IntroductionThe following presentation is intended to provide the Board of Trustees with an update on the progress of Measure L Construction Bond Projects. These are projects that are currently active throughout the District.
Vinci Park MPR Floor Sierramont ChillerPiedmont
Ø Phase 2 Technology Upgrade –Cable
Ø Remaining Work by School
Ø Energy Conservation – Solar
Ø Central Kitchen – Expected start date – 10/28/16
Measure L – 2016 Project Overview
Vinci Park PavingSummerdale – Site of the 2016 Ribbon Cutting Event
Measure L – 2016 Project DetailsØ Phase II Technology Upgrade -‐ Cabling
a. Stage I Cabling Upgrades: • Majestic Way, Piedmont, Toyon, Summerdale – completed
• Laneview:ü Buildings B, D & portables to be
completed Feb. & Apr. 2017 breaks• FIS Cabling & Exterior Wireless Access Points – in progress
b. Stage II Cabling Upgrades –• MOT awarded – Thanksgiving Break
c. Stage III Cabling Upgrades: • Noble awarded – Winter Break
Laneview
Ruskin
Laneview
Measure L – Remaining Work by School1. Noble ES:
• Shade structure: 10/16/16• FIS Furniture: 10/28/16• Stage curtain replacement: 11/9/16• Front gate replacement: 11/14/16• Specialty doors : 11/21/16• Punch list items: 11/23/16• FIS & MPR Audio Visual: 11/30/16
2. Northwood ES:• FIS Furniture: 10/28/16• Library wall graphics: 10/5/16• Wood ceiling & lighting: 10/14/16• FIS Furniture: 10/28/16• Specialty partition wall: 11/15/16• Façade backing: 11/23/16• Punch list items: 11/28/16• FIS & MPR Audio Visual: 11/30/16
Northwood FIS
Noble FIS
Measure L – Remaining Work by School3. Sierramont MS:
• Playground restrooms: 10/14/16• FIS Furniture: 10/28/16• East access paving: 11/4/16• FIS & MPR Audio Visual: 11/25/16• Specialty partition walls: 11/22/16• Punch list items: 11/22/16
4. Summerdale ES:• FIS Furniture: 10/28/16• Fence installation: 11/11/16• FIS & MPR Audio Visual: 11/29/16• Punch list items: 11/29/16
5. Vinci Park ES:• Punch list items: 10/28/16• MPR Audio Visual: 11/16/16• Fence installation: Winter Break
Sierramont FIS & Chromebooks
Summerdale FIS Ceiling
Vinci Park – Ms. Jensen instructing
Measure L – Energy Conservation SolarØ Solar Installation:• All interconnects complete as of 10/9/16
except Morrill and Brooktree. PG&E schedule for Morrill and Brooktree are pending.
• Permission to Operate – pending PG&E commissioning.
Majestic Way Interconnect
Piedmont – PG&E Interconnected Thur. 9/29/16
1. Stage IV Cabling Upgrades• Brooktree, Northwood, Ruskin, Vinci Park –
awarded – Summer 20172. Central Kitchen – expected completion
April 20173. F.I.S./Modernization/Classroom Furniture• Laneview, Majestic Way• Vinci Park (F.I.S. only)
4. Modernization/Classroom Furniture • Piedmont, Ruskin
5. Pavement Rehabilitation• Brooktree, Cherrywood, Majestic Way• Piedmont Drop-‐Off Area
Measure L – 2017 Project Overview
Central Kitchen
Majestic Way
Construction Legend Furniture LegendDesign Furniture Order FinalizedBid Quote DateAward AwardConstruction Furniture OrderedStart of School Start of SchoolLong Lead Items & Added Project Scope Lead TimeProject Complete Furniture Received and Placed
2016 Construction Projects
1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4Central Kitchen Const & Equip
Sierramont Chiller Upgrade COMPLETED
Sierramont FIS/Modernization
Noble FIS/Modernization
Northwood FIS/Modernization
Summerdale FIS/Modernization
Vinci Park/Modernization
Paving Rehabilitation
Solar Project
Stage I Cabling Upgrades
Stage II Cabling Upgrades
Stage III Cabling Upgrades
2016 Furniture Projects
Furniture COMPLETED
FIS Furniture
OctoberWeek
DecemberWeek
FebruaryWeek
JanuaryWeek Week
November
2016 Construction & Furniture Projects
SeptemberWeek
Construction Legend Furniture LegendDesign Furniture Order FinalizedBid Quote PricingAward PO GeneratedConstruction Furniture OrderedStart of School Start of SchoolLong Lead Items Lead TimeProject Complete Furniture Received and Placed
2017 Construction Projects
1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4Laneview FIS/Modernization
Majestic Way FIS/Modernization
Vinci Park FIS
Piedmont/Modernization
Ruskin/Modernization
Paving Rehabilitation
Piedmont Dropoff
Stage IV Cabling Upgrades
2017 Furniture Projects
Furniture
FIS Furniture
2017 Construction & Furniture Projects
JanuaryWeek Week Week Week Week
September October November December FebruaryWeek
Thank You