7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 1/29 Semarang, 21 September 2014
Transcript
Page 1: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 1/29

Semarang, 21 September 2014

Page 2: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 2/29

| 2

1. GEOTHERMAL

2. GEOTHERMAL

INDONESIA

3. PERTAMINAGEOTHERMAL ENERGY

PT PERTAMINA GEOTHERMAL ENERGY

Page 3: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 3/29

GEOTHERMAL ENERGY

Geothermal  merupakanenergi yang dihasilkan dari

interaksi panas batuandengan air yang mengalir

disekitarnya. Interaksitersebut menghasilkan uapyang dapat dimanfaatkan

untuk menggerakkan turbindan menghasilkan listrik.

Geothermal Energy, Energi Baru Terbarukan 

Berbeda dengan energi

fosil seperti minyak bumidan batubara, energigeothermal  dapat

diperbaharui dengan caramenjaga kandungan air

yang berinteraksi denganpanas yang berasal dari

dalam bumi.

Dengan cadangan

geothermal  sebesar 40%cadangan global,Indonesia memiliki

potensi yang luar biasauntuk mengembangkan

energi geothermal  untukmenjawab kebutuhan

energi nasional dan dunia

Page 4: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 4/29

CAP 

HOT WATER 

STEAM

ST

EAM

HEAT SOURCE 

GEOTHERMAL ENERGY

4

EARTH GEOTHERMAL COMPONENT

1. Heat Source (intrusi magma)

2. Water Recharge system3. Permeable Reservoir

4. Cap Rock 

Page 5: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 5/29

GEOTHERMAL ENERGY

Peta WKP PT. Pertamina Geothermal Energy (PT. PGE)

Sarulla - Sibual-buali

Sungai Penuh

2 x 55 MW

Hululais – Tb Sawah

2 x 55 MW

Lumut Balai

4 x 55 MW

Ulubelu Unit 1&2

(@= 110MW)

SUMATERA

JOC Cibeureum - Salak 

(@= 377MW)

JOC Wayang Windu

(@= 227 MW)

JOC Darajat 

(@= 271 MW)

Karaha - Talaga Bodas

1 x 30 MW

Kamojang Unit 1-4

(@ = 200 MW)

Iyang Argopuro

Tabanan- Bali 

Kotamobagu

Lahendong Unit 1-4

(@= 80 MW)

Legenda :

Produksi (Kapasitas terpasang 402 MW)

Eksplorasi

KALIMANTAN

SULAWESI

MALUKU

PAPUA

Sibayak - Sinabung

(@ = 12 MW)

Pengembangan/proyek

Ulubelu Unit 3&42 x 55 MW

Joint Operation Contract (JOC) (Kapasitas

terpasang 875 MW)

Lahendong Unit 5&6

(Tompaso)

2 x 20 MW

14 Wilayah Kuasa Pengusahaan (WKP) Geothermal PT PGE di Indonesia sesuai Surat Keputusan Menteri

ESDM No.: 2067.K/30/ MEM/2012

Kamojang Unit 5

1 x 35 MW

Page 6: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 6/29

GEOTHERMAL ENERGY

6

2

11

1

2

3

1

1 5

Mexico

113

5

Philippines

4

4

Others1

Iceland

New Zealand 1 3

6

Total 102

6

18

Japan

6

1 19

U.S.

20

20

Indonesia

20

27

23

28

1 Includes mostly South/South-East Asia and Africa

Kapasitas konvensional Geothermal 2010 dan total

potensi kapasitasnya

GW

POTENSI SUMBER DAYA GEOTHERMAL DUNIA

Installed

Potential

Utllisasi

Sumber Daya

%

4

13

3

10

33

20

10

16

10

• Walaupun memiliki

potensi sumber daya

Geothermal terbesar

didunia, utilisasinyahanya 4%.

• Sumber daya Geothermal

Indonesia memiliki

temperatur tinggi,

sehingga akan membuat

proyek semakin

ekonomis.

