+ All Categories
Home > Documents > Mll Industries - Brief Company Overview (April 2009)

Mll Industries - Brief Company Overview (April 2009)

Date post: 18-Dec-2014
Category:
Upload: mll-industries
View: 688 times
Download: 1 times
Share this document with a friend
Description:
 
19
7 Years of Growth 7 Years of Cooperation 7 Years of Success
Transcript
Page 1: Mll Industries - Brief Company Overview (April 2009)

7 Years of Growth

7 Years of Cooperation

7 Years of Success

Page 2: Mll Industries - Brief Company Overview (April 2009)

MLL INDUSTRIES

Quick Facts• Established in 2002

• Operating In Armenia

• Number of Own Employees at Peak 700

• Specialization: Earth Works, Heavy Concrete, M&E, Finishing

• Vertically Integrated - Own labor, own equipment, own material supply

Page 3: Mll Industries - Brief Company Overview (April 2009)

MLL INDUSTRIES- PRINCIPLE

The main Principles by which we operate• We perform everything once and well.

• We don't waste time on “red tape”, but rather solve problems and answer questions.

• We don't waste resources, but rather carefully plan them.

• We are a quality team performing quality work.

• We don't hire people whose personal and professional interests are not aligned with those of the company.

Page 4: Mll Industries - Brief Company Overview (April 2009)

Quality Control and Quality Assurance

Main tasks of QC/QA program is management of the quality of construction via:

• Setting of Quality Requirements at the initial or preparatory phase before start of construction.

• Continuous improvement within the organization directed at raising the quality of construction and client service.

• Improvements of measures used to evaluate quality of performed works.

• Improvement of economics of construction activities

Page 5: Mll Industries - Brief Company Overview (April 2009)

Quality Control and Quality Assurance

The following basic principles are applied to unify and manage QC/QA program:

• Systematic Approach

• Standardization

• Two-way Information Flow

• Dynamic Feedback

• Optimization

• Integration and Modular Approach

Page 6: Mll Industries - Brief Company Overview (April 2009)

SAFETY – NUMBER ONE

To Assure Safety at our construction sites we implement the following:

• Preparation of work places to highest possible safety standards or at least to levels required by local laws and regulations.

• Supply of safety gear necessary to carry out the works (Hard hats, Safety harnesses, Safety Glasses, etc)

• Installing guard rails and indentification/markings of construction sites and dangerous areas.

• Timely removal of construction trash• Continuous training of all construction site staff to safety

requirements.

Page 7: Mll Industries - Brief Company Overview (April 2009)

Own Construction Means and Capacities

We Vertically Integrate many processes for ensure the success of our projects

• Own team of highly qualified engineers working on full-time basis;• Rebar processing shop;• Concrete Batching Plant;• Own Transportation and construction equipment (Concrete pumps, concrete Mixers, Dump Trucks, Excavators, Tower

Cranes);• Own concrete forming material imported from Europe. (MLL

INDUSTRIES is the local representative of DOKA and PASCHAL Forms);

• We uses power tools and measuring instruments of leading companies in the world. We are the exclusive distributor of HILTI in Armenia.

Page 8: Mll Industries - Brief Company Overview (April 2009)

List of Own Equipment

Description Capacity Quantity Description Capacity Quantity

Excavation and Earth Processing Equipment Concreteting EquipmentExcavator Komatsu PC 300 (2007) 30 ton 1 Concrete Mixer Truck 6 m3 2Excavator Komatsu PC 200 (2009) 20 ton 1 Concrete Mixer Truck 4 m3 3Dump Trucks 20 ton 2 Concrete Pump (Mobile) 21 meter boom 1Dump Trucks 10 ton 5 Concrete Pump (Stanionary) 40 m3/hour 1Skid Loader (Case) 0.2 m3 1 Concrete Troweling Machine ("helicopter") 4Front Loader ZTZ 0.5 m3 1 Concrete Batch Plant 25 m3/hour 1Front Loader TO-25, TO-30 0.7 m3 2 Concrete Batch Plant 15 m3/hour 1Plate Compactor (Large) 1Plate Compactor (Small) 2 Other EquipmentPlate Compactor ("jumping jack") 1 Air Compressor Atlas Compco 1Roller Compactors 10 ton 1 Air Compressor (other) 2Roller Compactors 7 ton 1 Light Tower (Diesel) 1Roller Compactors (with vibration) 1 ton 1 Surveying Equipment Leica (TC 305, TCR 407) 2

Surveying Equipment Top Con 1Lifting Equipment Rebar Cutting Machines 3Crawler Cranes 25 ton, 40 ton 3 Rebar Bending Machines 3Man Lift 28 meters 1Fork Lift 2Tower Cranes 10 tons 5

Page 9: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Together with J.A. Jones Construction, MLL INDUSTRIES completed the construction of the US Embassy In Armenia. The US Embassy Complex in Armenia is considered to be the largest US Embassy in the World by the size of its territory. The US Embassy construction project is the largest construction project of such type implemented in Armenia during the last 15 years, and which was financed by the State Department of USA.Construction works were carried out in accordance to the highest international quality and safety standards. The construction works were completed in 3 years, from June 2002 till May 2005.

