NCC Section J DTS Report
Good Luck Plaza 5-19 George Street, Blacktown NSW 2148
PREPARED FOR PREPARED BY
Jackson Teece Northrop Consulting Engineers
Lot 1, Pier 8-9 Level 11, 345 George Street
23 Hickson Road Sydney NSW 2000
Walsh Bay NSW 2000
Tel: 0292902722 Tel: 02 9241 4188
Ref: SY181363-00-SER03
Rev: B
Date: 11.04.2019
REPORT
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 1
NCC SECTION J DTS REPORT
Activity Schedule
Date Revision Issue Prepared By Approved By
18.03.2019 A Preliminary J.Caparrotta M.Dempsey
11.04.2019 B DA Issue J.Caparrotta B. Fung
Northrop Consulting Engineers Pty Ltd
ACN 064 775 088 | ABN 81 094 433 100
Level 11, 345 George Street, Sydney NSW 2000
02 9241 4188 | [email protected] | www.northrop.com.au
© 2019 Northrop Consulting Engineers Pty Ltd. All rights reserved.
This document has been prepared on behalf of and for the exclusive use of Jackson Teece and is subject to and issued in accordance with
the agreement between Jackson Teece and Northrop Consulting Engineers. Northrop Consulting Engineers accepts no liability or
responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party. Copying this document without the
permission of Jackson Teece or Northrop Consulting Engineers is not permitted.
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 2
TABLE OF CONTENTS
1. Summary ............................................................................................................................................................. 3
2. Report Limitations ............................................................................................................................................... 4
3. DTS Assessment ................................................................................................................................................ 5
3.1 Referenced Drawings ................................................................................................................................. 5
3.2 Building Classification ................................................................................................................................ 6
3.3 J1 Building Fabric ....................................................................................................................................... 6
3.4 J2 Glazing .................................................................................................................................................. 9
Appendix A - Glazing Calculators ........................................................................................................................... 11
Appendix B - Building Thermal Boundary Markup ................................................................................................... 15
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 3
1. SUMMARY
Northrop Consulting Engineers have been engaged to conduct a NCC Section J Deemed-to-Satisfy (DTS)
assessment according to National Construction Code (NCC) 2016, Sections J1 & J2. This summary report
provides minimum compliance requirements for Building Fabric (J1) and Glazing (J2).
The table below outlines compliance requirements for J1 and J2;
Table 1: Insulation and Glazing System requirements for the main building elements
* Refer to Table 4 for individual glazing requirements
Should the requirements listed above be deemed unfeasible, it is recommend that the project team should
proceed with a JV3 performance based solution. This approach is more flexible as it offers a holistic assessment
of the building performance, rather than individual components.
Building Fabrics Required total R-
value Equivalent insulation / glazing example
Roof and Ceiling 3.2 Equates to 155mm Fletcher R3.0 Pink Batts
insulation
External Walls 2.8 Equates to 90mm R2.5HD Fletcher Pink
Batts Insulation
South Facing Walls 2.3 Equates to 70mm R2.0HD Fletcher Pink
Batts insulation
Well Shaded Walls >30° Projection 2.3 Equates to 70mm R2.0HD Fletcher Pink
Batts insulation
Well Shaded Walls >60° Projection 1.8 Equates to 70 mm R1.5 Fletcher Pink Batts
insulation
Insulated Partition Walls 1.8 Equates to 70 mm R1.5 Fletcher Pink Batts
insulation
Suspended Floors 2.0 Equates to 70mm R1.7 Fletcher Pink Batts
Silencer Insulation
Floors and Ceilings to non-
conditioned space e.g. Plantrooms 1.0 Equates to 25mm R0.7 Bradford Multitel
Blanket insulation
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 4
2. REPORT LIMITATIONS
Due care and skill has been exercised in the preparation of this report.
This report is intended as a guide to illustrate the potential NCC section J compliance methods to be considered
in the development. It should be read in conjunction with the other design documentation and specific applications
may vary during the development of the project.
No responsibility or liability to any third party is accepted for any loss or damage arising out of the use of this
report by any third party. Any third party wishing to act upon any material contained in this report should first
contact Northrop for detailed advice, which will take into account that party’s particular requirements.
