+ All Categories
Home > Documents > MORGAN RESUME.doc 1

MORGAN RESUME.doc 1

Date post: 22-Jan-2018
Category:
Upload: morgan-ng
View: 287 times
Download: 0 times
Share this document with a friend
14
RESUME POST: PIPING SUPERVISOR PERSONAL PARTICULAR NAME: NG PENG NAM (MORGAN) SEX:MALE NRIC NO: 590326-08-5159 NATIONALITY: MALAYSIAN MARITAL STATUS: MARRIED DATE OF BIRTH: 26 MARCH 1959 CORRESPONDANCE ADDRESS: 68, LADANG CENTRAL PALOH , 86600 PALOH, KLUANG, JOHOR TELEPHONE CONTACT: +6- 07-7812821 (RES) +6- 017-7833167 (H/P) HEALTH: EXCELENT EMAIL ADDRESS; [email protected] ACADEMIC QUALIFICATION; ENGLISH SECONDARY SCHOOL LANGGUAGE KNOWN: MANDARINE,MALAY& ENGLISH WORKING EXPERIENCE AND TECHNICAL KNOWLEDGE
Transcript
Page 1: MORGAN RESUME.doc 1

RESUME

POST: PIPING SUPERVISOR

PERSONAL PARTICULAR

NAME: : NG PENG NAM (MORGAN)

SEX:∶ MALE

NRIC NO: 590326-08-5159

NATIONALITY: MALAYSIAN

MARITAL STATUS: MARRIED

DATE OF BIRTH: 26 MARCH 1959

CORRESPONDANCE ADDRESS: 68, LADANG CENTRAL PALOH , 86600 PALOH, KLUANG, JOHOR

TELEPHONE CONTACT: +6- 07-7812821 (RES) +6- 017-7833167 (H/P)

HEALTH: EXCELENT

EMAIL ADDRESS; [email protected]

ACADEMIC QUALIFICATION; ENGLISH SECONDARY SCHOOL

LANGGUAGE KNOWN: MANDARINE,MALAY& ENGLISH

WORKING EXPERIENCE AND TECHNICAL KNOWLEDGE。

Page 2: MORGAN RESUME.doc 1

Twenty years of working experience in following Details

CAREER HISTORY

JGC DONGGI-SENORO LNG PROJECTUOC.Desa Uso,Btui Banggai 94762,Province Of Central Sulawesi . Indonesia

EMPLOYMENT PERIOD: Feb 2014 TO FEB 2015

EMPLOYER: JGC INDONESIA

POSITION: REINSTATEMENT SUPV

PRODUCTS: LNG

ROLE AND RESPONSIBILITY:

1. LINE CHECK AND PREPARE REINSTATEMENT WORK.2. SUPERVISING/ MONITORING THE REINSTATEMENT PUNCH KILLING TEAM.3. SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4. ATTEND DAILY COORDINATUION MEETING.

Page 3: MORGAN RESUME.doc 1

BINTULU ONSHORE RECEIVING FACILITIES GAS TURBINE COMPRESSOR PROJECT – MURPHY OIL.SARAWAK MALAYSIA

EMPLOYMENT PERIOD: SEPT 2013 TO JAN 2014

EMPLOYER: WELTECH SDN BHD

POSITION: PIPING SUPERVISOR/ LINE CHECKER

PRODUCTS: NATURAL GAS

ROLE AND RESPONSIBILITY:

1 LINE CHECK AND PREPARE PUNCH LIST.2 SUPERVISING/ MONITORING THE PUNCH KILLING TEAM.3 SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4 ATTEND DAILY COORDINATUION MEETING.5 MAKE DAILY REPORT TO PRODUCTION CONTROL.6 ENSURE THE PIPE PRESSURE TEST AS PER SCHEDULE.7 INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.8 COORDINATE WITH OTHER DISCIPLINE.9 EXPIDATE SITE DEVIATION & NON CONFORMANCE 10 SUPERVISE THE FABRICATION SHOP TO ENSURE IT FOLLOW ISO DRAWING11 REVIEW WELDING CONTROL SHEETS PRIOR TO HAND OVER12 TEST PACKAGE COMPILATION ACCONDANCE WITH PROJECT SPECIFICATION

