Modelo ABB Parada de Planta

Date post: 27-Apr-2015
Category:
Upload: reyvaxx
View: 1,251 times
Download: 3 times
Share this document with a friend
Description:
Parada de Planta ShutDown
32
PRIMERAS JORNADAS DE GESTION DE ACTIVOS & EFICIENCIA PRIMERAS JORNADAS DE GESTION DE ACTIVOS & EFICIENCIA ENERGETICA ENERGETICA GEDAEFE 2008 ABB PERFORMANCE SERVICE Modelo ABB de Excelencia para Paradas de Planta Click to buy NOW! P D F - X C H A N G E w w w . d o c u - t r a c k . c o m Click to buy NOW! P D F - X C H A N G E w w w . d o c u - t r a c k . c o m
Transcript
Page 1: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

ABB PERFORMANCE SERVICE

Modelo ABB de Excelencia paraParadas de Planta

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 2: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

CARACTERÍSTICAS DE PARADAS DE PLANTA­

The workers

ContractorsAn army ofstrangers!?

Increased risk

Supervision

Fatigue

TheBoss Updating

Thegrandplan

?

?

WearCorrosio

n

Damage

PERM

ITS

Fouling

PPE

The clockis ticking

?

?

Multilevelworking

Audits

ScaffoldInspection

CommunicationCo­ordination

Issues

Confinedspaces

DURATION

COSTS

?EMERGENT

WORK

E Theworklist

?

?LEGISLATION

Projects

Workingat height

ssssss

sss

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 3: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

CARACTERÍSTICAS DE PARADAS DE PLANTA

§ Gran volumen de recursos, Materiales y Humanos, mobilizadosen cortos períodos de tiempo.

§ Gran  desembolso  de  Recursos  Financieros,  en  período  dePérdida de Producción.

§ Fuerte  impacto  en  las  cuestiones  relacionadas  con  losIngresos, Flujo de Caja y la Capacidad de Producción.

§ Actividades  de  Gran  Riesgo,  Peligroso,  presionadofuertemente en términos de Tiempo y de Seguridad.

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 4: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

CARACTERÍSTICAS DE PARADAS DE PLANTA

§ Algunas  actividades  pueden  tener,  un  alto  grado  deComplejidad, Desconocimiento e Incertidumbre.

§ Necessário la  plena  participación  en  diversos  ámbitos  de  laempresa. Proceso con un gran número de interfaces.

Teniendo en cuenta los principales tipos de mantenimiento, siconstituye la más Cara, Estresante y Compleja forma de

desarrollar este tipo de actividad industrial.

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 5: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

ALGUMAS REFERENCIAS DE LOS ÚLTIMOS AÑOS

• La mayoría das Paradas de Planta se vieron afectados por  la escasez dePersonal Cualificado.

• Tres de cada cuatro Paradas las Planificaciones fueron abandonadas en laprimera semana.

• La  mayor  parte  de  personal  informó el  estrés  y  los Conflictos  deOrganización como sus mayores preocupaciones personales.

• 90% de las recomendaciones del informe final nunca se aplican.

• Ocho de cada diez experimentado los Excesos de Costes de 10 ­40%.

• La mitad de las Paradas sufrido Desviaciones de Calendario.

• Casi nueve de cada diez informó el Crecimiento de Trabajo ­ 10 ­ 50% de lalista de servicio.

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 6: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

¿Cómo podemos extraer un modelo de excelência de este

1. Necesario  que  las empresas  reconocían  la  fuerte  relación  entre  elresultado  de  las  actividades  de  Parada  y  el  rendimiento  de  susnegocios

RESULTADODE LA PARADA

PERFORMANCEDEL NEGOCIO

Cumplimento del plazo

Distancia entre paradas

Cumplimento del presupuesto

Eficiencia de la ejecución

Seguridad Industrial

Cuestiones Ambientales

Beneficios de la Empresa

Nivel de Producción

Fiabilidade de las Operaciones

Integridad de los Equipos

Imagen de la empresa

La seguridad y la salud

IMPACTO

Paradas no deben ser Dirigidas como un Simples evento deMantenimiento, sino como un componente importante de los Planes

Estratégicos y Financieros de la Empresa.

