Klenkhart & Partner Consulting 1
MASTER PLAN
Winter Sports Developmenton the Postavarul in
Poiana Braşov
Klenkhart & Partner Consulting 2
Klenkhart & Partner Consulting• Established in 1991• Wide Experience on „planning in skiareas“• Realization of about 500 projects of lifts, skiruns and
artificial snow making• Realization of about 40 artificial lakes for snow-
making from a volume of 10.000 m³ to 200.000m³ (sum of about 2 Mio. m³)
• Today – a leading Austrian company in:– Masterplan – studies for winter- and outdoor sports all over
the world– Detailled plannings of projects in ski-areas and infrastructure
• For public and private clients
Klenkhart & Partner Consulting 3
Team Work for Poiana Braşov• Contract for Masterplan, June 2007, signed
by the Consiliul Judetean Brasov – ThankYou!
• Team of 10 experts working on the project(some of them):– Christian Klenkhart (Project Manager)– Peter Hartl (Satellit images, 3D-Views, GIS)– Stefan Szauter (snow making)
• Very thanks to Dir. Mr. Ion Rufa for the detailled information and his support
Klenkhart & Partner Consulting 4
Table of Contents
• Climatic conditions• The Existing Skiarea (Ski Lifts, Slopes, etc.)• Capacity of the Existing Skiarea• Goal for the development• Step 1: Snow making, widening and flattering
of ski runs and 2 new lifts• Step 2: Development to Rişnov• Investments• Recommendations for Implementation
Klenkhart & Partner Consulting 5
Climatic conditions
• Poiana Braşov: continental climate
• Cold and dry conditions are good for snow - making• The Skiarea of Poiana Braşov is north – faced: long
lasting good snow - conditions, but in Dec. and Jan. it isvery cold in the lower parts without any sun
-3,18°C-5,81°C- 5,76°C-5,44°C-1,45°Cnight
0,00°C-2,56°C- 2,84°C-2,19°C1,80°Cday
MarchFeberJan.Dec.Nov.1992-2001
Klenkhart & Partner Consulting 6
Existing Lifts
7.377Sum of the capacity
90031317831969/1986Teleschi Kanzel
90050216551969/1986Teleschi Ruia
50049213261978Teleschi Subteleferic
60057512551977Teleschi Slalom
90030010391988Teleschi Stadion
90045811141969/1986Teleschi Bradul SL
1.823214017102005Telegondola Postavarul Expres 8EUB
504280917751982Telecabina Capra Neagra PB
350244917261971Telecabina Kanzel PB
Capacity inpers. / h
Length inm
Altitude of the top –station
Year ofbuilding
Name of the lift
Klenkhart & Partner Consulting 7
Existing Lifts and Pists
Teleski Ruia
Klenkhart & Partner Consulting 8
Existing Lifts and Pists
The famous LupuluiA lot of steep an small pists
Klenkhart & Partner Consulting 9
Simulation existing area:
„a good day in winter“
1600 pers. on pists
500 pers. on the lift
600 pers. waiting
300 pers. in restaurants
3000 pers. in the area1 skier needs about 150 m² !
Results of the capacity analyses
Klenkhart & Partner Consulting 10
Existing ski area• Many small and steep pists
• Pists to croweded from 10 am
• Artficial snow making only at Bradul
• 16.000 m / 50 ha skiruns
• pists are bumpy
• old machines for grooming
• pists in good stabil conditionsin summer
Klenkhart & Partner Consulting 11
Inklination modell
FIS - Guideline:
Blue: easy, up to 25%
Red: medium, 25% - 40%
Black: difficult, more than 40%
Klenkhart & Partner Consulting 12
Exposition - modell
Blue: north - face
Green: west - face
Yellow: south – face
Red: east - face
Klenkhart & Partner Consulting 13
The Intention of the„Ski – Plan“
• First Step:– Flattering and widening of the existing pists and
skiways
– Establishing an Artificila Snow making system
– Development of the lifts: 2 new lifts (Ruia and Lupului); building of new pists for these lifts
• Second Step:– Development of the skiarea to Risnov (2 lifts)
Klenkhart & Partner Consulting 14
Ski area after Step 1• 6 CLD Ruia: 2.400 pers./h;
ca. 1.100 m length
• 4 CLF Lupului: 1.600 pers./h; ca. 800 m length
• Artficial snow making witha lake with 120.000 m³
• 22.800 m / 67 ha skiruns
• corrections and widening of all existing pists
• new machines for grooming
Klenkhart & Partner Consulting 15
Pists after Step 1
Klenkhart & Partner Consulting 16
Artificial Snow Making• Basic layer of artificial snow on 58 ha within
100 snow-making hours• 2.500 m³ water/ha and year• Artificial Lake on Ruia: 120.000 m³, water
from melting ( two refill – stations with pumps) and from the don’t used water of the drinking water asset of Poiana Brasov
• 3 pumps with 50 l/s and 50 bar (400 kW)• Water with gravitation pressure for the lower
parts of the pists about 100 l/s
Klenkhart & Partner Consulting 17
Hydraulik systemof the suggested snow - making
asset
Klenkhart & Partner Consulting 18
Suggested system of Snow Making
• System of snow – making lances with a central compressor –station:– Advantage: the lances are situated along all pists (every 50 m)
and ski – runs (every 100 m); you don‘t have to transport it duringthe whole winter, you ca use it whenever the conditions are good
– Advantage: the lances were build up in Oct. and must not berelocated during the whole winter
