9/15/2011 2
Presentation outline
Company backgrounds
The IJmuiden site.
The need for pipeline management at IJmuiden.
The solution
Model predictive control
The solution so far Working together
Further work
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
3/25
9/15/2011 3
Gases
Healthcare ( medical )
Tonnage ( on-sites )
Merchant and packaged ( liquefied and cylinder gases )
Electronic gases
The Linde group
The Linde Group is one of the largest and most global of the world's leading gases and engineering
companies. Following the acquisition of BOC in 2006, we have 50,000 employees in more than 100
countries, and over 12 billion a year in sales.
Engineering
OlefinNatural gas
Air separation
Hydrogen and synthesis gas plants
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
4/259/15/2011 4
4500
Operations
Personnel
300
ASUs
70
HyCO
plants
100
CO2
plants
900
Ecovar
plants
350
Production
Sites
56
countries
Global Business Unit Tonnage: Global Operations
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
5/259/15/2011 5
Linde Global Operations ASU plants
Globally: 300 plants
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
6/259/15/2011 6
Linde Gas Global operations
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
7/259/15/2011 7
Tata Steel
In 2007 Tata Steel Limited acquired Corus Group plc
On 27 September 2010 Corus rebranded to Tata Steel
Tata Steel Group:
Fortune 500 company
Top 10 global steel producer
Annual crude steel capacity of 28 million tonnes
More than 80,000 employees
Manufacturing operations in 26 countriesacross 5 continents
Serving customers all across the globe
Turnover 2009-10: $22.8 billion
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
8/25
9/15/2011 8
Strip Products Mainland Europe & IJmuiden site (TataSteel)
Produces hot rolled steel strip, cold rolled, metallic coated
steels and processed steel products for industrial
applications (for example, for construction)
Manufacturing locations in different European countries.Largest production location in IJmuiden (9.300 employees)
Annual crude steel capacity of 7,5 million tonnes
Crude steel made by combination of 2 blast furnaces and
3- converter BOS plant Blast furnaces operate with high coal and O2 injection
rates
IJmuiden
Raw materials - Pig iron - Steelmaking - Casting - Rolling - Coating
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
9/25
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
10/25
9/15/2011 10
IJmuiden site
Challenges
TATA steel looking for improved site operation
HPGOX demand is not constant but highly changing due to the batch making pattern of steel making.
HPGOX pipeline with limited buffer capacity
MPGOX is constant for the blast furnaces but can go up and down in steps. This also is a challenge.
Typical HPGOX pattern
resulting in high pipeline pressure changes
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
11/25
9/15/2011 11
The need for better pipeline management
Improvements necessary in two main areas
Reduction in venting. Production to meet demand.
Better setting of the loads of the three main plants LF33, LF41, LF51 to improve overall
efficiency.
For Tata Steel
Reduced energy bill therefore reduced costs.
More reliable and consistent operation.
For Linde
Meeting the customers needs.
Reduced operator input and thereby can concentrate on other tasks.
More reliable and consistent operation.
Site can be brought into ROC operation.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
12/25
9/15/2011 12
Model predictive control solution
Tata Steel had already proven in simulation that model predictive control can give improvements
in pipeline control. Online advisory system for Linde operators.
Linde has significant experience with implementing online model predictive controllers on their
air separation and HYCO units.
Model predictive control was our solution.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
13/25
9/15/2011 13
Simplified architecture of the pipeline
LF41
LF51
PIC
PIC
HPGOX
VAROX ( 1- FAST )
BASIC ( 3 - SLOW )
MPGOX ( 2 MEDIUM )
22 bar gas to converters
( variable demand,
frequent large changes )
8 bar gas to blast furnace
(flatter demand pattern,
changes less frequent)
LOX TO
STORAGE
LIN TO
STORAGE
Other MP streams
( Normally constant unless plant /
compression change )
Other HP streams
( Normally constant
unless plant / compression change )
LET-DOWN
FLOW
FI
MP VENT
FLOW
HP VENTFLOW
LOX TANK
LEVEL
LIN TANK
LEVEL
MPGOX pressure needs to be very stable and so
HP supplements all the time unless very low
demand from blast furnace.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
14/25
9/15/2011 14
LF51 simplified controls
FIC
LICFIC
FIC
HP TURBINE
PIC
MAIN
EXCHANGER
FIC
ARGON
SYSTEM
HPGOX TO PIPELINE
FIC
LIN TO
STORAGE
1
FIC
1
LPGAN
FIC
AIR TO
PLANT
LIQUID EXPANDER
LP TURBINE
LIC
LOX TO
STORAGE
*
*
*
*
*
**
**
**
* Adjusted for VAROX or BASIC
** Adjusted for BASIC
HP
COL
LP
COL
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
15/25
9/15/2011 15
LF41 simplified controls
FIC
LICFIC
FIC
HP TURBINE
PIC
MAIN
EXCHANGER
FIC
ARGON
SYSTEM
HPGOX TO PIPELINE
FIC
LIN TO
STORAGE
1
FIC
1
LPGAN
FIC
AIR TO
PLANT
LIQUID EXPANDER
LP TURBINE
LIC
LOX TO
STORAGE
*
*
*
*
*
**
**
**
* Adjusted for VAROX or BASIC
** Adjusted for BASIC
HP
COL
LP
COL
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
16/25
9/15/2011 16
Key handles.
