    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   6+400 6+420

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    6/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    7/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= 1.#0BR= 0.$0

    LP= 3.00

    LHR= #0.00

    SR= 0.14

    PP= 0.%0

    Hm= 1.!0

    COTA 1= 3"80.00

    COTA #= 3"%%.#8

    COTA 3= 3"%%.8$

  • 8/18/2019 Metrado Rapida Final

    8/94

    0.30 m

    0.14 m0.008 m/m

    1.14 m/seg

    0.30 m

    0.01!

    3"80.00 msm

    3"%%.#8 msm

    0.0%0 m3/seg

    0.30 m

    0.#0 m

    P I D A

    COTA 3

    9#

    91

    ec

  • 8/18/2019 Metrado Rapida Final

    9/94

    0.30 m

    #.%# m

    #0.00 m

    0.14 m/m

    #0.18 m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    1.#0 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.00"# m

    #."8 m 2e< 62s2 -7e se2 g72es$.38 m/seg

    #.0%

    %1.10

    0.#8

    1.3! m Seg? Sec6

    1.$# m Seg? Sme22

    1.## m Seg? S22e@

    1.#$ m Seg? B2mee  

    3.00 m

    0.$% m

    0.08# m

    0.%0 m

      LA POZA

    1.40 m

    .*" m

    3"%%.8$ msm

  • 8/18/2019 Metrado Rapida Final

    10/94

    0.#8

    )0.4# Res2< 6927c<

    0."0

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    11/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    12/94

  • 8/18/2019 Metrado Rapida Final

    13/94

  • 8/18/2019 Metrado Rapida Final

    14/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    15/94

  • 8/18/2019 Metrado Rapida Final

    16/94

  • 8/18/2019 Metrado Rapida Final

    17/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   6+430 6+640  Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL = 0.30 mYc1 = TIRANTE EN EL CANAL DE ENT = 0.#0 m

    Sc = PENDIENTE EN EL CANAL = 0.008 m

    Vc = VELOCIDAD EN EL CANAL = 0."1 m

    Hc = ALTURA DEL CANAL = 0.30 m

    = 0.01!COTA 1 = 3"%0.00 m

    COTA # = 3"!#."$ m

    &'CAUDAL( = 0.0%0 m

    B# = ANCHO DE CANAL = 0.30 m

    Yc# = TIRANTE EN EL CANAL DE SAL = 0.#0 m

    Hc = ALTURA DEL CANAL = 0.30 m

    COTA1 ) COTA# = 1%.04 m

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA = #10.00 m

    SR = PENDIENTE EN LA RAPIDA = 0.08 m

    LIR = LON*ITUD INCLI. DE LA RAPIDA = #10.$" m

    BR1 = ANCHO DE LA RAPIDA1 = 0.13 m

    BR# = ANCHO DE LA RAPIDA# = 0.#$ m

    BR = ANCHO DE LA RAPIDA 'ASU,( = 0.$0 m

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A 0.4" m

    BP = ANCHO DE LA PO+A 'ASU,( = #.00 m

    SECCION DE CONTROL

    - = & / BR = 0.#3 m

    c1 = TIRANTE CRITICO 1 = 0.18 m

    c# = TIRANTE CRITICO # = 0.18 m

    c3 = TIRANTE CRITICO 3 = 0.1$ m

      c = TIRANTE CRITICO 'ASU,IDO( = 0.40 mSOBREELEVACION

    = SOBREELEVACION = )0.3%0

       D I S E Ñ O D E R A P I D A

    NOTA )

    Yc1

    91

    T2sc

  • 8/18/2019 Metrado Rapida Final

    18/94

    COTA #= 3"!#."$

    COTA 3= 3"!3.40

  • 8/18/2019 Metrado Rapida Final

    19/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   0+760 0+830

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    20/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    21/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= 1.#0BR= 0.$0

    LP= 3.00

    LHR= %0.00

    SR= 0.0!

    PP= 0.3!

    Hm= 1.$0

    COTA 1= 3"80.00

    COTA #= 3"%$.#$

    COTA 3= 3"%$.8!

