+ All Categories
Home > Engineering > Mitos del sistema de puesta a tierra

Mitos del sistema de puesta a tierra

Date post: 14-Apr-2017
Category:
Upload: procobre-mexico
View: 837 times
Download: 9 times
Share this document with a friend
77
Consumo Fuente de suministro L N ? ? Generación ? ? OTROS USOS SISTEMAS DE POTENCIA NEC IEEE 80 de 2000 IEEE 80 de 2000 ó NEC ó NEC IEC IEC NEC NEC IEEE IEC NFPA NFPA Mitos y realidades sobre los Sistemas de Puesta a Tierra Ing. Alberto Braulio Alzate Duque. México, D.F. 25 de Agosto de 2015
Transcript
Page 1: Mitos del sistema de puesta a tierra

Front page picture

Change picture by marking

Picture , right click and choose

send to front.

Click on the icon in the middle

of the picture and locate the

new picture.

After inserting once again

mark the picture, right click

and choose send to back.

Picture Size

For best quality the size

should be:

H15.1 cm x W25.4 cm

ConsumoFuente de suministro

L

N

? ?

Generación

?

?

OTROS USOSSISTEMAS DE POTENCIA

NECIEEE 80 de 2000IEEE 80 de 2000

ó

NEC

ó

NEC

IEC

IEC

NEC

NEC

IEEE

IEC

NFPA

NFPA

Mitos y realidades sobre los

Sistemas de Puesta a Tierra

Ing. Alberto Braulio Alzate Duque. México, D.F. 25 de Agosto de 2015

Page 2: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

ICA –PROCOBRE

2

Aviso Importante:

Esta presentación ha sido preparada por el Ingeniero Braulio Alzate Duque en

colaboración con Procobre Centro Mexicano de Promoción del cobre A.C. con

el propósito de difundir y diseminar diferentes aspectos relacionados con

ventajas y beneficios para quienes adopten o implementen las

recomendaciones aquí expuestas. Ha sido preparado y revisado por personas

conocedoras del tema, sin embargo, el Procobre Centro Mexicano de

Promoción del Cobre, A.C. y otros organismos participantes no se

responsabilizan de su aplicación ni de la profundidad en relación al contenido

aquí expuesto, ni por cualquier daño directo, incidental o consecuencial que

pueda derivarse del uso de la información o de los datos aquí contenidos.

Page 3: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

ICA –PROCOBRE

•ICA-Procobre México, red de instituciones latinoamericanas cuya misión es promover el uso y

consumo de aplicaciones de cobre mediante una adecuada gestión de información, impulsando la

investigación, el desarrollo de nuevas aplicaciones, el mejoramiento de la calidad de vida y el

progreso de la sociedad.

3

LATINO

AMERICA

- México

- Brasil

- Perú

- Chile

- Argentina

NORTE

AMERICA

- Canadá

- EEUU

EUROPA

- Reino Unido

- Italia

- Francia

- Alemania

- Polonia

- Hungría

- Suecia

- España

- Benelux

- Grecia

- Rusia AFRICA

Sud Africa

ASIA

- S.E. Asia

- Singapur

- Australia

- China

- India

- Japón

ICA

Page 4: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Proviene del griego mo = fábula

Explicación pre-lógica, simplista e incompatible con la ciencia y pensamiento modernos.

Persona o cosa a las que se atribuyen cualidades o excelencias que no tienen.

MITO

Page 5: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

REALIDAD

Del latin «realis» = La desinencia de abstracción.

El modo de ser de las cosas en cuanto existen fuera de la mente humana independiente de ella.

Contraposición de lo fantástico e ilusorio.

Page 6: Mitos del sistema de puesta a tierra

La búsqueda de una buena “TIERRA” es similar a la búsqueda del Santo Cáliz o Grial Sagrado, en muchos aspectos. Según la leyenda se disipa y desaparece cuando se acerca a él alguno que no es puro y santo.

Warren H. Lewis.

Page 7: Mitos del sistema de puesta a tierra

«La picardía y osadía de muchos es impresionante en relación a los temas de Tierras y Rayos: todos son expertos cuando se trata de ganar dinero, pero nadie es responsable cuando se trata de ver qué pasó con lo que se suponía protegería».

Dr. Horacio Torres

Page 8: Mitos del sistema de puesta a tierra
Page 9: Mitos del sistema de puesta a tierra

