+ All Categories
Home > Documents > Mobile311: Instant feedback from your mobile workforce › library › userconf › serug11 ›...

Mobile311: Instant feedback from your mobile workforce › library › userconf › serug11 ›...

Date post: 26-Jun-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
17
Mobile311: Instant feedback from your mobile workforce May 3, 2011
Transcript

Mobile311: Instant feedback from your mobile workforce

May 3, 2011

Presentation Outline

• City of Asheboro, NC - Facts

• Case Study - Prior to Technology Implementation

• Technology Requirements - Goals

• Mobile311 – The Technology

• Mobile311 – The Implementation

• Mobile311 – The Benefits

• Case Study - Post Technology Implementation

City of Asheboro, North Carolina

• Population 26,000

• Over 10,000 Households

• 16 sq. mile City Limits

• Home of the NC Zoo

City Facts

Sanitation Case Study - Asheboro

Prior to Technology Implementation• $100 / hour operation costs• 4 Automated Solid Waste Trucks

• 2 Bulky Item Trucks• 3 Yard Waste Trucks• 5 days a week• 8 hour days

City of Asheboro, North Carolina

• Reduce Field Operations Costs– Fuel Cost– Vehicle Maintenance– Man-hours

• Provide Quality Service

• Improve Efficiency

Goals

Technology - Mobile311

Mobile Application Features

Real-Time InformationTracking for AccountabilityBetter Customer ServiceInstant “Re-tasking” of DriversCritical Issue Notification via email

User-Friendly AppSingle Button ClickMinimal Training Required

Cost Effective HardwareAndroid Smartphone / TabletWindows SmartphoneiPhone / iPad

Powerful Data ManagementUtilizes ArcGIS Map Services

Cloud-based Web Services

Executive Dashboard

Real-Time Updates

Powerful Reporting and Visualization

Integrates with other Enterprise Software

Web Interface Features

Executive Dashboard

Asheboro, North Carolina - Implementation

Automated trash drivers collect real time data that automatically creates work orders for:

• Bulky Items• Yard Waste• Construction Debris• Other (water leaks, potholes, etc.)

Sanitation Case Study - Asheboro

Prior to Technology Implementation• $100 / hour operation costs• 4 Automated Solid Waste Trucks

• 2 Bulky Item Trucks• 3 Yard Waste Trucks• 5 days a week• 8 hour days

Annual Operation Cost $1,872,000

Sanitation Case Study - Asheboro

After Mobile311• $100 / hour operation costs• 4 Automated Solid Waste Trucks

• 1 Bulky Item Truck• 2 Yard Waste Trucks• 4 days a week• 6 hour days

36%OperationsReduction

Annual Operation Cost $1,206,400

Sanitation Director Quote

“With Mobile311, we are saving three man-days per week. What used to take us five days,we are now doing in two.

Mobile311 is paying for itself in fuel savingsalone and we are giving better service to ourcommunity.”

Kermit Williamson

Solid Waste Director

City of Asheboro, NC

Mobile311 Applications Throughout Asheboro

• Sanitation

• Street Maintenance

• Code Enforcement

• Utilities

• Law Enforcement

• Management

Graffiti removal team collect tags with location and name to be analyzed by crime analyst.

Utility patch crews collect location of utility cuts with size and location.

Code Enforcement officials collect data including pictures and attributes.

Asheboro, North Carolina - Implementation

Some Other Successful Implementations

• Asheville, NC – pop. 84,000

• Rocky Mount, NC – pop. 58,000

• Greenville, NC – pop. 150,000

• Greensboro, NC – pop. 260,000

• Raleigh, NC – pop. 410,000

• Sumter, SC – pop. 40,000

• Oldsmar, FL – pop. 12,000

• Gillette, WY – pop. 30,000

Questions?


Recommended