+ All Categories
Home > Documents > Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass...

Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass...

Date post: 10-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
4
Monroe Connector/Bypass Final EIS Fact Sheet M M M M M M M M M M M M M M M M M M Mo o o o o o o o o o on n n n n n n n n n n nr r r r r r r r r r r ro o o o o o o o o o o oe e e e e e e e e e e e e e e e e e e C C C C C C C C C C C C C C C Co o o o o o o o o o o n n n n n n n n n n n nn n n n n n n n n n n ne e e e e e e e e e e e e e ec c c c c c c c c c c t t t t t t t t t t t t t t to o o o o o o o o o or r r r r r r r r r r r/ / / / / / / / / / / / / / / /B B B B B B B B B B B B B B B B B B B B B By y y y y y y y y y y y y p p p p p p p p p p p p p a a a a a a a a a a a a a a as s s s s s s s s s s s s s s s s s s s s s s s s s s s s s p p p p Monroe Connector/Bypass Final EIS Fact Sheet 1 The Final Environmental Impact State- ment (EIS) for the Monroe Connec- tor/Bypass has been approved by the Federal Highway Administration. The document includes selection of the Preferred Alternative for the highway and responds to comments received on the Draft EIS (see Appendix B of the Final EIS for comments and re- sponses). The Final EIS is available for public comment through June 25 on the project web site at www.ncturn- pike.org/projects/monroe and at the following locations: NCTA Ofce 5400 Glenwood Ave. Suite 400 Raleigh, NC 27612 (919) 571-3000 NCDOT Div. 10 Ofce 716 W. Main St. Albemarle, NC 28001 (704) 982-0101 Monroe Planning Dept. 300 West Crowell St. Monroe, NC 28112 (704) 282-4527 Indian Trail Planning Dept. 130 Blythe Dr. Indian Trail, NC 28079 (704) 821-5401 Monroe Library 316 East Windsor St. Monroe, NC 28112 (704) 283-8184 Edwards Memorial Library 414 Hasty St. Marshville, NC 28103 (704) 624-2828 Stallings Planning Dept. 315 Stallings Rd. Stallings, NC 28104 (704) 821-8557 Matthews Branch Library 230 Matthews Station St. Matthews, NC 28105 (704) 416-5000 Union West Library 123 Unionville-Indian Trail Rd. Indian Trail, NC 28079 (704) 821-7475 MUMPO / Charlotte- Mecklenburg Planning Dept. 600 East Fourth St. (8th Floor) Charlotte, NC 28202 (704) 336-2205 The following project documents were prepared in support of the Final EIS and are available on the project web site at www.ncturnpike.org/projects/ monroe: Freshwater Mussel Survey Report (July 2009) Addendum to Trafc Noise Technical Memorandum (January 2010) Review for Potential On-Site Mitiga- tion Technical Memorandum (Febru- ary 2010) Final Addendum to Year 2035 Build Trafc Operations Technical Memo- randum (February 2010) Archaeological Inventory and Evalua- tion for the U.S. 74 Monroe Connector (March 2010) Monroe Connector/Bypass Service Road Study (May 2010) Indirect and Cumulative Effects Quantitative Analysis (April 2010) Indirect and Cumulative Effects Wa- ter Quality Analysis (April 2010) Draft Biological Assessment of Caro- lina Heelsplitter (Lasmigona decorata) and Designated Critical Habitat, Schweintiz’s Sunower (Helianthus schweinitzii), Michaux’s Sumac (Rhus michauxii), and Smooth Coneower (Echinacea laevigata) (April 2010) Final EIS Now Available Preferred Alternative Development Alternative D was identied as the project’s Recommended Alternative in the Draft Environmental Impact Statement (EIS) approved by the Federal Highway Administration in March 2009. Based on public comments received on the Draft EIS and in coordination with environmental resource and regulatory agencies, Alterna- tive D has now been conrmed as the project’s Preferred Alternative. Alternative D was selected because it has lower overall impacts to the natural environment and residential areas than the other alternatives consid- ered. Final approval of the Preferred Alternative is expected this summer when the Federal Highway Administra- tion issues a Record of Decision (ROD). The ROD signals formal federal approval of the preferred alternative corridor and authorizes the Turnpike Authority to proceed with nal design, right-of-way acquisition and construction as funds are available. May 2010 Additional Studies
Transcript
Page 1: Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass NCDOT STIP Project No. R-3329/R-2559 * * Partial Interchange POTENTIAL INTERCHANGE