Indonesia memiliki potensi sumber daya Geothermal terbesar di dunia

Page 7: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 7/29GEOTHERMAL ENERGY

• AMDAL / UKL / UPL• Izin Lokasi• Izin penggunaan lahan untuk

kegiatan Eksplorasi – Kemenhut

• SIPPA• IMB

PROSES HEAD OF AGREEMENTPROSES NEGOSIASIHARGA UAP / LISTRIK

Notice Of Resorces ConfirmationNotice Of Intend to

Develop

•  AMDAL (yang belum termasuk dalam AMDAL pertama)

• Perijinan (lokasi, IPPKH, IMB, SIPPA)

• Persiapan lokasi (pembebasan lahan)

• Pemboran sumur ekploitasi (sumur pengembangan dan sumur injeksi)

2-3 Tahun

PJBU /PJBLEFEKTIVEDATE (30 TH)PJBU /PJBL

COD6 BULAN - 2 TAHUN

3-5 Tahun

TAHAPAN PENGEMBANGAN GEOTHERMAL

Page 8: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 8/29GEOTHERMAL ENERGY

Karakteristik Bisnis Geothermal

Page 9: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 9/29

GEOTHERMAL ENERGY FOR ELECTRICITYGEOTHERMAL UTILIZATION FOR

ELECTRIC ITY GENERATION

Type Air cooled

(GTLRI)

Rated output 80

MVA

Rated voltage

13.8 kV

Rated Current3,347 A

Rated power

factor 0.8

Rated

frekwensi 50

Hz

Rated speed

3,000 rpm

InsulationClass F

Exciter type

Brushless

SWITCH YARD 150 kV

COOLING TOWER

Main steam pressure11.0 bar abs

Main steam temp.184.07 ºC

Exhaus pressure 0.16bar abs

Type Single casingdouble flow reaction

Rated output 63.000 kW

Rated speed 3000 rpm

SEPERATOR & DIMISTER

WELL

G th l B i P

Page 10: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 10/29

10

Geothermal Business Process

Pre-feasibilityFeasibility

studyDevelopmentand Financing

Operation

Time Frame: 6 – 2 Months Time Frame : 1-2 years  Time Frame : 3-4 years  Time Frame : 25-30 years 

Production drilling

•Construct access roads and

pads

•Drilling targets

•Engineering specifications

•Procurement of drilling

services

•Well testing

•Reservoir modellingPermit

•Drilling permits

•PPA + grid interconnection

•Forestry Permit

•Water permits

•Building permits

Financing

•Submission of NOID

•Financial modeling

•Financial closing

Construction

•EPC Contract

Surface exploration

• Geochemical analysis and

Geophysical survey

• Resource assessment and

preliminary conceptual

modelling

Lease and permit

• Land acquisition,

• Forestry permit,• Water utilisation permit,

• Environmental Permit

(AMDAL)

Exploration drilling

• Identification of drill sites

•  Access roads / pad

construction

• Procurement of Rig

•Exploration and delineationdrilling

Update comercial model

• Site, capacity & technology

• Resource and generation

updates

• Feasibility Study

Preliminary Resources

assessment

• Desktop study,

Geochemistry&Geology

survey,

• Infrastructure assessment

• Regional reconnaissance

Permit

• Land acquisition• Forestry permit

• Water permit

• Environment Review

Basic Commercial

• Head of Agreement

• Market Analysis,

• Project scale

• Grid connection.

•Initial Financial modelling.

• Pre-feasibility study

O&M

• Staffing  – employ &

train staff

• Routine maintenance /

overhauls

• Spare parts

Resource Management

• Resource / reservoir

modeling• Makeup wells

• Well workover

Page 11: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 11/29

Mata air panas

Kolam lumpur panas

SURVEI MANIFESTASI PERMUKAAN

11

Page 12: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 12/29

| 12

1. GEOTHERMAL

2. GEOTHERMAL

INDONESIA

3. PERTAMINAGEOTHERMAL ENERGY

PT PERTAMINA GEOTHERMAL ENERGY

POTENSI GEOTHERMAL INDONESIA

Page 13: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 13/29Brigade 100K

•   Jumlah Gunung Api : 150

•   Potensi : 40% dari potensi dunia•   Lapangan menjanjikan : 250 fields, Potensi : lebih dari 28,000 MW

•   Kapasitas Terpasang saat ini : 1,324 MW

JICA/WestJEC

ICA/WestJEC

EXPLOITABLE RESOURCE POTENTIAL 50 fields)

XPLOITABLE RESOURCE POTENTIAL 50 fields)