LNG REGASIFICATION PROJECT- LEKAS PETRONAS(P2)MALACCA MALAYSIA

EMPLOYMENT PERIOD: FEB 2013 TO JULY 2013

EMPLOYER: 3OCEAN SDN BERHAD MALACCA MALAYSIA

POSITION: PIPING SUPERVISOR/ LINE CHECKER

PRODUCTS: LIQUIFIED NATURAL GAS

ROLE AND RESPONSIBILITY:

1. LINE CHECK AND PREPARE PUNCH LIST.2. SUPERVISING/ MONITORING THE PUNCH KILLING TEAM.3. SUPERVISE AND CONTROL SUB CONTRACTOR MANPOWER.4. ATTEND DAILY COORDINATUION MEETING.5. MAKE DAILY REPORT TO PRODUCTION CONTROL.6. ENSURE THE PIPE PRESSURE TEST AS PER SCHEDULE.7. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.8. COORDINATE WITH OTHER DISCIPLINE.9. RESPONSIBLE TO REINSTATEMENT OF ALL TESTED PACKAGE.10. EXPIDATE SITE DEVIATION & NON CONFORMANCE

Page 4: MORGAN RESUME.doc 1

11. SUPERVISE THE FABRICATION SHOP TO MAKE SURE THE FOLLOW ISO DRAWING12. REVIEW WELDING CONTROL SHEETS PRIOR TO HAND OVER13. TEST PACKAGE COMPILATION ACCONDANCE WITH PROJECT SPECIFICATION

TOKUYAMA POLYCRYSTALLINE SILICON PLANT PROJECTBINTULU SARAWAK EAST MALAYSIA

EMPLOYMENT PERIOD: JUNE 2011 TO JAN 2013

EMPLOYER: SHINKO PLANTECH CO. LTD CONTRACTOR OF CHIYODA SARAWAK SDN BERHAD BINTULU EAST MALAYSIA

POSITION: PIPING SUPERVISOR

PRODUCTS: POLYCRYSTALLINE SILICON

ROLE AND RESPONSIBILITY:

1. SUPERVISE AND CONTROL SUB CONTRACTOR.2. ATTEND DAILY COORDINATUION MEETING.3. MAKE DAILY REPORT TO PRODUCTION CONTROL.4. MAKE SCHEDULE AND PLAN NING.5. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.6. COORDINATE WITH OTHER DISCIPLINE.7. RESPONSIBLE TO REINSTATEMENT OF ALL TESTED PACKAGE.8. SUPERVISE THE FABRICATION SHOP TO MAKE SURE THE FOLLOW ISO DRAWING9. SUPERVISE AND CONTROL THE INSTALLATION OF S1 CLASS AND C1 CLASS LINE IN THE

PROCESS AREA.(AREA C1 TMP1).

Page 5: MORGAN RESUME.doc 1

QATAR GAS 3 AND 4 LNG EXPANSION PROJECTMIDDLE EAST QATAR

EMPLOYMENT PERIOD: NOV.01 TO FEB. 28 2010

EMPLOYER: CHIYODA TECHNIP JOINT VENTURE PROJECT

POSITION: PIPING SUPERVISOR / LINE CHECKER

PRODUCTS: PROCESSED LIQUIFIED NATURAL GAS

ROLE AND RESPONSIBILITY:

1. SUPERVISE AND CONTROL SUB CONTRACTOR.2. ATTEND DAILY COORDINATUION MEETING.3. MAKE DAILY REPORT TO PRODUCTION CONTROL.4. MAKE SCHEDULE AND PLAN NING.5. INSTRUCT TO SUB CONTRACTOR DAILY PRIORITY WORK.6. COORDINATE WITH OTHER DISCIPLINE.

