Physical Infrastucture Checklist Decription : Proj No Company Date: Plant IPage: Of: By: TRANSPORTATION External: Rail Siding Rail Dock Truck Docks Truck Turnaround Truck Parking Truck Scale Truck Maintenance Road Access/ Egress Airport / heliport Off Site Storage Internal: Pedestrian Aises Pallet Truck Aisles Tractor/Fork/ Trek Aisles Tractor/Fork/ Trek Repair Battery Charge Overhead Crane Freight Elevators Scale Other:______________ _____ ADMINISTRATION Visitor/ Reception: Conference Rooms Customer Service Display Room Training Center Photo/ Artwork Storage: Archives/ Tapes Secure Storage Catalogue/ Display Microfilm/ Microfiche Surplus HUMAN RESOURCES Administration: Personnel Office Employment office Credit Union Library Training Faculties Food Service: Cafeteria Vending Area Lounge / Break Room Executive Dining Room Health: Exercise Room Jogging Track Personnel: Toilets Washrooms/ HEALTH AND SAFETY Medical Center Disaster Alarma System Fire Egress Sprinkler Controls Fire Station Tomado/ Fallout Sheiter Other:_________ ___ PRODUCTION Production Offices Quality Laboratores Gage Calibration Tool Crib Formulation Labs Clean Room Storage: Packaging Materials Lubricants/ Cutting Oil MAINTENANCE Shops Electrical/Electronic Mechanical Carpenter Tool And Die Yard Maintenance Other:_______________ ____ Storage: Service Parts Vehicles/ Equipment Obsolete/ Equipment UTILITIES Electrical Outdoor Substation Indoor Substation Switchgear Room Motor Control Center Uninterruptible Power 115v. 1-Ph 208/120v, 1- Ph 208/120v, 3- Ph 460v, 3 - Ph 450/277v 3-Ph Other Lighting: High Intensity Low Intensity Natural Light Other___________ ________________ Water/Sewer: Drinking Water Process Water Cooling Tower Water Treatment Wastewater Treatment _________________ _________________ Steam: Boiler Room Distributions System Fuel: Fuel Gas Storage Fuel Gas Mix Plant Oil Storage Coal Yard Compressed Gas: Air compressor Surge Tanks Distribution system Oxigen storage CO2, NO2, Ar, He, Xe Other: _______________ ___________________ __ Other Utilities: Vacuum Dust Collection
Transcript
Page 1: manual de ingles tecnico

Physical Infrastucture Checklist

Decription:   Proj NoCompany   Date:

Plant                                                    IPage:        Of: By:

TRANSPORTATIONExternal:

Rail SidingRail DockTruck DocksTruck TurnaroundTruck ParkingTruck ScaleTruck MaintenanceRoad Access/ EgressAirport / heliportOff Site Storage

Internal:Pedestrian AisesPallet Truck AislesTractor/Fork/ Trek AislesTractor/Fork/ Trek RepairBattery ChargeOverhead CraneFreight ElevatorsScaleOther:___________________

ADMINISTRATION

Visitor/ Reception:Conference RoomsCustomer ServiceDisplay RoomTraining CenterPhoto/ Artwork

Storage:Archives/ TapesSecure StorageCatalogue/ DisplayMicrofilm/ MicroficheSurplus Furniture /EquipOther______________

HUMAN RESOURCESAdministration:

Personnel OfficeEmployment officeCredit UnionLibraryTraining Faculties

Food Service:CafeteriaVending AreaLounge / Break RoomExecutive Dining Room

Health:Exercise RoomJogging Track

Personnel:ToiletsWashrooms/ShowersLocker RoomWater FountainPublic TelephonesEmployee Parking___________________

Other:_________________

_________HEALTH AND SAFETY

Medical CenterDisaster Alarma SystemFire EgressSprinkler ControlsFire StationTomado/ Fallout SheiterOther:____________

PRODUCTION

Production OfficesQuality LaboratoresGage CalibrationTool CribFormulation LabsClean Room

Storage:Packaging MaterialsLubricants/ Cutting OilDiscrepant MaterialsIncidentalsOther:____________________

MAINTENANCEShops

Electrical/ElectronicMechanicalCarpenterTool And DieYard MaintenanceOther:___________________

Storage:Service PartsVehicles/ EquipmentObsolete/ EquipmentOther:_________________

UTILITIES

ElectricalOutdoor SubstationIndoor SubstationSwitchgear RoomMotor Control CenterUninterruptible Power115v. 1-Ph208/120v, 1- Ph208/120v, 3- Ph460v, 3 - Ph450/277v 3-PhOther

Lighting:High IntensityLow IntensityNatural LightOther___________________________

Water/Sewer:Drinking WaterProcess WaterCooling TowerWater TreatmentWastewater Treatment__________________________________

Steam:Boiler RoomDistributions System

Fuel:Fuel Gas StorageFuel Gas Mix PlantOil StorageCoal Yard

Compressed Gas:Air compressorSurge TanksDistribution systemOxigen storageCO2, NO2, Ar, He, XeOther: ____________________________________

Other Utilities: Vacuum Dust Collection