20
Dog Swamp Shopping Centre Parking Assessment 14 November 2016 Cardno 21 Figure 15: Parking occupancy at Zone 3 Friday 29 April 2016 midday peak period (10:00am to 3:00pm) Saturday 30 April 2016 midday peak period (10:00am to 3:00pm) Peak demand at Zone 3 is observed to be 92 bays on Friday at 11:30 pm, approximately 79% of total supply. 65 78 83 92 86 82 79 80 78 79 79 51 38 33 24 30 34 37 36 38 37 37 0 119 10:00:00 AM 11:00:00 AM 12:00:00 PM 1:00:00 PM 2:00:00 PM 3:00:00 PM Parking Supply Time Occupancy Vacancy 54 56 59 54 63 59 66 53 44 44 51 62 60 57 62 53 57 50 63 72 72 65 0 119 10:00:00 AM 11:00:00 AM 12:00:00 PM 1:00:00 PM 2:00:00 PM 3:00:00 PM Parking Supply Time Occupancy Vacancy
Transcript

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 21

Figure 15: Parking occupancy at Zone 3

Friday 29 April 2016 midday peak period (10:00am to 3:00pm)

Saturday 30 April 2016 midday peak period (10:00am to 3:00pm)

Peak demand at Zone 3 is observed to be 92 bays on Friday at 11:30 pm, approximately 79% of total supply.

6578 83

92 86 82 79 80 78 79 79

5138 33

24 30 34 37 36 38 37 37

0

119

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Par

kin

g Su

pp

ly

Time

Occupancy Vacancy

54 56 59 5463 59 66

5344 44 51

62 60 57 6253 57 50

6372 72 65

0

119

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Par

kin

g Su

pp

ly

Time

Occupancy Vacancy

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 22

2. Survey results per parking zone for Flingers Square Shopping Centre:

Figure 16: Parking occupancy at Zone 4

Friday 29 April 2016 midday peak period (10:00am to 3:00pm)

Saturday 30 April 2016 midday peak period (10:00am to 3:00pm)

Peak demand at Zone 4 is observed to be 57 bays on Friday at 1:30 pm, approximately 97% of total supply.

4551 52 52 55 51 51

5748 45

39

148 7 7 4 8 8

211 14

20

0

59

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

4941 45 49 49 48 48 51

4249

43

1018 14 10 10 11 11 8

1710

16

0

59

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 23

Figure 17: Parking occupancy at Zone 5

Friday 29 April 2016 midday peak period (10:00am to 3:00pm)

Saturday 30 April 2016 midday peak period (10:00am to 3:00pm)

Peak demand at Zone 5 is observed to be 115 bays on Saturday at 11:00 pm, approximately 77% of total supply.

92108 112 107 112 104 101

114 108 100 108

5842 38 43 38 46 49

36 42 50 42

0

150

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

91102

115 113 104 100 107 9784 90 99

5948

35 37 46 50 43 5366 60 51

0

150

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 24

Figure 18: Parking occupancy at Zone 6

Friday 29 April 2016 midday peak period (10:00am to 3:00pm)

Saturday 30 April 2016 midday peak period (10:00am to 3:00pm)

Peak demand at Zone 6 is observed to be 78 bays on Friday at 11:30 pm, approximately 53% of total supply.

6078 78

66 65 5845 45 45 49 59

8668 68

80 81 88101 101 101 97 87

0

146

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

55 61 66 74 77 75 76 68 65 7560

91 85 80 72 69 71 70 78 81 7186

0

146

10:00:00AM

11:00:00AM

12:00:00PM

1:00:00PM

2:00:00PM

3:00:00PM

Park

ing

Sup

ply

Time

Occupancy Vacancy

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 25

Parking Assessment

APPENDIX

C SURVEY DATA

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 26

Appendix C

Dog Swamp Shopping Centre - Each parking bay within a zone was inspected for occupancy and was divided in

sub-zones as shown in Figure 19.