Monroe Connector/Bypass

Final EIS Fact SheetMMMMMMMMMMMMMMMMMMMooooooooooonnnnnnnnnnnnrrrrrrrrrrrrooooooooooooeeeeeeeeeeeeeeeeeee CCCCCCCCCCCCCCCCoooooooooooonnnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeeecccccccccccctttttttttttttttooooooooooorrrrrrrrrrrr////////////////BBBBBBBBBBBBBBBBBBBBBByyyyyyyyyyyyyyyyyyppppppppppppppppppppppaaaaaaaaaaaaaaasssssssssssssssssssssssssssssssMMMMMMMMMMMMMMMMMMMooooooooonnnnnnnnnnnnrrrrrrrrrrroooooooooooeeeeeeeeeeeee CCCCCCCCCCoooooooooonnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeccccccccccttttttttttttttooooooooorrrrrrrrrrr/////////BBBBBBBBBBBBBBBBBBBBBByyyyyyyyyyyyyyypppppppppppppppaaaaaaaaaaaaassssssssssssssssssssssssMonroe Connector/Bypass

Final EIS Fact Sheet

1

The Final Environmental Impact State-ment (EIS) for the Monroe Connec-tor/Bypass has been approved by the Federal Highway Administration. The document includes selection of the Preferred Alternative for the highway and responds to comments received on the Draft EIS (see Appendix B of the Final EIS for comments and re-sponses). The Final EIS is available for public comment through June 25 on the project web site at www.ncturn-pike.org/projects/monroe and at the following locations:

NCTA OfÞ ce 5400 Glenwood Ave. Suite 400 Raleigh, NC 27612 (919) 571-3000

NCDOT Div. 10 OfÞ ce 716 W. Main St. Albemarle, NC 28001 (704) 982-0101

Monroe Planning Dept.300 West Crowell St.Monroe, NC 28112(704) 282-4527

Indian Trail Planning Dept.130 Blythe Dr.Indian Trail, NC 28079(704) 821-5401

Monroe Library316 East Windsor St.Monroe, NC 28112(704) 283-8184

Edwards Memorial Library414 Hasty St.Marshville, NC 28103(704) 624-2828

Stallings Planning Dept.315 Stallings Rd.Stallings, NC 28104(704) 821-8557

Matthews Branch Library230 Matthews Station St.Matthews, NC 28105(704) 416-5000

Union West Library123 Unionville-Indian Trail Rd.Indian Trail, NC 28079(704) 821-7475

MUMPO / Charlotte-Mecklenburg Planning Dept.600 East Fourth St. (8th Floor)Charlotte, NC 28202(704) 336-2205

The following project documents were prepared in support of the Final EIS and are available on the project web site at www.ncturnpike.org/projects/monroe:

Freshwater Mussel Survey Report (July 2009)

Addendum to TrafÞ c Noise Technical Memorandum (January 2010)

Review for Potential On-Site Mitiga-tion Technical Memorandum (Febru-ary 2010)

Final Addendum to Year 2035 Build TrafÞ c Operations Technical Memo-randum (February 2010)

Archaeological Inventory and Evalua-tion for the U.S. 74 Monroe Connector (March 2010)

Monroe Connector/Bypass Service Road Study (May 2010)

Indirect and Cumulative Effects Quantitative Analysis (April 2010)

Indirect and Cumulative Effects Wa-ter Quality Analysis (April 2010)

Draft Biological Assessment of Caro-lina Heelsplitter (Lasmigona decorata) and Designated Critical Habitat, Schweintiz’s Sunß ower (Helianthus schweinitzii), Michaux’s Sumac (Rhus michauxii), and Smooth Coneß ower (Echinacea laevigata) (April 2010)

Final EIS Now Available

Preferred Alternative Development

Alternative D was identiÞ ed as the project’s Recommended Alternative in the Draft Environmental Impact Statement (EIS) approved by the Federal Highway Administration in March 2009. Based on public comments received on the Draft EIS and in coordination with environmental resource and regulatory agencies, Alterna-tive D has now been conÞ rmed as the project’s Preferred Alternative. Alternative D was selected because it has lower overall impacts to the natural environment and residential areas than the other alternatives consid-ered.

