+ All Categories
Home > Documents > MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC...

MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC...

Date post: 03-Jan-2016
Category:
Upload: justina-shaw
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
21
MICE Integration Engineering Jason Tarrant - STFC Contents » Device Interfaces – General » AFC » Spectrometer Solenoids » RFCC » EMR / KL » South Mezzanine (summary)
Transcript
Page 1: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration EngineeringJason Tarrant - STFC

Contents» Device Interfaces – General» AFC» Spectrometer Solenoids» RFCC» EMR / KL» South Mezzanine (summary)

Page 2: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Device Interfaces - General

MICE centre to grouted inplate = 1649 mm-120 mm, rolling platform-1515 mm, base to centre= 14 mm min shim

Shim to take up heightand clocking (rotation)deviations

Page 3: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering AFC

» Geometry– Tesla support system modifications = suspension system turrets changed (model received 3/7/11)

1534!Asked to changeback to 1515

Page 4: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering AFC

» Geometry– Hydrogen Safety Vacuum Line clash with South Mezzanine

Old

flo

or

hei

gh

t

Rai

sed

flo

or

hei

gh

t

Page 5: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering

Clash with rails

Clash withsupport leg

AFCs not shownso vacuum pipe run can be seen

Page 6: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering

Beams cut back

Support legmoved tonext beam

Raised & narrowedfloor section(removable butH system partstemporarily moved)

Cut required in floor panelaround vacuum pipe

Page 7: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Spectrometer Solenoid

» Interface with rolling platforms

Mismatch withlatest model

Page 8: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Spectrometer Solenoid

» Interface with rolling platforms

BoltedInterface withadjustment?

Page 9: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Spectrometer Solenoid

» Geometry

Rotate for convenience?

Port closeto mezzanine

Page 10: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Spectrometer Solenoid

» Geometry

Brackets not alignwith latest model

Page 11: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering RFCC

Ports to be moved?

Services tray to be moved

Mezzanine to beshortened locally & raised (poss. wholelength to preventtrip hazard?

1m walkway(0.8m min)

Page 12: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering RFCC

Ports to be movedto opposite side

Services tray replacement(need water pipe move)

Mezzanine narrowed & raised at front

Width of walkway < 800mm (localised)

Gas

pan

el

Page 13: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering RFCC

Page 14: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering EMR

Page 15: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering

Mezzanine & EMR Beams cut back

Floor plates removed

Hydrogen frameclash (work postponed)

Page 16: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering Mezzanine & EMR Potential clash

With support pillars

June2011

Step VStep VI

Step IV

Supportlegs moved

Beams cut back

Removablefloor section

Page 17: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering South Mezzanine change summary

» Move 4 of 5 support legs to another beam» Fit cross beam between support legs to support

intermediate beams before cutting intermediates» Fit removable platform sections spanning

between support leg beams– Higher & narrower than current mezzanine (avoids

RFCC & AFC pipe line)– Outer beam = kick plate– Rail with dog leg fitted to outer beam

Page 18: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering South Mezzanine change summary

Page 19: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering South Mezzanine change summary

Hydrogensupply

Existingmezzanine

Movedsupports

Cut beamsRemovable

sections

Fixed crossbeam (supports

Intermediatebeams)

Page 20: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering South Mezzanine change summary

Page 21: MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

MICE Integration Engineering South Mezzanine – Before change!

» Is the narrow walkway acceptable for safety?» Can the H system frame & pipes be raised to give headroom?»

» Is the raised floor compatible with the hydrogen racks?» What needs to be installed / moved along the mezzanine

walkway? Is it compatible?» Structurally OK?

Can H system frame /pipes be temporarily re-moved to move platforms?


Recommended