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 7: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

¿Cómo podemos extraer un modelo de excelência de este

2. Entendiendo  las Relaciones  Clave  y  los  Elementos  Críticosde las Paradas de Planta

3. Identificando  y  integrando  todas  las  actividadesdesarrolladas  no Proceso  de  Gestión  y  Planificación  deParadas de Planta en un Modelo Racional

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 8: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

EL NEGOCIO PARADAS DE PLANTA

Las empresas que promuevan  las mejores prácticas entiendenel negocio de Paradas en dos niveles

NIVEL 1 (Estratégico) –Foco en la mejora continua del negocio

NIVEL 2 (Operacional) –Foco en la preparación, planificación y la ejecucióndel evento

Un entendimiento de los dos niveles y la relación entre elloses la base para el éxito del proceso

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 9: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

NIVEL 1 (Estratégico)–El NEGOCIO

ASPECTOS ESTRATÉGICOS QUE DEBEN SER CONSIDERADOS:

El Principal Objetivo: Eliminar  la necesidad, minimizar su  impacto yaumentar el ciclo

Foco  en  los  Negocios:  Alinear  los  eventos  con  la  estrategia  daempresa en términos de ventas

Cuestiones Financieras: Impacto sobre los negocios, financiación delevento y enfoque en los gastos

Rendimiento Actual: Nivel de producción, calidad de los productos ynivel de fiabilidad da planta

Inversión: El  volumen  de  proyectos,  la  justificación  del  proyecto  yinterfaz con el evento

Lista de Servicio: Se centró en  la  necesidad,  complejidad  técnica  yvolumen de trabajo

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 10: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

NIVEL 2 (Operacional)–El EVENTODIMENSIONES OPERACIONALES DEL EVENTO:

ØUn  evento  costoso  que  requiere  fundos  de  los  beneficios  de  lasempresas

ØUn  evento  complejo  que  involucra  a  personas,  sistemas  yfunciones

ØUn evento de ingeniería que requiere planificación y preparación

ØUn  evento  potencialmente  peligrosas  que  requiere  la  seguridadgestionada

ØUn  evento  centrado  en  la  fiabilidad  desarrollado  para  proteger  laintegridad de plantas

ØEn  muchas  ocasiones  un  evento  impulsado  por  los  requisitoslegales

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 11: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

El Modelo de Excelencia para Paradas de Planta

§ Las grandes Paradas son actividades extremadamente complejas

§ Para comprender, tenemos que trabajar con todos los elementos juntos

§ Esto requiere un modelo conceptual

§ Para ser de cualquier uso, el modelo debe:Ø Cubrir todos los aspectos do Proceso de ParadaØ Reducir la complejidad do proceso de parada a un nivel manejableØ Mostrar las actividades esenciales en forma clara y concisaØ Proporcionar un esquema para escribir los procedimientos da paradaØ Forma la base de un programa de entrenamiento de ParadaØ Proporcionar un marco de la auditoría de paradas

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 12: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

El Modelo de Excelencia para Paradas de Planta

• Organización Professional “One Team”design

• Planificación Rational “Task Centred”work control

• Contratistas Focussed “Win ­ Win”relationship

• Costo Aggressive “Value for Money”strategy

• Logística Dynamic “Right Right Right”approach

• Ejecución Streamlined “Results Oriented”performance

BASE EM SEIS ELEMENTOS FUNDAMENTALES

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 13: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

EstructuraOrganisacíonal

Planificación Contratacíonde Recursos

LogisticaControle deCosto

Ejecucióndel Evento

ElementosFundamentales

Less PeopleMore Professional

Work ra

tiona

lised

Durat

ion Sh

orten

edWin ­ Win” relationship

Costs rationalised

Waste Eliminated Syste

m Simpli

fied

Time S

aved

Negative ImpactMinimised

Improvement via repeatability

MANAGEMENT OVERVIEW

A safe

 syste

m of w

orkA total quality approach

Syste

m & Co

mplian

ce Au

ditsEffective Communications

El Modelo de Excelencia para Paradas de PlantaClick t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 14: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PlanningPhilosophy

