OFFICIAL [INSERT PLANNING SCHEME NAME] PLANNING SCHEME SCHEDULE TO CLAUSE 72.04 DOCUMENTS INCORPORATED IN THIS PLANNING SCHEME 1.0 Incorporated documents Name of document Introduced by: Australian Standard AS2021-2015, Acoustics – Aircraft Noise Intrusion – Building Siting and Construction, Standards Australia Limited, 2015 VC107 Cape Bridgewater Resort, Blowholes Road, Cape Bridgewater, November 2020 C107gelg Cape Nelson Livestock Assembly Depots, March 2005 C19 Coastal Land East of Portland between Dutton Way and Narrawong, Incorporated Document, April 2011 C60 Crown Allotments 1-18, Section 3A, Parish of Narrawong – Use and Development Controls, 2011 C70 Development Plan for DPO5A Area, Allestree, July 2006 C32 Glenelg Planning Scheme Heritage Overlay Permit Exemptions & Application Requirements, Incorporated Plan, June 2013 C55 (Part 1) Glenelg Shire Local Floodplain Development Plan, August 2018 C095gelg Heywood Pulp Mill Site Layout Plan Drawing 31-16509- 221-SK001 Rev B C23 Lot 1, Ocean View Drive East, Narrawong (PS518204W), September 2012 C93 Lot 4, Ocean View Drive West, Narrawong (PS522386N), September 2012 C93 Lots 5, 7, 8 & 9, Ocean View Drive West, Narrawong (PS522386N), September 2012 C93 Portland Airport Obstacle Limitation Surfaces plan prepared by AUSLIG reference 3336/002 C5 (Part 1) Portland Emergency Operations Helipad, Incorporated Document, 2010 C59 Portland Heritage Precincts Statements of Significance, Incorporated Document, 2019 C102gelg Portland Wind Energy Project: Cape Bridgewater Wind Energy Facility, Cape Nelson Wind Energy Facility, Cape Sir William Grant Wind Energy Facility, May 2004 C15 Portland Woodchip Storage and Handling Facilities Master Plan 2008 C39 OPERATIONAL PROVISIONS – CLAUSE 72.04 – SCHEDULE PAGE 1 OF 1 31/07/2018 VC148 --/--/---- Proposed C107gelg
Transcript

MINISTERIAL DIRECTION

[Insert Planning Scheme name] Planning Scheme

SCHEDULE TO CLAUSE 72.04 documents incorporated in this planning scheme

31/07/2018

VC148

1.0Incorporated documents

Name of document

--/--/----

Proposed C107gelg

Introduced by:

Australian Standard AS2021-2015, Acoustics – Aircraft Noise Intrusion – Building Siting and Construction, Standards Australia Limited, 2015

VC107

Cape Bridgewater Resort, Blowholes Road, Cape Bridgewater, November 2020

C107gelg

Cape Nelson Livestock Assembly Depots, March 2005

C19

Coastal Land East of Portland between Dutton Way and Narrawong, Incorporated Document, April 2011

C60

Crown Allotments 1-18, Section 3A, Parish of Narrawong – Use and Development Controls, 2011

C70

Development Plan for DPO5A Area, Allestree, July 2006

C32

Glenelg Planning Scheme Heritage Overlay Permit Exemptions & Application Requirements, Incorporated Plan, June 2013

C55 (Part 1)

Glenelg Shire Local Floodplain Development Plan, August 2018

C095gelg

Heywood Pulp Mill Site Layout Plan Drawing 31-16509-221-SK001 Rev B

C23

Lot 1, Ocean View Drive East, Narrawong (PS518204W), September 2012

C93

Lot 4, Ocean View Drive West, Narrawong (PS522386N), September 2012

C93

Lots 5, 7, 8 & 9, Ocean View Drive West, Narrawong (PS522386N), September 2012

C93

Portland Airport Obstacle Limitation Surfaces plan prepared by AUSLIG reference 3336/002

C5 (Part 1)

Portland Emergency Operations Helipad, Incorporated Document, 2010

C59

Portland Heritage Precincts Statements of Significance, Incorporated Document, 2019

C102gelg

Portland Wind Energy Project: Cape Bridgewater Wind Energy Facility, Cape Nelson Wind Energy Facility, Cape Sir William Grant Wind Energy Facility, May 2004

C15

Portland Woodchip Storage and Handling Facilities Master Plan 2008

C39

Operational Provisions – Clause 72.04 – SchedulePage 1 of 1