  • 7/29/2019 Module#2Radio Network Planning and Design

    1/15

    Modul 2- Transmission Network Design and Documentation 1

    TND321:Modul#2Transmission Network Design &

    Documentation

    Modul 2- Transmission Network Design and Documentation 2

    Outline

    z Pendahuluan

    z High level transmission network design &documentation

    z Detailed transmission network design &documentation

  • 7/29/2019 Module#2Radio Network Planning and Design

    2/15

    Modul 2- Transmission Network Design and Documentation 3

    PendahuluanNetwork Planning Team Customer

    Protection andcapacity planning

    Detailed networkdiagram

    Networkarchitecture andcross-connection

    granularity analysis

    Capacity, sparecapacity and

    transportmediaanalysis

    Management andsynchronisation

    analysis

    Technicalinformation about

    the existingnetwork

    Restrictions intransmission

    media & capacity,and equipment

    architecture

    Equipmentarchitecture

    analysis

    Networkarchitecture andcross-connection

    granularityplanning

    Cost andnetworkanalysis

    Roughequipment listfor one year

    Rolloutready?

    Networkrollout plan includingequipment lists andmanagement and

    synchronization principles

    Management &synchronisation

    principles

    Updatedtechnical

    requirements

    Timeslotplanning

    Managementplanning

    Synchronisationplanning

    Detailednetwork plan

    Physical routecalculations

    Technicalrequirements

    OK

    Not OK

    OK

    Not OK

    12

    4 56

    89

    10

    7

    11

    12

    13

    14

    15

    1617

    18

    21

    3

    1921

    Network Planning Team danCustomer ...responsibilitas

    Modul 2- Transmission Network Design and Documentation 4

    Implementasi Step Pekerjaan

    1. 2. 3. 4. 5.

    LOGISTICS

    SITE

    ACQUISITION

    NETWORK

    PLANNING

    SITE DESIGN &

    PERMITTING

    CONSTRUCTION

    WORKS

    TELECOM

    IMPLEMENTATION

    PreliminaryRadio

    andTransmissionNetworkP lans

    Longtermforecast

    (TRX,radios,halfyear)

    Roll-outforecast(TRX,

    cabinets,combiners,radios,12-16 weeks)

    CW andtelecom

    forecast(subcontractedworks &material)

    OrderingCW

    (works &materials)

    OrderingRAS:

    incl.SISO ,BTS, Radios(frozen,2weeks)

    InvoicingCWInvoicingNE +

    Telecom

    Site Validation

    CW Acceptance

    FinalSiteAcceptance

    Technical Site

    Survey

    Site Prevalidation

    Technical Site

    Survey

    Technical Site

    Survey

    LeaseContract

    Permitting

    DetailedDesign

    ConstructionWorks

    TelecomImplementation

    RNP frequencyandparametersplanning,

    TransmissionPlanning(time-slot,cross-connect,Q3/Q1andsynchronisation)SARF

    SAR

    NetworkPlanning&

    ImplementationQuidelines

    N omi na l Pl an nin g P r e- Su rve y

    Pre-Survey

    NetworkPlanning&

    ImplementationQuidelines

    NetworkPlanning&

    ImplementationQuidelines

    NetworkPlanning&

    ImplementationQuidelines

    NetworkPlanning&

    ImplementationQuidelines

    LOS Check Network Verification

    0.-1. 6. 8. 9.

    Site Validation

    Site Validation

    7.

    NetworkVerification

  • 7/29/2019 Module#2Radio Network Planning and Design

    3/15

    Modul 2- Transmission Network Design and Documentation 5

    Organisasi Proyek

    z Struktur organisasi project

    z Dokumen: TND_ProjectOrganisation

    Modul 2- Transmission Network Design and Documentation 6

    Review: Nominal transmission plan

    Pendekatan pertama jaringan transmisiSewaktu-waktu dapat berubah karena perubahanlokasi site dan kondisi LOS yang tidak diketahui diawal

    Model lengkap jaringan, berisi:BTS, BSC, MSC sitesTransmission links with capacity estimateTransmission mediaEquipment neededUse of existing network, if available

  • 7/29/2019 Module#2Radio Network Planning and Design

    4/15

    Modul 2- Transmission Network Design and Documentation 7

    Review: Nominal Plan Contents (=high level planning,dimensioning)

    zTopology plan including media andtechnology selections

    z Capacity calculations including futureexpansions

    z General network layout drawings

    z Initial synchronisation plan (tdk mutlak)

    z General transmission management networkplan (tdk mutlak)

    Modul 2- Transmission Network Design and Documentation 8

    Document Template: Utk Nominal Plan (High Level)

    z BSC

    Number of:

    Capacity: BTS TRX A-ter

    Location:

    z BTS transmission:Used media:

    priority 1:

    priority 2:

    priority 3:

    priority 4:

