1paul drumm; VC September 2005; PR
MICE Project Report
Paul DrummVC 14th September 2005
paul drumm; Date; Title
2
Technical
• Target– Scrutiny at the RAL CM– Prototype test in beam in January
• Readiness review in November• Benchmark pi-production vs beam loss
• Beam Line– Optics
• new rates & beam sizes to be issued to PID group CM13
– Solenoid by CM?– Cryogenics – kick-off meeting imminent
paul drumm; Date; Title
3
Technical
• RF– Aim single test stand
• Test components for two systems
– Availability issues with tubes• ISIS 116 tubes are being ring-fenced for ISIS• New 116 tubes available
– need to buy & fabricate glass in next two years– expensive – tube made to order at market price
• 170 tubes– Cern tube – low demand– available for ~ next year– no plan in place – depends on CERN’s attitude
paul drumm; Date; Title
4
Management
• FAC meeting 19th September– AB & PD representing & reporting on MICE– Membership:
• R Wade – Chair, PPARC UK
• LK Len - Office of High Energy Physics - Washington, DC
• Randy Ruchti - NSF/eXP Particle Physics, USA
• Franke Linde (?) - NIKHEF, Netherlands
• Kenzo Nakamura (x) - KEK-IPNS, Japan
• A Skrinsky (?) - BINP
• Plus two (admin) PPARC UK
paul drumm; Date; Title
5
Collaboration Meeting
• As of 9am 14th – 25 registered• 11 UK XXXXXXXXXXX• 9 USA XXXXXXXXX• 2 JP XX• 1 CH X• 1 Italy X• 1 Netherlands X• Room availability:
– deadline noon GMT 19th September– Thereafter at risk (& more work for debbie )