Metra Construction: Winnemac Area

Date post: 08-Apr-2018
Category:
Upload: centersquare
View: 222 times
Download: 0 times
Share this document with a friend
2
View North Foster to Winnemac Existing Anticipated Parking on east side o street 68 spaces 53 spaces (approximately) Community Green Space 14,358 square eet 21,909 square eet (+53%) Natural Drainage Area none 3 areas Area Facts The West Ravenswood Corridor Greenway Metra North Line Improvements Cross Section  Winnemac Area Te green space between Winona Street and Winnemac Avenue has been cared or by a group o neighbors  who live on the west side o Ravenswood Avenue. Over the years they have made many improvements to this landscape and continue to maintain it. Te narrowing o Ravenswood to a one-way street will make trac ow riendlier and increase the amount o green space available or community landscaping. Te new green space will also appear as a larger and more continuous parkway due to the landscape improvements planned between Winona and Foster. Te need or a continuous high retaining wall will be avoided through use o lower, plantable landscape walls to handle the soil slopes, producing a tiered, garden-like efect. Te tiered walls will also allow or the preservation o some o the larger existing trees. Tis plan also includes converting the head-in parking just north o Winnemac to parallel parking to urther increase the amount o community green space. Green Space Landscape Wall Landscape Wall Trafc Flow Trafc Flow Existing Train Track Parallel Parking Parallel Parking Parallel Parking Parallel Parking New Train Track  Width o Existing Green Space Green Space RR Property Line Saety Fence Saety Fence RR Property Line Green Space Saety Fence (onRRproper tyline) Landscape Wall New and wider landscape plantings    W    I    N    O    N    A    S    T    R    E    E    T Landscape “bump-out” or trafc calming and stormwater mitigation
Transcript
Page 1: Metra Construction: Winnemac Area

8/7/2019 Metra Construction: Winnemac Area

http://slidepdf.com/reader/full/metra-construction-winnemac-area 1/1

View North

Foster to Winnemac Existing Anticipated

Parking on east side o street 68 spaces 53 spaces (approximately)

Community Green Space 14,358 square eet 21,909 square eet (+53%)

Natural Drainage Area none 3 areas

Area Facts

The West Ravenswood Corridor Greenway Metra North Line Improvements

Cross Section

 Winnemac AreaTe green space between Winona Street and Winnemac Avenue has been cared or by a group o neighbors who live on the west side o Ravenswood Avenue. Over the years they have made many improvements to this

landscape and continue to maintain it.Te narrowing o Ravenswood to a one-way street will make trac ow riendlier and increase the amounto green space available or community landscaping. Te new green space will also appear as a larger and morecontinuous parkway due to the landscape improvements planned between Winona and Foster. Te need ora continuous high retaining wall will be avoided through use o lower, plantable landscape walls to handle thesoil slopes, producing a tiered, garden-like efect. Te tiered walls will also allow or the preservation o someo the larger existing trees.

Tis plan also includes converting the head-in parking just north o Winnemac to parallel parking to urtherincrease the amount o community green space.

Green Space Landscape Wall

Landscape Wall

Trafc Flow Trafc Flow

Existing Train Track

Parallel Parking Parallel ParkingParallel Parking Parallel Parking

New Train Track

 Width o Existing Green SpaceGreen Space

RR Property Line

Saety FenceSaety Fence

RR Property Line

Green Space

Saety Fence(onRRpropertyline)

Landscape Wall

New and widerlandscape plantings

   W   I   N   O   N   A   S   T   R   E   E   TLandscape “bump-out”

or trafc calming andstormwater mitigation


Recommended