TITLE Road Construction Project for New Expressway in Pasir Gudang
INTRODUCTION
The need for an open-ended laboratory activity is emphasized in enhancing independent learning
activities and inculcating creativity and innovation of the students.
The dry density of the compacted soil or pavement material is a common measure of the
compaction achieved during the construction. Knowing the field density and field moisture
content, so the dry density is calculated. Therefore, the field density test is importance as a field
control test for the compaction of soil or any other pavement layer.
Besides for Soil compaction which is a vital part of the construction process. It is used for
support of structural entities such as building foundations, roadways, walways, and earth
retaining structures to name a few. !or a given soil type certain properties may deem it more or
less desirable to perform ade"uately for a particular circumstance. In general, the preselected soil
should have ade"uate strength, be relatively incompressible so that future settlement is not
significant, be stable against volume change as water content or other factors vary, be durable
and safe against deterioration, and possess proper permeability.
#eanwhile for $alifornia bearing ratio %$B&' is a penetration test for evaluation of the
mechanical strength of natural ground, subgrades and base course beneath new carriageway
construction. It was developed by the $alifornia (epartment of Transportation before )orld )ar
II. The basic site test is performed by measuring the pressure re"uired to penetrate soil or
aggregate with a plunger of standard area. The measured pressure is then divided by the pressure
re"uired to achieve an e"ual penetration on a standard crushed roc material.
O!ECTI"E#
The ob*ectives of conducting this mini pro*ect is +-
• To determine the field density of soil at a given location by sand replacement method.
• (etermine the maimum dry density at the optimum moisture content under laboratory
condition.
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 2/15
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 3/15
the volume of pit, the density of soil is calculated. Therefore, in this eperiment there are two
stages, namely
• $alibration of sand density
• #easurement of soil density
7 hole of specified dimensions is ecavated in the ground. The mass of the ecavated soil is
determined.
The volume of the hole is determined by filling it with clean, uniform sand whose dry density
% ' is determined separately by calibration. The volume of the hole is e"ual to the mass of the
sand filled in the hole divided by its dry density.
The dry density of the ecavated soil is determined as
)here #8 mass of the ecavated soil,
98 volume of the hole and
w8 water content.
#T%ND%RD PROCTOR CO$P%CTION TE#T
The test consists of compacting the soil or aggregate to be tested into a standard mould using a
standardized compactive energy at several different levels of moisture content. The maimum
dry density and optimum moisture content is determined from the results of the test.
Soil in place is tested for in-place dry bul density, and the result is divided by the maimum
dry density to obtain a relative compaction for the soil in place.
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 4/15
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 5/15
controlled moisture and density conditions. The test yields bearing ratio number that is
applicable for the state of crushed aggregatesoil as tested. The $B& is obtained as the ratio of
the unit stress re"uired of effect a certain depth of penetration of the piston %<=>? mm' into a
compacted specimen of crushed aggregatesoil at some water content and density to the standard
unit stress re"uired to obtain the same depth of penetration on a standard sample of crushed
stone. Thus.
CR , *Test unit stress 1#tandard unit stress+ x -//
The $B& is usually base on the load ratio for the penetration of @-?mm. If the $B& value at
the penetration of ?.A mm is larger, the test should be repeated. If a second test yields a larger
value of $B& at ?.A mm penetration then this larger value should be adopted. The $B& tests are
usually made on test specimens at optimum moisture content %6#$' for the crushed
aggregatesoil as determined from modified compaction test.
%PP%R%TU#
#and Rep5ace6ent $et7od
<. Sand 1ouring cylinder
@. $alibrating container, <AAmm diameter and <?Amm height
>. Soil cutting and ecavating tools.C. 4lass plate , C?AmmD, =mm thic.
?. #etal container to collect ecavated soil.
E. #etal tray, >AAmmD and CAmm deep with a hole of <AAmm in diameter at the center.F. )eighing balance
G. #oisture content cans=. 6ven<A. (esiccator
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 6/15
#tandard Proctor Co6paction Test
<. @.? g hammer and mould
@. Scraper tool
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 7/15
>. Straight 3dge
C. Sample 3truder ?. Soil Sample, Scoop, #etal Tray and basin.
E. <G.> mm and EAA um sieve pans
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 8/15
F. )eight balance
C%LI)ORNI% E%RING R%TIO *CR+
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 9/15
<. 7utomatic $ompaction #achine
'( $ompaction mould e"uipment.
