AN ISO 9001:2008 COMPANY Corporate Profile-2010 Capabilities & Expertise Profile Included 1. Fixed Platforms 2. Submarine Pipeline Engineering 3. FPSO
Transcript
Page 1: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Corporate Profile-2010Capabilities & Expertise Profile Included

1. Fixed Platforms2. Submarine Pipeline Engineering3. FPSO

Page 2: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

About Us NAUVATA Engineering was incorporated in 2005 as Silicon Designs

with the aim of providing quality Engineering Design services to the Oil

and Gas sector.

NAUVATA Engineering has a clear objective of providing world class

Engineering Design services with a personalized service and with a

proven process driven delivery model.

Based out of Bangalore (India) & Johor Bahru, Malaysia. Total team size

100+ and growing with an accessible manpower pool of 300+

An ISO 9001:2008 Company

Page 3: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Vision Provide Quality ‘Design Engineering Services’ to Our Clients.

To be a socially conscious company and the top solution

provider in areas of Design Engineering Services

To create value for our Investors, Clients, and Employees.

To be environmentally friendly and embrace Green/Clean

Technology processes and tools wherever possible

Employees & Stake Holders

Page 4: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

CoimbatoreSingapore

Our Presence

UAE

Malaysia

Houston

London

Bangalore

Vancouver

Sales Office

Page 5: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Nauvata Infrastructure

17000 Sq Feet of Design Center

located in a prime location

4 MBPS secure IP and ISDN

link

State of the art IT

Infrastructure( PC, Servers and

Firewall)

Page 6: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Expertise

Advantages of ‘Engaging’ with us

Ready availability of infrastructure and skilled

manpower.

Proven Upstream Design Engineering Experience.

Complete end to end Engineering Design

addressing all disciplines like Process, Structural,

Mechanical, Electrical, Instrumentation, Piping, HSE

& PIPELINE.

Quality Value

Page 7: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Verticals Areas Addressed

Oil & Gas – Upstream

– Fixed Platforms

– Submarine Pipeline Design Engineering

Page 8: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Service - Horizontals

FEED, Basic & Detail Design Engineering

Production Engineering Services

Fabrication Engineering Services

Page 9: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Discipline Wise – PERMANANT STAFF

* Above figure is exclusive of the Support ( IT Admin, Finance, Operations & Contract) Staff

# Discipline Team Size

1 PROCESS 10

2 MECHANICAL 12

3 PIPING 20

4 STRUCTURAL ENGINEERS 16

DESIGNERS- DRAFTSMEN 22

5 ELECTRICAL & INSTRUMENTATION 15

6 PIPELINE 14

7 HSE 2

111Total

Page 10: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

FEED & Detail Design

E & I and Controls• Complete E & I Solutions• DCS, ESD & SCADA• Electrical Drives, VSDs• Cables

Structural• Jacket / Topside• Pile , Conductors,• Transportation

& Lifting Analysis

Process• Process Engineering• Process Simulation• Optimization• Design ReviewPIPELINE

• Expansion / Stability• Seabed routing• Design drawings

Piping & Mechanical• Piping Isometrics• 3D modeling• Pipe Support Details• Pipe Stress Analysis• Equipment Design

Engineering Design• Feasibility Studies• Conceptual Design• FEED• Detail Engineering

Applications• Wellhead and Process Platforms• FPSO / FSO Topside design• Separation (AP 118 to AP 1154)• Gas Dehydration • CO2 Removal /Dew Point Control • Production Water Treatment• N2 Generation/Water Injection• Chemical Injection

Page 11: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Topsides / Packages Detail Design

Detail Design of Topsides

• Well Head Platform (WHP) – Offshore

• Well Pad facilities - Onshore

• Process Platforms – Offshore / Onshore

• Fuel Gas Conditioning System

• Cyclone Separator System

• Gas Dehydration System

• Gas Sweetening System

• Produced Water Conditioning

• Separator System

• Utility Packages System

• Compressor Modules System

Page 12: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Page 13: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Case Study : MHN Bid Support

Project Name : ONGC MHN Bid Support for SIME

Engineering.

MHN Overview :

Process Platform with 3 process modules, Utility Module

with 2 GTGs (Free Issue), 3 Compressor Module (Free

Issue), 3 Cooler Modules (Free Issue)

8 Legged jacket

Living Quarters

Inputs:

Design Basis and Spec for Structural, Piping, Process,

Architectural, E&I, HVAC systems.

