Why?
Around 2.37 lakh houseless families and 37.5 lakh families live in semi-pukka houses in MP.
With allotment of 70000 houses per annum under IAY, fulfilling unmet need will take decades.
To fulfill this urgent need, CM decided to launch a state sponsored bank linked scheme.
MPRRHA to be headed by an IAS officer
Beneficiary
Maximum annual income per family upto 1.25
lakhs/ 1 hectare land
Should own land or should be eligible for land
allotment.
Both APL and BPL families are eligible.
House and Land
Min 225 sqft built up area. Houses can be built individually or in clusters 9 designs and 81 sub designs of houses available for
beneficiary to choose. Provision of land allotment. Construction of houses by using latest environment
friendly low cost building technique. State wide on-site training of masons in these
technologies. Villagers to earn livelihood by production and sale of
local construction material.
Unit cost of House
House Rs.70]000@&
¼Minimum½
Beneficiary’s Contribution ¼Minimum½
Rs.10]000@&
Subsidy ¼Fixed½ Rs. 30,000/-
Bank loan Rs.30]000&45]000
Bank linkage
Bank linkage to overcome paucity of funds with state government.
Banks to provide long term loans. Nominal EMI of Rs. 325 which can be earned
in 3 days of labour. To ensure repayment, beneficiaries to be
linked with income generating activities.
Construction & Installment stages
S. No
Activity Tentative duration Installment amount
1 Layout Within 15 days of sanction of loan
_
2 Foundation 15 days Beneficiaries contribution.
3 Plinth 30 days 20 %
4 Lintel 45 days 30 %
5 Roof 45 days 35%
6 Completion 45 days 15%
C.M. Rural Housing Mission-MPLow cost houses at Sukaldhana,
Hoshangabad
Beneficiary Name - Mohan Singh (BPL) Beneficiary Name - Suresh Singh
Beneficiary Name - Amar Singh
C.M. Rural Housing Mission-MPLow cost houses at Sukaldhana,
Hoshangabad
Beneficiary Name - Buddhu Beneficiary Name – Vishnu (BPL)
C.M. Rural Housing Mission-MPLow cost houses at Sukaldhana,
Hoshangabad
Implementation, Monitoring & Evaluation (MIS) All operations to be done using state of the art web
portal and GPS enabled PDA devices. Online registration of beneficiaries. Loan cases sent electronically to banks. Beneficiaries to be informed at each stage through SMS. Online release of loan installments in beneficiaries bank
account. Use of GPS based PDA device to capture geo-tagged
photographs of construction activity. All inspection reports will be available on Google earth.
Benefits Valuation. Stage clearance through GPS and IT based
devices Minimal Interaction of beneficiary and govt. officials. PULL and PUSH, SMS based system to inform
stakeholders. Online system ensures minimum time lag between
capture and usage of info. Minimal time consuming paper based work. Real time data transfer. Event and trigger system reduces administrative burden.
Lesser paper work reduces chances of errors and mistakes.
GPS system negates chances of faking photograph location.
All information to be available on website ensuring transparency.