MAREC
114-07-2014
MAREC provides instruments and concepts for sustainable mining through the entire mining life cycle.
2
Reference projects Mining
14-07-2014
3
Mine Closure ENCI Pit Maastricht Nl
Executed by MAREC partner: Witteveen+Bos
Client: Heidelberg Cement - ENCI
Description:
• Closure of 130 hectares open chalk pit mine
• Transformation into natural area, leisure and innovative business park
Services provided:
• Project management and financial planning
• Stakeholder participation
• Post closure landscaping and ecological design
4
Portuario – Puerto Busch project (PVPMMPB) Bolivia
Executed by MAREC partner: Witteveen+Bos
Associated parties: DHV
Client: Bolivian Ministry of Public Works, Services and Housing
Description:
• Transport study between Mutun- iron ore area and existing infrastructure
• Tender documentation for selected transport means
• Assessment of environmental feasible solutions
Services provided:
• Advice on feasibility study, ecological and hydrological situation
• Design review, review environmental impact assessment
Executed by MAREC partner: Witteveen+Bos
Client: Solidaridad – Aqua4All
Description:
• Study on the possible negative impacts of the Marlin Gold Mine in Guatemala
Services provided:
• Desk study on hydrological and environmental aspects
• Desk study on dam stability
5
Environmental aspects Marlin Mine Guatemala
Executed by MAREC partner: Witteveen+Bos
Associated parties: Fichtner FME (De)
Client: Kazakhmys Services Ltd.
Description:
• Feasibility study on re-opening the abandoned Konraud Copper mine
Services provided:
• Review of mining plan
• Field assessment
• Financial study (cost price assessment, risk assessment, multi variable analyses)
6
Re-opening Konraud mine Kazakhstan
Executed by MAREC partner: Witteveen+Bos
Client: Fundacja Greenpeace Poland
Description:
• Study on the hydrological effects of closing the Tomislawice lignitemine near lake Lubstwoski Poland (Nature 2000 area)
Services provided:
• Hydrologeological review and assessment, including water balance and development of surface water (SOBEK) and groundwater modeling (MODFLOW)
• Recommendations for closing
7
Tomislawace Lignite Mine Poland
Executed by MAREC partner: Witteveen+Bos
Associated partners: AEA/CE-Delft (European study), Fugro/Arcadis Dutch study
Client: European Union, Ministry Economic affairs
Description:
• Study on the effects of shale and coal gas production
Services provided:
• Geological, geohydrological, geomechanical assessment
• Effect studies on seismic activity, noise, ecology etc.
• Assessment of legal aspects
8
Impact studies on shale and coal gas production
Executed by MAREC partner: Witteveen+Bos
Associated partners: IC Consulenten ZT, S&E Consulting engineers
Client: UNDP
Description:
• Assessment of 26 hot spot areas
• Half of the sites involved (former) mining sites, including Rehove copper mine, Perrenjas, Bulquize mine, Guri Kuq tailing dam and Elbasan and Burel ferrochrome smelters
Services provided:
• Site investigation, risk assessment
• Development of prioritising tool, prioritising
• Assessment of remedial options
9
Albanian Hot Spot Study
10
Rehabilitation of 3 Serbian sites
Executed by MAREC partner: Witteveen+Bos
Associated partners: NIRAS, REC
Client: EU agency for Reconstruction
Description:
• Assessment and ranking of hot spots in Savah river area, including Cupper Mines of Bor, Majdanpek and Rudnik
• Preparation of remedial action plans for three sites including the Bor mining area
Services provided:
• Site investigation, risk assessment,
• Feasibility studies, remedial action plans, cost estimates
• Stakeholder involvement
Executed by MAREC partner: Witteveen+Bos
Associated partners: Medusa, Tauw, Fugro
Client: Province of Brabant (ABdK)
Description:
• Assessment of 1,100 km of tailing ore (zinc) roads by using innovative investigation techniques
• Based on results, risk assessment and cost estimates the various sites were ranked for remediation
Services provided:
• Site investigations, risk assessment
• GIS-database
• Development of remedial strategy
11
Zinc ash project Campina Region
12
Bor Serbia Rehabilitation project
Executed by MAREC partner: Witteveen+Bos
Associated partners: REC, Dvokut ECRO, Energoproject-hydroengineering
Client: Ministry of Environment and Spatial Planning Serbia
Description:
• Rehabilitation of the Bor mining area (in total 4,000 ha.), including tailing ponds, tailing dams
Services provided:
• Various studies (environmental, geohydrological, geotechnical, etc) remedial plans, preparation of remedial tender documents
• Landscaping
• Permitting, stakeholder involvement, training etc.