Tanjung Langsat Terminal One MID/NA-EPCC Project JOHORE MALAYSIA

Page 6: MORGAN RESUME.doc 1

Employment Period: Feb2009 To August2009

Employer: Dialog Construction Sdn.Bhd

Position: Piping Supervisor, and Punch List Clearing

Oil import and export terminal

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the timely

and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with the

company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a good

and safe condition 7. Coordinating to subcontractor to complete the job 8 Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance

TPC DUNG QUAT REFINERY PROJECT (VIETNAM)

Employment Period: Nov 2007 To Oct 2008

Employer: Technip Consortium JV JGC

Position: Piping Supervisor, and Punch List Clearing ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the timely

and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with the

company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a good

and safe condition7 Coordinating to subcontractor to complete the job8 Responsible for joint walkdown with client for inspection and reinstatement9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance

Page 7: MORGAN RESUME.doc 1

Dolphin Onshore Facility Project MIDDLE EAST (Qatar):-

Employment Period: Nov. 2006 To Nov. 2007

Employer: JGC Middle East FZE

Position: Piping Supervisor, Line Checker

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition 7 Coordinating to subcontractor to complete the job 8 Responsible for joint walkdown with client for inspection and reinstatement

9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance Alcan Vietnam Super Pam Facility (Vietnam:-)

Employment Period: May 2006 To Sept. 2006

Employer: VINA OFFSHORE VIETNAM

Position: Piping and Mechanical Supervisor To installed module piping and equipment for Australia aluminiumproject including punch list clearing

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and

Material problem until the client acceptance

Page 8: MORGAN RESUME.doc 1

Tanjung Bin Power Station, Pontian, Johor (Malaysia:- )

Employment Period: Oct 2005 To May 2006

Employer: Jiwa Harmoni OFFSHORE SDN BHD

Position: Piping and Mechanical Supervisor

To installed piping and all structural material ,Hopper and equipmentROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement

9 Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance

BAKP B. M2, M3 MSF and Flare Broom SarawakEAST Malaysia

Employment period: March 2005 To Oct. 2005

Employer: BROOKE DOCKYARD & Engineering Work

Position: Piping and Mechanical Supervisor.

To fabricate all piping and support to installed on Moduleincluding installation of equipment and punch list clearing

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement

Page 9: MORGAN RESUME.doc 1

PRR OIL AND GAS Project.GPPI Shut Down.Terengganu Malaysia:-

Employment period: Sept. 2004 To Feb 2005

Employer: Sinocan Engineering Sdn. Bhd.

Position . Piping supervisor

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition 7 To apply hot work permit

8 Daily tool box talk before start work

DRAGON OIL COMPANY. LAM21. OFF SHORE. TUKISMINISTANEmployment Period: Jan 2004 To Aug 2004

Employer: First Gas Engineering Sdn Bhd

Position: Construction supervisor.

To installed new structure, platform and piping on top of existing platformon LAM 21

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition 7 To apply hot work permit daily

8 Daily tool box talk before start work

Guntong F & Iron Barat C Topsides. Johore. (Malaysia )

Page 10: MORGAN RESUME.doc 1

Employment Period: Jan 2003 To Nov 2003

Employer: First Gas Engineering Sdn Bhd

Position: Piping and Mechanical Supervisor.

To fabricate all piping and support to installed on Module including installation of equipment and punch list clearing

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition 7. Responsible for joint walkdown with main contractor and client for inspection and

reinstatement8. Responsible for re-instatement and coordinating to engineering to some modification and

Material problem until the client acceptance

BASF PETRONAS BDO PROJECT – GEBENG KUANTAN MALAYSIA:

Employment Period: Feb 2002 To Dec 2002

Employer: KVAERNER DIALOG Joint veture Engineering Sdn. Bhd.

Position: Piping Supervisor, and Punch List Clearing

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition 7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and

Material problem until the client acceptance

Page 11: MORGAN RESUME.doc 1

Malaysia Olefins Project-Kertih Terengganu (Malaysia:-)

Employment Jan 2001 To Jan 2002

Employer: Samsung Engineering Malaysia

Position: Piping and Pre Commissioning Supervisor.