Work scopedefinition

ProjectDefinition

WorklistControl

DetailedPlanning

Pre­shutdownWork

ScheduleOptimisation

RiskManagement

ManagementControl

BriefingProgram

PlannedDaily Routines

PlantShut­down

ScheduledWork

EmergentWork

Humanfactors

Equipmenthand­back

ORGANISATION                      PLANNING                       CONTRACTS                            COST LOGISTICS                      EXECUTION TERMINATION

ContractPolicy

ContractorCommitment

Critical ContractElements

Incentiveschemes

ContractorMobilisation

PerformanceMonitoring

Subcontractorpolicy

ContractorDemobilisation

LogisticsApproach

Procurement

SupplyControl

Infrastructure

OrganisingBulkwork

Cranes &Transport

OffsiteServices

Sitedemobilisation

Steering GroupStrategy

EventManager

Planning &preparation team

Designedorganisation

ProcessTeam Input

TechnicalTeam Input

ResourceLevels

Client/ ContractorIntegration

RiskManagement

Pricingframework

BallparkEstimate

EstimateRefinement

Cost controlProcess

Monitoring(during event)

Closing­outAccounts

ContractPricing

Start ­upControl

Criticalactivities

PlantStart­up routine

PlantStart­up

Monitor plantperformance

Post mortemde­brief

Close outmeeting

Action toimprove

Preparing forNext event

ScheduleUpdating Criteria

RiskManagement

RiskManagement

RiskManagement

RiskManagement

El Modelo de Excelencia para Paradas de PlantaACTIVIDADES

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 15: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

Planning Philosophy~ Task planning approach~ Estimating method~ Scheduling strategy~ Use of re­usable planning

Work scope definition~ Identify/ specify tasks~ Collect/ collate tasks~ Employ “Ideal work scope”~ Prioritise Task planning

Project Definition~ Project integration strategy~ Final approval dates~ Drawing completion dates~ Delivery dates for all items

Worklist Control~ Justify/ clarify tasks~ Close and freeze worklist~ Approve final worklist~ Control worklist growthDetailed Planning~ Job steps/ resource/ hours~ Specify procurement /Tech/

Insp./ Test/ document needs~ Issue indexed Job Packs

Pre­shutdown Work~ Define work requirements~ Schedule work packages~ Execute work packages~ Control work variations

Schedule Optimisation~ Product to Product duration~ Input all task networks~ Define total critical paths~ Optimise the schedule

Schedule Updating Criteria~ Define update requirements~ Delegate responsibilities~ Specify updating regime~ Define Supervisors roleRisk Management~ CP Overrun/ CP change~ Emergent work impact~ Duration creep (hours)~ Optimisation strategy

Risk Management~ SWOT assessment~ Worst case scenario~ Risk avoidance plan~ “Stay on track”strategy

Management Control~ Chain of command~ Client management role~ Mobilise client/ contractor~ Agree goals and targetsBriefing Program~ Briefing agenda~ Timing and location~ Adequate health, safety &

environmental concerns

Planned Daily Routines~ Event manager’s routine~ Daily work program~ Daily control meetings~ Problem solving routinesPlant Shut­down~ Key dates & times~ Handover process~ Install isolations~ Issue permitsScheduled Work~ Execute Task & projects~ Execute Bulkwork~ Track Critical Path~ Track manpower & costsEmergent Work~ Identify/ plan/ execute~ Calculate & report impact~ Resource emergent work~ Finance emergent work

Human factors~ Check qualifications~ Test briefing adequacy~ Motivate and guide~ Tool box safety talks

Equipment hand­back~ Complete each task~ Inspect & sign­off~ Remove isolations~ Withdraw permits

ORGANISATION                                PLANNING CONTRACTS COST                                         LOGISTICS                                EXECUTION TERMINATIONContract Policy~ Appropriate contract type~ Contract administration~ Separate/ Integrated contract~ Contract letting programContractor Commitment~ SHE systems and history~ Quality assurance/ control~ Expertise/ competence~ Infrastructure/ site logisticsCritical Contract Elements~ Define total work scope~ Estimate hours (Norms?)~ Schedule of rates of pay~ Create variation strategy

Incentive schemes~ Purpose and justification~ Reward/ penalty structure~ Mutual Levels of risk~ Conflict resolutionMobilisation~ Company mobilisation plan~ Contractor mobilisation~ Briefing/ familiarisation~ Proving competencePerformance Monitoring~ Agreed (imposed?) KPIs~ 3P Monitoring strategy~ Identifying deviations~ Remedial action strategy

