MICE RFCC Modules
Transcript
Page 1: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

MICE RFCC Modules

Page 2: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

MICE Step VI

Alan Bross PMG February 16, 2012 2

Page 3: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

The MICE RFCC Module

Alan Bross PMG February 16, 2012 3

Page 4: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

RFCC Module II

Alan Bross PMG February 16, 2012 4

Cavities removed

Page 5: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

RFCC III

Alan Bross PMG February 16, 2012 5

Page 6: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

Testing the CC

Alan Bross PMG February 16, 2012 6

Page 7: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

Test Cryostat for CHL

Alan Bross PMG February 16, 2012 7

Page 8: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

RF – Single Cavity Test System For tests in the MTA

Alan Bross PMG February 16, 2012 8

Page 9: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

First CC + SCTS

Alan Bross PMG February 16, 2012 9

Page 10: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

SCTS-CC in MTA

Alan Bross PMG February 16, 2012 10

Page 11: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

Alan Bross PMG February 16, 2012 11

Magnet

RF

Page 12: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

Schedule

• Meeting this schedule requires a number of things Supplemental funding so that we can procure the assembly of the first cryostat this year

Engineering to allow us to install large components in the MTA And technician resources during assembly and installation

Development of detailed plan for final assembly of the Coupling Coil magnet that will be moved into the MTA

Alan Bross PMG February 16, 2012 12

Page 13: MICE RFCC Modules...2012/02/16  · MICE RFCC Modules MICE Step VI Alan Bross PMG February 16, 2012 2 The MICE RFCC Module Alan Bross PMG February 16, 2012 3 RFCC Module II Alan Bross

Fermilab Resources

• The critically needed resources that are needed are for Mechanical engineering and design/drafter

• In addition, the on-going MTA RF program is now at the stage where mechanical technician support is extremely critical to our continued progress Many configuration changes

• The needs have been enumerated in detail to the AD mechanical department The scope has not changed since the last communication