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 5
3. DTS ASSESSMENT
3.1 Referenced Drawings
Drawing No. Rev Date Title
DA-100.5 A 18/03/2019 Floor Plan – Upper Ground
DA-100 A 18/03/2019 Floor Plan - Ground
DA-101 A 18/03/2019 Floor Plan – Level 1
DA-102 A 18/03/2019 Floor Plan – Level 2
DA-103 A 18/03/2019 Floor Plan – Level 3
DA-201 A 18/03/2019 Street Elevation – South- (George Street)
DA-202 A 18/03/2019 Street Elevation – East (Sunny Holt Rd) & West
DA-203 A 18/03/2019 Street Elevation – North – Humphries Ln)
DA-204 A 18/03/2019 East Tower – Elevation South & West
DA-205 A 18/03/2019 East Tower – Elevation North & East
DA-206 A 18/03/2019 West Tower – Elevation South & West
DA-207 A 18/03/2019 West Tower - Elevation East
DA-401 B 28/03/2019 East Tower Section – East West
DA-403 A 18/03/2019 West Tower – Section – North South
DA-404 A 18/03/2019 Podium - Section
DA-405 A 18/03/2019 Podium - Section
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 6
3.2 Building Classification
The Good Luck Plaza development is classified as
a) Basement Level 1-8: Class 7a (Car-parking);
b) Ground Floor & Level 1: Class 6 (Retail);
c) Level 2 Western Tower: 9b (Public assembly/community space and gym);
d) Level 2 Eastern Tower: Class 9b (Childcare);
e) Levels 2-23: Class 2 (Residential);
and is located in 5-19 George Street, Blacktown NSW 2148 which belongs to climate zone 6 as shown in Figure 1
below.
3.3 J1 Building Fabric
Building fabric thermal insulation requirements apply to the building fabric that encloses habitable and conditioned
spaces forming parts of the thermal boundary of the site. Refer to appendix B for marked up drawings which
examine and identify thermal insulation requirements for the building.
Figure 1: Climate Zone Map - Blacktown
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 7
The tables below outline typical compliance requirements;
a) R3.2 Flat Concrete Roof and Ceiling construction example
Item Description R-Value
Outdoor Air Film (7m/s) 0.04
40mm Waterproof Membrane 0.03
200mm Solid Concrete Slab 0.14
R3.0 Ceiling Insulation 3.0
13mm Plasterboard/Ceiling Tiles 0.08
Indoor Air Film 0.11 Required
Total R-Value: 3.4 3.2
*Equates to 155mm Fletcher R3.0 Pink Batt Insulation
A roof that has metal sheet roofing fixed to metal purlins, metal rafters or metal battens; and does not have a
ceiling lining or has a ceiling lining fixed directly to those metal purlins, metal rafters or metal battens, must have a
thermal break, consisting of material with an R-Value of not less than R0.2, installed between the metal sheet
roofing and its supporting metal purlins, metal rafters or metal battens.
b) R2.8 External Walls (Brickwork) construction example
Item Description R-Value
Outdoor Air Film 0.04
110mm Brickwork 0.18
R2.5 Insulation* 2.5
13mm Plasterboard 0.08
Indoor Air Film 0.11 Required
Total R-Value: 2.92 2.8
*Equates to 90mm R2.5HD Fletcher Pink Batts Insulation
c) R2.3 External Walls (Brickwork) construction example
Item Description R-Value
Outdoor Air Film 0.04
110mm Brickwork 0.18
R2.0 Insulation* 2.0
13mm Plasterboard 0.08
Indoor Air Film 0.11 Required
Total R-Value: 2.42 2.3
*Equates to 70mm R2.0HD Fletcher Pink Batts Insulation
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 8
d) R1.8 External Walls construction example
Item Description R-Value
Outdoor Air Film 0.04
13mm Plasterboard 0.08
R1.5 Insulation* 1.5
13mm Plasterboard 0.08
Indoor Air Film 0.11 Required
Total R-Value: 1.82 1.8
*Equates to 70mm R1.5 Fletcher Pink Batts Insulation
A wall that has lightweight external cladding such as weatherboards, fibre-cement or metal sheeting fixed to a
metal frame; and does not have a wall lining or has a wall lining that is fixed directly to the same metal frame,
must have a thermal break, consisting of a material with an R-Value of not less than R0.2, installed between the
external cladding and the metal frame.