Subcontractors~ Engagement strategy & plan~ Client imposed companies~ “Specialist”strategy~ Monitoring Subcontractors

Demobilisation~ Completion agreement~ Demobilisation plan~ Data collation & review~ Data update and archivingRisk Management~ Workscope uncertainties~ Contractual uncertainties~ Variation/ claims issues~ Recovery strategy

Logistics Approach~ Logistics Team~ Organising the “Elements”~ Current disposition~ Control by plot planProcurement~ Materials & proprietary items~ Tools/ equipment/ cranes~ Services (lagging, gas etc)~ Facilities (cabins, food etc)

Supply Control~ On­site Reception~ Inspect/ verify~ Store & protect~ Issue/ mobilisation

Infrastructure~ Material Stores/ lay down~ Foul/ clean item bays~ Decontamination services~ Lay down/ uplift plan

Organising Bulkwork~ Marshalling program~ Schedule item removal~ Create Onsite/offsite plan~ Plan installation dates

Cranes/ Transport~ Specify routes & locations~ Plan crane control system~ Create lifting plans~ Specify emergency routes

Offsite Services~ Select & workload~ Specify Testing criteria~ Create coordinated plan~ Monitor progress

Site demobilisation~ Demobilise all resources~ Return to stores/ dispose~ Clean & clear site~ Finally inspect & handoverRisk Management~ Late/ unavailable/ NFFP~ Emergent work/ changes~ Disorganisation~ Contingency plan

Steering Group Strategy~ Stakeholders/ decision

makers/ fund providers~ Set objectives & policy~ Delegate & overviewEvent Manager~ Full time appointment (?)~ Competent & experienced~ Steering group agent~ Total span of control

Planning & preparation team~ Led by Turnaround Manager~ Task/ site oriented team~ “Total package”planners~ CP schedule experience

Designed organisation~ Effective chain of command~ Matches functional needs~ Identifies individual functions~ Written roles/ responsibilities

Process Team Input~ Isolation/ permits/ tagging~ Shutdown/ start up plans~ Process driven tasks~ Plant equipment defects listTechnical Team Input

~ Engineering standards~ Maintenance work specs~ Project requirements~ Technical support facilityResource Levels

~ Availability/ competence~ Trade spread/ qualification~ Costs/ on costs/ expenses~ Resource sustainabilityClient/ Contractor Integration~ Client/ contractor roles~ Integration/ functional Links~ Levels of discretion~ “One Team”cultureRisk Management~ Roles & responsibility issues~ Organisation shortcomings~ Shortage of skilled resources~ Resourcing strategy

Pricing framework~ Budget allocation~ Cost breakdown structure~ Forced price adjustment plan~ Contingency strategyBallpark Estimate~ Uncertainty +/­ 20%~ Early definition/ early warning~ Compare with allocation~ Optimisation costsEstimate Refinement~ Gather data/ map costs~ Define sub contractor costs~ Allocate contingency~ Issue control estimate early

Cost control Process~ Nail key cost generators~ Set detailed cost targets~ Control contingency~ Minimise wasteMonitoring (during event)~ Based on detailed cost map~ Data gathering routine~ Use “Anticipated final cost”~ Report spend trend regularlyClosing­out Accounts~ “Four week”close out rule~ Settle all claims~ Settle all invoice.~ Update cost model

Contract Pricing

Risk Management~ Cost sensitive change/ delay~ Underestimation of costs~ Impact of duration overrun~ Cost recovery strategy

Reimbursable man­hours~ Fixed management Fee~ Set against targeted hoursDay­work (body shopping)~ Value for money issues~ Level of Client supervision

Fixed price (Lump sum)~ Accurate workscope critical~ “Variation to contract" rules

Start ­up Control~ Chain of command~ Production Led~ Turnaround team support~ Program of eventsCritical activities~ Complete punch­listed work~ Rectify start up faults~ Synchronise activities~ Increase risk assessmentPlant Start­up routine~ Key dates and times~ Process activities~ Instrumentation testing~ Function TestingPlant Start­up~ Start plant & monitor~ Rectify start­up faults~ Run up to full production~ Release Turnaround teamMonitor plant performance~ Report any faults due to