  • 8/18/2019 Metrado Rapida Final

    22/94

    0.30 m

    0.14 m0.008 m/m

    1.14 m/seg

    0.30 m

    0.01!

    3"80.00 msm

    3"%$.#$ msm

    0.0%0 m3/seg

    0.30 m

    0.#0 m

    P I D A

    COTA 3

    9#

    91

    ec

  • 8/18/2019 Metrado Rapida Final

    23/94

    0.30 m

    3.%4 m

    %0.00 m

    0.0! m/m

    %0.10 m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    1.#0 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.00%" m

    4.00 m 2e< 62s2 -7e se2 g72es%.38 m/seg

    #.%8

    "!.38

    0.30

    1.4$ m Seg? Sec6

    1.%! m Seg? Sme22

    1.3# m Seg? S22e@

    1.3! m Seg? B2mee  

    3.00 m

    0.%% m

    0.0"1 m

    0.3! m

      LA POZA

    1.0% m

    .+" m

    3"%$.8! msm

  • 8/18/2019 Metrado Rapida Final

    24/94

    0.30

    )0.0! Res2< 6927c<

    0.!!

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    25/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    26/94

  • 8/18/2019 Metrado Rapida Final

    27/94

  • 8/18/2019 Metrado Rapida Final

    28/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    29/94

  • 8/18/2019 Metrado Rapida Final

    30/94

  • 8/18/2019 Metrado Rapida Final

    31/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   1+090 1+140

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    32/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    33/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= 1.00BR= 0.$0

    LP= #.00

    LHR= !0.00

    SR= 0.04

    PP= 0.3!

    Hm= 1.$0

    COTA 1= 3"80.00

    COTA #= 3"%%."1

    COTA 3= 3"%8.!#

  • 8/18/2019 Metrado Rapida Final

    34/94

    0.30 m

    0.14 m0.008 m/m

    1.14 m/seg

    0.30 m

    0.01!

    3"80.00 msm

    3"%%."1 msm

    0.0%0 m3/seg

    0.30 m

    0.#0 m

    P I D A

    COTA 3

    9#

    91

    ec

  • 8/18/2019 Metrado Rapida Final

    35/94

    0.30 m

    #.0" m

    !0.00 m

    0.04 m/m

    !0.04 m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    1.00 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.0103 m

    #.3! m 2e< 62s2 -7e se2 g72es$.80 m/seg

    #.3!

    $%.34

    0.3#

    1.!3 m Seg? Sec6

    1.84 m Seg? Sme22

    1.38 m Seg? S22e@

    1.4# m Seg? B2mee  

    #.00 m

    0.%1 m

    0.0%$ m

    0.3! m

      LA POZA

    1.0" m

    .+" m

    3"%8.!# msm

  • 8/18/2019 Metrado Rapida Final

    36/94

    0.3#

    )0.03 Res2< 6927c<

    0.!!

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    37/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    38/94

  • 8/18/2019 Metrado Rapida Final

    39/94

  • 8/18/2019 Metrado Rapida Final

    40/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    41/94

  • 8/18/2019 Metrado Rapida Final

    42/94

  • 8/18/2019 Metrado Rapida Final

    43/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   1+250 1+290

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    44/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    45/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= 1.00BR= 0.$0

    LP= #.00

    LHR= 40.00

    SR= 0.0!

    PP= 0.3!

    Hm= 1.$0

    COTA 1= 3"80.00

    COTA #= 3"%%."8

    COTA 3= 3"%8.!"

  • 8/18/2019 Metrado Rapida Final

    46/94

  • 8/18/2019 Metrado Rapida Final

    47/94

    0.30 m

    #.03 m

    40.00 m

    0.0! m/m

    40.0! m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    1.00 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.0103 m

    #.#8 m 2e< 62s2 -7e se2 g72es$.80 m/seg

    #.3!