e) R1.8 Insulated partition construction example
Item Description R-Value
Indoor Air Film 0.11
13mm Plasterboard 0.08
R1.5 Insulation* 1.5
13mm Plasterboard 0.08
Indoor Air Film 0.11 Required
Total R-Value: 1.88 1.8
*Equates to 70mm R1.5 Fletcher Pink Batts Wall Insulation
f) R2.0 Suspended external floor construction example
Item Description R-Value
Outdoor Air Film 0.04
Concrete Panel 0.09
R1.7 Insulation* 1.7
19mm Timber Floor 0.12
Indoor Air Film 0.11 Required
Total R-Value: 2.06 2.0
*Equates to 70mm R1.7 Fletcher Pink Batts Silencer Insulation
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 9
g) R1.0 Floor and ceiling to non-conditioned area construction example
Item Description R-Value
Indoor Air Film 0.11
200mm Solid Concrete Slab 0.14
R0.7 Insulation* 0.7
13mm Plasterboard 0.08
Indoor Air Film 0.11 Required
Total R-Value: 1.14 1.0
*Equates to 25mm R0.7 Bradford Multitel Insulation Blanket
3.4 J2 Glazing
Glazing requirement in terms of U-value and Solar Heat Gain Coefficient (SHGC) as well as indicative glazing
type are listed below. The DTS glazing calculator assess the glazing on different orientations independently, thus
the below provides different glazing requirement on different orientation and example of equivalent glazing
product;
Table 3: DTS Glazing requirements
Ground Floor
Orientation U-Value SHGC Equivalent Glazing
E 4.7 0.49 Single Glazed 4mm SolTech Neutral
SE 2.7 0.65 Double glazed 6mm Clear / 12mm Air Gap /
6mm Energy Advantage
S 3.3 0.70 Double glazed, 4mm clear / 14mm Air gap /
4mm clear
SW 3.1 0.67 Double glazed 6mm Clear / 12mm Air Gap /
6mm Clear
Upper Ground
Orientation U-Value SHGC Equivalent Glazing
NE 5.5 0.73 Single glazing – 10.38mm Clear Laminate
SW 2.9 0.66 Double glazed, 4mm clear / 10mm Air gap /
4mm clear
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 10
Level 1
Orientation U-Value SHGC Equivalent Glazing
N 5.0 0.44 6.38mm ComfortPlus Grey
NE 6.0 0.76 Single glazed 6mm Clear
E 1.3 0.15 N/A
SE 1.6 0.70 N/A
S 2.7 0.65 Double glazed 6mm Clear / 12mm Air Gap /
6mm Energy Advantage
SW 2.1 0.62 Double Glazed 6mm Clear / 12mm Argon Gap
/ 6mm Energy Tech
NW 5.0 0.70 Single 4mm LowE Clear Glazing
Level 2
Orientation U-Value SHGC Equivalent Glazing
SE 1.7 0.32 Double glazed Viridian Light Bridge Grey
5mm / 14mm air gap / 5mm
S 2.4 0.42 Double glazed 6mm Sunergy Clear / 12mm
Argon gap / 6mm clear
There is no single uniform glazing solution available. It is recommended that the project team consider a JV3
performance-based approach solution which would provide greater flexibility around compliant glazing options
and potentially provide cost savings for the project.
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 11
APPENDIX A - GLAZING CALCULATORS
Ground Level
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 12
Upper Ground
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 13
Level 1
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 14
Level 2
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 15
APPENDIX B - BUILDING THERMAL BOUNDARY MARKUP
Ground – Walls, Ceiling and Roof
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 16
Upper Ground Walls, Ceiling and Roof
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 17
Level 1 - Walls and Ceiling
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 18
Level 1 - Walls and Floor
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 19
Level 2- Walls and Floor
SY181363-00-SER03: Good Luck Plaza NCC Section J DTS Report | Rev B | 11.04.2019 Page 20
Level 2 – Walls and Ceiling