  • 7/29/2019 Module#2Radio Network Planning and Design

    5/15

    Modul 2- Transmission Network Design and Documentation 9

    Document Template: Utk Nominal Plan (High Level)

    z Needed equipment: (estimation)

    1:

    2:

    3:4:

    z Topology

    Main principle:

    Al lowed exceptions:

    z Capacity needs

    Most common capacity used:

    Exceptions:Spare capacity for expansion: (% out of to tal capacity)

    Modul 2- Transmission Network Design and Documentation 10

    Document Template: Utk Nominal Plan (High Level)

    z Availability objectivesITU-T or ITU-R recommendat ion used as reference

    Objectives

    SESR:

    Al lowed unavailabil ity:

    z AppendiksMap ( and countour map)

    Capacity calcu lation

    Detail calculation and topo logy

    General network layout drawing (sinopsis, channeling plan, etc)

    BoQ (bill of quantity) year by year

  • 7/29/2019 Module#2Radio Network Planning and Design

    6/15

    Modul 2- Transmission Network Design and Documentation 11

    Detailed Network Planning

    Optimizing / fine tuningz Detailed network diagram

    z Protection plan (protection topology,synchronisation)

    z Managementplan

    zTimeslot plan

    z Synchronisation plan

    z

    Physical route calculations.

    Modul 2- Transmission Network Design and Documentation 12

    Example Documents

    Nominal Planning

  • 7/29/2019 Module#2Radio Network Planning and Design

    7/15

    Modul 2- Transmission Network Design and Documentation 13

    Capacity Calculations

    16 E1 (34 Mbps) -

    STM1 (155Mbps)34432179232640

    Muara Kaman

    Tenggarong

    16 E1 (34 Mbps)1996876819200Kota Bangun Mr Kaman

    4 E1 (8 Mbps)40962563840Muara Wis Kota Bangun

    4 E1 (8 Mbps)60162565760Muara Muntai Kota

    Bangun

    16 E1 (34 Mbps)1228876811520Kembang J anggut

    Mr Kaman

    4 E1 (8 Mbps)40962563840Kahala Kembang

    J anggut

    4 E1 (8 Mbps)40962563840Tabang KembangJ anggut

    Rekomendasi

    kapasitas radio

    Rate minimum

    total yg

    diperlukan

    (kbps)

    Rate total untuk

    keperluan video

    conference

    (kbps)

    Rate total

    Untuk j aringan

    lokal akses radio

    CDMA2000 1x

    (kbps)

    Link

    Modul 2- Transmission Network Design and Documentation 14

    Contoh : Sinopsis Link

    Synopsis Diagram

  • 7/29/2019 Module#2Radio Network Planning and Design

    8/15

    Modul 2- Transmission Network Design and Documentation 15

    Detailed Synopsis Diagram

    Modul 2- Transmission Network Design and Documentation 16

    Site Parameters

    Marangkayu8 Mbps3572.460

    16 Mbps2222.4100

    102Muara Badak4

    16 Mbps82.48587Samboja3

    8 Mbps1511.83035Loajanan2

    Palaran

    STM1150350

    MuarakamanSTM1315372

    T. Seberang34 Mbps601.872

    Loakulu8 Mbps1681.850

    72PKMTenggarong

    1

    Link toKapasitas

    radio l ink

    Bearing

    (derajat)

    Diameter

    antena (m)

    Tinggi

    antena

    (m)

    Tinggi

    tower (m)