13
Arsenic mine waste project Georgia
Executed by MAREC partner: Witteveen+Bos
Associated partners: CENN, Balast Nedam
Client: Dutch gouvernament (EVD Netherlands, PSO environment)
Description:
• Former arsenic mining area, still containing large deposits and waste sites for toxic Arsenic. Waste materials must be isolated in order to protect humans and environment
Services provided:
• Site investigations, risk assessment
• Design of containment options
• Stakeholder involvement
14
Case study mining on Romang Island Indonesia
Executed by MAREC partner: Witteveen+Bos
Associated partners: Saxion highschool
Client: Nuffic
Description:
• At Roman Island a program is currently under way to develop mining activities. Gold and other minerals are present
Services provided:
• Course on the use of GIS and remote sensing for sustainable mining development
Executed by MAREC partner: Eijkelkamp Agrisearch Equipment
Client: Les Carrières du fond des vaulx
Description:
• Minimize effects of mining activities
• Protection of nature
Services provided:
• Project management and installation of groundwater
monitoring network (GPRS & webapplication)
Groundwater monitoring networkBelgium
15
16
Monitoring equipment & services Botswana
Executed by MAREC partner: Eijkelkamp’s distributor in Botswana
Associated partners: Aridus Hydro Geotechnik
Client: Jwaneng diamond mine
Services provided:
• Supply & installation of geotechnical instrumentation for monitoring & plant infrastructure
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: PT Weda Bay Nickel
Description:
• Grade control drilling for nickel in laterite and saprolite formation
Services provided:
• Sampling for construction materials such as e.g. gravels and sands
• Drilling small diameter water wells for local municipalities
Grade control drilling, Indonesia
17
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: Minatura Colombia
Description:
• Grade control drilling for gold in alluvial deposits, large diameter samples up
to 45 meters in old tailings and virgin material
Services provided:
• Installation of monitoring pipes to measure ground water fluctuation
Grade control drilling, Colombia
18
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: Boskalis, Surinam
Description:
• Comprehensive training for grade control drilling for Bauxite deposits,
sampling in hard and soft formations with 99 % recovery and high
production per day
Services provided:
• Blast hole drilling and dewatering wells
Bauxite deposits, Surinam
19
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: GEMM
Description:
• Grade control drilling for titanium sands
• high production per day and 99 % recovery in saturated sands
• Installation of water wells, monitoring wells
Grade control drilling, India
20
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: Guinea titanium
Description:
• Accurate sampling of off shore and ocean elements for grade control drilling
• Soft sediment sampling with SSD patented AquaLock sampler up to 40
meters deep. 100 % determination of mineral deposits instead of dredging it
all
River and off shore titanium sampling
21
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: BMP Indonesia
Description:
• Sampling of soft mineral sands in jungle
• Low footprint rig to avoid damage to surroundings
• Installation of water wells for local villages
Soft mineral sands
22
Executed by MAREC partner: SonicSampDrill (part of Royal Eijkelkamp group)
Client: Ural Platinum
Description:
• Grade control drilling for platinum in the far East in arctic conditions
• Accurate sampling to allow accurate land stripping instead of 100 %
excavating
Grade control drilling Russia
23
Executed by MAREC partner: Eijkelkamp Agrisearch
Client: Ministry of Water
Description:
• Groundwater basic investigation with waterloggers in 162 cities in order to
manage water
Groundwater basic investigation Korea
24
Environment-friendly cutter
25
Executed by MAREC partner: IHC
Client: Government of Hungary
Description:
• Removal of a thin polluted silt layer in a lake in Hungary
Services provided:
• Design of an environment-friendly cutter, which can remove the polluted
silt layer without polluting the lake
Environment-friendly jig
26
Executed by MAREC partner: IHC
Client: Dutch government
Description:
• Improving the cleaning of contaminated material by using special jigs
Services provided:
• Development of a new method of jigging for the cleaning of contaminated
material
Dust prevention for coal transport
27
Executed by MAREC partner: IHC
Client: Port of Rotterdam
Description:
• Development of alternative coal handling and transport methods, aimed at
prevention of dust and sound pollution of coal transport by using slurry
transport instead of a belt conveyer
Services provided:
• Conceptual development on the hydraulic transport of coal for harbor
terminals
Domingas Project
28
Executed by MAREC partner: IHC
Client: Mineraçao Rio Novo
Description:
• Assessment of minimized-impact mining methods for a diamond and gold
mine in Brazil
Services provided:
• Planning and control of the tailings
• Development of a sustainable dredge mining method
• Resulting in mitigating measures and efficient method
Mining of diatomite in Iceland
29
Executed by MAREC partner: IHC
Client: Mining company in Iceland
Description:
• Feasibility study on the mining of diatomite with minimized impact of the
top biolayer
Services provided:
• Environmental Impact Assessment of the potential mining operation
• Study on how to minimize impact on the top most sediment layer
• Extensive tests on laboratory scale
Dredge mining of Chalk
30
Executed by MAREC partner: IHC
Client: Holcim
Description:
• Evaluation of the possibilities to extend mine life of chalk quarry in
Germany
Services provided:
• Study on the feasibility of using dredge mining equipment for the mining of
chalk
• Tests for the behavior of dredged chalk during transport
• Providing a possible sustainable solution to prevent environmental impact
on sensitive marshlands
Grensmaasproject
31
Executed by MAREC partner: IHC
Client: RWS – directie Limburg
Description:
• Mining and processing of sand and gravel for the ‘grensmaasproject’, in a
challenging environmental framework
Services provided:
• Study on different ways to mine and process the sand and gravel
• Incorporation of environmental boundary conditions in the process design
Dry to wet mining operation
32
Executed by MAREC partner: IHC
Client: Millennium Inorganic Chemicals
Description:
• Changing a heavy minerals mine in Brazil from dry mining methods to a
wet mining operation, increasing the lifetime of the mine with >10 years
Services provided:
• Evaluation of wet mining methods
• Water management
• Tailings management
• Training of personnel
Rehandling of tin tailings
33
Executed by MAREC partner: IHC
Client: Minsur SA
Description:
• Rehandling of tin tailings in Peru
Services provided:
• Study on the possibility of tailings rehandling with a dredge mining option
Gold mining in Colombia
34
Executed by MAREC partner: IHC
Client: Mineros de Antioquia
Description:
• Improvement of gold dredge mining process efficiency by the introduction
of dedicated clay overburden stripping dredgers
Services provided:
• Evaluation of mining process optimisation
• Design of an overburden dredger
• Training of personnel
• Study on the reclamation of the land