Morrison Copper/Gold/Moly (Silver) Project

Date post: 21-Mar-2016
Category:
Upload: jetta
View: 36 times
Download: 1 times
Share this document with a friend
Description:
Morrison Copper/Gold/Moly (Silver) Project. Pacific Booker Minerals Inc. Forward Looking Statement. - PowerPoint PPT Presentation
37
Morrison Copper/Gold Project pacific booker minerals inc. Morrison Copper/Gold/Moly (Silver) Morrison Copper/Gold/Moly (Silver) Project Project Pacific Booker Minerals Inc.
Transcript
Page 1: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Morrison Copper/Gold/Moly (Silver) ProjectMorrison Copper/Gold/Moly (Silver) Project

Pacific Booker Minerals Inc.

Page 2: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

This presentation may include forward-looking statements respecting the strategies. By their nature, forward-looking statements are subject to numerous risks and uncertainties that can significantly affect future results. Actual future results may differ materially from those assumed or described in such statements as a result of the impact of issues, risks and uncertainties, which the Company may not be able to control. The Company disclaims any intention or obligation to update or revise these forward-looking statements.

Forward Looking StatementForward Looking Statement

Page 3: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Pacific Booker Minerals Inc. (PBM) is a publicly traded company (TSX-Venture: BKM; NYSE MKT: PBM)

• PBM owns 100% of the Morrison property located in Central British Columbia, Canada

• 30,000 tonnes/day open-pit mining and milling operation for the production of copper/gold concentrate and molybdenum concentrate

• Completed a full Feasibility Study

Company ProfileCompany Profile

Page 4: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• BC Environmental Assessment Certificate Application Review completed. Application rejected by Provincial Ministers October 1, 2012 although:

– The Proposed Project does not have the potential for significant adverse effects, and

– First Nations have been consulted and accommodated appropriately.

• Draft Federal Comprehensive Study report also concludes that the Project does not have the potential for significant adverse effects

• The company is strongly committed to continue to work forwards bringing the proposed Morrison Copper/Gold Project to commercial production

Company ProfileCompany Profile

Page 5: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Project LocationProject Location

Page 6: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Paved Provincial Highways to the Village of Granisle

• All-season barge across Babine Lake and a logging road network that extends to the Morrison deposit (40km)

• Within 30 km of two former producing mines, Granisle and Bell

Site AccessSite Access

Page 7: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

The Granisle Mine produced 214,000 tonnes of copper, 6,833kg of gold and 69,753kg of silver from 52.7 million tonnes of ore averaging 0.47% copper

Granisle MineGranisle Mine

Page 8: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

The Bell Mine produced 303,277 tonnes of copper, 12,749kg of gold and 27,813kg of silver from 77.2 million tonnes of ore averaging 0.47% Cu

Bell MineBell Mine

Page 9: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Morrison HistoryMorrison History

• The Morrison was discovered by Noranda Exploration in 1962

• Noranda drilled 95 holes totaling 13,893m from 1963 to 1973

• Noranda published two resource estimates for the Morrison

• The first in 1976 was 86 million tonnes grading 0.42% copper

• The second in 1992 was an inferred resource of 190 million tonnes of 0.41% copper and 0.21 g/t gold

Page 10: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Drill ProgramDrill Program

Pacific Booker Minerals Inc. commenced with a 43-101 compliant drill program in January 1998 to establish grade and continuity of copper values and gold grades. PBM drilled 177 holes totaling 31,872.83m for:– Resource Estimation– Metallurgical Test-work– Geotechnical Engineering– Geochemical– Condemnation– Water Monitoring

Page 11: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Site ArrangementSite Arrangement

Page 12: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Cut-off % Eq Cu

Measured + Indicated Inferred

Tonnes>Cut-off

Average Grade

Tonnes>Cut-off

Average Grade

Cu EQ (%) Cu (%)

Au (g/t) Mo (%)

Cu EQ (%) Cu (%)

Au (g/t) Mo (%)

0.15 281,652,590 0.40 0.34 0.17 0.005 87,806,392 0.38 0.33 0.16 0.004

0.20 265,954,503 0.41 0.35 0.17 0.005 81,798,181 0.40 0.34 0.17 0.005

0.25 238,475,426 0.44 0.37 0.18 0.005 61,661,854 0.45 0.38 0.19 0.004

0.30 206,869,448 0.46 0.39 0.20 0.005 56,524,341 0.47 0.40 0.21 0.005

0.35 170,772,241 0.49 0.42 0.21 0.005 47,875,646 0.50 0.42 0.22 0.005

0.40 133,351,540 0.52 0.44 0.22 0.005 38,587,285 0.53 0.45 0.23 0.005

•CuEq=Cu+Au*0.303+Mo*3.18

Resource EstimateResource Estimate

Page 13: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Metallurgy is straightforward and good recoveries and acceptable concentrates can be achieved

• Metallurgical recoveries would be very similar to former nearby Bell Mine.

