MAPEiG: MAPa de Electricidad y GasMAPEiG: MAPa de Electricidad y GasPlanning and monitoring system of inspections of th e
electrical network
Josep Maria de Juan Capdevila
HEAD OF THE SERVICE OF INSPECTION AND
CONTROL OF ELECTRICAL FACILITIES
General Direction of Energy, Mines and
Industrial Security
INDEX
• The origin
• Action of the Government
• TIC utilisation
• TIC in inspection procedure
• MAPEiG construction
• Working with MAPEiG• Working with MAPEiG
• Physical Architecture (Pro. environment)
• Technologies Schema
• General Schema
• Several numbers about MAPEiG
• MAPEiG in the future
• Final considerations
• Contacts
2
THE ORIGIN
3
THE ORIGIN
BLACKOUT OF BARCELONA BLACKOUT OF BARCELONA
CITY
23.07.2007(COSTUMERS AFECTED: 350.000)
(BARCELONA POPULATION: 1,5 Mhab)4
ACTION OF THE GOVERNMENT
IN LAWS
• Law 18/2008,
December 23th, of
guarantee and quality
5
guarantee and quality
of the electrical
supply
(DOGC 31.12.08)
Decree.... about
procedures of control
of security conditions
of the electrical
network (in progress)
ACTION OF THE GOVERNMENT
IN ORGANIZATION
• Decree 194/2008, of 7
October 7th, of partial
restructuring of the
IN LAWS
• Law 18/2008,
December 23th, of
guarantee and quality
6
restructuring of the
Department of Economy and
Finances. Creation of the
Service of Inspection and
Control of Electrical Facilities
(DOGC 09.10.08).
• Selection of inspector staff.
• Acquisition of material
supplies for inspection.
guarantee and quality
of the electrical
supply
(DOGC 31.12.08)
• Decree.... about
procedures of control
of security conditions
of the electrical
network (in progress)
ACTION OF THE GOVERNMENT
IN PROCEDURES
• Design criteria for the
Inspection Planning of the
Electrical Network of
IN LAWS
• Law 18/2008,
december 23th, of
guarantee and quality
IN ORGANIZATION
• Decree 194/2008, of 7
October 7th, of partial
restructuring of the
7
Electrical Network of
Catalonia (2008-2009)
• New inspection guides.
(2008-2009)
• New inspection protocols.
(2008-2009)
• TIC use for the
management of Catalonia
energetic facilities (2008...)
guarantee and quality
of the electrical
supply
(DOGC 31.12.08)
• Decree.... about
procedures of control
of security conditions
of the electrical
network (in progress)
restructuring of the
Department of Economy and
Finances. Creation of the
Service of Inspection and
Control of Electrical Facilities
(DOGC 09.10.08).
• Selection of inspector staff.
• Acquisition of material
supplies for inspection.
TIC UTILISATION
ELECTRONIC MINUTES
• Intelligent PDFs made with Adobe
Acrobat Professional.
• Data extraction in XML format.
8
TIC UTILISATION
ELECTRONIC MINUTES
• Intelligent PDFs made with Adobe
Acrobat Professional.
• Data extraction in XML format.
9
ELECTRONIC SIGNATURE
• Digital identity card supplied by the
Platform CatCert of the Catalan
Agency of Certification.
TIC UTILISATION
COMMUNICATIONS
• E-mail communications with people
involved in inspection procedure.
• New mail-box only for the
inspection activity.
ELECTRONIC MINUTES
• Intelligent PDFs made with Adobe
Acrobat Professional.
• Data extraction in XML format.
10
inspection activity.
ELECTRONIC SIGNATURE
• Digital identity card supplied by the
Platform CatCert of the Catalan
Agency of Certification.
TIC UTILISATION
ELECTRONIC MINUTES
• Intelligent PDFs made with Adobe
Acrobat Professional.
• Data extraction in XML format.
COMMUNICATIONS
• E-mail communications with people
involved in inspection procedure.
• New mail-box only for the
inspection activity.
11
NETWORK MANAGEMENT
• GIS and application in web page
portal. MAPEiG.
ELECTRONIC SIGNATURE
• Digital identity card supplied by the
Platform CatCert of the Catalan
Agency of Certification.
inspection activity.
