+ All Categories
Home > Documents > MEG Experiment - PSI

MEG Experiment - PSI

Date post: 01-Oct-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
18
MEG Experiment Status and prospects
Transcript
Page 1: MEG Experiment - PSI

MEG ExperimentStatus and prospects

Page 2: MEG Experiment - PSI

Our goal:

A “significant” result before any LHC discovery

presented last year

Page 3: MEG Experiment - PSI

LHC Luminosity Profile

100 fb-1/yrSHUTDOWN

1000 fb-1/yr

200

fb-1

/yr

3000

300

30

10-20 fb-1/yr

SUSY@1TeV

SUSY@3TeV

Z’@6TeV

ADD X-dim@9TeV

Compositeness@40TeV

H(120GeV)γγ

Higgs@200GeV

L = 1033 L = 1034 SLHC: L = 1035

Michel Della NegraCMS week (Sep.2005)

First physics run: O(1fb-1)0.5 ~ 10 fb-1 by the end of 2008

presented last year

Page 4: MEG Experiment - PSI

Publish in 2008 the “significant” result

Start data taking in 2006to fully test the whole experiment

Full data taking in 2007

MEG

presented last year

Page 5: MEG Experiment - PSI

Publish in 2008 the “significant” result

Start data taking in 2006to fully test the whole experiment

Full data taking in 2007

MEG

presented last year

?

Page 6: MEG Experiment - PSI

Publish in 2008 the “significant” result

Start data taking in 2006to fully test the whole experiment

Full data taking in 2007

MEG

presented last year

??

Page 7: MEG Experiment - PSI

Dec

Nov

Oct

Sep

Aug

Jul

Jun

MEG schedule 2006

• Installation coordination by Wataru• Run coordination by Malte

Page 8: MEG Experiment - PSI

Dec

Nov

Oct

Sep

Aug

Jul

Jun

MEG schedule 2006

• Installation coordination by Wataru• Run coordination by Malte

DC+TC Run

Page 9: MEG Experiment - PSI

Detector Installation

Drift Chambers (8 out of 16) Timing Counters (bars, not fibers)

Stopping Target

Gas Control System(Cobra+DC)

N2 Bag

Page 10: MEG Experiment - PSI

Data Acquisition

Trigger & Splitter

Online

Waveform Digitizer(DRS)

Online PCsTC data

DC data

Page 11: MEG Experiment - PSI

Publish in 2008 the “significant” result

Started “data taking” in 2006

Full data taking in 2007

MEG

?

Page 12: MEG Experiment - PSI

Publish in 2008 the “significant” result

Started “data taking” in 2006

Full data taking in 2007

MEG

without LXe detector

?

Page 13: MEG Experiment - PSI

LXe CalorimeterLiquid circulatingpurifier

Liquid pump(100L/h)

Purifier1000L storage dewar

Cryocooler(100W)

LN2

LN2

Getter+Oxysorb

GXe pump(10-50L/min)

GXe storage tank

Cryocooler(150W)

Heat exchanger

Status of the LXe detector

~900L kept

cryostat honeycomb • SIMIC problems (deformation, neglect)• honeycomb pressure test failures (twice)

Page 14: MEG Experiment - PSI

Tasks & Problems DC

TC

LXe

Trigger/DAQ

Computing

gas leakagebuild / rebuild the chamberstrack reconstruction code still missing

much higher rate than expected - PMT lifefiber detectors (APD electronics) & laser systemredesign & build N2 bagsfurther tests/calibration at Frascattimatching with DC tracks

honeycomb window ready this week - pressure testC-W will arrive earlier! - testing mid-April

data rate limited at 5Hz (full detector) - toward 100Hz?DRS3 probably not for 2007

add more resources ~300kCHF - expect >50% paid by PSIdata size reduction (9MB/event)

Page 15: MEG Experiment - PSI

Tasks & Problems DC

TC

LXe

Trigger/DAQ

Computing

gas leakagebuild / rebuild the chamberstrack reconstruction code still missing

much higher rate than expected - PMT lifefiber detectors (APD electronics) & laser systemredesign & build N2 bagsfurther tests/calibration at Frascattimatching with DC tracks

honeycomb window ready this week - pressure testC-W will arrive earlier! - testing mid-April

data rate limited at 5Hz (full detector) - toward 100Hz?DRS3 probably not for 2007

add more resources ~300kCHF - expect >50% paid by PSIdata size reduction (9MB/event)

Ready in mid-June

Ready in mid-May(N2 bag by April)

Cryostat delivery in mid-April

Page 16: MEG Experiment - PSI

N2 bag CW

LXe cryostatdelivery

TC

CW

LXe

N2+EC(US)

DC

TC(US)

DC

N2+TC(DS) CW

Beam CommisionEC+IS

BTS

LXe to PiE5

MEG schedule 2007

Other experiment might be accommodated in Apr-Maywith minimum interference

Running Strategy?• calibration runs• beam intensity optimization• blind analysis• likelihood analysis

Tokyo Physics Meeting in March

“contingency” included

gas

Page 17: MEG Experiment - PSI

Publish in 2008 the “significant” result

Started “data taking” in 2006

Hopeful forfull data taking in 2007

MEG

without LXe detector

Page 18: MEG Experiment - PSI

Background and Sensitivity Measured SimulationGamma Energy (%) 4.5-5.0 Gamma Timing ~0.15Gamma Position (mm) 4.5-9.0Gamma Efficiency (%) >40e+ Timing (nsec) 0.1e+ Momentum (%) 0.8e+ Angle (mrad) 10.5e+ Efficiency (%) 90Muon Decay Point (mm) 2.1Muon Rate (108/sec) 0.25-0.35Running Time (107sec) 4.0Accidental Rate (10-14) 1.9-3.0# Accidental Events 0.690% CL Limit (10-13) 0.9-1.4

Updated number should be availableafter Physics Meeting in Tokyo, March 29-30

} needs reevaluation+ info from ‘06 data

under intensive studywith “2007 setup”


Recommended