Final approval of the Preferred Alternative is expected this summer when the Federal Highway Administra-tion issues a Record of Decision (ROD). The ROD signals formal federal approval of the preferred alternative corridor and authorizes the Turnpike Authority to proceed with Þ nal design, right-of-way acquisition and construction as funds are available.

May 2010Additional Studies

Page 2: Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass NCDOT STIP Project No. R-3329/R-2559 * * Partial Interchange POTENTIAL INTERCHANGE

Right-of-Way Acquisition

Once construction plans are far enough along, the Turnpike Authority will begin the process of acquiring the property needed to construct the project. Individual land own-ers will be contacted by a right-of-way agent who will explain this acquisition process. Based on current schedules, it is anticipated that agents will begin contacting property owners in early 2011.

Brochures regarding the right-of-way acquisition process and relocation assistance can be found at www.ncturnpike.org/projects/monroe/documents.asp

Funding

The Monroe Connector/Bypass is estimated to cost between approximately $750 and $825 million and will be Þ nanced using a variety of sources, including toll revenue bonds, federal loans, and state funding. Project Þ nancing is expected to be Þ nalized in 2010.

Project Schedule

Record of Decision (ROD) 3rd quarter 2010

Finance Plan 4th quarter 2010

Award Contract to 4th quarter 2010Design-Build Team

Begin Construction Plan 1st quarter 2011Development

Begin Right-of-Way 1st quarter 2011Acquisition

Public Meetings 2nd quarter 2011

Project Open to TrafÞ c 2014 / 2015

Updates to the Preferred Alternative

During the public comment period following the publication of the Draft EIS, several concerns regarding the design of the Preferred Alternative and its impacts to the surrounding areas were raised by the members of the public, local municipalities and resource/regu-latory agencies. In response, design modiÞ cations were made in the following areas: Forest Park subdivision, Beverly Drive, Bonterra Village, Unionville-Indian Trail Road interchange, and Austin Chaney Road interchange/McIntyre Road. These changes are discussed in Section 2.3 of the Final EIS.

The table below gives the estimated impacts of the Preferred Alternative along with alternatives presented in the Draft EIS. Impacts associated with the Preferred Alternative reß ect the design changes made since the Draft EIS and the inclusion of service roads. A complete summary of the project impacts is included in the Final EIS.

Range of all Alternatives in Draft EIS

Alternative D in Draft EIS

Preferred Alternative in Final EIS

Business Relocations 14 - 49 48 47

Residential Relocations 94 - 149 107 95

Farm Relocations 3 3 3

Stream Impacts (ft) 21,146 - 24,818 21,709 23,083

Wetland Impacts (ac) 6.2 - 11.0 8.1 8.1

Costs (millions $)1 $695.0 - $859.5 $716.3 - $850.0 $749.1 - $824.3

1- Costs of the Preferred Alternative reß ect a higher level of conÞ dence than previous estimates resulting in a narrower price range.

2

Page 3: Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass NCDOT STIP Project No. R-3329/R-2559 * * Partial Interchange POTENTIAL INTERCHANGE

Leg

en

d

Pre

ferr

ed A

ltern

ative R

ight of W

ay

Pre

ferr

ed A

ltern

ative S

erv

ice R

oads

Pre

ferr

ed A

ltern

ative S

tudy C

orr

idor!

!

!

!

!

!

!

!

!