• Metallurgical Test-work results:

– IME Inc. - 88.4% copper, 63.0% gold

– PRA Ltd. - 85.7% copper, 59.7% gold

– SGS Canada - 84.0% copper, 59.0% gold, 50.0% Molybdenum; 26.5% concentrate grade

MetallurgyMetallurgy

Page 14: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• The treatment process will be a conventional crushing, grinding and flotation system

• High Pressure Grinding Rolls (HPGR) will be utilized to reduce Power and Consumables costs

• Production of approximately 135,000 to 160,000 tonnes of concentrate per year containing copper, gold and molybdenum

ProcessingProcessing

Page 15: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

HPGRHPGR

Page 16: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Development of the open pit is planned as a four-phase mining operation utilizing conventional truck and shovel equipment

• Mining methods will incorporate drilling, blasting, loading and haulage

• Planned production rate is 30,000 t/d ore

Mine PlanMine Plan

Page 17: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

The total mineable reserve included in the measured and indicated resource, classified as proven and probable, at Net Smelter Return (NSR) cut-off-value of $CDN5.60/t, is 224.25Mt with an average grade of 0.330% Cu, 0.163g/t Au and 0.004% Mo.

TOTAL

Cut-off $5.60 NSR

ROM Cu Au Mo

(TONNES) % g/t %

Proven 115,121,000 0.355 0.173 0.004

Probable 109,130,000 0.304 0.152 0.004

Subtotal 224,251,000 0.330 0.163 0.004

Inferred 7,381,000 0.225 0.102 0.003

Mineable ReserveMineable Reserve

Page 18: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• The mineable reserve is 224.25 Mt;• The waste total is 184.12 Mt for a strip ratio of 0.82:1;• Recoveries are Cu 84.0%, 56.0% Au and 50.0% Mo.• Recovered metal is 1.37 billion lbs (625,000 tonnes) Cu, 658,090 oz (25

tonnes) Au and 10.05 million lbs (4,559 tonnes) Mo;• Mine life of 21 years;• Capital cost is estimated at CDN$516.68 million (including a CDN$59.92

million contingency allocation).• A projected exchange rate of C$1.00/ US$0.87;• Operating cost of CDN$8.15 per tonne milled;• Pre-Income Tax Internal Rate of Return (IRR) of 20.05%, based on

metal prices of (four year trailing average as of January 12, 2009) Cu $2.75, Au $658.32 and Mo $29.23;

• Net Present Value (NPV) at 8.0% discount rate is CDN$495.9M; and• Payback period on capital is 4.2 years.

Feasibility Study ResultsFeasibility Study Results

Page 19: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Note: Silver was not included in the financial analysis; however, there is an opportunity for improved economic performance if silver credits are received from the treatment and refining of the copper concentrate. Metallurgical test-work to date has reported silver present in the concentrate ranging from 65.3g/t to 100g/t.

Feasibility Study ResultsFeasibility Study Results

Page 20: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

The Project has the advantage of existing regional infrastructure in place to service the region:– Road network– Nearby electrical power 25 km from the Project

site– Full service town (Granisle) within daily

commuting distance from the Project site – Deep-sea shipping terminal at the Port of

Stewart

InfrastructureInfrastructure

Page 21: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Hagan Forest Service RoadHagan Forest Service Road

Page 22: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Electrical Power SupplyElectrical Power Supply

Page 23: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Village of GranisleVillage of Granisle

Page 24: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

The Environmental Assessment Certificate is required to apply for a Mining Permit for the construction, operation and maintenance, decommissioning and reclamation of the proposed 30,000 tonnes/day open-pit mine• A number of Licences and Permits accepted for

Concurrent Review• Federal Comprehensive Study Report completed • Provincial and Federal Review harmonized to

ensure joint steps are undertaken consistent with the Canada-British Columbia Agreement for Environmental Assessment

EnvironmentalEnvironmental

Page 25: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• BC Environmental Assessment Certificate Application Review completed. Application rejected by Provincial Ministers October 1, 2012 although:

– The Proposed Project does not have the potential for significant adverse effects, and

– First Nations have been consulted and accommodated appropriately.

• Draft Federal Comprehensive Study report also concludes that the Project does not have the potential for significant adverse effects

• The company is strongly committed to continue to work forwards bringing the proposed Morrison Copper/Gold Project to commercial production

EnvironmentalEnvironmental

Page 26: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Pre- ProductionPre- Production

During the review and in anticipation of issuance of an Environmental Assessment Certificate, PBM intends to:

• Finalize our contracting strategy for Pre-production;• Tender Pre-Production Contracts (EPCM or EPC)• Procurement including ordering long lead time items

(i.e. HPGR, Ball Mills, etc); • Detailed Engineering and Design; and• Site Engineering Survey

Page 27: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Upon issuance of an Environmental Assessment Certificate and Federal authorizations, the Company may proceed with construction commencing September 2013:

• Construction of new 25 km 138kV overhead power line from the existing former Bell mine site to the proposed Morrison Mine Site substation;

• Clearing of timber from the tailings storage facility, plant site, waste storage dump, on-site road corridors, on-site pipeline and power line corridors; and

• On-site road construction between existing Forest Service Road and proposed Plant Site

• Process Plant, etc.

