MICE RF Cavities and RFCC Module Update

Date post: 23-Feb-2016
Category:
Upload: burke
View: 76 times
Download: 0 times
Share this document with a friend
Description:
Allan DeMello and Derun Li Lawrence Berkeley National Laboratory. MICE RF Cavities and RFCC Module Update. MICE CM32 at RAL, UK February 9, 2012. Current Status of RFCC Module. RF Cavities: All 11 beryllium windows received at LBNL (1 st RFCC module) - PowerPoint PPT Presentation
Popular Tags:
15
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012
Transcript
Page 1: MICE  RF Cavities and  RFCC  Module  Update

MICE RF Cavities and RFCC Module Update

Allan DeMello and Derun LiLawrence Berkeley National Laboratory

MICE CM32 at RAL, UK February 9, 2012

Page 2: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 2Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 2Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

Current Status of RFCC Module• RF Cavities:

• All 11 beryllium windows received at LBNL (1st RFCC module)• Ten ceramic RF windows received• Six tuner flexures are being fabricated at Fermilab• Components for 6 actuators are being fabricated• RF coupler design has been modified to eliminate the gap between

the outer coax and the RF loop• Fabrication of fixturing for the electropolishing is complete• Mechanical smoothing of the cavity inside surface before EP• Single cavity vacuum vessel, being fabricated at Keller Technology in

Buffalo New York, is complete and should be at Fermilab this wk.

Page 3: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 3Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 3Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

Beryllium Windows

• Eleven beryllium windows have been fabricated so far:

• Curved thin (0.38-mm thick) window with TiN-coating on both sides

• Received two new beryllium windows recently, these two windows have been fabricated by Materion Electrofusion (fomer Brush-Wellman) to replace the windows rejected due to excess distortion with improved brazing design/technique: no distortion is observed.

Page 4: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 4Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 4Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

RF Cavity Frequency Tuner Components

• Dual – action actuator

• Flexure tuner arm

• RF cavity

Cross-section viewTuning range: 230 kHz

Page 5: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 5Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 5Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

Cavity Frequency Tuner Flexure

Six full size tuner flexures are being fabricated at Fermilab

Jan. 25-26, 2012 in Fermilab

Finished tuner arm

Page 6: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 6Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 6Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

Actuator Component Fabrication

Center plate

Lower piston

Upper piston

Lower support

• Component for six actuators are currently being fabricated by a local vendor• The actuators will be assembled at LBNL

Page 7: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 7Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 7Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

RF power (loop) coupler

• RF power (loop) coupler design has been modified to eliminate the gap between the loop and the outer coax tube

Page 8: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 8Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 8Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

• Testing/experience of the prototype cavity at MTA: sparking at the coupler• The coupler design has been changed slightly to increase the gap spacing• The sparking region can be TiN coated if necessary (plan to be tested at MTA

using the prototype cavity)• Adding diagnostics: arc detector at the coupler region

RF Power (loop) Coupler (old)

Old MICE design

Cross-section view MTA RF coupler

Page 9: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 9Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UK

Page 9Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012

RF power (loop) coupler

• Modified MICE RF power coupler design is complete, drawing package has been delivered to FNAL, and ready for fabrication

• Fabrication of the couplers will start soon

Cross-section view

Cross-section view

Page 10: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 10Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

10Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

Cavity Measurements

Cavity physical measurement Cavity frequency measurement

• Physical measurements for the six remaining cavities expected to take approximately 1-1/2 weeks (60 hours)

• RF measurements and tuning to a center frequency after EP

Page 11: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 11Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

11Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

Cavity Electropolish at LBNL

• The inner surface of each cavity will be mechanically smoothed and then electropolished at LBNL using the similar techniques developed at JLab for the prototype cavity

• Fabrication of EP fixturing is complete and electropolishing will start in soon (ES & H approval)• Electropolishing process will take approximately 1- 2 days for each cavity or 4 weeks to complete

all 10 cavities

Cavity section view

EP rotation fixture at LBNL

Page 12: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 12Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

12Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

Simulations of MICE RF CavityStudy of external magnetic field on MICE RF cavity and coupler (Dr. Tianhuan Luo)

• 3D simulations (from CAD model) using SLAC’s Omega-3P code: f = 201.866 MHz • MP simulations, and RF breakdown studies with an external magnetic field

Page 13: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 13Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

13Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

Single RF Cavity Vacuum Vessel

Single Cavity Vacuum Vessel Exploded View

Page 14: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 14Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

14Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

Fabrication of the single cavity vacuum vessel is complete at Keller Technology in Buffalo New York

Single Cavity Vacuum Vessel

Single Cavity Vacuum Vessel and MuCool Coupling Coil Magnet

Vacuum vessel stand

Vacuum vessel

Vacuum vessel cover plate

Page 15: MICE  RF Cavities and  RFCC  Module  Update

MICE RFCC Module – MICE Schedule Review at RAL, UK

Page 15Derun Li - Lawrence Berkeley National Lab – May 24, 2011

MICE RFCC Module Update – MICE CM32 at RAL, UKPage

15Allan DeMello- Lawrence Berkeley National Lab – February

9, 2012

RFCC Future Work• RFCC Vacuum Vessel:

• Vessel design is complete but needs to be updated to incorporate changes to the interface with the new coupling coil cryostat design

• Fixturing for the assembly process needs to be finalized and drawings for fabrication generated

•RFCC Module:• Finalize fixturing for module assembly and shipping

• for aligning the frequency tuners onto cavities• for inserting the cavities into vacuum vessel• shipping skid/tilt fixturing for shipping RFCC to RAL

• RF control/analysis :• Diagnostics/control/analysis/interfaces • LLRF control (amplitude/phase) and correlations with detectors

• Timing signal from detector, and calibration & synchronization with RF