Turnaround activities~ Recommend action~ Implement actionPost mortem de­brief~ Debrief contractors~ Debrief specialists~ Collect/ collate event data~ List “changes to plan”Close out meeting~ Capture “what went well”~ Capture “what went badly”~ List technical faults~ list “what we have learned”Action to improve~ Perform root cause analysis~ Recommend improvements~ Formulate action plan~ Implement & reviewPreparing for Next event~ Update and archive plans~ Write final report~ Set date for 1st Steering group

meeting for next event

El Modelo de Excelencia para Paradas de PlantaACTIVIDADES

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 16: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

Dificuldades de Implantação do Modelo

§ Ocurrencia de cero accidentes e incidentes§ Reducir Lista de los servicios§ Reducir el Costo Total del evento§ Reducción de Plazo de Ejecución§ Aumentar el intervalo entre los eventos§ Mejoramiento de la Calidad de Ejecución§ Re­establecimiento de las condiciones de funcionamiento§ Las reducciones de los acontecimientos relacionados con la

SHE

§Productividad X  Seguridad§Fiabilidad X Lista de Servicio§Costo X Fecha de Ejecución§Plazo X Costo§Lista de Servicio X Plazo§Plazo X Calidad

Principales Objetivos da Parada Principales Conflictos

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 17: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PROCESO DE GESTION Y PLANIFICACIÓN DE PARADAS.

INTEGRAR AO PROCESO DE GESTION DA PARADA LAS DIRETRIZESESTRATÉGICAS DE LA EMPRESA

NÍVELESTRATÉGICO

OPERACIONALFINANCIERO COMPROMISSOCON MERCADO

COMERCIAL REQUISITOSLEGAIS

PLANIFICACIÓN PREPARACIÓN EJECUCIÓN EVALUACIÓN

PROCESO CONTÍNUO DE MEJORIA DO NEGÓCIO

Feedback

NÍVELOPERACIONAL

n Proceso de Paradas ↔ Mejoría Continua de lo Negocio

n Evento de Parada ↔ Preparación, planificación y ejecución de lo eventon Integrado Modelo Racional

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 18: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

Proceso de Gestion y Planificación de Paradas.Ca

pacid

adpa

ra  In

fluir

Start Completion

High

LowTime

DIRECTRICESESTRATÉGICA

DESARROLLO DE LALISTA DE SERVICIO

DESARROLLO DE LALISTA DE SERVICIO

PLANIFICACIÓNESTRATÉGICO

PARADAPARADAPRÉ­PARADAPRÉ­PARADA

EVALUACÍONPÓS­PARADA

EVALUACÍONPÓS­PARADA

CONTRATACIÓNDE LOS RECURSOS

CONTRATACIÓNDE LOS RECURSOS

DESARROLLO DELPLANIFICATION

DESARROLLO DELPLANIFICATION

Se consideran las Paradas Programadas de Mantenimiento,  como un Proceso deMejora Continua, un ciclo claramente definido, desarrollados por etapas o

fases de trabajo

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 19: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

Proceso de Gestion y Planificación de Paradas.

VOLUME X VALOR

Valor

Planning phase.Relatively smallteam and lowexpenditure

Build up of pre­shutdown workand  remainderof planning

Execution phasePlant shut down,scheduled workand start up

10%

80%

2%

8%

Volume

Highest valuederived from

lowest revenuespend

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 20: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

Proceso de Gestion y Planificación de Paradas.

INÍCIO TIPO DO EVENTO

n3 Meses antes Parada de Pequeno PorteBaixa Complexidade

n6 Meses antes Parada de Pequeno PorteMaior Complexidade

nn12 Meses antes12 Meses antes Parada PrincipalParada PrincipalDados não consolidadosDados não consolidados

n18 Meses antes Revamp de unidadeDados consolidados

n24 Meses antes Revamp de unidadeDados não consolidados

Buenas Prácticas

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 21: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