Pre- ProductionPre- Production

Page 28: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Reduced operating costs– Reagents, diesel, road transportation, ocean freight,

maintenance supplies, treatment and refining charges• Reduced Capital Costs

– Costs obtained at peak of price cycle• Lower strip ratio (ie better ore grades)• Pilot Plant Tests – improve recoveries• Revenue from Silver• LNG (financial and environmental benefit)• Revised closure plan (ie eliminate progressive closure,

deferred water discharge until pit full, optimized water handling and treatment, metal recovery from water prior to discharge

• Accelerated MLARD

OpportunitiesOpportunities

Page 29: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Project SummaryProject Summary

• Ore production rate of 30,000 tonnes / day• The total mineable reserve is 224.25Mt with an

average grade of 0.330% Cu, 0.163g/t Au and 0.004% Mo

• Recovered metal is 1.37 billion lbs (625,000 tonnes) Cu, 658,090 oz (25 tonnes) Au and 10.05 million lbs (4,559 tonnes) Mo;

• Mine life is 21 years• Proposed Construction Date is 2013• Proposed Start of Operation is 2015

Page 30: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

• Gold, Copper, Molybdenum, (Silver) Resource• Excellent access and regional infrastructure in

place• Deep-sea shipping terminal, road network, nearby

electrical power (25km), full service town• Low operating cost• Low capitalization • Opportunities for improved economic performance• Shares Outstanding - 12.2 Million• Shares Fully Diluted - 15.0 Million• No Debt

Project AdvantagesProject Advantages

Page 31: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Pre-Tax Financial ModelPre-Tax Financial Model

Discount Rate 8%   Discount Rate 5%  Cu $/lb 2.75 Cu $/lb 2.75Au $/troy oz 658.32 Au $/troy oz 658.32Mo $/lb 29.23 Mo $/lb 29.23Ag $/troy oz 0 Ag $/troy oz 0Ag $/troy oz 30 Ag $/troy oz 30

IRR   20.06% IRR   20.06%NPV   $496 M NPV $790MIRR   21.87% IRR 21.87%NPV   $583 M NPV $906M

Page 32: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Pre-Tax Financial ModelPre-Tax Financial Model

Discount Rate 8% Discount Rate 5%  Cu $/lb 3 Cu $/lb 3Au $/troy oz 900 Au $/troy oz 900Mo $/lb 16 Mo $/lb 16Ag $/troy oz 0 Ag $/troy oz 0Ag $/troy oz 30 Ag $/troy oz 30

IRR 23.99% IRR 23.99%NPV $684M NPV $1,039MIRR 25.70% IRR   25.70%NPV $771M NPV $1,155 M

Page 33: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Pre-Tax Financial ModelPre-Tax Financial Model

Discount Rate 8%

Discount Rate 5%

Cu $/lb 3.25 Cu $/lb 3.25Au $/troy oz 1200 Au $/troy oz 1200Mo $/lb 16 Mo $/lb 16Ag $/troy oz 0 Ag $/troy oz 0Ag $/troy oz 30 Ag $/troy oz 30

IRR 29.01% IRR 29.01%NPV $942M NPV $1,381MIRR 30.61% IRR   30.61%NPV $1,029M NPV $1,498 M

Page 34: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Pre-Tax Financial ModelPre-Tax Financial Model

Discount Rate 8%

Discount Rate 5%

Cu $/lb 3.5 Cu $/lb 3.5Au $/troy oz 1500 Au $/troy oz 1500Mo $/lb 16 Mo $/lb 16Ag $/troy oz 0 Ag $/troy oz 0Ag $/troy oz 30 Ag $/troy oz 30

IRR 33.75% IRR 33.75%NPV $1,199M NPV $1,724MIRR 35.26% IRR 35.26%NPV $1,287 NPV $1,841 M

Page 35: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

•Exchanges - TSX-V (BKM)NYSE MKT(PBM)

•Shares Outstanding - 12.2 M

•Shares Diluted - 15.0 M

•Stock price - $5.50

•Market Cap - $67 M

•No Debt

MarketMarket

Page 36: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Office: #1702-1166 Alberni StreetVancouver, B.C. V6E 3Z3

Phone: 604-681-8556Fax: 604-687-5995

Toll Free: 1-800-747-9911US Toll Free: 1-800-234-3680

Website:www.pacificbooker.com

Contact InformationContact Information

Page 37: Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold Project

pacific booker minerals inc.

Thank you Thank you