Modul 2- Transmission Network Design and Documentation 1
TND321:Modul#2Transmission Network Design &
Documentation
Modul 2- Transmission Network Design and Documentation 2
Outline
z Pendahuluan
z High level transmission network design &documentation
z Detailed transmission network design &documentation
7/29/2019 Module#2Radio Network Planning and Design
2/15
Modul 2- Transmission Network Design and Documentation 3
PendahuluanNetwork Planning Team Customer
Protection andcapacity planning
Detailed networkdiagram
Networkarchitecture andcross-connection
granularity analysis
Capacity, sparecapacity and
transportmediaanalysis
Management andsynchronisation
analysis
Technicalinformation about
the existingnetwork
Restrictions intransmission
media & capacity,and equipment
architecture
Equipmentarchitecture
analysis
Networkarchitecture andcross-connection
granularityplanning
Cost andnetworkanalysis
Roughequipment listfor one year
Rolloutready?
Networkrollout plan includingequipment lists andmanagement and
synchronization principles
Management &synchronisation
principles
Updatedtechnical
requirements
Timeslotplanning
Managementplanning
Synchronisationplanning
Detailednetwork plan
Physical routecalculations
Technicalrequirements
OK
Not OK
OK
Not OK
12
4 56
89
10
7
11
12
13
14
15
1617
18
21
3
1921
Network Planning Team danCustomer ...responsibilitas
Modul 2- Transmission Network Design and Documentation 4
Implementasi Step Pekerjaan
1. 2. 3. 4. 5.
LOGISTICS
SITE
ACQUISITION
NETWORK
PLANNING
SITE DESIGN &
PERMITTING
CONSTRUCTION
WORKS
TELECOM
IMPLEMENTATION
PreliminaryRadio
andTransmissionNetworkP lans
Longtermforecast
(TRX,radios,halfyear)
Roll-outforecast(TRX,
cabinets,combiners,radios,12-16 weeks)
CW andtelecom
forecast(subcontractedworks &material)
OrderingCW
(works &materials)
OrderingRAS:
incl.SISO ,BTS, Radios(frozen,2weeks)
InvoicingCWInvoicingNE +
Telecom
Site Validation
CW Acceptance
FinalSiteAcceptance
Technical Site
Survey
Site Prevalidation
Technical Site
Survey
Technical Site
Survey
LeaseContract
Permitting
DetailedDesign
ConstructionWorks
TelecomImplementation
RNP frequencyandparametersplanning,
TransmissionPlanning(time-slot,cross-connect,Q3/Q1andsynchronisation)SARF
SAR
NetworkPlanning&
ImplementationQuidelines
N omi na l Pl an nin g P r e- Su rve y
Pre-Survey
NetworkPlanning&
ImplementationQuidelines
NetworkPlanning&
ImplementationQuidelines
NetworkPlanning&
ImplementationQuidelines
NetworkPlanning&
ImplementationQuidelines
LOS Check Network Verification
0.-1. 6. 8. 9.
Site Validation
Site Validation
7.
NetworkVerification
7/29/2019 Module#2Radio Network Planning and Design
3/15
Modul 2- Transmission Network Design and Documentation 5
Organisasi Proyek
z Struktur organisasi project
z Dokumen: TND_ProjectOrganisation
Modul 2- Transmission Network Design and Documentation 6
Review: Nominal transmission plan
Pendekatan pertama jaringan transmisiSewaktu-waktu dapat berubah karena perubahanlokasi site dan kondisi LOS yang tidak diketahui diawal
Model lengkap jaringan, berisi:BTS, BSC, MSC sitesTransmission links with capacity estimateTransmission mediaEquipment neededUse of existing network, if available
7/29/2019 Module#2Radio Network Planning and Design
4/15
Modul 2- Transmission Network Design and Documentation 7
Review: Nominal Plan Contents (=high level planning,dimensioning)
zTopology plan including media andtechnology selections
z Capacity calculations including futureexpansions
z General network layout drawings
z Initial synchronisation plan (tdk mutlak)
z General transmission management networkplan (tdk mutlak)
Modul 2- Transmission Network Design and Documentation 8
Document Template: Utk Nominal Plan (High Level)
z BSC
Number of:
Capacity: BTS TRX A-ter
Location:
z BTS transmission:Used media:
priority 1:
priority 2:
priority 3:
priority 4:
7/29/2019 Module#2Radio Network Planning and Design
5/15
Modul 2- Transmission Network Design and Documentation 9
Document Template: Utk Nominal Plan (High Level)
z Needed equipment: (estimation)
1:
2:
3:4:
z Topology
Main principle:
Al lowed exceptions:
z Capacity needs
Most common capacity used:
Exceptions:Spare capacity for expansion: (% out of to tal capacity)
Modul 2- Transmission Network Design and Documentation 10
Document Template: Utk Nominal Plan (High Level)
z Availability objectivesITU-T or ITU-R recommendat ion used as reference
Objectives
SESR:
Al lowed unavailabil ity:
z AppendiksMap ( and countour map)
Capacity calcu lation
Detail calculation and topo logy
General network layout drawing (sinopsis, channeling plan, etc)
BoQ (bill of quantity) year by year
7/29/2019 Module#2Radio Network Planning and Design
6/15
Modul 2- Transmission Network Design and Documentation 11
Detailed Network Planning
Optimizing / fine tuningz Detailed network diagram
z Protection plan (protection topology,synchronisation)
z Managementplan
zTimeslot plan
z Synchronisation plan
z
Physical route calculations.