DIRECTRICES ESTRATEGICAS

COMERCIAL

FINANCEIRO

ProduçãoInvestimentosAmpliações

REQUESITOSLEGAIS

OPERACIONAL

COMPROMISSOSCOM MERCADO

VendasPeríodoPrazo

IntegridadeConfiabilidadeSegurança

SH&ENR´s

Recursos Disp.Fluxo de CaixaCustos Eventos

DIRETRIZES

ESTRATÉGICAS

CRITÉRIOS DE SUCESSO

PRESUPUESTO

OBJETIVOSLISTA SERVICIOPRELIMINAR

METAS

GERENTE DEPARADA

FECHAPARADA

Negócio

Produção

Organização

Execução

PLANEJAMENTO E EXECUÇÃO DOS SERVIÇOSESTRATÉGIAS DE EXECUÇÃO

PLANOS DE AÇÃOPROCEDIMENTOS

DIMENSÕES

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 22: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

GERENTE DE PARADA

Ø Respetado y probada experiencia en materia de gestión;Ø Capacidad de liderazgo y motivación de grupos de trabajo;Ø Conocimientos  básicos  de  métodos  técnicos  y  herramientas

utilizadas  en  la  planificación  de  las  paradas  y  los  servicios  demantenimiento;

Ø Conocimiento  de  las  principales  directrices  administrativas  y  dedirección de la empresa

ØEste  es  el  representante  legal  de  la  junta  directiva  en  el  proceso  ­ unmiembro  permanente  del  Comité de  Paradas  ­ con  la  autoridad  paraadministrar los recursos financieros disponibles para el evento

ØResponsable para la creación de la estructura de organización da Parada

ØResponsable  para  el  despliegue  del  modelo  adoptado  para  la  gestión  yplanificación da ParadaØResponsable para el desarrollo del proceso de Paradas el nivel de control

de costes, calidad, productividad, rendimiento, seguridad y moralidad

Ø Responsable para el resultado final del evento

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 23: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

DESARROLLO DE LA LISTA DE SERVICIOOBJETIVO

FOCO

PRODUCTO

Desarrollar Y Consolidar la Lista de Servicio da Parada,a través de un análisis crítico de las solicitudes damanutención, operación, ingeniería, inspección y

proyectos.

Optimización da la Lista de ServicioUso de herramientas para Análisis de Riesgo ( RBI)

Respuesta a los objetivos presupuestariosIntegridad física de los equiposFiabilidad y el rendimiento operacionalIntegración de las inversiones con los servicios de Parada

Lista de Servicios DetalladosRegistro de las informaciones en un Sistema Informatizado e Asequible –

CMMS (SAP)

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 24: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

OBJETIVO

IN PUT

PRODUTO

Identificar y desarrollar los planes y estrategias quedeben adoptarse, para el estructura de planificación delos trabajos, a fin de lograr y / o superar los objetivos

establecidos para el evento

Objetivos e Metas da ParadaPlazo y Período ­ Valores de Presupuesto

Lista de Servicios ­ Complejidad ­ Potencial Riesgo RecursosRecursos Disponibles ­ Proveedores ­ Logística de la Región

Estrategia de Planificación, Ejecución y Contratación de Servicios

Plan de PreparaciPlan de Preparacióón Bn Báásicasica ­­ PPBPPBEstructura Organizacional de la PlanificaciónMacro Planificación de los ServiciosEstimación Preliminar de los Costos

PLANIFICACIÓN ESTRATEGICOClic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 25: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PLANIFICACIÓN ESTRATEGICO

Schedule pre­shutdown workSchedule pre­shutdown work Complete all pre­shutdown workComplete all pre­shutdown work

