+ All Categories
Home > Documents > Mate Competition 2013

Mate Competition 2013

Date post: 22-Feb-2016
Category:
Upload: val
View: 46 times
Download: 0 times
Share this document with a friend
Description:
Mate Competition 2013. Task 1 steps 1-5. Step 1. 5 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor . Step 2. 20 pts – Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly). Step 3. - PowerPoint PPT Presentation
Popular Tags:
8
Mate Competition 2013 Task 1 steps 1-5
Transcript

Mate Competition 2013

Mate Competition 2013Task 1steps 1-5Step 15 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor

Step 220 pts Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly)

Step 35 pts Removing the CTA (Cable Termination Assembly) from the seafloor

Step 4

20 pts Inserting the CTA from the bulkhead connector on the BIA

Not this kind of CTAStep 510 pts Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.

Elevator OBS PIN!!!Pull me!!

Step 5

10 pts Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.Step 510 pts Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.

Robot Paradenull22151.875


Recommended