Overview Metro and the City of Los Angeles are partnering to improve 5th Street and 6th Street in downtown LA to enhance mobility and safety for the thousands of people who walk, bike, roll, ride transit or drive in the area. This project is an important step in building a comprehensive, multi-modal transit network in downtown LA. Street Improvements > Improve road conditions by repaving and restriping lanes along both streets. > Add protected bike lanes to create a safe and well connected network that better facilitates east-west travel, especially in the eastern section of downtown. > Add dedicated bus lanes to enhance service and efficiency for transit users. Project Boundaries This project is located along 5th Street and 6th Street in downtown LA, between Flower Street on the west and Central Avenue on the east. Road improvements and bus lanes will span the entire corridor. Protected bike lanes will run from Spring Street to Central Avenue. Timeline phase 1 (june – july 2020) > Pre-construction activities > Repave and restripe 5th Street and 6th Street > Activate bus-only lane on westbound 5th Street from Central Avenue to mid-block pedestrian crossing signal (roughly 400 feet east of Flower Street) > Activate bus-only lane on eastbound 6th Street from Hope Street to Central Avenue phase 2 (tentatively april 2021) > Extend bus-only lane on westbound 5th Street from mid-block to Flower Street > Install signal queue jumper for buses on 5th Street at Flower Street Resumen Metro y la ciudad de Los Angeles se asociaron para mejorar las calles 5th y 6th en el centro de Los Angeles para mejorar la movilidad y la seguridad de las miles de personas que caminan, andan en bicicleta, ruedan, viajan en transporte público o conducen en el área. Este proyecto es un paso importante en la construcción de una red de transporte público integral y multimodal en el centro de Los Angeles. Mejoras de la calle > Mejorar las condiciones de la calle por medio de repavimentación y volviendo a marcar los carriles a lo largo de ambas calles. > Agregar carriles dedicados a las bicicletas para crear una red segura y bien conectada que facilite los viajes de este a oeste, especialmente en la sección al lado este del centro de la ciudad. > Agregar carriles de autobús dedicados para mejorar el servicio y la eficiencia para usuarios de transporte público. Límites del proyecto Este proyecto se ubica a lo largo de las calles 5th y 6th en el centro de Los Angeles, entre Flower St en el oeste y Central Av en el este. Las mejoras en las calles y los carriles de autobuses abarcarán todo el corredor. Los carriles dedicados a las bicicletas correrán desde Spring St hasta Central Av. Horario fase 1 ( junio a julio de 2020) > Actividades previas a la construcción > Repavimentar y volver a pintar los carriles en las calles 5th y 6th > Activar el carril de autobús dedicado en la calle 5th hacia el oeste desde Central Av hasta la señal de cruce peatonal a mitad de la cuadra (aproximadamente 400 pies al este de Flower St) > Activar el carril de autobús dedicado en la calle 6th en dirección este desde Hope St a Central Av fase 2 (tentativamente abril de 2021) > Extender el carril de autobús dedicado en la calle 5th hacia el oeste desde la mitad de la cuadra hasta Flower St > Instalar señal para dar prioridad a los autobuses en la intersección 5th y Flower St metro.net/dtlaimprovements Next stop: improving mobility in downtown LA. Fact Sheet 5th street ⁄ 6th street improvement project summer 2020
Transcript
Page 1: metro.net/dtlaimprovements Next stop: improving mobility ...media.metro.net/2020/factsheet-5thst6thst-2020-06.pdf · This project is located along 5th Street and 6th Street in downtown

Overview Metro and the City of Los Angeles are partnering to improve 5th Street and 6th Street in downtown LA to enhance mobility and safety for the thousands of people who walk, bike, roll, ride transit or drive in the area. This project is an important step in building a comprehensive, multi-modal transit network in downtown LA.

Street Improvements > Improve road conditions by repaving and restriping lanes along both streets.

> Add protected bike lanes to create a safe and well connected network that better facilitates east-west travel, especially in the eastern section of downtown.

> Add dedicated bus lanes to enhance service and efficiency for transit users.

Project BoundariesThis project is located along 5th Street and 6th Street in downtown LA, between Flower Street on the west and Central Avenue on the east. Road improvements and bus lanes will span the entire corridor. Protected bike lanes will run from Spring Street to Central Avenue.

Timelinephase 1 (june–july 2020)

> Pre-construction activities

> Repave and restripe 5th Street and 6th Street

> Activate bus-only lane on westbound 5th Street from Central Avenue to mid-block pedestrian crossing signal (roughly 400 feet east of Flower Street)

> Activate bus-only lane on eastbound 6th Street from Hope Street to Central Avenue

phase 2 (tentatively april 2021) > Extend bus-only lane on westbound 5th Street from mid-block to Flower Street

> Install signal queue jumper for buses on 5th Street at Flower Street

Resumen Metro y la ciudad de Los Angeles se asociaron para mejorar las calles 5th y 6th en el centro de Los Angeles para mejorar la movilidad y la seguridad de las miles de personas que caminan, andan en bicicleta, ruedan, viajan en transporte público o conducen en el área. Este proyecto es un paso importante en la construcción de una red de transporte público integral y multimodal en el centro de Los Angeles.

