+ All Categories
Home > Documents > Method of Fastening 513 Brass or Stainless Steel ...

Method of Fastening 513 Brass or Stainless Steel ...

Date post: 13-Mar-2022
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
6
J-frame grille Hex head screw (provided) Removable AG10 core Typical dry wall screw (not provided) Parts needed for assembly using method #513 Hex. head screw driver (provided) Disclaimer: This step by step layout is one of the many ways someone can install their custom grille using method #513 Architectural Grille REV SHEET - A3 SIZE SCALE 42 Second Avenue Brooklyn, NY 11215 www.archgrille.com DESCRIPTION CUSTOMER Drawn by Heg #513 Method of fastening 1"=1.5" DMS.513.1
Transcript

J-frame grille

Hex head screw(provided)

Removable AG10 core

Typical drywall screw(not provided)

Parts needed for assembly using method #513

Hex. head screw driver(provided)

Disclaimer:This step by step layout is one of the many ways someone can install their custom grilleusing method #513

Architectural Grille

REV

SHEET

-A3

SIZE

SCALE

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

DESCRIPTION

CUSTOMER Drawn byHeg

#513 Method of fastening 1"=1.5" DMS.513.1

A

DETAIL A SCALE 2 : 1.5

Step 1:Remove the AG10 core from j-frame by removing all the hex head tab screws,using the hex head screw driver that is provided. (If installing multiple grilles be sure to keep cores and frames together for easier installation).

DMS.513.21"=1"#513 Method of fastening

HegDrawn byCUSTOMER

DESCRIPTION

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

SCALE

SIZE

A3 -

SHEET

REV

Architectural Grille

B

DETAIL B SCALE 1.5 : 1

Wall with frame set in

Step 2:Place j-frame into your opening. Attach frame to wall / ceiling using drywall screws(not provided).Screw through the provided holes in the flange as necessary.

DMS.513.31"=1.75"#513 Method of fastening

HegDrawn byCUSTOMER

DESCRIPTION

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

SCALE

SIZE

A3 -

SHEET

REV

Architectural Grille

Step 3:Spackle, sand and finish painting before reinstalling your AG10 core.

DMS.513.41"=1.75"#513 Method of fastening

HegDrawn byCUSTOMER

DESCRIPTION

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

SCALE

SIZE

A3 -

SHEET

REV

Architectural Grille

Step 4:Reattach AG10 core to j-frame usinghex head screws and the hex head screw driver provided.

DMS.513.51"=1.75"#513 Method of fastening

HegDrawn byCUSTOMER

DESCRIPTION

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

SCALE

SIZE

A3 -

SHEET

REV

Architectural Grille

Installation complete.Save hex head screw driver for later use.

DMS.513.61"=1.75"#513 Method of fastening

HegDrawn byCUSTOMER

DESCRIPTION

42 Second AvenueBrooklyn, NY 11215www.archgrille.com

SCALE

SIZE

A3 -

SHEET

REV

Architectural Grille


Recommended