Figure 19: Parking Sub-zones - Dog Swamp Shopping Centre

Table 2: Occupancy (Friday - 29/04/2016) - Dog Swamp Shopping Centre

Zone Total Bays

Occupancy (Friday - 29/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

1A 28 19 19 24 23 22 21 25 23 23 24 24

1B 3 2 0 2 2 3 3 1 2 2 1 1

1C 22 10 16 18 19 18 18 20 17 18 18 20

1D 24 17 18 21 23 23 23 24 23 23 24 21

1E 24 7 13 12 18 11 11 13 14 24 11 10

1F 17 10 7 10 15 13 11 13 14 13 13 10

1G 12 6 7 7 8 8 7 8 8 8 6 5

1H 27 14 16 17 24 17 21 20 21 24 19 16

1I 27 23 20 21 25 23 24 25 24 22 23 20

1J 27 18 26 21 24 22 24 20 19 23 22 18

1 Total 211 126 142 153 181 160 163 169 165 180 161 145

2a 14 6 7 8 7 6 6 6 6 5 5 4

2b 10 0 0 0 0 0 0 0 0 0 0 0

2C

3B

3C

3E

2B

1A

1C

1B

1D

1E

1J

1F

1G1H

1I 1K2D

2E

3D

2A

3A

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 27

Zone Total Bays

Occupancy (Friday - 29/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

2c 31 10 10 10 10 11 12 13 13 10 11 13

2d 27 13 10 12 16 15 16 16 11 11 13 10

2E 32 12 15 14 17 19 18 18 20 19 15 13

2F 28 19 17 20 23 22 24 19 15 21 19 13

2 Total 142 60 59 64 73 73 76 72 65 66 63 53

3A 14 10 9 13 12 11 11 11 9 11 11 10

3B 27 12 19 18 21 17 17 17 15 13 15 18

3C 27 15 18 17 23 23 18 18 18 18 17 17

3D 33 16 20 23 24 23 23 20 24 23 24 21

3E 15 12 12 12 12 12 13 13 14 13 12 13

3 Total 116 65 78 83 92 86 82 79 80 78 79 79

Total Surveyed 469 251 279 300 346 319 321 320 310 324 303 277

Total Site Occupancy

54% 59% 64% 74% 68% 68% 68% 66% 69% 65% 59%

Table 3: Occupancy (Saturday - 30/04/2016) - Dog Swamp Shopping Centre

Zone Total Bays

Occupancy (Saturday - 30/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

1A 28 23 26 25 26 26 24 26 25 26 27 23

1B 3 2 2 3 3 2 1 2 2 2 2 2

1C 22 18 20 17 18 19 19 18 19 13 19 16

1D 24 23 24 23 24 24 24 21 24 20 23 24

1E 24 19 22 20 20 19 16 19 15 14 20 16

1F 17 10 10 12 15 15 10 11 10 10 9 13

1G 12 6 7 11 8 9 9 11 9 8 9 10

1H 27 21 19 25 25 26 26 25 22 24 22 21

1I 27 22 23 23 25 24 26 26 23 26 26 25

1J 27 23 20 25 25 26 24 22 20 21 20 22

1 Total 211 167 173 184 189 190 179 181 169 164 177 172

2a 14 8 8 7 7 7 8 9 6 7 7 8

2b 10 0 0 0 0 0 0 0 0 0 0 0

2c 31 11 10 11 12 11 13 12 14 10 12 12

2d 27 11 11 12 19 22 17 14 14 12 14 9

2E 32 10 9 7 19 22 18 17 13 14 13 11

2F 28 15 20 20 24 26 24 23 13 16 16 18

2 Total 142 55 58 57 81 88 80 75 60 59 62 58

3A 14 11 10 8 11 11 12 12 10 9 8 9

3B 27 8 11 15 9 17 10 13 8 9 9 12

3C 27 13 10 12 10 10 9 10 8 5 5 7

3D 33 21 23 22 21 21 23 26 21 18 19 19

3E 15 1 2 2 3 4 5 5 6 3 3 4

3 Total 116 54 56 59 54 63 59 66 53 44 44 51

Total Surveyed 469 276 287 300 324 341 318 322 282 267 283 281

Total Site Occupancy

59% 61% 64% 69% 73% 68% 69% 60% 57% 60% 60%

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 28

Flingers Square Shopping Centre - Each parking bay within a zone was inspected for occupancy and was divided

