NAC Human Capital Committee Lucy Fortson, Gerald Kulcinski (chm) Ioannis Miaoulis, and Jim Milgram Feb. 3-5, 2009 KSC
Transcript
Page 1: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

NAC Human Capital Committee

Lucy Fortson, Gerald Kulcinski (chm) Ioannis Miaoulis, and Jim Milgram

Feb. 3-5, 2009KSC

Page 2: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Topics Covered• NASA’s Workforce:– Use of the Student Cooperative Education Program in

NASA’s Strategic Hiring, Ms. Toni Dawsey, Assistant Administrator, Office of Human Capital Management

– KSC Cooperative Education Program, Tracy Anania HR Director

• Informal Education Metrics • NASA Television Update• 2009 Human Capital Tasks

Page 3: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

NASA’s current workforce is approximately 18,075 FTE equating to approximately 18,370 employees and students

05,000

10,00015,00020,00025,00030,00035,00040,000

1958

1961

1964

1967

1970

1973

1976

1979

1982

1985

1988

1991

1994

1997

2000

2003

2006

2009

Year

Hea

dcou

nt

Page 4: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

FY09 NASA Total Workforce

NASA FTEs18,075

NASA On-/Near-site

WYEs 45,909

► OMB-established civil service workforce target for NASA is 17,900 FTE (not including students)

► FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce

4

Page 5: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

NASA’s Civil Service Workforce

► NASA has emphasized to OMB the importance of maintaining civil service workforce size at each Center, due to:► Commitment to 10

Healthy Centers► Robust set of

program requirements across Science, Aeronautics and Space Flight, even though transition from Shuttle to Exploration causes temporary disruptions

► Importance of maintaining in-house technical capabilities in science and engineering, representing 61% of workforce

Technicians 7%

Clerical 4%Wage Grade

1%Professional

Administrative 28%

Scientists & Engineers 61%

5

Page 6: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

The NASA Workforce Has Aged Significantly Over the Past 4 Decades

Page 7: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Government Constraints on the NASA Workforce

• Congress imposed moratorium on RIF’s for NASA only-NASA HR-6063 (2008)

• OMB FTE limit (term and perm)-17,900 FTE (now at 18,075 FTE)

Page 8: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

• Co-ops are the Main Source of New Entry Level Hires• Co-op hires tend to be local vs nationwide recruiting• Does near exclusive Co-op hiring insure the highest

quality entry level hires?

NASA Science & Engineering New Hires

700

se 600

r 500

Hi

f o 400

reb 300

m 200

Nu 1000

2004 2005 2006 2007 2008

Fiscal Year

ExecutiveSenior LevelMid-LevelEntry Level

Page 9: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Observation• The OHCM in Washington DC should

determine if the Co-op program, as currently structured, is the best way to expand its recruitment and selection of the best and brightest hires on a national scale.

Page 10: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Additional Observations on the NASA Hiring Culture (from discussions with HC staff-Washington DC)

• Managers are reticent to hire young people to do jobs that they (the managers) did when they were hired at the same age.

• Tactical (not Strategic) hiring favors increased age demographics

Page 11: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Additional Observations on the NASA Workforce

• Local financial impact of workforce reductions (i. e., Brevard County)• Workers less likely to accept employment at Centers

where there is a lack of opportunities should they lose their job

• It is going to be more difficult to recruit under current economic conditions especially at KSC, Stennis, and Dryden.

Page 12: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

NASA TV Developments• Received “NASA Television Update”-1/30/09-

Robert Jacobs. • Good abbreviated account of history and current issues.

• Another personnel change, Chief Strategic Communications-Chris Shank left at the transition. Mary Kerwin (acting)

• Status of HC recommendation HC-08-01

Page 13: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Original April, 2008Modified July, 2008

HC-08-01 Independent Evaluation of NASA TVRecommendation:• An outside organization should be contracted

to do an evaluation of the current effectiveness and viewership of NASA TV and to recommend a clear rationale and set of themes for its continuance. This outside entity should take into account the NASA internal 2007 review of NASA TV.

Page 14: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

October, 2008

HC-08-01 Independent Evaluation of NASA TVExcerpts from NASA Response:• The Strategic Communications/Public Affairs Office (PAO) believes that

the previous 2007 review of NASA TV provided sufficient analysis of what is necessary to improve the effectiveness of the programming and that further outside evaluation is not needed at this time.

• Subsequent to the PAO presentation to the Human Capital Committee of the NASA Advisory Council of July 9, 2008 the PAO developed a comprehensive plan to produce improved content for programming for the NASA TV medium, along with NASA's Web site. …………………..

• PAO recommends that any outside evaluation of the current effectiveness and viewership be conducted at some period in the future after this plan is implemented.

• The HCC has not seen any progress in implementing this plan! (2/5/09)

Page 15: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Comments on Informal Education Metrics

• OMB needs a meaningful set of metrics for the assessment of the effectiveness of education funding.

• In particular, we addressed informal science education (i.e., if public visits a museum, how do we measure the effectiveness of that experience?)

• Current metric definitions come from OMB; Outcome, Output, and Efficiency.

• The explanations of these terms are obscure and it is difficult for NASA to come up with a uniformly accepted set of metrics

Page 16: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Comments on Informal Education Metrics

• NASA does not have the resources to measure the impact on the learning experience of informal education.

• OE has requested HCC assistance in constructing meaningful metrics that match OMB requirements and definitions.

• HCC will investigate possible assistance from NSF and Education in the assessment of metrics.

Page 17: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend

Human Capital Plans for 2009• Continue to work with the Exploration and Space Operations

Committees in examining NASA's approach and progress in the transition from Space Shuttle Operations to those related to Constellation (including continued examination of issues related to workforce retention (especially contractor), facility maintenance and upgrades, and inclusion of all ten centers in the Vision).

• Review NASA co-op program in the context of workforce issues.• Continue the investigation of NASA's education strategy. In particular,

examine the possibility of increasing NASA’s support and emphasis on engineering in schools.

• Examine and recommend approaches for how NASA can better convey its message about the Vision to the science and engineering communities.

Page 18: NAC Human Capital Committee - NASA · FTE Target of 17,900 applies to FY09-14, so NASA does not anticipate growth in size of the civil service workforce 4. ... • Co-op hires tend