Modul 2- Transmission Network Design and Documentation 12
Example Documents
Nominal Planning
7/29/2019 Module#2Radio Network Planning and Design
7/15
Modul 2- Transmission Network Design and Documentation 13
Capacity Calculations
16 E1 (34 Mbps) -
STM1 (155Mbps)34432179232640
Muara Kaman
Tenggarong
16 E1 (34 Mbps)1996876819200Kota Bangun Mr Kaman
4 E1 (8 Mbps)40962563840Muara Wis Kota Bangun
4 E1 (8 Mbps)60162565760Muara Muntai Kota
Bangun
16 E1 (34 Mbps)1228876811520Kembang J anggut
Mr Kaman
4 E1 (8 Mbps)40962563840Kahala Kembang
J anggut
4 E1 (8 Mbps)40962563840Tabang KembangJ anggut
Rekomendasi
kapasitas radio
Rate minimum
total yg
diperlukan
(kbps)
Rate total untuk
keperluan video
conference
(kbps)
Rate total
Untuk j aringan
lokal akses radio
CDMA2000 1x
(kbps)
Link
Modul 2- Transmission Network Design and Documentation 14
Contoh : Sinopsis Link
Synopsis Diagram
7/29/2019 Module#2Radio Network Planning and Design
8/15
Modul 2- Transmission Network Design and Documentation 15
Detailed Synopsis Diagram
Modul 2- Transmission Network Design and Documentation 16
Site Parameters
Marangkayu8 Mbps3572.460
16 Mbps2222.4100
102Muara Badak4
16 Mbps82.48587Samboja3
8 Mbps1511.83035Loajanan2
Palaran
STM1150350
MuarakamanSTM1315372
T. Seberang34 Mbps601.872
Loakulu8 Mbps1681.850
72PKMTenggarong
1
Link toKapasitas
radio l ink
Bearing
(derajat)
Diameter
antena (m)
Tinggi
antena
(m)
Tinggi
tower (m)
LokasiNo
7/29/2019 Module#2Radio Network Planning and Design
9/15
Modul 2- Transmission Network Design and Documentation 17
Contoh : Channelling Plan
Modul 2- Transmission Network Design and Documentation 18
Example documents
Detailed Transmission Network
Planning
7/29/2019 Module#2Radio Network Planning and Design
10/15
7/29/2019 Module#2Radio Network Planning and Design
11/15
Modul 2- Transmission Network Design and Documentation 21
Plan Sinkronisasi
BSC
DN2
1
3
2
OSCOSCOSC
TRU
1
3
2OSC 1
3
2OSC
TRU
BTS
MCB =
0 MCB =
0
MCB/LCB = 0/0
MCB/LCB = 0/0
MCB/LCB = 0/1
MCB/LCB = 0/0MCB/LCB = 0/0MCB/LCB = 0/0
MCB/LCB = 0/1MCB/LCB = 0/1
MCB/LCB = 0/0 MCB/LCB = 0/0
MCB/LCB = 0/0
BTS
OSC
BTS
OSC
OSC
TRU
OK OK
OK
Modul 2- Transmission Network Design and Documentation 22
Q1 Management Diagram
ET 19
Q1ch A-bis
BSC01DN201 DN202 DN203
3
BCF001
L1
DMR 38W to I
Suosaarenkallio
BCF004
DF 34 I
RRI1
Q1:TSL 31
10021001
ET 34
Kutoja
DH:ON
1031
1005
DF 34I2M
13
DH:ON
M MM
DH:OFF DH:OFF
0001 0002 0003Q1:TSL 0
DH:ON
CU
21B1, B2used
O&M/Q1
Q1:TSL 31
B7, B8used
B7,B8usedQ1:TSL 31ch 1
ch 0
DMR 23I
Laajalahti
BCF005
DF 45
RRI2
A1
1006
DH:ON
PA:4071
Prime Hopper
Q1
C11003DH:ON 1007
D2
D1
D1J1
J1
J2
1004
Prime Hopper
DH:ON
PA:4070
1001
M
D
LEGEND:
Q1 in TSL i orin internal bus inside DE/DF 34 BTS orin Radio
Q1 via cable (V.11)
Q1 in Radio/Optical Frame (In AUX data channel)
Service interface box
Address of Network Element in decimal mode