HSE Plan, Safety requirement, Installation requirements

Reference P&ID, Process design etc…

Page 14: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Case Study( FEED): MHN BID SupportScope of work :

Process Design, Simulation - Heat And Material Balance,P&ID, PFD, Process Specification For Process Package &Process Equipment

Piping MTO, Specialty Items, Engineering Specification forPiping Materials, Equipment List, Data sheets for major longlead equipment, Sites Data And Environmental Conditions

Electrical Load List and analysis, Electrical Equipment List ,SLD

Instrument Index (including packaged skid) , I/O LIST(instruments), ESD I/O List , PCS I/O List , Field transmitters,Level Instruments , Control Valve , Shutdown valves,Pressure Relief Valves , Flow Elements, Flow Meters, Fireand Gas Detector Data Sheet

Pile / Conductor Drivability, Pile/ Conductor Sizing, MTO forPrimary / secondary & tertiary steel.

RFQ for Major Systems, Data sheets etc..

Page 15: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Case Study (FEED) : MHN Bid Support (Contd..)

Highlights

28000 man hour project with 24 weeks loading

On time delivery within 24 weeks.

All required data like Equipment Layouts, Modular Tonnage,

MTO, RFQs required for the preparation of BID, supplied in time

enabling our client to get an accurate pricing.

Primary and secondary MTO supplied in 6 weeks for structural

tonnage.

Page 16: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Client : SimeDarby Engineering Sdn. Bhd.

End Client : Oil and Natural Gas Corporation LimitedDuration : 6 Months Scope : FEED, DETAIL, PRODUCTION AND FABRICATON ENGINEERING SERVICESSoftware Used : HYSIS, PIPESIM, Plus One, SACS, STAAD, CEASER, PDMS, BOCADTonnage : 17,500 MT Discipline : Structural, Process, Mechanical, Piping, Electrical, Instrumentation,

Pipeline, HSEDeliverables

• PROCESS : HYSIS Simulation, PFD, HMBT, P&ID, Layouts, Equipment Sizing, Line Sizing• MECHANICAL : Process / Mechanical Data Sheets, Equipment Design calculation• PIPING: PDMS Modeling, Pipe Stress Analysis, Pipe Support Modeling, Isometrics etc.• STRUCTURAL : Pile / Conductor Drivability, Pile makeup, Mud-mat, Lift, Upending, Flotation,

Loadout, Primary, Secondary & Tertiary Steel design• PIPELINE : Expansion Analysis, Stability Analysis for PIPEPLINE, Riser design• ELECTRICAL Cable Tray routing, Load List, SLD, Solar Panel sizing, Cathodic protection• INSTRUMENTATION : Instrument Data Sheets, Instrument Index, IO List, Control Valves etc..• SAFETY : HAZID / HAZOP, Safety Layouts, CO2 snuffing etc.

05 Well Head Platform for B-193 Project

Page 17: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

05 Well Head Platform for B-193 Project

Design and Detail Engineering of B-172A

Production rates B-172A Platform

Stream/ Case Max. Oil, Liquid & Gas Max. Water

Oil, BOPD 5082 1604

Water, BWPD 0 219

Total Liquid, BLPD 5082 1823

Gas, MMSCMD 0.11 0.1

Facilities :

• Unmanned, 4 Legged Jacket, Single batter, 61 meter water depth , 4 slots,Curved conductors, & preinstalled Riser.

• Main Deck cum Helideck, Cellar Deck, Sub cellar deck, 3 level boat landing.

• Monorails for material handling, Solar Panels.

• Production and Test Header Manifold, Test Separators, HIPPS, Aircompressor / Dryer, Utility Air Receiver, Glycol seal pot, C02 snuffing systemwith 10 mtr. vent boom, Launchers / Receivers, E&I Shelter rooms, Potablewater system, CCD and Diesel Storage System.

Page 18: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

05 Well Head Platform for B-193 Project

Design and Detail Engineering of B-178A

Production rates B-178A Platform

Stream/ Case Max. Oil Max. Water Max. Liquid Max. Gas

Oil, BOPD 4504 1653 2365 1342

Water, BWPD 0 2379 2183 2285

Total Liquid, BLPD 4504 4032 4548 3627

Gas, MMSCMD 0.07 0.23 0.13 0.25

Facilities :

• Unmanned, 4 Legged Jacket, Single batter, 63.5 meter water depth , 4 slots,vertical conductors, Chemical Injection & preinstalled Riser.

• Main Deck cum Heli-deck, Cellar Deck, Sub-cellar deck, 3 level boat landing.

• Monorails for material handling, Solar Panels.

• Production and Test Header Manifold, Test Separators, HIPPS, Air compressor /Dryer, Utility Air Receiver, Glycol seal pot, C02 snuffing system with 15 mtr. ventboom, Launchers / Receivers, E&I Shelter rooms, Potable water system, CCD andDiesel Storage System.

