friend
Description:
Photos of iPro activities during 2011 (Part 1)
10
iPro
Transcript
Page 1: M si i-pro pictures 2011 part1

iPro

Page 2: M si i-pro pictures 2011 part1

Business Process Re-engineering (BPR)

Page 3: M si i-pro pictures 2011 part1

A two-day focus group discussion (FGD) on June 6-7  to complete the validation process of the OMB Manual of Procedures (MOP). This will be attended by the OMB Technical Working Group members.

Feb. 24 meeting @ OMB Hearing Room, re-CCMS Walk through and design input session

Page 4: M si i-pro pictures 2011 part1

Risk mapping of Select Local Govt Units (RM)

Page 5: M si i-pro pictures 2011 part1

Mar. 28-31 – Local Peer Mentoring Program at Alang-alang, Tacloban, Catarman and Allen (Visayan Region)

Page 6: M si i-pro pictures 2011 part1
Page 7: M si i-pro pictures 2011 part1
Page 8: M si i-pro pictures 2011 part1
Page 9: M si i-pro pictures 2011 part1
Page 10: M si i-pro pictures 2011 part1

Sept. 13 – OMB DILG Joint Mgmt Meeting “Presentation of the TWG on OMB-DILG Integrity Development Program at Annabel’s Restaurant, Timog Ave., Quezon City


Recommended