USA Embassy Complex in Yerevan, Armenia

Page 10: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Client: Armenian International Airports.

MLL INDUSTRIES carried out the interior

Finishing works on all level of the new

terminal.

The finishing works started in November

2005 and finished in June 2006.

New Terminal of Zvartnots International Airports

Page 11: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

The project was carried out according to constructs

signed with private developers of Armenian origins

from Iran – Mr. Vahe Nazlumyan and Robert

Nazaryan.

The residential complex consists of two towers,

symbolizing the Biblical Mountain Ararat.

The construction works were carried out form

April 2004 till August 2005.

MLL INDUSTRIES carried out the concrete

works of the foundation and shell of the

building with total area of 3,360 sq. meters

of parking and 16,900 sq. meters of residential space.

Residential Complex “Ararat”

Page 12: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Local development company Renshin, contracted MLL INDUSTRIES to

perform the excavation, concrete and interior finishing works

of its office and residential complex.

“…The specialists from MLL INDUSTRIES always approach

the assigned tasks with the highest sense of professionalism

and responsibility… Buildings built by MLL INDUSTRIES can

be distinguished by highest quality and craftsmanship…”

Edward Maroutyan,

General Director,

Renshin Investments and Construction Company.

Residential Complex “RENSHIN

Page 13: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

The project is implemented as per order of ELIT GROUP, the largest RE

Developer in the Country.

MLL INDUSTIRES performed also exterior façade stone finishing works as

well as interior finishing works.

Address: Yerevan, 14 Demirchyan St

Construction Start – February 2005

Consruction End – June 2008.

Total area of the building is slightly above

10,000 sq. meters.

Residential Complex “Cascade”

Page 14: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Client – “Diaspora Investments Company”

Address: 1st Dead-end, 24, Bagramyan Ave. Yerevan

Construction Start – May 2006.

Construction end– November 2008

MLL INDUSTRIES carried out the wide range

of works starting with excavation, erection,

and interior rough–in finishing works.

“…As an Employer, I can describe MLL INDUSTRIES as with

highest sense of quality and with great sense of timing and

dead-lines. The works were performed according to the

highest norms and standards.”

General Director Diaspora Investments Company

M. Shekerdemyan

Residnetial Complex “Britania”

Page 15: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Employer – Silenium Star

Project size – 21,400 sq. meters.

The excavation works were started in March

of 2006 and the shell will completed in

December of 2008.

Residential and Apartment Hotel – Alpian District.

Page 16: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

Client: MLL Developments

The construction works of the complex were

started in April 2008.

MLL Industries will carry out full scope of the

construction works of the building in the total

area of over 7,000 sq. meters.

Address: 32/8 Komitas Ave, Yerevan, Armenia.

Residential Complex of High Comfort “GARUN”

Page 17: Mll Industries - Brief Company Overview (April 2009)

Recent Projects

• Residential Complex “Diamond House”. Client: Diamong House.

Address, 88 Arami St. Yerevan, Armenia.

• Residential Complex “Davitashen”. Client: Renshin.

Address: 2 Sasna Tsrer, Yerevan, Armenia

• Residential Complex “Maliby”. Client: Renshin,

Address 15 Byuzandi St, Yerevan, Armenia

MLL INDUSTRIES also carried out the concrete forming works for the

Residential complex “MIKA” and “Yekmalyan”, as well as the core concrete

works for the Volkswagen Dealer Center in Yerevan.

Among other projects built by MLL INDUSRTIES

Page 18: Mll Industries - Brief Company Overview (April 2009)

It is always a pleasure for us to tackle any problems of our clients no mater how hard or challenging they may seem in the beginning. We build with dedication, with soul, with intelligence, with passion. We hope that this introduction to our company will be our first step to long friendship and mutually beneficial cooperation.

With best wishes – Team “MLL INDUSTRIES”

Page 19: Mll Industries - Brief Company Overview (April 2009)

THANK YOU!Contacts:10/1 Babayan St,Yerevan, ArmeniaTel/fax: (+374 10) 255152


Recommended