    $%.34

    0.3#

    1.!3 m Seg? Sec6

    1.84 m Seg? Sme22

    1.38 m Seg? S22e@

    1.4# m Seg? B2mee  

    #.00 m

    0.%1 m

    0.0%! m

    0.3! m

      LA POZA

    1.0" m

    .+" m

    3"%8.!" msm

  • 8/18/2019 Metrado Rapida Final

    48/94

    0.3#

    )0.03 Res2< 6927c<

    0.!!

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    49/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    50/94

  • 8/18/2019 Metrado Rapida Final

    51/94

  • 8/18/2019 Metrado Rapida Final

    52/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    53/94

  • 8/18/2019 Metrado Rapida Final

    54/94

  • 8/18/2019 Metrado Rapida Final

    55/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   0+825 0+870

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    56/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    57/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= 1.00BR= 0.$0

    LP= #.00

    LHR= 4!.00

    SR= 0.08

    PP= 0.3!

    Hm= 1.40

    COTA 1= 3"80.00

    COTA #= 3"%$.4"

    COTA 3= 3"%%.14

  • 8/18/2019 Metrado Rapida Final

    58/94

  • 8/18/2019 Metrado Rapida Final

    59/94

    0.30 m

    3.!1 m

    4!.00 m

    0.08 m/m

    4!.14 m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    1.00 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.0081 m

    3.%% m 2e< 62s2 -7e se2 g72es8.$0 m/seg

    3.%%

    10%.80

    0.3!

    1.%3 m Seg? Sec6

    #.08 m Seg? Sme22

    1.!$ m Seg? S22e@

    1.!" m Seg? B2mee  

    #.00 m

    0."0 m

    0.08" m

    0.3! m

      LA POZA

    1.1# m

    .," m

    3"%%.14 msm

  • 8/18/2019 Metrado Rapida Final

    60/94

    0.3!

    0.00 Res2< 6927c<

    0.!!

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    61/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    62/94

  • 8/18/2019 Metrado Rapida Final

    63/94

  • 8/18/2019 Metrado Rapida Final

    64/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    65/94

  • 8/18/2019 Metrado Rapida Final

    66/94

  • 8/18/2019 Metrado Rapida Final

    67/94

    PROYECTO : SIST. RIEGO TICUYO - PHASÑATIANAUBICACIÓN : COPORAQUE - ESPINAR DISEÑO : W.CH.M

    PROGRESIVA:   1+615 1+760

      Poza Circular 

    A. DATOS DEL CANAL DE ENTRADA Y DE SALIDA

    B1 = ANCHO DE CANAL =

    Yc1 = TIRANTE EN EL CANAL DE ENT =Sc = PENDIENTE EN EL CANAL =

    Vc = VELOCIDAD EN EL CANAL =

    Hc = ALTURA DEL CANAL =

    =

    COTA 1 =

    COTA # =

    &'CAUDAL( =

    B# = ANCHO DE CANAL =

    Yc# = TIRANTE EN EL CANAL DE SAL =

       D I S E Ñ O D E R

    NOTA )