in sub-zones as shown in Figure 20

Figure 20: Parking Sub-zones - Flingers Square Shopping Centre

Table 4: Occupancy (Friday - 29/04/2016) - Flingers Square Shopping Centre

Zone Total Bays

Occupancy (Friday - 29/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

4A 27 18 22 26 22 24 23 21 27 21 22 18

4B 32 27 29 26 30 31 28 30 30 27 23 21

4 Total 59 45 51 52 52 55 51 51 57 48 45 39

5A 17 12 15 11 12 14 12 13 14 11 16 13

5B 27 22 23 24 24 24 22 22 25 22 20 25

5C 3 1 2 2 1 3 2 2 3 3 1 2

5D 71 42 52 52 47 49 50 46 52 53 46 52

5E 32 15 16 23 23 22 18 18 20 19 17 16

5 Total 150 92 108 112 107 112 104 101 114 108 100 108

6A 23 8 8 8 8 8 8 7 6 6 6 7

6B 4 2 2 2 1 1 1 1 1 1 0 3

6C 28 18 24 23 17 18 21 14 14 11 16 17

6D 36 21 30 29 25 25 21 18 21 23 21 22

6E 55 11 14 16 15 13 7 5 3 4 6 10

4A

5E

4B

5A

5B

5C

6B6A

5D

6D

6C6E

Dog Swamp Shopping Centre Parking Assessment

14 November 2016

Cardno 29

Zone Total Bays

Occupancy (Friday - 29/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

6 Total 146 60 78 78 66 65 58 45 45 45 49 59

Total Surveyed 355 197 237 242 225 232 213 197 216 201 194 206

Total Site Occupancy

55% 67% 68% 63% 65% 60% 55% 61% 57% 55% 58%

Table 5: Occupancy (Saturday - 30/04/2016) - Flingers Square Shopping Centre

Zone Total Bays

Occupancy (Saturday - 30/04/2016)

10:00 10:30 11:00 11:30 12:00 12:30 13:00 13:30 14:00 14:30 15:00

4A 22 19 18 21 22 22 21 23 17 22 20 22

4B 27 22 27 28 27 26 27 28 25 27 23 27

4 Total 49 41 45 49 49 48 48 51 42 49 43 49

5A 11 14 15 14 13 13 12 12 10 13 13 11

5B 22 26 26 26 25 21 22 22 23 24 27 22

5C 1 2 1 1 1 2 2 0 0 0 0 1

5D 38 37 44 49 40 40 44 37 28 28 37 38

5E 19 23 29 23 25 24 27 26 23 25 22 19

5 Total 91 102 115 113 104 100 107 97 84 90 99 91

6A 6 5 6 10 8 9 9 11 10 8 9 6

6B 2 2 2 1 1 2 3 1 3 2 2 2

6C 15 19 23 24 23 24 24 18 21 25 18 15

6D 21 24 27 27 33 27 27 29 26 29 26 21

6E 11 11 8 12 12 13 13 9 5 11 5 11

6 Total 55 61 66 74 77 75 76 68 65 75 60 55

Total Surveyed 355 195 204 226 236 230 223 231 216 191 214 202

Total Site Occupancy

55% 57% 64% 66% 65% 63% 65% 61% 54% 60% 57%

PERTH OFFICEP: +61 8 6336 9299F: +61 8 6336 9288E: [email protected] GOODWOOD PARADEBURSWOOD WA 6100P.O. BOX 134BURSWOOD WA 6100

City of Stirling3 Nov 2016RECEIVED

PERTH OFFICEP: +61 8 6336 9299F: +61 8 6336 9288E: [email protected] GOODWOOD PARADEBURSWOOD WA 6100P.O. BOX 134BURSWOOD WA 6100

City of Stirling3 Nov 2016RECEIVED

PERTH OFFICEP: +61 8 6336 9299F: +61 8 6336 9288E: [email protected] GOODWOOD PARADEBURSWOOD WA 6100P.O. BOX 134BURSWOOD WA 6100

City of Stirling3 Nov 2016RECEIVED

PERTH OFFICEP: +61 8 6336 9299F: +61 8 6336 9288E: [email protected] GOODWOOD PARADEBURSWOOD WA 6100P.O. BOX 134BURSWOOD WA 6100

City of Stirling3 Nov 2016RECEIVED

Form 2 - Responsible Authority Report (Regulation 17)

Property Location: Lot 604, House Number 114, Cedric Street,

Stirling Application Details: Mixed Use Commercial and Multiple Dwelling

Development DAP Name: Metro North-West JDAP Applicant: Greenhaven Property Pty Ltd Owner: Cedric Investments Pty Ltd LG Reference: DA16/2069 Responsible Authority: City of Stirling Authorising Officer: Ross Povey

