Description:
MQXF project schedule Short model program: 5 CERN-LARP models, – Coil fabrication started in 03/2014 – First magnet test (MQXFS1) in 08/2015 (3 LARP coils, 1 CERN coil) Long model program: 2 (CERN) + 3 (LARP) models, – Coil fabrication starts in 2015: 02 (LARP), 10 (CERN) – First magnet test in 11/2016 (LARP) and 11/2017 (CERN) Series production: 10 (CERN) + 10 (LARP) cold masses, – Coil fabrication starts in 01/2018 – First magnet test in 10/ /12/2014 Paolo Ferracin, Giorgio Ambrosio3

If you can't read please download the document

Transcript

MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN Program overview Short model status and plans Long model plans Links 11/12/2014 Paolo Ferracin, Giorgio Ambrosio2 MQXF project schedule Short model program: 5 CERN-LARP models, Coil fabrication started in 03/2014 First magnet test (MQXFS1) in 08/2015 (3 LARP coils, 1 CERN coil) Long model program: 2 (CERN) + 3 (LARP) models, Coil fabrication starts in 2015: 02 (LARP), 10 (CERN) First magnet test in 11/2016 (LARP) and 11/2017 (CERN) Series production: 10 (CERN) + 10 (LARP) cold masses, Coil fabrication starts in 01/2018 First magnet test in 10/ /12/2014 Paolo Ferracin, Giorgio Ambrosio3 Program overview Short model status and plans Long model plans Links 11/12/2014 Paolo Ferracin, Giorgio Ambrosio4 Short model program 3 models with first set of coils All tested by LARP Coil design update by March 2015 Second set of coil start in Oct models with 2 nd set of coils PIT coils and models in /12/2014 Paolo Ferracin, Giorgio Ambrosio5 RRP coils, CERN 1 st set 2014 CERN coil LARP coil RRP coils, CERN 2 nd set PIT, CERN 1 st set RRP coils, LARP 1 st set RRP coils, LARP 2 nd set MQXFS1-2, 1 st coil set MQXFS3-4, 2 nd coil set Models Mirror MQXFS 5, PIT Short model status Coil fabrication 5/11/2014 Paolo Ferracin6 LARP coil #1 completed LARP coil #3 Prep. for impregn. at BNL LARP coil #2 completed CERN coil #001 (Cu) completed CERN coil #101 (Low-grade) Completed CERN coil #102 Prep. for impregn. CERN coil #103 Winding LARP coil #4 Winding Short model status Models 2 identical support structures fabricated One at CERN, one shipped to LBNL Same CAD model and same fabrication companies 150 mm mock-up being tested Mirror magnet to be tested in Feb.-Mar /12/2014 Paolo Ferracin, Giorgio Ambrosio7 Program overview Short model status and plans Long model plans Links 11/12/2014 Paolo Ferracin, Giorgio Ambrosio8 LARP prototypes Winding in Feb sets of coils 2 long prototypes before start of pre-series coil fabrication 11/12/2014 Paolo Ferracin, Giorgio Ambrosio MQXF1-1b Mirror MQXF2 MQXF3 RRP coils, 1 st set RRP coils, 2 nd set RRP coils, 3 rd set CERN prototypes 11/12/2014 Paolo Ferracin, Giorgio Ambrosio RRP coils PIT coils MQXF1-1b MQXF2 Winding in Oct. 2015, reaction in mid set of RRP coils, 1 set of PIT coils 1 long prototypes before start of pre-series RRP coil fabrication Mirror Prototypes status LARP taking the lead with 4 m coil fabrication starting in February 2015 Equipment upgrades in progress: Automatic (Selva) winder (FNAL) Curing mold (FNAL) Vertical test facility (BNL) Coil tooling is under procurement Structure assembly tooling under design CERN Coil and tooling CAD models in progress Price inquiry in Jan./Feb /12/2014 Paolo Ferracin, Giorgio Ambrosio11 Program overview Short model status and plans Long model plans Links 11/12/2014 Paolo Ferracin, Giorgio Ambrosio12 Links Short mirror LARP long coil MQXFS1 CERN long coils MQXFS3 LARP long II set MQXFS4 LARP long III set MQXFS5 CERN long PIT 3 long models results ~before start series coils 11/12/2014 Paolo Ferracin, Giorgio Ambrosio


Recommended