    Yc1

    T2sc

  • 8/18/2019 Metrado Rapida Final

    68/94

    Hc = ALTURA DEL CANAL =

    COTA1 ) COTA# =

    B. DATOS DE LA RAPIDA

    LHR = LON*ITUD HO+. DE LA RAPIDA =

    SR = PENDIENTE EN LA RAPIDA =

    LIR = LON*ITUD INCLI. DE LA RAPIDA =

    BR1 = ANCHO DE LA RAPIDA1 =

    BR# = ANCHO DE LA RAPIDA# =

    BR = ANCHO DE LA RAPIDA 'ASU,( =

    ANCHO DE LA POZA

    BP1 = ANCHO DE LA PO+A

    BP = ANCHO DE LA PO+A 'ASU,( =

    SECCION DE CONTROL

    - = & / BR =

    c1 = TIRANTE CRITICO 1 =

    c# = TIRANTE CRITICO # =

    c3 = TIRANTE CRITICO 3 =

      c = TIRANTE CRITICO 'ASU,IDO( =

    SOBREELEVACION

    = SOBREELEVACION =

    = SOBREELEVACION 'ASU,IDO(=

    CANAL DE LA RAPIDA

    51 = BORDE LIBRE 1 =

    5# = BORDE LIBRE # =

    5 = BORDE LIBRE 'ASU,IDO( =

    6 = 272 292

    POZA DE DISIPACION

    VC = & / 'BP : c( =

    91 =

    HV1 = )91;c;C#/#g

    = NU,ERO DE ROUD =

    9# =

    LONGITUD DE LA POZA

    LP1 = LON*ITUD DE PO+A1 =

    LP# = LON*ITUD DE PO+A# =

    LP3 = LON*ITUD DE PO+A3 =

    LP4 = LON*ITUD DE PO+A4 =

    LP = LON*ITUD PO+A 'ASU,( =

    B = BORDE LIBRE DE LA PO+A =

    PROFUNDIDAD DE LA POZA

    PP = P

  • 8/18/2019 Metrado Rapida Final

    69/94

     A1 = 9#

    YC# = 9# ) PP

     A# = PP;YC#

     A1 = A#

    R$%u&$& Valor  

    BP= #.00BR= 0.$0

    LP= #.!0

    LHR= 14!.00

    SR= 0.1"

    PP= 0.3!

    Hm= 1.$0

    COTA 1= 3"80.00

    COTA #= 3"!1.88

    COTA 3= 3"!#.!"

  • 8/18/2019 Metrado Rapida Final

    70/94

  • 8/18/2019 Metrado Rapida Final

    71/94

    0.30 m

    #8.1# m

    14!.00 m

    0.1" m/m

    14%.%0 m

    0.13 m

    0.#$ m

    0.$0 m

    0.4" m

    #.00 m

    0.#3 m

    0.18 m

    0.18 m

    0.14 m

    0.#0 m Vec2 Hc22es

    )0.114

      )

    0.08 m

    0.04 m

    0.!0 m

    1.#0

    1.1% m/seg

    0.001! m

    #8.3" m 2e< 62s2 -7e se2 g72es#3.$0 m/seg

    #8.3"

    1$#3."0

    0.41

    #.0! m Seg? Sec6

    #.4$ m Seg? Sme22

    1.84 m Seg? S22e@

    1.8! m Seg? B2mee  

    #.!0 m

    #.40 m

    0.1%$ m

    0.3! m

      LA POZA

    1.18 m

    .+" m

    3"!#.!" msm

  • 8/18/2019 Metrado Rapida Final

    72/94

    0.41

    0.0$ Res2< 6927c<

    0.!!

    O A7me2 e 5

  • 8/18/2019 Metrado Rapida Final

    73/94

     ELEMENTOSDATOS DE RAPIDA

      Progresiva Cota.Ingr. Cot.Sald. Dif.H Lg.Inclin. Lg.Hor. ! " #$%s& Pendiente

    0+232 0+251 3220.44 ### 3.08 20.60 20.06 0.85 0.15

    0+329 0+354 3211.06 ### 4.08 25.38 25.05 0.85 0.16

    0+354 0+359 3206.98 ### 2.36 6.03 5.54 0.85 0.42

    0+359 0+367 3204.62 ### 1.68 7.89 7.80 0.85 0.21

    0+394 0+400 3202.35 ### 1.66 6.67 6.46 0.85 0.250+415 0+436 3199.88 ### 2.25 22.11 21.99 0.85 0.10

    1+206 1+220 3162.55 ### 1.90 13.93 13.88 0.85 0.14

    1+306 1+338 3157.42 ### 3.41 31.78 31.62 0.85 0.11

    1+448 1+458 3150.24 ### 3.99 11.42 10.74 0.85 0.37

    1+525 1+554 3143.88 ### 8.23 29.46 28.35 0.85 0.29

    1+554 1+618 3135.64 ### 5.94 64.37 64.16 0.85 0.09

    1+618 1+640 3129.70 ### 4.24 27.69 27.36 0.85 0.18

    1+640 1+724 3125.45 ### 4.89 79.48 79.33 0.85 0.06

    1+724 1+744 3120.56 ### 2.96 20.22 19.93 0.85 0.15

    1+773 1+812 3116.55 ### 5.38 39.00 38.63 0.85 0.14

    1+812 1+878 3111.18 ### 5.73 67.00 66.84 0.85 0.092+136 2+167 3099.23 ### 3.49 31.10 30.95 0.85 1.13