Director Planning and Development Department of Planning File No: DAP/13/00723 Report Date: 22 November 2016 Application Receipt Date: 4 October 2016 Application Process Days: 50 Days Attachment(s): Attachment 1

Development Application Plans: a) Undercroft Car Park (SK02.01F) received

10 November 2016 b) Ground Floor (SK02.02F) received 10

November 2016 c) First Floor (SK02.03E) received 7

November 2016 d) Second Floor (SK02.04E) received 7

November 2016 e) Third Floor (SK02.05E) received 7

November 2016 f) Roof Plan (SK05.01E) received 7

November 2016 g) Elevations 01 (SK06.01E) received 7

November 2016 h) Elevations 02 (SK06.02E) received 7

November 2016 Attachment 2 Aerial Location Plan Attachment 3 Metropolitan Region Scheme (MRS) Zoning Attachment 4 City of Stirling Local Planning Scheme No. 3 (LPS3) Zoning Attachment 5 Applicant Submission received 4 October 2016 Attachment 6 Previous Approvals:

a) Original Determination Notice (Form 1) dated 24 July 2014

b) Extension of Time Determination Notice (Form 2) dated 13 July 2016

Attachment 7 Department of Environment Regulation response dated 9 November 2016

Officer Recommendation: That the Metro North-West JDAP resolves to: 1. Accept that the DAP Application reference DP/13/00723 as detailed on the

DAP Form 2 received 4 October 2016 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;

2. Approve the DAP Application reference DP/13/00723 as detailed on the DAP

Form 2 received 4 October 2016 and accompanying plans (Attachment 1) in accordance with the provisions of the Local Planning Scheme No. 3, for the proposed minor amendments to the approved Mixed Use Development at Lot 604, House Number 114, Cedric Street, Stirling, subject to:

Amendments to Conditions Condition 2 of the original approval is to be deleted and conditions renumbered accordingly. Insert the following additional conditions: 17. The ramp down into the basement car park is to comply with Australian

Standard AS/NZS2890.1:2004 (sections 2.5.3 and 3.3), to the satisfaction of the City.

18. A total of 20 bicycle spaces are to be provided on-site, comprised of two (2) bicycle parking spaces for the commercial component, four (4) visitor spaces for residential component and 14 spaces for residents, located in accordance with the City of Stirling’s Local Planning Policy 6.2 – Bicycle Parking to the satisfaction of the City of Stirling, prior to the completion of the development.

Background:

Property Address: Lot 604, House Number 114, Cedric Street, Stirling

Zoning MRS: Urban TPS: Local Centre Use Class: Multiple Dwelling & Office Strategy Policy: Not applicable Development Scheme: Not applicable Lot Size: 2443m2 Existing Land Use: Vacant (Previously Service Station) Value of Development: $11 million

Page 2

A development application for a four (4) storey mixed use development was submitted to the City on 29 August 2013. The Metro North-West JDAP met on 12 December 2013 to consider the development application, at which time the following procedural motion was carried unanimously:

That Item 8.3 be deferred until the court resolves the issue of whether the application is in breach of the terms of the DEED, and the DAP is able to receive further advice with respect to the legal proceedings, the DEED and the implications for the development application.

The applicant subsequently sought a review of the deemed refusal of the development application by the State Administrative Tribunal. On 24 March 2014, the State Administrative Tribunal invited the JDAP to reconsider the matter at its meeting on 6 May 2014. The Metro North-West JDAP met on 6 May 2014 to consider the development application, at which time the following motion was carried unanimously:

That the Metro North-West Joint Development Assessment Panel, pursuant to section 31 of the State Administrative Tribunal Act 2004 in respect of SAT application DR 12/ 2014, resolves to:

Refuse DAP Application reference DA13/1171 and accompanying plans (Attachment 1) for a Mixed Use Commercial and Multiple Dwelling Development in accordance with Clause 10.3.1 of the City of Stirling Local Planning Scheme No.3, for the following reason:

1. Reciprocal parking and access between the subject land and adjoining Lot 602 is necessary to give effect to the proposed development, and the JDAP is not satisfied that arrangements for reciprocal parking and access are capable of being implemented.