Specify & procurelong delivery itemsSpecify & procurelong delivery items

Specifyequipment

Specifyequipment

Specifyservices/ utilities

Specifyservices/ utilities

Specify accommodationand site facilities

Specify accommodationand site facilities

Procure all otherrequired materialsProcure all other

required materialsOrganise stores, laydown areas

& material quarantine areasOrganise stores, laydown areas

& material quarantine areasReceive allmaterials

Receive allmaterials

Establish equipment, services, utilitiesaccommodation & facilities on site

Establish equipment, services, utilitiesaccommodation & facilities on site

Operate late workauthorisation system

Operate late workauthorisation system

Estimate major job durationsand resource levels

Estimate major job durationsand resource levels

Produce & validate Shutdown &start up networks

Produce & validate Shutdown &start up networks

Input intoscheduleInput intoscheduleInput intoschedule

PackagecontractsPackagecontracts

Negotiate& award

Negotiate& award

Obtain plansfrom contractors

Obtain plansfrom contractors

Final  projectdecision dateFinal  projectdecision date

Finaliseproject plans

Finaliseproject plans

Define eventorganisationDefine eventorganisation

Appoint all key personnelAppoint all key personnel

Define projectstatus

Define projectstatus

Define majorjobs

Define majorjobs

Optimisejob methods

Optimisejob methods

Produce majorjob networks

Produce majorjob networks

Review &finalise

Review &finalise

Produce finalorganisation chart

Produce finalorganisation chart

Formulatesafety policy

Formulatesafety policy

Appoint Turnaroundsafety team

Appoint Turnaroundsafety team

Produce finalsafety plan

Produce finalsafety plan

Define qualityrequirementsDefine qualityrequirements

Appoint Turnaroundquality team

Appoint Turnaroundquality team

Produce finalquality plan

Produce finalquality plan

Prepare initialcost estimatePrepare initialcost estimate

Set up costing procedures& produce cost reports

Set up costing procedures& produce cost reports

Produce finalcost estimateProduce finalcost estimate

Submit tosteering group

Submit tosteering group

Steering groupapproval

Steering groupapproval

Brief allpersonnelBrief all

personnelPrepare briefing

packagePrepare briefing

package

Planning the Planning: Preparation

Produce areaWork PackagesProduce area

Work Packages

Specify pre­shutdown workSpecify pre­shutdown work

Issue Work Packagesto area teams

Issue Work Packagesto area teams

FreezeFreeze Issue& display workcontrol documents

Issue& display workcontrol documents

Produce workcontrol documents

Produce workcontrol documents

CompileWorkList

CompileWorkList

Produce job specificationwork packs and validate

Produce job specificationwork packs and validate

Run &validateRun &

validateMake Final

adjustmentsMake Final

adjustmentsIssue control

scheduleIssue control

scheduleProduce job networks& input into scheduleProduce job networks& input into schedule

StartDateStartDate

Challenge & clarifyall work requests

Challenge & clarifyall work requests

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 26: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PLANIFICACIÓN ESTRATEGICOID Descrição da Atividade Dur %

CompleteStart

1 PPB ­ PARADA SOSSEGO 86 d 62% Fri 21/9/072 Reunião Inicial 1 d 100% Fri 21/9/073 DESENVOLVIMENTO DO ESCOPO 20 d 100% Mon 24/9/0718 PLANEJAMENTO ESTRATÉGICO 75 d 80% Mon 1/10/0719 Definição da Estratégia de Planejamento, Execução e Contratação 15 d 100% Mon 15/10/0720 Desenvolver o Macro Planejamento dos Serviços ­ ABB 10 d 75% Mon 22/10/0721 Efetuar o levantamento Preliminar dos Custos de Parada ­ ABB 15 d 100% Mon 12/11/0722 Levantamento dos Serviços de Fabricação 15 d 100% Mon 15/10/0723 Levantamento e Reserva dos Materiais de Aplicação 15 d 75% Mon 1/10/0724 Levantamento e Reserva dos Materiais de Apoio e Consumo 15 d 75% Mon 1/10/0725 Diligenciamento da Compras dos Materiais 70 d 70% Mon 8/10/0726 CONTRATAÇÕES DOS RECURSOS 65 d 71% Mon 15/10/0727 Serviços 65 d 74% Mon 15/10/0734 Mão de Obra Adicional 50 d 60% Mon 5/11/0737 Logística 30 d 78% Mon 12/11/0738 Aluguel / Compra de Máquinas e Equipamentos 10 d 100% Mon 12/11/0739 Aluguel / Compra de Ferramentas 10 d 0% Mon 10/12/0740 Contratação dos Serviço de Apoio e Logística 25 d 100% Mon 12/11/0741 DESENVOLVIMENTO DO PLANEJAMENTO 57 d 51% Mon 22/10/0742 Detalhamento dos Serviços 45 d 57% Mon 22/10/0760 Consolidação do Planejamento e Estimativa de Custo 47 d 24% Mon 5/11/0770 Apoio Administrativo e Logístico 25 d 100% Mon 29/10/0773 Segurança 50 d 45% Mon 29/10/0774 Identificação das Atividades de Risco e Providências Necessárias 25 d 75% Mon 29/10/0775 Elaboração das Listas dos EPIs + EPEs + Outros 5 d 50% Mon 3/12/0776 Aquisição do Material Complementar de Segurança ­ ABB 20 d 50% Mon 10/12/0777 Elaboração e Emissão do Plano de Segurança Industrial 20 d 0% Mon 3/12/0778 PREPARAÇÃO DA  PARADA 50 d 24% Mon 5/11/0789 PARADA 5 d 0% Mon 14/1/0890 Parada Geral da Usina de Sossego 5 d 0% Mon 14/1/08