>. The digital $alifornia Bearing &atio %$B&' Test device.
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 10/15
PROCEDURE
#and Rep5ace6ent $et7od Procedure
#tage8- *Ca5i0ration of #and Density+
<. The internal dimensions %diameter, d and height, h' of the calibrating can
measured and computed its internal volume, 9c 8 Hd@hC.
@. The sand pouring cylinder %S1$' was filled with sand with < cm top clearance
%to avoid any spillover during operation' and its weight was found %)<'
>. The S1$ was placed on a glass plate, the slit above the cone was opened by
operating the valve and allowed the 6ttawa sand to run down. The sand will
freely run down till it fills the conical portion. )hen there is no further
downward movement of sand in the S1$, close the slit.
C. The weight of the S1$ along with the sand remaining after filling the cone %)@'
was measured
?. The S1$ was placed concentrically on top of the calibrating can. The slit was
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 11/15
opened to allow the sand to run down until the sand flow stop by itself. This
operation will fill the calibrating can and the conical portion of the S1$. 2ow
the slit was closed and the weight of the S1$ with the remaining sand was
measured %)>'
#tage 8' *$easure6ent of #oi5 Density+
<. $leaned and leveled the ground surface where the field density is to be determined.
@. The tray was placed with a central hole over the portion of the soil to be tested.
>. 7 pit was ecavated into the ground, through the hole in the plate, approimately <?
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 12/15
cm deep %same as the height of the calibrating can'. The hole in the tray will guide the
diameter of the pit to be made in the ground.
C. The ecavated soil was collected into the tray and weighed the soil %)'
?. The moisture content of the ecavated soil was determined.
E. The S1$ was placed, with sand having the latest weight of )>, over the pit so that the
base of the cylinder covers the pit concentrically.
F. The slit of the S1$ was opened and allowed the sand to run into the pit freely, till
there was no downward movement of sand level in the S1$ and then the slit was
closed.
G. The weight of the S1$ with the remaining sand was measured %)C'
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 13/15
#tandard Proctor Co6paction Test Procedure
-( The soil was sieved with <G.> mm and EAA um sieve pans@. @. ? g sieved soil was taen.
>. The sieved soil was left in the oven for one day.
C. The sieved soil was taen from oven to commence the standard proctor compaction
test.
?. The mass of mould and the inner volume of mould were recorded.
E. The desired moisture content was measured and poured into the sample.
F. The water and soil were mied together until it is homogenous.
G. The soil was taen into the mould and compacted by @.? g hammer.
=. Step F was taen > times for interval of <> volume of soil was taen into the mould.
<A. The mass of compacted soil and mould were recorded.
<<. Then the sample was taen on sample etruder in order to lift up the sample from its
mould.
<@. 7fter that, the lifted sample was mied again with remaining soil in the metal tray.
<>. The net moisture content was added into the soil.
<C. These steps were taen until C moisture contents were attained.
<?. 4raph dry density and moisture content was plotted to determine optimum moisture
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 14/15
content.
Ca5ifornia earing Ratio *CR+ Test
1. Take 5kg of the soil then crushed it by using hammer.2. The volume of water was measured by taking 15% of the mass of
soil which is 750ml. Then the sand was mixed with water until it
homogenous.. !oil was "lled into the mould before com#acted in the automatic
com#action machine.$. ith the interval of 1& volume of soil was "lled in the mould and
com#acted for '2 times for each interval until it full "lled.5. (fter the com#action #rocess has ended) the soil in the mould
now was taken o* from the machine
'. .The mould was setu# on +alifornia ,earing -atio device.
7. The !tart/ button was #ressed in the com#uter to run the test.. The data was observed by the com#uter and waited until it
reached its failure.. The "nal data was taken in the com#uter after the test has
ended.10. The mould was dissembled and the soil was lifted u# by sam#le
extruder.11. The observation was taken.
8/17/2019 MINI PROJECT Introduction Procedure
http://slidepdf.com/reader/full/mini-project-introduction-procedure 15/15
%N%L9#I# O) D%T%
DI#CU##ION
CONCLU#ION