On 23 May 2014, the State Administrative Tribunal again invited the JDAP to reconsider the application at a future meeting and a Mediation Hearing was scheduled for 1 August 2014. On 24 July 2014, the Metro North-West Joint Development Assessment Panel (JDAP) resolved to approve the development under Clause 10.3 of the City’s Local Planning Scheme No. 3 (LPS 3) subject to conditions. A Form 2 application was submitted to the City on 19 May 2016 for an extension of the term of approval. The Metro North-West JDAP at its meeting on 13 July 2016 approved the application for an extension of the term of the original approval for a further two year period. Details: outline of development application The current development approval allows for the construction of a four storey mixed use development comprising nine (9) Offices, 44 Multiple Dwellings and associated car parking. This Form 2 application proposes the following minor modifications to the approved development: • Relocating the Western Power transformer from the Sanderling Street boundary

to the basement with the intention of providing a main pedestrian entry to

Page 3

Sanderling Street in future following a land purchase agreement with Western Power;

• Modification of the ground floor layout as a result of relocation of the Western Power transformer. This includes:

o A reduction in the number of ground floor tenancies from nine (9) offices to seven (7) offices;

o A reduction in the gross floor area of the ground floor office tenancies from 786m2 to 713m2;

o The relocation of the commercial amenities and bin store; and o The reconfiguration of the ground floor parking layout.

• Minor modifications to the configuration of the basement level layout to accommodate the new facilities;

• Amending the colours of the façade from predominately white with grey vertical stripes and a grey awning to neutral colours comprised of light brown face brickwork with a painted grey cladding on the upper level;

• A new roof terrace for residents on the third floor; • Reduction in the number of multiple dwellings from 44 dwellings to 41 dwellings

by replacing of six (6) one-bedroom dwellings with three (3) three-bedroom dwellings;

• Internal alterations to the corner dwellings on the first floor, second floor and third floor; and

• An increase in the total number of car parking bays from 92 bays to 93 bays. Legislation & policy: Legislation

• Planning and Development Act 2005 • Planning and Development (Local Planning Schemes) Regulations 2015 • Metropolitan Region Scheme (MRS) • Local Planning Scheme No. 3 (LPS3)

State Government Policies

• Residential Design Codes of Western Australia (R-Codes)

Consultation: Public Consultation

Public consultation was not required to be undertaken as part of the assessment of this application. Consultation with other Agencies or Consultants

The City referred the application to the Department of Environmental Regulation for comment (Attachment 7) which is discussed further below. Planning assessment: The development has been assessed against the City of Stirling’s Local Planning Scheme No. 3 (LPS3) and relevant local planning policies. It should be noted that while LPS3 provides guidance in respect to zoning and objectives of zones, the specific development standards are provided in relevant local planning policies.

Page 4

Given the number of Scheme elements and Local Planning Policies that are applicable to the proposed development, the planning assessment part of this report has been broken down into the following sections:

1. Schedule of Amendments 2. Car Parking 3. Referrals

1. Schedule of Amendments The table below outlines compliance with respect to the proposed amendments:

No. PROPOSED CHANGE

PLANNING IMPLICATIONS COMPLIES?

1. Relocating the Western Power transformer from the Sanderling Street boundary to the basement with the intention of providing a main pedestrian entry to Sanderling Street in future following a land purchase agreement with Western Power.

No planning implications. Any future modifications to the approved DAP application may require a Form 2 application under the current regulations.

Yes.

2. The reduction in the number of ground floor tenancies from nine (9) offices to seven (7) offices and reduction in the gross floor area of the ground floor office tenancies from 786m2 to 713m2.

The car parking assessment has been updated to reflect the altered gross floor areas of the office tenancies accordingly.

Yes. Refer to comment below.

3. The relocation of the commercial amenities and bin store as well as the reconfiguration of the ground floor parking layout.

The alterations to the internal areas have no planning implications.

Yes.

4. Minor modifications to the configuration of the basement level layout to accommodate the new facilities.

The design and layout of car parking areas have been assessed by the City’s engineers who advise that the proposal is supported subject to the ramp down to the car parking being compliant with the Australian Standards AS2890.1:2004 (sections 2.5.3 and 3.3). A condition has been recommended accordingly.

The assessment of bicycle parking bays has been altered as a result of

Yes. Refer to comment below.

Page 5


Recommended