Eliomar

Laercio EliomarABB

ABBJorge

JorgeJorge

Paulo Matos

CVRDCVRD

CVRD

ABB CVRDABB CVRD

ABB CVRDABB CVRD

CVRD

27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 4 11 18 25 3 10 17 24 31 7 14 21September October November December January February March April

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 27: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

CONTRATACIÓN DE LOS RECURSOSOBJETIVO

IN PUT

PRODUCTO

Estructurar el proceso de contratación deservicios, organizar la compra de materiales

y consolidar el presupuesto da parada.

Estrategia de ContrataciónEstimación preliminar de los costoMacro planificación y la lista detallada de los serviciosRegistro de Proveedores

Documentos de licitación, acompañamiento y contratación de los serviciosMapa de acompañamiento de meteríaisConsolidación del presupuesto da parada

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 28: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

DESARROLLO  DEL  PLANIFICACIÓNOBJETIVO

IN PUT

PRODUCTO

Desarrollar las actividades de preparación yplanificación de los servicios da parada

Estrategia de Planificación y Ejecución da paradaEstructura Analítica do PROJETO –EAPEstrategia de Liberación e Partida (start up) –SOP´sPlazo y presupuesto da parada

Detalle dos servicios y el histograma de recursosPlan de Ejecución de Servicios –PESPlan de Inspección y Controle de Cualidad –PICQPlan para la Seguridad, Salud y Medio Ambiente ­ PSHEPlan de Acción Administrativa y Logística –PAALDimensionamiento  y Proyecto de las Instalaciones Provisorias ­ DIP

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 29: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PRÉ­PARADAOBJETIVO

IN PUT

PRODUTO

Supervisar y coordinar las actividades depreparación para el inicio del evento

Manual de ejecución da parada y sus procedimientosListas de las actividades preparatorias –Andamios, fabricacionesPlanos de acción administrativa, movilización de recursos y logística

Divulgación da paradaProgramación y acompañamiento das actividades de pré­paradaImplantación da estructura de planificación e acompañamiento da paradaImplantación da estructura de controle de los servicios e costos.

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 30: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

PARADAOBJETIVO

IN PUT

PRODUCTO

Coordinar y ejecutar las actividades deplanificación, seguimiento y control de la parada

y apoyar la coordinación general del evento

Manual de ejecución da parada y sus procedimientosPresupuesto da parada, los plazos y supuestos de planificaciónLos planes de ejecución da parada (inspección, control de calidad,

seguridad, logística, etc.)

Programación y acompañamiento da ejecución de los serviciosCurvas, hojas de cálculo y los informes de seguimientoHojas de cálculo y los informes de los servicios y controle de los costos

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 31: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

EVALIACIÓN Y  PÓS­PARADAOBJETIVO

FOCO

PRODUCTO

Controlar  las  actividades  de  POS­PARADA  yconducir la evaluación general del evento

Procedimientos de start up de las unidadesPlan de desmovilización de los recursosLas principales desviaciones (planificación, ejecución, contratación y gastos)

Consolidación de los informes de ejecuciónLa emisión del informe final de evaluación del evento

Identificación de lagunas y la retroalimentación de la base de datosRecomendaciones

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com

Page 32: Modelo ABB Parada de Planta

PRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAPRIMERAS JORNADAS  DE GESTION DE ACTIVOS & EFICIENCIAENERGETICAENERGETICA

GEDAEFE 2008

[email protected]

Click t

o buy NOW!

PDF­XCHANGE

www.docu­track.com Clic

k to buy N

OW!PDF­XCHANGE

www.docu­track.com