– Drawback: the lances make not so much snow (max. 4l/s)We recommand: a system of lances for all ski-runs except on the wide pists
• System of snow – making propeller - machines:– Advantage : the propellor machines make a lot of snow (max. 12l/s)– Drawback: electricity in the field, expansive machines
We recommand: propellor machines on the wide pists (upper part of Subteleferic, Sulinar below Ruia, pists above Bottom station
Klenkhart & Partner Consulting 19
Artificial Lake on Ruia
120.000 m³
Klenkhart & Partner Consulting 20
Artificial Lake on Ruia3D - Modell
Sulinar
Subteleferic
Klenkhart & Partner Consulting 21
Artificial Lake on Ruia
Upper layer: fine sand
Below: gravel
Depth of 3-5 m: limestone – rock
80.000m³ material to dig
sealing: HDPE-Folie
geological – geotechnical study made by NEOLITOS SRL / Brasov
Klenkhart & Partner Consulting 22
Examples of artificial lakes
Klenkhart & Partner Consulting 23
Examples of artificial lakes
Klenkhart & Partner Consulting 24
Examples of artificial lakes
Klenkhart & Partner Consulting 25
Methods of pist-corrections
Riprap (stones)
Klenkhart & Partner Consulting 26
More parking - places
Costs: parkdeck: about € 6.000,--/place
underground car park: about € 10.000,--/place
Klenkhart & Partner Consulting 27
Simulation after step 1:
„a good day in winter“
2500 pers. on pists
700 pers. on the lift
700 pers. waiting
300 pers. in restaurants
4200 pers. in the area
Results of the capacity analyses
Klenkhart & Partner Consulting 28
3D View Step 1
Klenkhart & Partner Consulting 29
Ski area after Step 2
• 8 EUB Rişnov: 2.400 pers./h; ca. 2.000 m length
• 6CLD Valea Seaca : 2.400 pers./h; ca. 1.950 m length
• 32.000 m / 105 ha skiruns
• 4 long new pists, skirun to the bottom station in Risnov
Klenkhart & Partner Consulting 30
Skirun north-ridge
Skirun valley
Skirun south-ridge
Top-station 8EUB Risnov
Klenkhart & Partner Consulting 31
Results of the capacity analyses
Simulation after step 2:
„a good day in winter“
3400 pers. on pists
1300 pers. on the lift
800 pers. Waiting
500 pers. In restaurants
6000 pers. In the area
Klenkhart & Partner Consulting 32
3D View Step 2
Klenkhart & Partner Consulting 33
FIS - Homologation
Discipline Min. Altitude Diff. Max. Altitude Diff.
Slalom Men 120 m 220 mSlalom Women 120 m 180 mGiant Slalom Men 200 m 400 mGiant Slalom Women 200 m 400 m
Super G Men 225 m 500 mSuper G Women 225 m 500 mDownhill Men 400 m 1.000 mDownhill Women 400 m 700 m
Klenkhart & Partner Consulting 34
Required Investments• Step 1:
– 2 Lifts and pists, 2 grooming machines 7,81 Mio €– Artificial Snow – making incl. Lake 10,00 Mio €– Electricity, other pists, parking, etc. 2,19 Mio €
• Sum step 1 20,0 Mio €
• Step 2:– 3 Lifts and pists, grooming machines 18,0 Mio €– Electricity, pists, snowmaking, parking... 7,5 Mio €
• Sum step 2 25,5 Mio €
Klenkhart & Partner Consulting 35
The investments include
• Power supply (medium voltage system, transformer stations)
• All lifts complete (delivery and assembly, implementation: poles, foundations, cable track, etc…)
• Ski run and ski trail construction in the area• All technical snow facilities incl. pump-stations• Ticket system• 5 Grooming machines• Safety equipment for pists• Construction of funpark, ski beginners area, etc.
Klenkhart & Partner Consulting 36
Recommendation forImplementation
• Complementing the winter season, various attractions to promote the winter and thesommer season should be developed;
• The result of the Cost-Benefit Analysis ispositive for the implementation of Step 1 (2 new lifts, pists, grooming machines) and realistic scenario (15% more skiers, switch to day tickets, imputed interest: Euribor + 2%)
• Development of infrastructure and snow-makingis of common interest (Municipality, EU, etc.)
• Therefore the implementation of Phase 1 isdefinitely recommended
Klenkhart & Partner Consulting 37
Recommendation forImplementation
• Investment of the Municipality will triggersignificant private investments (hotels, restaurants, services, etc.)
• Further flexible development of Step 2 depending on the reception of the potential markets and the highway from Bukarest;
• Implementation of these 2 Steps guaranteehigh standard of the Ski Area – comparablewith leading resorts in the Alps;
Klenkhart & Partner Consulting 38
Recommendation forImplementation
• Pist – corrections and pist - construction:Construction company with experience in „alpin -
constructions“ in steep slopes and in dynamiting• Building of the artificial lake:
The Construction company should have realized at least 2 or 3 such artificial lakes and should also have experience in dynamiting
• Building the cable and pipe- trenches, etc.:Local Construction company
Klenkhart & Partner Consulting 39
Starting Point ...
Poiana Brasov: The capital for winter sports
in Romania and the wider region!
... It‘s feasible!... It‘s attractive!