 

y = 185.08x - 417.83

R2 = 0.9705

0

5,000

10,000

15,000

20,000

25,000

30,000

0 20 40 60 80 100 120 140 160

No. of Volcanoes

   G  e  o   t   h  e  r  m  a   l  p  o   t  e  n   t   i  a   l   (   M   W

Indonesia

USA

Japan

Philippines

Mexico

Iceland

New ZealandItaly

POTENSI GEOTHERMAL INDONESIA

13

ENERGI MIX INDONESIA

Page 14: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 14/29

|PERTAMINA 14

Target kapasitas geothermal

Pemerintah Indonesia sedang gencar mendorong energi terbarukan, dengan rencana serius untuk

meningkatkan produksi energi geothermal

GW

25

17

46

64

100% =

2025 1

670 TWh

12

61

2010

146 TWh

57

17

Geothermal

Hydro

Minyak

Gas

Batubara

8.6

Target

2025

1.2

Kekurangan

5.1

Rencana

Tambahan

2.3

Kapasitas

2010

1 Proposisi 2025 diasumsikan sama dengan yang ditunjukkan pada RUPTL 2020

Pemerintah berencana memiliki kapasitas

energi geothermal 8~9 GW tahun2025

▪ Tambahan kapasitas geothermal ~7 GWdibutuhkan tahun 2025, untuk mencapai

rencana 12% produksi energi dari RUPTL

▪ Rencana pengembangan kapasitas hanya 1/3

dari target 2025

Target energi mix di Indonesia

ENERGI MIX INDONESIA

Page 15: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 15/29

| 15

1. GEOTHERMAL

2. GEOTHERMAL

INDONESIA

3. PERTAMINAGEOTHERMAL ENERGY

PT PERTAMINA GEOTHERMAL ENERGY

KONSEP PENGEMBANGAN

Page 16: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 16/29

| 16

   T   E   C   H   N   I   C   A   L   A   S   P   E   C   T

   (   G   G   R

  -   G   E   O   T   H   E   R   M

   A   L   )

   L   E   G   A   L   B   A   S   E

   B

   U   S   I   N   E   S   S   P   O   R   T   F   O   L   I   O 

         E   C   O   N   O   M   I   C

   A   P   P   R   O

   A   C   H

         E   N   V   I   R   O   N   M   E   N   T   A   L   A   S   E   P   C   T

 

   I   M   P   L   E   M   E   N   T   A   T   I   O

   N

         M   A   N   A   G   E   M   E   N   T   P   R   O

   J   E   C   T

         R   I   S   K

   M   G   T ,   T   E   C   H .   E   N   G .   R   I   S   K

         E   N   V   M   G   T ,   T   I   M   E   M

   G   T

 

GEOTHERMAL ENERGY DEVELOPMENT POLICY(PERPRES No. 5 / 2006; PP No. 3/2005 – No. 70/2010 : PERMEN ESDM. No. 5 / 2009; No. 2/2011;

PERPRES No. 4/2010 : PERPRES No. 10/2011)

1000 MW :

42.250 BOEPD

6.1 JT TON CER”S/YEAR

TO SUPPORT ACCELERATION OF GEOTHERMALDEVELOPMENT

IN LINE WITH 10,000 MW POLICY STAGE II  – EBTKE’S VISION 25/25 (5 % ENERGY MIX / 12.332 MW -

2025)

KONSEP PENGEMBANGAN

GEOTHERMAL

Profil PT Pertamina Geothermal Energy

Page 17: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 17/29

Operation1

7

Survey

Studi GGGREPCC

Exploration &

Development

Is all around the business

Proses Bisnis dan Kaitannya dengan Potensi Risiko

Profil PT Pertamina Geothermal Energy

C t i & M i

Page 18: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 18/29

Framework & Infrastruktur ERM 

P

R

O

B

A

B

I

L

I

 T

A

 SDAMPAK

1

Insigni

ficant

4

Signifi

cant

3

Moder 

ate

2

Minor

5

Catast

rophy

Risk Mapping

Categories & Mapping

Strategy

&

Planning 

Finance 

Operation &

Infrastructure 

Hazard 

Enterprise Risk

Management

Technical 

HSE 

External 

Organizatio

ProjectManagement 

Project Risk

Management

Page 19: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 19/29

| 19

Area Operasi Eksisting (Kapasitas Terpasang 402 MW)2

Page 20: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 20/29

| 202020

SUMATERA KALIMANTAN

SULAWESI

MALUKU

PAPUA

ULUBELU

UAP TERSEDIA 190 MW

OPERASI 2x55 MW

SIBAYAK

OPERATION 12 MW

OFFTAKER TIDAK PERFORM

PEMANFAATAN SANGAT RENDAH

LAHENDONG

UAP TERSEDIA 110MW

OPERASI 4x20 MW

KAMOJANG

UAP TERSEDIA 240 MW

OPERASI 200 MW

Progress Proyek Pengembangan2

Page 21: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 21/29

| 212121

SUMATERA KALIMANTAN

SULAWESI

MALUKU

PAPUA

ULUBELU (2x55 MW)