    2+664 2+673 3088.85 ### 2.33 9.39 9.09 0.85 0.23

      DESCRIPCIO   'R ('ase de Canal de Ra

    HR (Alt*ra de Canal de R 

    d+.HR (Tirante Ma,or de Re

    DP (Dia#etr de )oaPP (Prof*ndidad de Po 

    HCP (Alt*ra de Ca-a de PoCot.SCP (Cota S*)erior de Ca

  • 8/18/2019 Metrado Rapida Final

    74/94

  • 8/18/2019 Metrado Rapida Final

    75/94

  • 8/18/2019 Metrado Rapida Final

    76/94

      IDRAULICOS DE RAPIDA TIPO DATOS DE CANAL DE ENTRADA SALIDA DIMENSIONAMIENTO RAPIDA

    c/ Entr. c.Sal. 01Entr. S1Canal 21Canal 'R HR d+.HR DP PP HCP Cot.SCP  

    0.17 0.190 0.4 0.0093 1.43 0.40 0.50 0.42 0.80 0.50 1.20 3218.060.11 0.190 0.4 0.0320 1.96 0.40 0.50 0.45 0.80 0.50 1.20 3207.710.19 0.190 0.4 0.005 1.00 0.40 0.50 0.40 0.80 0.50 1.20 3205.310.19 0.190 0.4 0.005 1.00 0.40 0.50 0.39 0.80 0.50 1.20 3203.30

    0.11 0.190 0.4 0.0210 1.91 0.40 0.50 0.37 0.80 0.50 1.20 3201.390.08 0.190 0.4 0.0570 2.69 0.40 0.50 0.40 0.80 0.50 1.20 3198.320.11 0.190 0.4 0.0246 1.92 0.40 0.50 0.36 0.80 0.50 1.20 3161.350.10 0.190 0.4 0.0376 2.23 0.40 0.50 0.43 0.80 0.50 1.20 3154.700.10 0.190 0.4 0.0342 2.16 0.40 0.50 0.45 0.80 0.50 1.20 3146.950.10 0.190 0.4 0.0355 2.19 0.40 0.50 0.69 0.90 0.70 1.50 3136.440.19 0.190 0.4 0.005 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3130.500.19 0.190 0.4 0.005 1.00 0.40 0.50 0.43 0.90 0.70 1.50 3126.250.19 0.190 0.4 0.005 1.00 0.40 0.50 0.44 0.90 0.70 1.50 3121.360.19 0.190 0.4 0.005 1.00 0.40 0.50 0.42 0.80 0.50 1.20 3118.300.10 0.190 0.4 0.0365 2.21 0.40 0.50 0.48 0.90 0.70 1.50 3111.980.19 0.190 0.4 0.05 1.00 0.40 0.50 0.46 0.90 0.70 1.50 3106.250.14 0.190 0.4 0.0126 1.52 0.40 0.50 0.44 0.80 0.50 1.20 3096.450.14 0.190 0.4 0.0115 1.47 0.40 0.50 0.40 0.80 0.50 1.20 3087.22

    N )idas Ra)ida

      a)idas

    anso

    aa de Poa

  • 8/18/2019 Metrado Rapida Final

    77/94

  • 8/18/2019 Metrado Rapida Final

    78/94

  • 8/18/2019 Metrado Rapida Final

    79/94

    EJe9ee ,eG

  • 8/18/2019 Metrado Rapida Final

    80/94

    EJe9ee ,eG

  • 8/18/2019 Metrado Rapida Final

    81/94

    3.4 /./

     Area Total I5

  • 8/18/2019 Metrado Rapida Final

    82/94

      C2c7< P2e9 9e T2ec

  • 8/18/2019 Metrado Rapida Final

    83/94

    PLANILLA DE METRADOS

    OYECTO:

    ICACION: REGION: CUSCO PROVINCIA: ESPINAR DISTRITO: ESPINAR

    FECHA: De-15 !EC!O POR: ". C!. .