PRE COMMISSIONING, LUBE OIL FLUSHING, STEAM BLOWING, INTERNAL PIPE CLEANING,. RAPTURE BLOWING , COOLING WATER RETURN AND SUPPLY FLUSHING.

ROLE AND RESPONSIBILITY:

1. REVIEW MARK UP P @ I D.2. CHECK WORK BOUNDERIES AS PER P @I D BEFORE WORK EXECUTION.3. COORDINATE WITH SUB CONTRACTOR ON PREPARATION BEFORE WORK COMMENCE.4. CHECK SAFETY CONCERN PRIOR TO WORK EXCECUTION.5. ASSIGN INDIVIDUAL AS WATCH MAN ON AREAS WHICH REQUIRES SAFETY TO

OTHERS.

Centralized Utility Facilities, CUF Kertih Terengganu (Malaysia:-)

Employment Period: NOV1999 To Oct 2000

Employer: FOSTER WHEELER MALAYSIA SND. BHD

Position: Piping Supervisor, and Punch List Clearing

To installed thick wall alloy pipe of HIGH HIGH STEAM and low steam including high pressure testingROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement

Page 12: MORGAN RESUME.doc 1

9. Responsible for re-instatement and coordinating to engineering to some modification and Material problem until the client acceptance

Kertih Vinyl Chloride Monomer, Kertih, Terengganu (Malaysia:-)

Employment Period: Feb. 1999 To Sept 1999

Employer: Toyo Engineering Corporation

Position: Piping Supervisor, and Punch List ClearingROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and

Material problem until the client acceptance

MPP PSR-2 Multi Product Pipe Line PSR-2 Melaka ( Malaysia:-

Employment Period: Sept 1996 To /Feb. 1998

Employer: Chiyoda Engineering Malaysia Position: Piping Supervisor and Punch List Clearing

ROLE AND RESPONSIBILITY:

1. Supervise all fit up, mark up work.2. Supervise all fit up, welding and marking off activities.3. Read drawings and specifications, and be familiar with the monitoring progress as necessary for the

timely and proper execution of the work.4. Report immediately to the CONT SUPT any discrepancies, or material shortage which may discover5. Ensure the crew adhere to established safety rules, codes, practice and regulations in accordance with

the company’s procedure6. Ensure all crew have the required tools and safety equipment, and that such item are maintained in a

good and safe condition7. Coordinating to subcontractor to complete the job8. Responsible for joint walkdown with client for inspection and reinstatement9. Responsible for re-instatement and coordinating to engineering to some modification and

Material problem until the client acceptance

Page 13: MORGAN RESUME.doc 1

FAR EAT LIVINGSTON SHIPYARD LIMITIED ( SINGAPORE:-)

Employment Period: Jun 1991 To /Feb. 1995

Employer: SBL PTE LTD SINGAPORE

Position: Piping Foreman

-As foreman to fabrication all piping & structural and installationon oil rig and super tanker including equipment and module piping

JURONG SHIPYARD LIMITED (SINGAPORE:-)

Employment Period: Feb.l 1989 To /Feb. 1991

Employer: Mizu Pte Ltd Singapore

Position: Piping Foreman

-As foreman to fabrication all piping &structural and installation on oil rig and super tanker including equipment and module piping

BALIKPAPAN REFINERY EXPANSION PROJECT- (INDONESIA:-)

Employment period: August 1987 to Dec. 1988

Employer: Bechtel International, Inc.

Position: Piping Foreman

-As foreman to installed all pipe and support and stream tracing at site including punch killing and reinstatement

SHELL OFF SHORE PROJECT F-23 MIRI SARAWAK EASTMALAYSIA

Employment Period: May 1985 To June 1986

Employer: Transerve Pte Ltd. Singapore

Position: FITTER

- As pipe fitter to installed pipe and modification of spool and to installed vessel on hook up platform

Page 14: MORGAN RESUME.doc 1

JURONG\ ENGINEERING PTE Ltd ( SINGAPORE )

Employment Period: May 1979 To June 1984

Position: FITTER

- Piping and steel fabrication and installation.- Shop fabrication for piping,structural and vessel for oversea products.


Recommended