Move to FNL

Date post: 31-Dec-2015
Category:
Upload: raymond-conrad
View: 35 times
Download: 0 times
Share this document with a friend
Description:
Move to FNL. ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3 / B4. ECAL/HCAL Movable Table Setup no change in basic dimension. Setup in test beam area update beam area ground dimension. ECAL/HCAL Movable Table Control room ?. HCAL Movable Table - PowerPoint PPT Presentation
10
K.Gadow 19.04.2007 K.Gadow 19.04.2007 CALICE technical review CALICE technical review 1 Move to FNL Move to FNL ECAL/HCAL-Movable Table Setup ECAL/HCAL-Movable Table Setup test beam integration test beam integration to Fermilab MT6-B3 to Fermilab MT6-B3 / / B4 B4
Transcript

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 11

Move to FNL Move to FNL

ECAL/HCAL-Movable Table Setup ECAL/HCAL-Movable Table Setup test beam integration test beam integration to Fermilab MT6-B3to Fermilab MT6-B3//B4B4

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 22

ECAL/HCAL Movable Table Setup ECAL/HCAL Movable Table Setup no change in basic dimension no change in basic dimension

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 33

Setup in test beam areaSetup in test beam area update beam area ground dimension update beam area ground dimension

HCAL Movable Tableplaced in MTB6-B3 ?

ECAL/HCAL Movable TableControl room ?

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 44

Setup in test beam areaSetup in test beam area inner height ? other equipment ? inner height ? other equipment ?

shielding concrete

roof support

dump

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 55

Setup in test beam areaSetup in test beam areaone escape route is sufficient ?one escape route is sufficient ?

Escape rote from B4

blocked

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 66

Setup in test beam areaSetup in test beam areacrane height and crane load criticalcrane height and crane load critical

needed hook height

over roof 4 m

transport weight 15 tons

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 77

Setup in test beam areaSetup in test beam area total height ~ 4 meter total height ~ 4 meter

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 88

Setup in test beam areaSetup in test beam areapermanent closed roof (except openings) permanent closed roof (except openings)

•installation of Movable Table HCAL and ECAL with “tricks” only

•installation of HCAL modules in position B3 criticalcrane needed !

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 99

Infrastructure at FermilabInfrastructure at Fermilab(Joe Howell)(Joe Howell)

Power ConversionPower Conversion– Experiment 2 x 50 Hz 400 VLL 25-32 AExperiment 2 x 50 Hz 400 VLL 25-32 A– Standard Fermilab 60 HZ, 208v/120v or 480vStandard Fermilab 60 HZ, 208v/120v or 480v– Initial checks indicate there is no existing on-Initial checks indicate there is no existing on-

site conversion equipmentsite conversion equipment– Continue checking optionsContinue checking options

Data TransferData Transfer– Desire at least 1 Gbit/s Eathernet LinkDesire at least 1 Gbit/s Eathernet Link– Erik Ramberg is checking current capacityErik Ramberg is checking current capacity

K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 1010

Operations Readiness ClearanceOperations Readiness Clearance(Joe Howell)(Joe Howell)

Approval given by the Fermilab Partical Physics Approval given by the Fermilab Partical Physics Division Head indicating that the experiment is Division Head indicating that the experiment is safe to operatesafe to operate

Safety Review CommitteesSafety Review Committees– Mechanical and Conventional SafetyMechanical and Conventional Safety– ElectricalElectrical– Fire (and flammable gas)Fire (and flammable gas)

Documentation Review and Equipment Documentation Review and Equipment InspectionInspection

Help provided to guide through the processHelp provided to guide through the process