    COD DESCRIPCIÓN UND CANTDIMENSIONES

    PARCLARGO ANCHO ALTO

    1.00.00 Rapidas01.01.02 TRA$O % REP&ANTEO CANA& M2

    6+265 1.00 125.00 1.00 12

    6+400 1.00 20.00 1.00 2

    6+430 1.00 210.00 1.00 21

    0+760 1.00 70.00 1.00

    1+090 1.00 50.00 1.00 5

    1+250 1.00 40.00 1.00 !0+825 1.00 45.00 1.00 !

    1+615 1.00 145.00 1.00 1!

    PO$A DISCIPADORA

    6+265 1.00 2.30 4.15

    6+400 1.00 2.00 3.14

    6+430 1.00 2.80 6.16

    0+760 1.00 1.80 2.54

    1+090 1.00 2.80 6.16

    1+250 1.00 2.80 6.16

    0+825 1.00 2.80 6.16

    1+615 1.00 3.30 8.55

    01.02.00 MOVIMIENTO DE TIERRAS

    01.02.05 E'CAVACI(N EN ATERIA& SUE&TO M"

    C)*) ,e )/,)

    6+265 1.00 125.00 0.80 10

    6+400 1.00 20.00 0.80 1

    6+430 1.00 210.00 0.80 1#

    0+760 1.00 70.00 0.80 5

    1+090 1.00 50.00 0.80 !

    1+250 1.00 40.00 0.80 "0+825 1.00 45.00 0.80 "

    1+615 1.00 145.00 0.80 11

    P) ,),)

    6+265 1.00 4.15 1.80

    6+400 1.00 3.14 1.50

    6+430 1.00 6.16 1.80 1

    0+760 1.00 2.54 1.60

    1+090 1.00 6.16 1.60

    1+250 1.00 6.16 1.60

    0+825 1.00 6.16 1.40

    1+615 1.00 8.55 1.60 1

    01.02.06 RE&&ENO COPACTADO PARA ESTRC. C. AT. PROPIO M"

    EORAIENTO % AP&IACION DE& SERVICIO DE AGUA PARA RIEGO CAON DE PORURO DISTRITO DE ESPINAR - REGION CUSCO

  • 8/18/2019 Metrado Rapida Final

    84/94

    - ,e e*))e*; e* 1.00 190.01

    01.02.10 E&IINACION DE ATERIA& E'CEDENTE M"

    1.00 395.85 1.20

    01.03.00 OBRAS DE CONCRETO

    01.03.01 CONCRETO 175 ?@2 M"

    C)*) ,e ),)