Service interface of Radio Link Equipment/DN2
Data interface of Radio Link Equipment/Optical Link Equipment
CU Control Unit
Branching UnitBU
PA 4070 Physical Address of the Radio Link equipment
1011DH:ON
Kilo
BCF007RRI1
DMR 38W
DMR 38I
Kilonkallio
BCF008
DF 34I
RRI1BCF007
Kilo
M
DF 34I
1012 1021
1013 1014
DH:ON DH:OFF
1015 1016
DH:ON DH:ON
M M
BU
A1 A2
A4
DMR 38I
D
M
M
D
DMR 38Wto W
7/29/2019 Module#2Radio Network Planning and Design
12/15
Modul 2- Transmission Network Design and Documentation 23
Field Works
Modul 2- Transmission Network Design and Documentation 24
Site Selection Criteria
zRadio&TRS criteria
good view in main beamdirection
no surrounding highobstacles
good visibility of terrain
LOS to next microwave site
availability of leased lines
Other criteria
space for equipment
power supply
access restrictions?
house ownershort cabling distances
room for antennamounting
rental costs
7/29/2019 Module#2Radio Network Planning and Design
13/15
Modul 2- Transmission Network Design and Documentation 25
Site Process
Site Aquisition
Site prevalidation
sign contractwith site owner
get building permit
construction work
installing & testing
on air!
SARF
SAR
LOS check
Technical sitesurvey
#1 rank
Nominal Radio plan Area survey
Modul 2- Transmission Network Design and Documentation 26
Site Survey
z Survey kondisi dan lokasi site :z Site informationz Site locationz Buildingz Surroundingsz Equipment roomz Electricalz
Battery roomz Cable rack and transitz Earthingz Signal cable and distribution framez Radio relay equipmentz Antenna towerz Drawings
z Dokumen: TND_SiteSurveyCheckList
7/29/2019 Module#2Radio Network Planning and Design
14/15
Modul 2- Transmission Network Design and Documentation 27
Site Acquisition
Ideal
geographicalarea for cell basestation
Second best
area
Third best area
Keyword : as close as possible to
the nil point (center of circle)
Site Aquisition Survey: mencari lokasi site terbaikdidalam search ring (daerah pencarian)
Modul 2- Transmission Network Design and Documentation 28
Site Acquisition SurveySite Acquisition Survey
Usually conducted by Civil Contractor
Deal with many bureaucracy & legal matter
Many negotiation with local government and local
resident to acquire the site is needed
Up to 3 alternative location for one search ring
(search ring diameter for urban area is about 50
100 m & rural area 200 500 m)
Dokumen:Dokumen: TND_SiteAcquisitionRequest
TND_SiteAcquisitionReport
7/29/2019 Module#2Radio Network Planning and Design
15/15
Modul 2- Transmission Network Design and Documentation 29
LOS Check
z Mengecek kondisi Line Of Sight
z LOS request
Dokumen: LosRequestForm
z LOS report
Dokumen: LosReport
Modul 2- Transmission Network Design and Documentation 30
Site Validation
z Validasi site yg disetujui
z Dokumen:
z TND_PreValidasi
z TND_SiteValidation