N Rocky River Rd

Un

ion

ville

- In

dia

n

Poplin Rd

S Rocky River Rd

Medlin Rd

Old

Mo

nro

e M

ars

hville

Rd

Ridge RdA

ust

in G

rove

Ch

urc

h R

d

Wal

kup A

ve

Mo

nro

e -

An

so

nville

Rd

Austin Chaney Rd

Oliv

e B

ranc

h R

d

Mills Harris Rd

Ans

onvi

lle R

d

Old

Hig

hw

ay R

d

Forest Hills School Rd

McIntyre Rd

Lake

Twitty

Lake

Lee

Ric

har

dso

n C

reek

Meadow Branch

Stumplick BranchSouth Fork Crooked Creek

Nort

h F

ork

Cro

oked C

reek

Bears

kin

Cre

ek

Ste

war

ts C

reek

Mo

nro

e

Un

ion

ville

Win

ga

te

Mars

hville

Ind

ian

Tra

il

Wed

din

gto

nSta

llin

gs

Lake P

ark

Hem

by B

rid

ge

Wesle

y C

hap

el

Mec

klen

burg

Co.

Uni

on C

o.

Matt

hew

s

Min

t H

ill

Fair

vie

w

ÕÖ21

8

ÕÖ51

ÕÖ84

ÕÖ20

5

ÕÖ75

ÕÖ20

0

§̈ ¦48

5

§̈ ¦48

5

Peb

ble

Cre

ek

Go

lf C

ou

rse

Ro

llin

g H

ills

Co

un

ty C

lub

Fu

ture

Matt

hew

sS

po

rts

ple

x

Belk

Sta

diu

m

Sard

isE

lem

en

tary

Sch

oo

l

Fo

rest

Hills

Hig

h S

ch

oo

l

Sta

llin

gs

Ele

men

tary

Sch

oo

l

Cen

tral P

ied

mo

nt

Co

mm

un

ity C

olleg

e

74

74

74

601

)"

1

2

3

4

5

6

7

8

9

Wesley C

hapel Sto

uts R

d

Waxhaw-Indian Trail Rd

Old

Char

lotte

Hwy

Stallings Rd

Indi

an T

rail

Fairvi

ew R

d

Matthews In

dian Trail Rd

Tra

il R

d

Un

ion

ville

- In

dia

nTr

ail R

d

Secrest Short Cut Rd

74Fo

wle

r-Sec

rest

Rd

Secrest Short

Cut

Rd

Fo

wle

r R

d

Deese R

d

Law

yers

Rd

Goose C

reek

Gra

ss C

reek

Salem Creek

Beaverd

am

Cre

ek

West F

ork T

welv

emile

Cre

ek

East

Fo

rk M

olly B

ran

ch

Davis Mine Creek

Price Mill Creek

Ch

arl

ott

e M

on

roe

Execu

tive A

irp

ort

US

74 B

usin

ess

India

n T

rail-

Fairvie

w R

oad

Rocky R

iver

Road

Concord

Hig

hw

ay (

US

601)

Morg

an M

ill R

oad (

NC

200)

Austin C

haney R

oad

Fore

st H

ills S

chool R

oad

US

74 B

usin

ess

987

654

21

Mo

nro

e C

on

ne

cto

r /

By

pa

ss

Pre

ferr

ed

Alt

ern

ati

ve

NC

DO

T S

TIP

Pro

ject

No

. R-3

32

9/R

-25

59

*

*P

art

ial In

terc

hange

PO

TE

NT

IAL

IN

TE

RC

HA

NG

E L

OC

AT

ION

S

*

NO

TE

: T

he P

refe

rred A

ltern

ativ

e, th

e li

ght yello

w a

rea o

n the m

ap, is

a m

inin

um

of 1,0

00 feet w

ide. T

he functio

nal e

ngin

eering d

esig

n for

the r

oad h

as a

min

imum

right-

of-

way w

idth

of 260 to 3

00 feet and is

locate

d w

ithin

the c

orr

idor.

G

o to

ww

w.n

ctu

rnpik

e.o

rg/p

roje

cts

/monro

e for

a d

eta

iled lo

ok a

t th

e P

refe

rred A

ltern

ativ

e.