Mejoras de la calle > Mejorar las condiciones de la calle por medio de repavimentación y volviendo a marcar los carriles a lo largo de ambas calles.

> Agregar carriles dedicados a las bicicletas para crear una red segura y bien conectada que facilite los viajes de este a oeste, especialmente en la sección al lado este del centro de la ciudad.

> Agregar carriles de autobús dedicados para mejorar el servicio

y la eficiencia para usuarios de transporte público.

Límites del proyectoEste proyecto se ubica a lo largo de las calles 5th y 6th en el centro de Los Angeles, entre Flower St en el oeste y Central Av en el este. Las mejoras en las calles y los carriles de autobuses abarcarán todo el corredor. Los carriles dedicados a las bicicletas correrán desde Spring St hasta Central Av.

Horariofase 1 ( junio a julio de 2020)

> Actividades previas a la construcción

> Repavimentar y volver a pintar los carriles en las calles 5th y 6th

> Activar el carril de autobús dedicado en la calle 5th hacia el oeste desde Central Av hasta la señal de cruce peatonal a mitad de la cuadra (aproximadamente 400 pies al este de Flower St)

> Activar el carril de autobús dedicado en la calle 6th en dirección este desde Hope St a Central Av

fase 2 (tentativamente abril de 2021) > Extender el carril de autobús dedicado en la calle 5th hacia el oeste desde la mitad de la cuadra hasta Flower St

> Instalar señal para dar prioridad a los autobuses en la intersección 5th y Flower St

metro.net/dtlaimprovements

Next stop: improving mobility in downtown LA.

Fact Sheet5th street ⁄6th street improvement project

summer 2020

Page 2: metro.net/dtlaimprovements Next stop: improving mobility ...media.metro.net/2020/factsheet-5thst6thst-2020-06.pdf · This project is located along 5th Street and 6th Street in downtown

LOS ANGELES RIVER

TRACTION

CESAR E. CHAVEZ

STADIUM WAY

AV

BAUCHET

ADOB

E

VIGNES

LYON

RAMIREZ

CLARA

NEW DEPOT COLLEGE

DUCOMMUN

TEMPLE

DUCOMMUN

CROCKERTO

WNE

MOLINO

HEWITT

STANFO

RDGLA

DYS

CERES

COLYTOW

SEATON

LOS ANGELES ST

SANTEE

WALL

SAN PEDRO

PL

PL

PL

FIGUEROA

Little Tokyo/Arts District

HistoricBroadway

Civic Center/Grand Park

Grand Av Arts/Bunker Hill

(Under Construction)

20-3

135j

o ©

2020

lac

mta

contact us ⁄ contÁctenosFor more information or to ask questions, please visit our website or contact us:Para obtener más información o hacer preguntas, visite nuestro sitio web o contáctenos:

Julia Brown, Community Relations ManagerJulia Brown, Gerente de Relaciones Comunitarias

[email protected]

metro.net/dtlaimprovements

5th street ⁄6th street improvement projectproyecto de mejoras en las calles 5th y 6th

Metro Rail Lines& Stations

Metro Busway & Station

Regional Connector& Station (under construction)

Amtrak/Metrolink

Existing ProtectedBike Lanes

Project Alignment

Protected Bike Lanes

Subject to Change 20-3148 ©2020 LACMTA

5th Street/6th Street Improvement Project (under construction)

Metro Rail Lines & StationsLínea y estación de Metro

Metro Busway & StationMetro Busway y estación

Regional Connector & Station (under construction)Regional Connector y estación (bajo construcción)

Amtrak/Metrolink

Existing Protected Bike LanesCarriles dedicados a bicicletas existentes

Project AlignmentAlineamiento del proyecto

Protected Bike LanesCarriles dedicados a bicicletas

Subject to Change Sujeto a cambios 20-3148 ©2020 LACMTA

5th Street/6th Street Improvement Project (under construction)Proyecto de mejoras en las calles 5th y 6th (bajo construcción)

Línea y estaciónde Metro

Metro Busway y estación

Regional Connectory estación (bajo construcción)

Amtrak/Metrolink

Carriles dedicados a bicicletas existentes

Pro

Alineamientodel proyecto

Carriles dedicadosa bicicletas

Sujeto a cambios 20-3148 ©2020 LACMTA

Proyecto de mejoras en las calles5th y 6th (bajo construcción)


Recommended