Page 19: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

05 Well Head Platform for B-193 Project

Design and Detail Engineering of B-179A

Production rates B-179A Platform

Stream/ Case Max. Oil & Gas Max. Water Max. Liquid

Oil, BOPD 3860 887 2369

Water, BWPD 1153 4047 2671

Total Liquid, BLPD 5013 4934 5040

Gas, MMSCMD 0.07 0.02 0.04

Facilities :

• Unmanned, 4 Legged Jacket, Single batter, 62.6 meter water depth , 3slots, vertical conductors, Chemical Injection & preinstalled Riser.

• Main Deck cum Helideck, Cellar Deck, Subcellar deck, 3 level boatlanding.

• Monorails for material handling, Solar Panels.

• Production and Test Header Manifold, Test Separators, HIPPS, Aircompressor / Dryer, Utility Air Receiver, Glycol seal pot, C02 snuffingsystem with 15 mtr. vent boom, Launchers / Receivers, E&I Shelterrooms, Potable water system, CCD and Diesel Storage System.

Page 20: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Facilities :

• Unmanned, 4 Legged Jacket, Single batter, 69.9 meter water depth , 3 slots,Curved conductors, preinstalled Riser.

• Main Deck cum Helideck, Cellar Deck, Subcellar deck, 3 level boat landing.

• Monorails for material handling, Solar Panels.

• Production and Test Header Manifold, Test Separators, HIPPS, Air compressor /Dryer, Utility Air Receiver, Glycol seal pot, C02 snuffing system with 10 mtr. ventboom, Launchers / Receivers, E&I Shelter rooms, Potable water system, CCDand Diesel Storage System.

05 Well Head Platform for B-193 Project

Design and Detail Engineering of B23A-A

Production rates B-23A-A Platform

Stream/ Case Max. Gas

Gas, MMSCMD 0.9

Condensate, BCPD 1873

Page 21: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

05 Well Head Platform for B-193 Project

Design and Detail Engineering of B28A-A

Production rates B28A-A Platform

Stream/ Case Max. Oil Max. Water& Gas Max. Liquid

Oil, BOPD 4455 2426 3557

Water, BWPD 564 2577 1493

Total Liquid, BLPD 5019 5003 5050

Gas, MMSCMD 0.09 0.13 0.08

Facilities :

•Unmanned, 4 Legged Jacket, Single batter, 63.5 meter water depth , 3 slots,vertical conductors, Chemical Injection & preinstalled Riser.

•Main Deck cum Heli-deck, Cellar Deck, Sub cellar deck, 3 level boat landing.

•Monorails for material handling, Solar Panels.

•Production and Test Header Manifold, Test Separators, HIPPS, Aircompressor / Dryer, Utility Air Receiver, Glycol seal pot, C02 snuffing systemwith 25 meter vent boom, Launchers / Receivers, E&I Shelter rooms, Potablewater system, CCD and Diesel Storage System.

Page 22: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Challenges - B-193 5 Well Platforms

18 month schedule compressed to 12 months

Changes in sea bed data, movement and rotation of platforms

Inconsistent Vendor Data

Constructability Issues

Fabrication and Production Engineering

Purchase Specification

Lack of data with the company for Pipeline portion.

Page 23: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

B193 PROCESS PLATFORM

Client : SimeDarby Engineering Sdn Bhd

End Client : Oil and Natural Gas Corporation LimitedDuration : 6 Months Scope : FEED, DETAIL (PROCESS DESCIPLINE)Software Used: HYSIS, PIPESIM, Plus One, SACS, STAAD,

CEASER, PDMS, BOCADTonnage : 17,500 MT Descipline : Structural, Process, Mechanical, Piping,

Electrical, Instrumentation,Pipeline, HSE

Facilities

8 Legged Jacket, 50,000 BPD Process Platform, 70 People LQwith 4 legged Jacket, LP Flare Tripod, Sub Sea connected HPFlare , 80 meter bridges, GTG Module, Compression Modules,MOL pumps, Integrated Well platform

