    Presentation outline

    Company backgrounds

    The IJmuiden site.

    The need for pipeline management at IJmuiden.

    The solution

    Model predictive control

    The solution so far Working together

    Further work

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    3/25

    9/15/2011 3

    Gases

    Healthcare ( medical )

    Tonnage ( on-sites )

    Merchant and packaged ( liquefied and cylinder gases )

    Electronic gases

    The Linde group

    The Linde Group is one of the largest and most global of the world's leading gases and engineering

    companies. Following the acquisition of BOC in 2006, we have 50,000 employees in more than 100

    countries, and over 12 billion a year in sales.

    Engineering

    OlefinNatural gas

    Air separation

    Hydrogen and synthesis gas plants

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    4/259/15/2011 4

    4500

    Operations

    Personnel

    300

    ASUs

    70

    HyCO

    plants

    100

    CO2

    plants

    900

    Ecovar

    plants

    350

    Production

    Sites

    56

    countries

    Global Business Unit Tonnage: Global Operations

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    5/259/15/2011 5

    Linde Global Operations ASU plants

    Globally: 300 plants

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    6/259/15/2011 6

    Linde Gas Global operations

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    7/259/15/2011 7

    Tata Steel

    In 2007 Tata Steel Limited acquired Corus Group plc

    On 27 September 2010 Corus rebranded to Tata Steel

    Tata Steel Group:

    Fortune 500 company

    Top 10 global steel producer

    Annual crude steel capacity of 28 million tonnes

    More than 80,000 employees

    Manufacturing operations in 26 countriesacross 5 continents

    Serving customers all across the globe

    Turnover 2009-10: $22.8 billion

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    8/25

    9/15/2011 8

    Strip Products Mainland Europe & IJmuiden site (TataSteel)

    Produces hot rolled steel strip, cold rolled, metallic coated

    steels and processed steel products for industrial

    applications (for example, for construction)

    Manufacturing locations in different European countries.Largest production location in IJmuiden (9.300 employees)

    Annual crude steel capacity of 7,5 million tonnes

    Crude steel made by combination of 2 blast furnaces and

    3- converter BOS plant Blast furnaces operate with high coal and O2 injection

    rates

    IJmuiden

    Raw materials - Pig iron - Steelmaking - Casting - Rolling - Coating

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    9/25

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    10/25

    9/15/2011 10

    IJmuiden site

    Challenges

    TATA steel looking for improved site operation

    HPGOX demand is not constant but highly changing due to the batch making pattern of steel making.

    HPGOX pipeline with limited buffer capacity

    MPGOX is constant for the blast furnaces but can go up and down in steps. This also is a challenge.

    Typical HPGOX pattern

    resulting in high pipeline pressure changes

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    11/25

    9/15/2011 11

    The need for better pipeline management

    Improvements necessary in two main areas

    Reduction in venting. Production to meet demand.

    Better setting of the loads of the three main plants LF33, LF41, LF51 to improve overall

    efficiency.

    For Tata Steel

    Reduced energy bill therefore reduced costs.

    More reliable and consistent operation.

    For Linde

    Meeting the customers needs.

    Reduced operator input and thereby can concentrate on other tasks.

    More reliable and consistent operation.

    Site can be brought into ROC operation.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    12/25

    9/15/2011 12

    Model predictive control solution

    Tata Steel had already proven in simulation that model predictive control can give improvements

    in pipeline control. Online advisory system for Linde operators.

    Linde has significant experience with implementing online model predictive controllers on their

    air separation and HYCO units.

    Model predictive control was our solution.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    13/25

    9/15/2011 13

    Simplified architecture of the pipeline

    LF41

    LF51

    PIC

    PIC

    HPGOX

    VAROX ( 1- FAST )

    BASIC ( 3 - SLOW )

    MPGOX ( 2 MEDIUM )

    22 bar gas to converters

    ( variable demand,

    frequent large changes )

    8 bar gas to blast furnace

    (flatter demand pattern,

    changes less frequent)

    LOX TO

    STORAGE

    LIN TO

    STORAGE

    Other MP streams

    ( Normally constant unless plant /

    compression change )

    Other HP streams

    ( Normally constant

    unless plant / compression change )

    LET-DOWN

    FLOW

    FI

    MP VENT

    FLOW

    HP VENTFLOW

    LOX TANK

    LEVEL

    LIN TANK

    LEVEL

    MPGOX pressure needs to be very stable and so

    HP supplements all the time unless very low

    demand from blast furnace.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    14/25

    9/15/2011 14

    LF51 simplified controls

    FIC

    LICFIC

    FIC

    HP TURBINE

    PIC

    MAIN

    EXCHANGER

    FIC

    ARGON

    SYSTEM

    HPGOX TO PIPELINE

    FIC

    LIN TO

    STORAGE

    1

    FIC

    1

    LPGAN

    FIC

    AIR TO

    PLANT

    LIQUID EXPANDER

    LP TURBINE

    LIC

    LOX TO

    STORAGE

    *

    *

    *

    *

    *

    **

    **

    **

    * Adjusted for VAROX or BASIC

    ** Adjusted for BASIC

    HP

    COL

    LP

    COL

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    15/25

    9/15/2011 15

    LF41 simplified controls

    FIC

    LICFIC

    FIC

    HP TURBINE

    PIC

    MAIN

    EXCHANGER

    FIC

    ARGON

    SYSTEM

    HPGOX TO PIPELINE

    FIC

    LIN TO

    STORAGE

    1

    FIC

    1

    LPGAN

    FIC

    AIR TO

    PLANT

    LIQUID EXPANDER

    LP TURBINE

    LIC

    LOX TO

    STORAGE

    *

    *

    *

    *

    *

    **

    **

    **

    * Adjusted for VAROX or BASIC

    ** Adjusted for BASIC

    HP

    COL

    LP

    COL

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    16/25

    9/15/2011 16

    Key handles.