CIENCIAS QUE INTERVIENEN

•ELECTRICIDAD

•ELECTROMAGNETISMO

•ELECTROQUÍMICA

•ÉTICA

•FÍSICA

•GEOELECTRICIDAD

•GEOFÍSICA

•GEOLOGÍA

•GEOMAGNETISMO

•GEOQUÍMICA

•GEOTECNIA

•GEOTERMIA

•GRAVIMETRÍA

•HIDROGEOLOGÍA

•INFORMÁTICA

•MATEMÁTICAS APLICADAS

•METALIZACIÓN O

GALVANOTECNIA

•METROLOGÍA

•MINERALOGÍA

•QUÍMICA

•SALUD OCUPACIONAL

Page 10: Mitos del sistema de puesta a tierra

• GENERACIÓN: IEEE 665

• TRANSMISIÓN: IEEE 1243

• SUBESTACIONES: IEEE 80 / IEEE 837/ IEEE 998

• DISTRIBUCIÓN: ANSI C2 / IEEE 1410

• BAJA TENSIÓN: NEC / NTC 2050 / RETIE / IEC 60364/IEEE 142

• PROTECCIÓN CONTRA RAYOS: IEC 62305 / NTC 4552/NFPA 780

• TELECOMUNICACIONES: UIT / EIA / TIA / MOTOROLA R-56

• EQUIPO ELECTRÓNICO: IEEE 1100 / IEC 61000-5-2/ NFPA 77

• MEDICIONES: IEEE 81 / IEC 61557

• TIERRAS TEMPORALES: IEC 61230 / IEEE 1048

PRINCIPALES NORMAS QUE APLICAN EN SISTEMAS DE PUESTA A TIERRA

Page 11: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

ÁMBITO DE APLICACIÓN

ConsumoFuente de suministro

L

N

? ?

Generación

?

?

OTROS USOSSISTEMAS DE POTENCIA

NECIEEE 80 de 2000IEEE 80 de 2000

ó

NEC

ó

NEC

IEC

IEC

NEC

NEC

IEEE

IEC

NFPA

NFPA

Page 12: Mitos del sistema de puesta a tierra
Page 13: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 14: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

DIÁMETRO

ANÁLISIS DE SENSIBILIDAD DE

PARÁMETROS DE UN ELECTRODO

Page 15: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

LONGITUD

ANÁLISIS DE SENSIBILIDAD DE

PARÁMETROS DE UN ELECTRODO

Page 16: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

PARALELO

ANÁLISIS DE SENSIBILIDAD DE

PARÁMETROS DE UN ELECTRODO

Page 17: Mitos del sistema de puesta a tierra
Page 18: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

CORRIENTE DE DESBALANCE

Page 19: Mitos del sistema de puesta a tierra

Ver Artículo 250.6 del NEC 2014

Page 20: Mitos del sistema de puesta a tierra
Page 21: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

CORTOCIRCUITO

Page 22: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

CORTOCIRCUITO

Page 23: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

FALLA A TIERRA

Page 24: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

FALLA A TIERRA

Page 25: Mitos del sistema de puesta a tierra
Page 26: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

EXTRACCIÓN DEL IEEE 142

¡ Grave error en la comprensión de la funcionalidad de los

conductores de neutro y tierra por parte de los fabricantes, ha llevado

a especificar instalaciones que incumplen el NEC !

(5.5.3.1 IEEE 142 de 2007)

Page 27: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

PROBLEMAS

Page 28: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

PROBLEMAS

Page 29: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 30: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 31: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 32: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 33: Mitos del sistema de puesta a tierra
Page 34: Mitos del sistema de puesta a tierra

?

Page 35: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 36: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

OBRA DE LADRONES !

Page 37: Mitos del sistema de puesta a tierra

?

Page 38: Mitos del sistema de puesta a tierra

Si r0 =L R = 94%

r1

r0

L

Cílindro crítico

Electrodo

ÁREA DE INFLUENCIA DE LOS

ELECTRODOS TIPO VARILLA

Page 39: Mitos del sistema de puesta a tierra

3:43:33 p.m.

Page 40: Mitos del sistema de puesta a tierra

3:43:33 p.m.

EL ÁREA INMEDIATAMENTE ALREDEDOR

DE UNA VARILLA ES EL MÁS IMPORTANTE

PARA REDUCIR SU RESISTENCIA.

Page 41: Mitos del sistema de puesta a tierra
Page 42: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

ASPECTOS QUE INFLUYEN

PROFUNDIDAD IDEAL

• Resistividad de la capa superficial artificial

• Resistividad aparente del terreno en los diferentes estratos.

• Tensión máxima de paso y contacto

• Duración de la falla

• Magnitud de la corriente de falla

• Distribución geométrica de la malla

• Conexión equipotencial a nivel de superficie

Page 43: Mitos del sistema de puesta a tierra
Page 44: Mitos del sistema de puesta a tierra

3:43:34 p.m.

Page 45: Mitos del sistema de puesta a tierra
Page 46: Mitos del sistema de puesta a tierra
Page 47: Mitos del sistema de puesta a tierra

L

R1 R2

Rm = R1 + R2

Para que Rm = R1;

R2 debe tender a cero

Rm

O cuando menos deberíamos

conocer R2 para tener dos de las

tres variables

Nota: Rm se podría considerar casi igual a R1 si R2 tiende a un valor al

menos 20 veces menor a R1, Por ejemplo en instalaciones con neutro

múltiplemente puesto a tierra

Page 48: Mitos del sistema de puesta a tierra
Page 49: Mitos del sistema de puesta a tierra

RESISTIVIDAD APARENTE; UNA

CARACTERÍSTICA DEL TERRENO

Page 50: Mitos del sistema de puesta a tierra

RESISTENCIA: UN PARÁMETRO DE

UNA PUESTA A TIERRA

Page 51: Mitos del sistema de puesta a tierra
Page 52: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