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
12
TIC IN INSPECTION PROCEDURE
MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
ANNUAL INSPECTION PLANNING
13
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
14
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
15
PRE-LOAD INSPECTION MINUTES MAPEiG
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
16
PRE-LOAD INSPECTION MINUTES MAPEiG
INSPECTION OF THE INSTALLATION PDF
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
17
PRE-LOAD INSPECTION MINUTES MAPEiG
INSPECTION OF THE INSTALLATION PDF
INSPECTION MINUTES COMMUNICATION E-MAIL
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
18
PRE-LOAD INSPECTION MINUTES MAPEiG
INSPECTION OF THE INSTALLATION PDF
DOWNLOAD INSPECTION MINUTES
INSPECTION MINUTES COMMUNICATION E-MAIL
MAPEiG
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
19
PRE-LOAD INSPECTION MINUTES MAPEiG
INSPECTION OF THE INSTALLATION PDF
DOWNLOAD INSPECTION MINUTES
INSPECTION MINUTES COMMUNICATION E-MAIL
MAPEiG
FAULTS CORRECTION COMMUNICATION E-MAIL
TIC IN INSPECTION PROCEDURE
ANNUAL INSPECTION PLANNING MAPEiG
MONTHLY INSPECTION PLANNING MAPEiG
MONTHLY PLANNING COMMUNICATION E-MAIL
PRE-LOAD INSPECTION MINUTES MAPEiG
20
PRE-LOAD INSPECTION MINUTES MAPEiG
INSPECTION OF THE INSTALLATION PDF
DOWNLOAD INSPECTION MINUTES
INSPECTION MINUTES COMMUNICATION E-MAIL
MAPEiG
FAULTS CORRECTION COMMUNICATION E-MAIL
FAULTS CORRECTION MANAGEMENT MAPEiG
MAPEiG CONSTRUCTION
21
WORKING WITH MAPEiG
IDENTIFICATION SCREEN
22
WORKING WITH MAPEiG
FIRST SCREEN
23
WORKING WITH MAPEiG
MAP MODULE
24
WORKING WITH MAPEiG
MAP MODULE
25
WORKING WITH MAPEiG
MAP MODULE
26
WORKING WITH MAPEiG
COI MODULE-ANNUAL PLANNING
27
WORKING WITH MAPEiG
COI MODULE-MONTHLY PLANNING
28
WORKING WITH MAPEiG
COI MODULE-LIST (upper view)
29
WORKING WITH MAPEiG
COI MODULE-LIST (down view)
30
WORKING WITH MAPEiG
ACCORDING THE INSPECTION MEETING
31
WORKING WITH MAPEiG
INSPECTION PROCEDURE (upper view)
32
WORKING WITH MAPEiG
INSPECTION PROCEDURE (down view)
33
WORKING WITH MAPEiG
FAULTS CORRECTION MANAGEMENT
34
WORKING WITH MAPEiG
REPORT MODULE
35
Physical Architecture ( Pro. environment )
36
Technologies Schema
37
Client desktop
ArcEditor
ArcCatalogESRI Flex API
General Schema
Web Client
MapInspections
ControlInvest-Control AdminReporting Alerts
Oracle BI Client
38
Application ServerGIS Server
Base de Dades
ArcGIS Server 9.2
Srv Oracle BI
Report modul Alert Modul
Web Server
Data Upload & Integrate Electrical Comp. Data
( ENDESA, REESA, …)
General Schema
Desktop client
ArcEditor
ArcCatalog
39
GIS Server
ArcGIS Server 9.2
General Schema
Web Client
MapInspections
ControlInvest-Control AdminReporting Alerts
ESRI Flex API
40
GIS Server Application Server
Report modul Alert Modul
Web Server
Data Upload & Integrate Electrical Comp. Data
( ENDESA, REESA, …)
ArcGIS Server 9.2
General Schema
Web Client
MapInspections
ControlInvest-Control AdminReporting Alerts
ESRI Flex API
41
GIS Server Application Server
Report modul Alert Modul
Web Server
Data Upload & Integrate Electrical Comp. Data
( ENDESA, REESA, …)
ArcGIS Server 9.2
Oracle BI Client
General Schema
Report Catalog Report Parameters
42
Srv Oracle BI
SEVERAL NUMBERS ABOUT MAPEiG
DEFINITION AND CONSTRUCTION COST 310.000,- €
DIRECTION PROJECT MEETINGS 3
FOLLOW-UP PROJECT MEETINGS 18
MEETINGS WITH ELECTRICAL COMPANY 3
43
MEETINGS WITH ELECTRICAL COMPANY 3
FACILITIES TO MANAGE 80 ± 100 mil
POTENTIAL USERS
PERIODICITY BETWEEN LOADING DATA MENSUAL
20 ± 30
USERS AT THE SAME TIME 10
OWN ANNUAL INSPECTIONS 2.500 ± 3.000
MAPEiG IN THE FUTURE
IN THE SHORT TERM
• Fill the application with the electrical transport grid and the final 5% of
electrical distribution grid.
• Final development of CPI module: Control of Inversion Planning.
IN THE MEDIUM TERM
• Information coming from the authorization of new electrical facilities.
• Incorporation of other energetic services.
• Interaction studies between several services.
•Availability “on line” the view of transport and distribution grids (like the
cartographic basis of the ICC)
44
FINAL CONSIDERATIONS
• Collaboration with the owner companies of the
energetic grids. The Administration have to convince them that it’s
necessary that energetic grid have to be in perfect use and
conservation.
• Elimination of paper procedure and substitute it for
computer procedures.
•Computer pedagogy before the actors in procedures
carried out by the Administration, with special emphasis in the
documental validation with recognized electronic signature.
45
CONTACTS
USER
SUPPLIER
46