    6+265 1.00 125.00 A > 0.26

    6+400 1.00 20.00 A > 0.26

    6+430 1.00 210.00 A > 0.26

    0+760 1.00 70.00 A > 0.26

    1+090 1.00 50.00 A > 0.26

    1+250 1.00 40.00 A > 0.26

    0+825 1.00 45.00 A > 0.26

    1+615 1.00 145.00 A > 0.26

    PO$A DISCIPADORA

    6+265 1.00 7.23 1.80 0.206+400 1.00 6.28 1.50 0.20

    6+430 1.00 8.80 1.80 0.20

    0+760 1.00 5.65 1.60 0.20

    1+090 1.00 8.80 1.60 0.20

      1+250 1.00 8.80 1.60 0.20

    0+825 1.00 8.80 1.40 0.20

    1+615 1.00 10.37 1.60 0.20

    PISO DE PO$A

    6+265 1.00 4.15 0.20

    6+400 1.00 3.14 0.20

    6+430 1.00 6.16 0.200+760 1.00 2.54 0.20

    1+090 1.00 6.16 0.20

    1+250 1.00 6.16 0.20

    0+825 1.00 6.16 0.20

    1+615 1.00 8.55 0.20

     TRANSICION BTOA

    + ) 7.00 2.00 1.20 0.200

    De*;e*e 141.00 0.20 1.20 0.200

    ,e*;e* ,e ),) 141.00 0.20 1.20 0.20

    01.04.00 ENCOFRADO Y DESENCOFRADO

    01.04.01 ENCO

  • 8/18/2019 Metrado Rapida Final

    85/94

    1+090 2.00 8.80 1.60

    1+250 2.00 8.80 1.60

    0+825 2.00 8.80 1.40

    1+615 2.00 10.37 1.60

    01.05.00 ACERO DE REFUERZO

    01.05.01 ACERO DE RE

  • 8/18/2019 Metrado Rapida Final

    86/94

    TOTAL

      !$.02

    #""."#

    2".51

    R PROVINCIA

  • 8/18/2019 Metrado Rapida Final

    87/94

      !5.02

    212.$

    1'""#."

  • 8/18/2019 Metrado Rapida Final

    88/94

      5'%$5.02

    1%.!0

  • 8/18/2019 Metrado Rapida Final

    89/94

    PLANILLA DE ACEROS

    PROYECTO:

    U(ICACION: REGION: CUSCO PROVINCIA: ESPINAR DISTRITO: ESPINAR

    FECHA: De-15 !EC!O POR: ". C!. .

     NF ,e NF ,e &*@. &*@;, BDESCRIPCION e;. e) P 14 38 12

    @)e eee*; e) 0.250 0.580 1.020PARTIDA: 01.05.01 ACERO DE REFUER)O

    CANAL RAPIDA

    Ae &*@;,*) 38 1.00 7.00 705.00 - 4935.00 -Ae T)*He) 38 1.00 ### 1.40 - 3949.40 -

    PO)A RAPIDA

    A*+,- +,/i*aACERO LONGITUDINAL

    6+265 38 1.00 8.00 7.23 - 57.81 -6+400 38 1.00 7.00 6.28 - 43.98 -6+430 38 1.00 8.00 8.80 - 70.37 -0+760 38 1.00 7.00 5.65 - 39.58 -1+090 38 1.00 7.00 8.80 - 61.58 -1+250 38 1.00 7.00 8.80 - 61.58 -0+825 38 1.00 7.00 8.80 - 61.58 -1+615 38 1.00 7.00 10.37 - 72.57 -

    A*+,- T,as+,sa6+265 38 1.00 30.00 1.80 - 54.00 -6+400 38 1.00 26.00 1.50 - 39.00 -6+430 38 1.00 36.00 1.80 - 64.80 -0+760 38 1.00 24.00 1.60 - 38.40 -1+090 38 1.00 36.00 1.60 - 57.60 -1+250 38 1.00 36.00 1.60 - 57.60 -0+825 38 1.00 36.00 1.40 - 50.40 -1+615 38 1.00 42.00 1.60 - 67.20 -

    Pis-

    6+265 38 1.00 2.30 10.00 - 23.00 -

    6+400 38 1.00 2.00 9.00 - 18.00 -6+430 38 1.00 2.80 12.00 - 33.60 -0+760 38 1.00 1.80 8.00 - 14.40 -1+090 38 1.00 2.80 12.00 - 33.60 -1+250 38 1.00 2.80 12.00 - 33.60 -0+825 38 1.00 2.80 12.00 - 33.60 -1+615 38 1.00 3.30 14.00 - 46.20 -

  • 8/18/2019 Metrado Rapida Final

    90/94

  • 8/18/2019 Metrado Rapida Final

    91/94

      Pe

    58 34 11.552 2.235 ###  @

    - - - 2862.30- - - 2290.65

    - - - 33.53- - - 25.51- - - 40.82- - - 22.96- - - 35.71- - - 35.71- - - 35.71- - - 42.09

    - - - 31.32- - - 22.62- - - 37.58- - - 22.27- - - 33.41- - - 33.41- - - 29.23- - - 38.98

    - - - 13.34

    - - - 10.44- - - 19.49- - - 8.35- - - 19.49- - - 19.49- - - 19.49- - - 26.80

    TOTAL ACERO + 3s. 5985.02