UAP TERSEDIA 78 MW

BOR 3 INJ + 4 BANG (2 RIG)

PROSES TENDER 2X55MW

KARAHA (1x30 MW)

UAP TERSEDIA 26 MW

BOR EKSPLOITASI

TENDER EPCC 30MWLUMUT BALAI (2x55 MW)

UAP TERSEDIA 106 MW

BOR 2 SMR INJEKSI

TENDER EPCC 55MW

SUNGAI PENUH (1x 55 MW)

UAP TERSEDIA 6 MW

BOR 1 EKS + 1 BANG (1 RIG)

LAHENDONG/TOMPASSO (2x20 MW)

UAP TERSEDIA 22 MW

BOR 2 INJ + 2 BANG (2 RIG)

PROSES TENDER EPCC 2X20MW

IYANG ARGOPURO

EKSPLORASI SURVEI GGG

PROSPEK DI CAGAR ALAM

HULULAIS (2x55 MW)

UAP TERSEDIA 30MW

TELAH DIBOR 3 SUMUR

(2 EKS + 1 BANG)

RENCANA BOR 2 BANG

KAMOJANG 5 (1x35 MW)

UAP TERSEDIA 39 MW

EPCC 35MW, COD 2015

KOTAMOBAGU (4x20 MW)

BOR EKSPLORASI 2 SMR

PROSPEK DI CAGAR ALAM

Total ketersediaan uap : 307 MW

Total kebutuhan uap : 435 MWEksplorasi

Pengembangan

PGE DEVELOPMENT PLAN

Page 22: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 22/29

| 22

LAHENDONG 4 : 20 MW

@ Des 2011

ULU BELU :

4 x 55 MW

LUMUT BALAI :

4 x 55 MW

LAHENDONG 5 & 6 :2 x 20 MW

KAMOJANG 5 :

35 MW

PGE DEVELOPMENT PLAN

KARAHA :

30 MW

KOTAMOBAGU

New additional Fields ,

Total HR = 533

(Eng: 254, ES: 69, Spr = 210)

PRODUCTION FIELD YANG DIOPERASIKAN SENDIRI OLEH PGE

Page 23: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 23/29

| 23

KAMOJANG GEOTHERMAL FIELDS SIBAYAK GEOTHERMAL

FIELD

LAHENDONG GEOTHERMAL FIELDS

POWER PLANT UNIT-1

POWER PLANT UNIT  – 4 ( 60 MW ) POWER PLANT UNIT 1,2 & 3

(30; 2 x 55 MW)

PRODUCTION

CLUSTER UNIT-2

POWER PLANT UNIT-4

GEOTHERMAL FIELDS PGE DENGAN SKEMA JOC

Page 24: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 24/29

| 24

WAYANG-WINDU GEOTHERMAL FIELDS (JOC-STAR ENERGY)

DARAJAT GEOTHERMAL FIELD (JOC-CHEVRON) SALAK GEOTHERMAL FIELD (JOC-CHEVRON) 

GEOTHERMAL ENERGY UTILISATION

Page 25: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 25/29

| 25

GEOTHERMAL ENERGY UTILISATION

GEOTHERMAL ENERGY - DIRECT USE

Page 26: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 26/29

| 262626

GEOTHERMAL ENERGY - DIRECT USE

GEOTHERMAL ENERGY FOR DIRECT USE

Page 27: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 27/29

| 272727

Steam Generator

Autoclave

Ruang Inkubasi

Pembuatan Media tanam

Proses sterilisasi 6 jamHasil Inkubasi 1 bulan

Produksi setelah 1 minggu

GEOTHERMAL ENERGY FOR DIRECT USE

Page 28: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 28/29

| 28

Bekerja dan ibadah

adalah energi kami

Semoga semua upaya

menghasilkan manfaat

TERIMA KASIH

Page 29: MATERI-UNDIP 21 SEPTEMBER 2014.pdf

7/23/2019 MATERI-UNDIP 21 SEPTEMBER 2014.pdf

http://slidepdf.com/reader/full/materi-undip-21-september-2014pdf 29/29

Peran PT PGE dalam Pengembangan Panasbumi 

Padang, 29 Agustus 2014

PT PERTAMINA GEOTHERMAL ENERGY