Unio

nvill

e-I

ndia

nT

rail

Road

3

May 2

010

01. 5

0.7

5

Miles

Pro

jec

t M

ap

sD

etai

led

pro

ject

map

s ca

n be

foun

d at

ww

w.n

ctu

rnp

ike.

org/

pro

cure

men

t/M

onro

e.as

p u

nder

Fun

ctio

nal D

esig

ns.

The

se m

aps

dep

ict

a su

gges

ted

alig

nmen

t w

ithi

n th

e P

refe

rred

Alt

erna

tive

cor

rido

r, d

evel

oped

as

par

t of

the

env

iron

men

tal p

lann

ing

pro

cess

. A

s th

e p

roje

ct m

oves

forw

ard

into

Þ na

l des

ign,

the

sug

gest

ed a

lign

men

t an

d de

sign

s m

ay b

e m

odiÞ

ed

but

mus

t re

mai

n w

ithi

n th

e P

refe

rred

Alt

erna

tive

cor

rido

r.

3

Page 4: Monroe Connector/Bypass Final EIS Fact Sheet · Preferred Alternative Monroe Connector / Bypass NCDOT STIP Project No. R-3329/R-2559 * * Partial Interchange POTENTIAL INTERCHANGE

Contact Information

[email protected](919) 571-3000

Jennifer Harris, P.E.Director of Planning andEnvironmental Studies

North Carolina Turnpike Authority1578 Mail Service CenterRaleigh, NC 27699-1578

Toll Collection System

An electronic toll collection system will be installed on the Monroe Bypass/Connector so drivers will not have to stop at toll booths. Instead, a wireless transponder/receiver system will be used to col-lect tolls. Drivers will set up a prepaid account and mount a small transponder on the windshield of their vehicle. A receiver mounted over the roadway will automatically deduct the tolls as the vehicle travels under it at highway speed.

The Turnpike Authority will work with other toll authorities to en-sure that transponders from other states can be used. Drivers who do not have a transponder will have a photo taken of their license plate and will be mailed a bill. In addition, the Turnpike Authority will operate a facility in the project area that accepts cash payments for tolls.

Monroe Connector/BypassMMMMMMMMMMMMMMMMMMMMooooooooooonnnnnnnnnnnnrrrrrrrrrrrrooooooooooooeeeeeeeeeeeeeeeeeee CCCCCCCCCCCCCCCCoooooooooooonnnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeeecccccccccccctttttttttttttttttooooooooooorrrrrrrrrrrrr///////////////BBBBBBBBBBBBBBBBBBBBBByyyyyyyyyyyyyyyyyyyppppppppppppppppppppppaaaaaaaaaaaaaaassssssssssssssssssssssssssssssMMMMMMMMMMMMMMMMMMMooooooooonnnnnnnnnnnnrrrrrrrrrrrrooooooooooeeeeeeeeeeeee CCCCCCCCCCoooooooooonnnnnnnnnnnnnnnnnnnnnnneeeeeeeeeeeeeccccccccccttttttttttttttoooooooooorrrrrrrrrrrr/////////BBBBBBBBBBBBBBBBBBBBBByyyyyyyyyyyyyyyyppppppppppppppppaaaaaaaaaaaaassssssssssssssssssssssssMonroe Connector/Bypass

4

The Need for the Project

Existing US 74 serves as an important commer-cial corridor for Union and Mecklenburg County residents and businesses, with many retail, com-mercial, and employment centers having direct access to/from US 74. The Monroe Connector/Bypass will improve mobility and capacity within the project study area by providing a facility for the US 74 corridor that allows for high-speed regional travel consistent with the designations of the North Carolina Strategic Highway Corridor program and the North Carolina Intrastate Sys-tem, while maintaining access to properties along existing US 74.

Aesthetic Design Guidelines

Community input plays an important role in de-cisions about the appearance of the bridges, noise walls and other structures along the Monroe Connector/Bypass. Through coordination with local stakeholders, Aesthetic Design Guidelines were developed to provide an attractive look for the new highway that reß ects regional architec-ture. A sample of this theme is shown to the left.


Recommended