Key handle Ramp speed Maximise or minimise
LF51 VAROX Minimal effect on
columns so can
move fast
Zero. Depends on how much LOX or LIN to produce.
Check tank levels.
LF51 BASIC Air change so
needs to be
slower
Maximise since LF51 BASIC can be produced
efficiently although high purity and high pressure
LF41 MPGOX No Argon so speed
can be medium
Minimise since LF41 oxygen is expensive to produce
although low purity.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
17/25
9/15/2011 17
Model predictive control solution to work with existingsupervisory controls
Production Controller ( LMPC )
LF51 HPGOX
VAROX target
LF51 HPGOXbasic target
LF41 MPGOX
target
ALC LF51 ALC LF41
DCS LF51
PLANT SET-POINTS
E.G. HPGOX, AIR, REFLUX FLOWS; ETC.
DCS LF41
Plant set-points
E.G. HPGOX, AIR, REFLUX FLOWS; ETC.
EXISTING
NEW
LF41 and LF51 already have existing load control programs or automatic load change ( ALC ).
These give good performance within certain ramp speeds. The LMPC pipeline controller or
Production Controller was therefore interfaced with these existing load controllers.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
18/25
9/15/2011 18
Variables in the model predictive controller
Type Description
MV
( manipulated )
LF51 VAROX target, LF51 BASIC target, LF41 MPGOX target
CV
( controlled )
VAROX target ( longer term requirement ). Note this is not actually a true CV but the
controller drives to it using a combination of LP weight.
LV
( constraint )
Let-down flow, HP pipeline pressure, LOX and LIN tank levels
FF
( feed-forward )
Demand forecast from Tata Steel ( still under test ).
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
19/25
9/15/2011 19
HPGOX demand forecast from customer
General expectation
Should be very useful for
ramping plants before the
actual demand changeoccurs
Key question
Quality of the forecast
Reliability of the signal
(data interface to
customer)
Demand picks up
before the
prediciton
Predicted time of
1hour with no
HPGOX demand
real demand
forecast (now)forecast (in past)
futurepastnow
Forecast given atthat time
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
20/25
9/15/2011 20
IJmuiden Production Controller: Control strategy
Use pipeline pressure as quickly reacting key measurement for demand changes.
Use LF51 VAROX and LF41 as quick control handles to control pressure within limits
Use LF51 base and LF41 to keep VAROX at target
On
Dropping pressure
(increased demand),ramping VAROX, LF41 andslowly LF51 base up
Slowly ramping LF51
base up, to be able to
keep VAROX at target
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
21/25
9/15/2011 21
Typical weekly performance: Production Controller
The Production Controller
significantly reduces venting that can be avoided
manages difficult situations without increase of controllable venting
On
High venting due to lack of MPGOX demand => high specific power
BUT: still very small controllable ventsHigh venting due to PC switched off(high controllable vents)
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
22/25
9/15/2011 22
IJmuiden Production Controller: First experience on site
What is observed so far
Significant reduction of GOX loss - benefit for customer Tata Steel
Reduction of specific norm power payments e.g. better balancing of ASUs for minimum
power - benefit for customer Tata Steel
Significant reduction of workload for the operator benefit for Linde
Operators do not have to permanently monitor changing customer demand of HPGOX and
MPGOX.
Production Controller automatically adapts production to meet varying customer demandand to minimise venting
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
23/25
9/15/2011 23
IJmuiden Production Controller: Novel features
Technology
Straight-forward LMPC solution at typical RTO layer.
In the LMPC solution, sensible approach to balance
short and long term objectives of the controller using LP weights.
People
Working closely with the customer ( Linde / Tata Steel ).
Working closely with the operators they like it !
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
24/25
9/15/2011 24
Further work
IMPROVE
Investigate further the use of demand forecast for improved oxygen pipeline control.
VAROX target at present operator set. Use longer term tools to advise e.g. steel works outage.
Replace ALC controllers on LF41/LF51 with LMPC for better control.
EXPAND
Inclusion of LF33 into the Production Controller once the LF33 control system has been upgraded.
8/10/2019 Mon 10.50 Use of Mpc for Pipeline Management P Buron BOC
25/25
9/15/2011 25
Any questions ?
The use of model predictive control foroxygen pipeline management.