N5 – WP1:Status and perspectives
G.Losurdo – INFN Firenze/UrbinoH.Grote – AEI Hannover
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
ILIAS N5 – GWA network
• Objectives– Increase the level of EU coordination– Maximise return on large investments already made– Enhance the performance of existing detectors– Prepare the future of this discipline in Europe– Improve the exchange of infos on subjects of common
interest– Foster the development of common methodologies for joint
observations
• Working groups:– WG1: antenna commissioning and characterization– WG2: joint operations of antennas, network data analysis– WG3: a european strategy for future antennas
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
WG1
• Objectives
– To speed up the commissioning and the characterization of Virgo and GEO by means of a deeper collaboration between the two teams
– To develop common methods of characterization of interferometric GW detectors to be applied to Virgo and GEO
– To provide inputs for establishing priorities for short term improvements of the existing interferometric detectors on the base of the Virgo and GEO characterization
• Budget for travels: 30 keuro/year from 2004 to 2007
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
From the1st EB meeting minutes
• Main statement: “We must create a community that represents our activity…”
• About the meetings:– Members of WG1 must meet 4 times/year at the
experimental sites.– Meetings are open to all interested persons belonging to
the network. – They have to meet twice before August (to be confirmed
by the chairmen)
• Appointed people have access to the detectors data
• They have to identify what software tools are missing to perform their job
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
The group
S.HildH.Grote (co-chairman)H.LueckJ.Smith
M.BarsugliaA.FreiseP.La PennaG.Losurdo (co-chairman)
L.TaffarelloM.Visco
Not a closed group:we can invite other people involved in WG1 topics to partecipate
GEO600
Virgo
Bars
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
WG1: 4-years execution plan
MILESTONES DELIVERABLES
YEAR 1Working group set-upGEO/Virgo noise sources comparison
Annual report
YEAR 2
GEO/Virgo joint noise characterizationDevelopment of common characterization algorithms
Annual reportRecommandations report for short term improvements
YEAR 3
GEO/Virgo joint noise characterizationImplementation of common characterization algorithms
Annual report
YEAR 4GEO/Virgo joint noise characterization
Annual reportRecommandations report for short term improvements
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
1st year milestones
• Working group set up– 1st meeting: Cascina, July 2004– 2nd meeting: Hannover, September 2004– 3rd meeting: January, TBD
• Web page set up (meeting agendas, minutes and presentations available)
• GEO/Virgo noise sources comparison, work started:– Comparing detector subsystems– Comparing detector operation– Comparing tools for data analysis– Comparing noise characterization methods
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
WG1 first meetings goals
• Keep in touch, know each other
• Understand where we are and where we are going: talks on detector status
• Develop a common language: talks on single detector subsystems of commissioning topics, demos of detector operation
• Noise characterization: talks on noise analysis methods and on data tools
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
1st meeting agenda
July 7th
• Introduction (G.Losurdo)
• Status of the detectors– Geo (H.Lueck)– Virgo (A.Freise)– Bars (M.Visco,
L.Taffarello)
• Commissioning/SubsystemsLocking/Control
– Geo (H.Grote)– Virgo (M.Barsuglia)
July 8th
• Commissioning/Noise– Geo (J.Smith)– Virgo (P.La Penna)– Bars (M.Visco,
L.Taffarello)
• General discussion
Social lunch (with WG3)
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
2nd meeting agenda
September 23rd
• Commissioning progress– Geo (H.Lueck)– Virgo (P. La Penna)
• Commissioning/Subsystems– Virgo suspension
control (G.Losurdo)– GEO detector operation
(H.Grote)– GEO detector operation
demo on site (GEO team)
Social event: visit to the nearby animal farm
• Commissioning/NoiseData tools and
exchange– Geo (S.Hild)– Virgo (A.Freise)
September 24th
• Commissioning/NoiseNoise analysis
– Geo (J.Smith)– Bars (M.Visco)
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
First achievements
• All the appointed group members attended both meetings, other participants present (everybody happy to be there)
• The discussion has been very deep and partecipated, with plenty of questions
• People start understanding similarities/differences in the commissioning approaches
• There is a strong will of collaboration and a widely open attitude
• A first test of data exchange has been done…
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
GEO data read with Virgo dataDisplayA.Freise
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Analogous Virgo channels: notice how different are the names…A.Freise
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Open “problems”: GEO-Virgo asymmetries
• We must create a common “dictionary”/language
• At the moment the meaning of commissioning is different for the two groups:– Virgo is working for making the detector fully operative– GEO is in the phase of noise charaterization
Full locking of Virgo reduces the “gap”
• The Virgo commissioning group is larger and the organization is different
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Actions for the next future
• Increase the frequency of the meetings (using video/audio-conference)
• Invite non-appointed people to give talks
• Participate to “commissioning meetings” of the two detectors: getting more involved into the commissioning life of the others
• Share progressively the noise puzzles, write common internal reports
• Exchange students for short periods
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Noise ProjectionsJ.Smith’s talk, 1st meeting
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Effect of the vacuum pump
Between 13h22 (UTC) and 14h40, all pumps are progressively switched off
At 13h59, IB pump switched off
ZOOM
Between 14h40 and 15h00, original conditions are restored
P.La Penna’s talk, 1st meeting
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
GAUSSIANITY GAUSSIANITY
EXPLORER NAUTILUS
1 day of data on July 2004
M.Visco’s talk, 1st meeting
ILIAS-GW N5 JRA – Paris, Nov 6th, 2004 G.Losurdo – INFN Firenze-Urbino
Conclusive remarks
• A group of people deeply involved in GW detector commissioning has been set up
• The group can be an open and permanent workshop for collaborative noise characterization in Virgo and GEO detectors
• There is a lot that we can learn from each other and there is an very good spirit of collaboration