Page 24: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

TYPICAL WORK ZONE

SUBMARINE PIPELINE DESIGN ENGINEERINGCAPABILITIES

Page 25: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Table of Contents

1. Range of Services

2. Pipeline Design

3. Documents Offered

4. Typical Deliverables

5. Typical Work Flow Diagram

6. Higher End Capabilities

Page 26: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

1. RANGE OF SERVICES

Conceptual Designs

Feasibility Studies

Basic Engineering Designs

Pre-Bid Engineering

Detail Engineering

Procurement Engineering

Installation Engineering

Project Management and Consultancy Services

Review and Verification of Basic/Detail design

Page 27: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

2. PIPELINE DESIGN

Pipeline Sizing

Pipeline Material Selection

Pipeline Mechanical Design

Pipeline Stability

Pipeline Span Analysis

Pipeline Crossings

Pipeline Protection Design

Pipeline CP System Design

Design for Pipeline Installation

Page 28: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

2. PIPELINE DESIGN (Continued)

RISER AND TIE IN SPOOLS

Mechanical Design

Span Evaluation

Flange Design

Detailed Stress Analysis

Riser Clamp Design

Riser Installation Engineering

Riser Protection Design

Page 29: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

2. PIPELINE DESIGN (Continued)

SHORE CROSSINGS

Shore Pull Analysis

Winch Foundation Design

DRAWINGS

Field Layouts

Alignment Drawings

Riser Drawings

Tie in Drawings

Clamp Drawings

Page 30: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

2. PIPELINE DESIGN (Continued)

PROCUREMENT ENGINEERING

Line Pipes & LR Bends

Anti Corrosion Coating

Concrete Weight Coating

Cathodic Protection System

Insulating Joints and Flanges

Flow Tees

Emergency Pipeline Repair Systems

Page 31: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

3. DOCUMENTS

Pipeline Wall Thickness Report

Flow Simulation Report

Pipeline Expansion Analysis Report

Pipeline Stability Report

Pipeline Span Analysis Report

Pipeline Route Selection Report

Pipeline Crossing Design Report

Riser Design Report

I/J Tube Design Report

Riser / I/J Tube Clamp Design Report

RFQ / PS for Procurement

Page 32: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

4. LIST OF MAJOR DELIVERABLES

DRAWINGS

Pipeline Alignment drawing

Pipeline Approach and Departure drawing

Riser / I-Tube location drawing

Riser / I-Tube Assembly drawing

Field Layouts

Clamp Typical drawings

Anode Arrangement drawings (Risers / Pipelines)

Pipeline Crossing drawings

Page 33: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

5. TYPICAL WORK FLOW DIAGRAM

Page 34: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

6. PIPELINE -ROLE IN OVERALL ENGINEERING

The ‘DEPARTMENT’ Interacts with other Engineering Departments and Outside Agenciesto Ensure Proper Information and Data Transfer at the Interface and Battery Limits. ATypical Interaction Matrix is given below.

# Department Inputs Received Outputs

1 PROCESSProduction Profile, Operating Parameters,

Fluid Density,Composition Etc.Slug Details Etc.

2 MECHANICAL Sub Sea Valves, Flange Design and related

DetailsExternal Loads on Piping Components

3 PIPINGPiping and Component Details from Riser Top

to Pig Barrel

Optimum Support Locations Types, Loads and

Supports

4 STRUCTURALJacket Face, Member Details and PLEM

Structural Details

Loads on Members, Riser Details and J-Tube

Details

5 ELECTRICAL & INSTRUMENTATION Anodes for J Tubes J-Tube Structural Details

6 SURVEY AGENCIES/CLIENTAll Pipeline Route Data, Jacket Face Survey

Data Etc.

Pipeline and Riser Drawings and Design

Reports

Page 35: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

B193 – Pipelines Case Study

Expansion data at hot and cold ends of the Riser not available with ONGC

for B193 5WHP Project since ONGC had not appointed the PIPELINE

contractor.

Nauvata carried out the modeling of the entire Pipeline length in PIPESIM

and arrived at a Temperature and Pressure profile along the PIPELINE

Length.

Temperature profiles were input to PlusOne software to carry out the

expansion analysis for the PIPELINE.

Stress analysis carried out using CEASER.

Basic design for the PIPELINE portion already carried out.

Page 36: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

B193 PIPELINES FLOW SIMULATION ANALYSIS BY PIPSIM SOFTWARE

Page 37: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Software Tools

PDMS

3d modeling of process plants / packages / skids/auto Iso extraction etc

HYSIS

Process Simulation

ETAP

Load flow calc, cable sizing, short circuit current estimate etc

CEASER II

Piping Flexibility/ Stress Analysis

PVElite

Pressure Vessel Design

STAAD PRO

Structural Analysis

Page 38: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

SACS

Structural Analysis

Intercorr

Corrosion Study

Plus One

Pipeline Engineering

Primavera / MS ProjectProject Scheduling Manager

PIPESIM

Pipeline Engineering

BOCAD

Structural Analysis and Design

Page 39: Nauvata  Corporate  Profile 2010

A N I S O 9 0 0 1 : 2 0 0 8 C O M PA N Y

Thank [email protected]