    LokasiNo

  • 7/29/2019 Module#2Radio Network Planning and Design

    9/15

    Modul 2- Transmission Network Design and Documentation 17

    Contoh : Channelling Plan

    Modul 2- Transmission Network Design and Documentation 18

    Example documents

    Detailed Transmission Network

    Planning

  • 7/29/2019 Module#2Radio Network Planning and Design

    10/15

  • 7/29/2019 Module#2Radio Network Planning and Design

    11/15

    Modul 2- Transmission Network Design and Documentation 21

    Plan Sinkronisasi

    BSC

    DN2

    1

    3

    2

    OSCOSCOSC

    TRU

    1

    3

    2OSC 1

    3

    2OSC

    TRU

    BTS

    MCB =

    0 MCB =

    0

    MCB/LCB = 0/0

    MCB/LCB = 0/0

    MCB/LCB = 0/1

    MCB/LCB = 0/0MCB/LCB = 0/0MCB/LCB = 0/0

    MCB/LCB = 0/1MCB/LCB = 0/1

    MCB/LCB = 0/0 MCB/LCB = 0/0

    MCB/LCB = 0/0

    BTS

    OSC

    BTS

    OSC

    OSC

    TRU

    OK OK

    OK

    Modul 2- Transmission Network Design and Documentation 22

    Q1 Management Diagram

    ET 19

    Q1ch A-bis

    BSC01DN201 DN202 DN203

    3

    BCF001

    L1

    DMR 38W to I

    Suosaarenkallio

    BCF004

    DF 34 I

    RRI1

    Q1:TSL 31

    10021001

    ET 34

    Kutoja

    DH:ON

    1031

    1005

    DF 34I2M

    13

    DH:ON

    M MM

    DH:OFF DH:OFF

    0001 0002 0003Q1:TSL 0

    DH:ON

    CU

    21B1, B2used

    O&M/Q1

    Q1:TSL 31

    B7, B8used

    B7,B8usedQ1:TSL 31ch 1

    ch 0

    DMR 23I

    Laajalahti

    BCF005

    DF 45

    RRI2

    A1

    1006

    DH:ON

    PA:4071

    Prime Hopper

    Q1

    C11003DH:ON 1007

    D2

    D1

    D1J1

    J1

    J2

    1004

    Prime Hopper

    DH:ON

    PA:4070

    1001

    M

    D

    LEGEND:

    Q1 in TSL i orin internal bus inside DE/DF 34 BTS orin Radio

    Q1 via cable (V.11)

    Q1 in Radio/Optical Frame (In AUX data channel)

    Service interface box

    Address of Network Element in decimal mode

    Service interface of Radio Link Equipment/DN2

    Data interface of Radio Link Equipment/Optical Link Equipment

    CU Control Unit

    Branching UnitBU

    PA 4070 Physical Address of the Radio Link equipment

    1011DH:ON

    Kilo

    BCF007RRI1

    DMR 38W

    DMR 38I

    Kilonkallio

    BCF008

    DF 34I

    RRI1BCF007

    Kilo

    M

    DF 34I

    1012 1021

    1013 1014

    DH:ON DH:OFF

    1015 1016

    DH:ON DH:ON

    M M

    BU

    A1 A2

    A4

    DMR 38I

    D

    M

    M

    D

    DMR 38Wto W

  • 7/29/2019 Module#2Radio Network Planning and Design

    12/15

    Modul 2- Transmission Network Design and Documentation 23

    Field Works

    Modul 2- Transmission Network Design and Documentation 24

    Site Selection Criteria

    zRadio&TRS criteria

    good view in main beamdirection

    no surrounding highobstacles

    good visibility of terrain

    LOS to next microwave site

    availability of leased lines

    Other criteria

    space for equipment

    power supply

    access restrictions?

    house ownershort cabling distances

    room for antennamounting

    rental costs

  • 7/29/2019 Module#2Radio Network Planning and Design

    13/15

    Modul 2- Transmission Network Design and Documentation 25

    Site Process

    Site Aquisition

    Site prevalidation

    sign contractwith site owner

    get building permit

    construction work

    installing & testing

    on air!

    SARF

    SAR

    LOS check

    Technical sitesurvey

    #1 rank

    Nominal Radio plan Area survey

    Modul 2- Transmission Network Design and Documentation 26

    Site Survey

    z Survey kondisi dan lokasi site :z Site informationz Site locationz Buildingz Surroundingsz Equipment roomz Electricalz

    Battery roomz Cable rack and transitz Earthingz Signal cable and distribution framez Radio relay equipmentz Antenna towerz Drawings

    z Dokumen: TND_SiteSurveyCheckList

  • 7/29/2019 Module#2Radio Network Planning and Design

    14/15

    Modul 2- Transmission Network Design and Documentation 27

    Site Acquisition

    Ideal

    geographicalarea for cell basestation

    Second best

    area

    Third best area

    Keyword : as close as possible to

    the nil point (center of circle)

    Site Aquisition Survey: mencari lokasi site terbaikdidalam search ring (daerah pencarian)

    Modul 2- Transmission Network Design and Documentation 28

    Site Acquisition SurveySite Acquisition Survey

    Usually conducted by Civil Contractor

    Deal with many bureaucracy & legal matter

    Many negotiation with local government and local

    resident to acquire the site is needed

    Up to 3 alternative location for one search ring

    (search ring diameter for urban area is about 50

    100 m & rural area 200 500 m)

    Dokumen:Dokumen: TND_SiteAcquisitionRequest

    TND_SiteAcquisitionReport

  • 7/29/2019 Module#2Radio Network Planning and Design

    15/15

    Modul 2- Transmission Network Design and Documentation 29

    LOS Check

    z Mengecek kondisi Line Of Sight

    z LOS request

    Dokumen: LosRequestForm

    z LOS report

    Dokumen: LosReport

    Modul 2- Transmission Network Design and Documentation 30

    Site Validation

    z Validasi site yg disetujui

    z Dokumen:

    z TND_PreValidasi

    z TND_SiteValidation


Recommended