    Key handle Ramp speed Maximise or minimise

    LF51 VAROX Minimal effect on

    columns so can

    move fast

    Zero. Depends on how much LOX or LIN to produce.

    Check tank levels.

    LF51 BASIC Air change so

    needs to be

    slower

    Maximise since LF51 BASIC can be produced

    efficiently although high purity and high pressure

    LF41 MPGOX No Argon so speed

    can be medium

    Minimise since LF41 oxygen is expensive to produce

    although low purity.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    17/25

    9/15/2011 17

    Model predictive control solution to work with existingsupervisory controls

    Production Controller ( LMPC )

    LF51 HPGOX

    VAROX target

    LF51 HPGOXbasic target

    LF41 MPGOX

    target

    ALC LF51 ALC LF41

    DCS LF51

    PLANT SET-POINTS

    E.G. HPGOX, AIR, REFLUX FLOWS; ETC.

    DCS LF41

    Plant set-points

    E.G. HPGOX, AIR, REFLUX FLOWS; ETC.

    EXISTING

    NEW

    LF41 and LF51 already have existing load control programs or automatic load change ( ALC ).

    These give good performance within certain ramp speeds. The LMPC pipeline controller or

    Production Controller was therefore interfaced with these existing load controllers.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    18/25

    9/15/2011 18

    Variables in the model predictive controller

    Type Description

    MV

    ( manipulated )

    LF51 VAROX target, LF51 BASIC target, LF41 MPGOX target

    CV

    ( controlled )

    VAROX target ( longer term requirement ). Note this is not actually a true CV but the

    controller drives to it using a combination of LP weight.

    LV

    ( constraint )

    Let-down flow, HP pipeline pressure, LOX and LIN tank levels

    FF

    ( feed-forward )

    Demand forecast from Tata Steel ( still under test ).

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    19/25

    9/15/2011 19

    HPGOX demand forecast from customer

    General expectation

    Should be very useful for

    ramping plants before the

    actual demand changeoccurs

    Key question

    Quality of the forecast

    Reliability of the signal

    (data interface to

    customer)

    Demand picks up

    before the

    prediciton

    Predicted time of

    1hour with no

    HPGOX demand

    real demand

    forecast (now)forecast (in past)

    futurepastnow

    Forecast given atthat time

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    20/25

    9/15/2011 20

    IJmuiden Production Controller: Control strategy

    Use pipeline pressure as quickly reacting key measurement for demand changes.

    Use LF51 VAROX and LF41 as quick control handles to control pressure within limits

    Use LF51 base and LF41 to keep VAROX at target

    On

    Dropping pressure

    (increased demand),ramping VAROX, LF41 andslowly LF51 base up

    Slowly ramping LF51

    base up, to be able to

    keep VAROX at target

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    21/25

    9/15/2011 21

    Typical weekly performance: Production Controller

    The Production Controller

    significantly reduces venting that can be avoided

    manages difficult situations without increase of controllable venting

    On

    High venting due to lack of MPGOX demand => high specific power

    BUT: still very small controllable ventsHigh venting due to PC switched off(high controllable vents)

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    22/25

    9/15/2011 22

    IJmuiden Production Controller: First experience on site

    What is observed so far

    Significant reduction of GOX loss - benefit for customer Tata Steel

    Reduction of specific norm power payments e.g. better balancing of ASUs for minimum

    power - benefit for customer Tata Steel

    Significant reduction of workload for the operator benefit for Linde

    Operators do not have to permanently monitor changing customer demand of HPGOX and

    MPGOX.

    Production Controller automatically adapts production to meet varying customer demandand to minimise venting

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    23/25

    9/15/2011 23

    IJmuiden Production Controller: Novel features

    Technology

    Straight-forward LMPC solution at typical RTO layer.

    In the LMPC solution, sensible approach to balance

    short and long term objectives of the controller using LP weights.

    People

    Working closely with the customer ( Linde / Tata Steel ).

    Working closely with the operators they like it !

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    24/25

    9/15/2011 24

    Further work

    IMPROVE

    Investigate further the use of demand forecast for improved oxygen pipeline control.

    VAROX target at present operator set. Use longer term tools to advise e.g. steel works outage.

    Replace ALC controllers on LF41/LF51 with LMPC for better control.

    EXPAND

    Inclusion of LF33 into the Production Controller once the LF33 control system has been upgraded.

  • 8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC

    25/25

    9/15/2011 25

    Any questions ?

    The use of model predictive control foroxygen pipeline management.