+ All Categories
Transcript

MINISTERIAL DIRECTION

[Insert Planning Scheme name] Planning Scheme

SCHEDULE TO CLAUSE 72.04 documents incorporated in this planning scheme

31/07/2018

VC148

1.0Incorporated documents

Name of document

--/--/----

Proposed C107gelg

Introduced by:

Australian Standard AS2021-2015, Acoustics – Aircraft Noise Intrusion – Building Siting and Construction, Standards Australia Limited, 2015

VC107

Cape Bridgewater Resort, Blowholes Road, Cape Bridgewater, November 2020

C107gelg

Cape Nelson Livestock Assembly Depots, March 2005

C19

Coastal Land East of Portland between Dutton Way and Narrawong, Incorporated Document, April 2011

C60

Crown Allotments 1-18, Section 3A, Parish of Narrawong – Use and Development Controls, 2011

C70

Development Plan for DPO5A Area, Allestree, July 2006

C32

Glenelg Planning Scheme Heritage Overlay Permit Exemptions & Application Requirements, Incorporated Plan, June 2013

C55 (Part 1)

Glenelg Shire Local Floodplain Development Plan, August 2018

C095gelg

Heywood Pulp Mill Site Layout Plan Drawing 31-16509-221-SK001 Rev B

C23

Lot 1, Ocean View Drive East, Narrawong (PS518204W), September 2012

C93

Lot 4, Ocean View Drive West, Narrawong (PS522386N), September 2012

C93

Lots 5, 7, 8 & 9, Ocean View Drive West, Narrawong (PS522386N), September 2012

C93

Portland Airport Obstacle Limitation Surfaces plan prepared by AUSLIG reference 3336/002

C5 (Part 1)

Portland Emergency Operations Helipad, Incorporated Document, 2010

C59

Portland Heritage Precincts Statements of Significance, Incorporated Document, 2019

C102gelg

Portland Wind Energy Project: Cape Bridgewater Wind Energy Facility, Cape Nelson Wind Energy Facility, Cape Sir William Grant Wind Energy Facility, May 2004

C15

Portland Woodchip Storage and Handling Facilities Master Plan 2008

C39

Operational Provisions – Clause 72.04 – SchedulePage 1 of 1

OFFICIAL


Top Related