MÉTODOS PARA MEDIR RESISTENCIA

DE PUESTA A TIERRA

Page 53: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

• POR TOMA DE MUESTRAS

• DE CUATRO ELECTRODOS

• DE SCHLUMBERGER O DE GRADIENTE

• DE SCHLUMBERGER MODIFICADO

• DE A.L. KINYON

• DE WENNER O DE POTENCIAL

• DE PALMER

• DE LEE

• DIPOLARES (6)

• DE DOS ELECTROS

• POR MEDIDA DE RESISTENCIA

MÉTODOS PARA MEDIR RESISTIVIDAD

APARENTE DEL TERRENO

Page 54: Mitos del sistema de puesta a tierra
Page 55: Mitos del sistema de puesta a tierra

MÉTODO DE CAIDA DE

POTENCIAL

Page 56: Mitos del sistema de puesta a tierra
Page 57: Mitos del sistema de puesta a tierra

IMPEDANCIA Y RESISTENCIA

Page 58: Mitos del sistema de puesta a tierra
Page 59: Mitos del sistema de puesta a tierra
Page 60: Mitos del sistema de puesta a tierra

USO PARA VALOR MÁXIMO DE RESISTENCIA DE PUESTA A TIERRA

Estructuras de líneas de transmisión. 20 Ω

Subestaciones de alta y extra alta tensión. 1 Ω

Subestaciones de media tensión en poste. 10 Ω

Subestaciones de media tensión de uso interior. 10 Ω

Protección contra rayos. 10 Ω

Neutro de acometida en baja tensión. 25 Ω

Descargas electrostáticas. 25 Ω

Equipos electrónicos sensibles. 5 Ω

VALORES DE RESISTENCIA DE PUESTA A

TIERRA

Page 61: Mitos del sistema de puesta a tierra

-10 -5 0 5 1010 5 0-5

-1014042

10532

7021

3511

010

50

-5

-10

-10

-5

0

5

1 0

14042

10532

7021

3511

11 70210 643

9 5858 5267 4686 409

5 3504 2923 233

2 1751116

COMPORTAMIENTO DE LA TENSIÓN EN UNA

PUESTA A TIERRA A TRAVÉS DE LA CUAL

CIRCULA CORRIENTE

Page 62: Mitos del sistema de puesta a tierra

V apl

V TH

V TH

GPR

Vs

Malla de

cerramiento

Cuerpo Superficie

GPR

Soportable

Page 63: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 64: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

QUÉ VALOR DE RESISTENCIA EXIGE EL

IEC 62305-3

Page 65: Mitos del sistema de puesta a tierra
Page 66: Mitos del sistema de puesta a tierra
Page 67: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

3:43:34 p.m.

Page 68: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

Page 69: Mitos del sistema de puesta a tierra
Page 70: Mitos del sistema de puesta a tierra

EL SÍMBOLO CORRECTO

R <<<<

R << R

Page 71: Mitos del sistema de puesta a tierra

EL SÍMBOLO CORRECTO

Tierra de protección Tierra aislada

Page 72: Mitos del sistema de puesta a tierra
Page 73: Mitos del sistema de puesta a tierra
Page 74: Mitos del sistema de puesta a tierra
Page 75: Mitos del sistema de puesta a tierra
Page 76: Mitos del sistema de puesta a tierra

¡Gracias! Escriba a : Ing. Alberto Braulio Alzate Duque. [email protected] Tel. (044) 55 3898 2766 / (+52) 55 6269 8840

Visite: www.segelectricamexico.com Visite www.procobre.org Visítenos en Redes Sociales

Page 77: Mitos del sistema de puesta a tierra

Headline

Maximum 2 lines

Subheading

Bullets

To change bullet and text level

use the ‘increase/decrease list

level’ found under the ribbon

Home > Paragraph

Footer text

Insert Presentation title and

date by opening the header

and footer dialog box placed

under the ribbon Insert>Text

PREGUNTAS Y RESPUESTAS

A continuación se enlistan las preguntas que no pudieron ser respondidas durante la sesión.

Pregunta 1. Si existen tres circuitos ramales que van alimentar eléctricamente a 3

equipos que están instalados físicamente cercanos, ¿se puede llevar un solo cable

de puesta a tierra de equipos en común para los 3 equipos o cada circuito ramal

debe llevar su conductor de puesta a tierra de equipos?

Respuesta: Siempre que el al menos un conductor de puesta a tierra para equipos

acompañe la trayectoria del circuito hasta el equipo, es decir que si en algún punto del

recorrido se separan, se deberá derivar del conductor de puesta a tierra para equipos

común hacia cada equipo y el dimensionamiento del conductor común debe hacerse de

acuerdo con la tabla 250-122 del NEC en función del interruptor de mayor capacidad entre

los 3 circuitos. Pueden consultar mayor información al respecto en el código eléctrico de su

país y lo encontrarán con el nombre de conductor común de puesta a tierra para equipos.


Recommended