New Psychiatric Facility at Fulton State Hospital A report to the Missouri Mental Health Commission 10.09.2014 1
Transcript
Page 1: New fulton state hospital presentation to mental health commission

New Psychiatric Facility at Fulton State Hospital

A report to the Missouri Mental Health Commission10.09.2014

1

Page 2: New fulton state hospital presentation to mental health commission

2

Page 3: New fulton state hospital presentation to mental health commission

Scope

• 300-Bed High Security

Forensic Psychiatric

Hospital

• Infrastructure to support an

additional 258 Beds within

Existing Buildings

• Dietary

• Materials Management

• Environmental Services

• Computer Information

Systems

• Maintenance / Shops

• Energy Control Center

(ECC)

• Administration

3

Page 4: New fulton state hospital presentation to mental health commission

Schedule & budget

• Construction Start in Spring

2015 with the New Fulton

State Hospital ready for

occupancy before

December 31, 2017

Construction $176.5 M

Planning & Design $13.0 M

Other Project Costs $21.5 M

Total $211.0 M

4

Page 5: New fulton state hospital presentation to mental health commission

Goals• Safety and security with

dignity

• Design a “Building for Generations”

• Design for future flexibility

• High security environment

• Recovery-based psychiatric care environment that facilitates and communicates state-of-the-art treatment

• Attract and retain the best staff to work and train

5

Page 6: New fulton state hospital presentation to mental health commission

Program

• 300 Beds

• Deployed in 12 Living Units

of 25 Beds Each

• 2 to 4 Living Units per

Community

• Treatment Mall

• Dietary

• Materials Management

• Environmental Services

• Computer Info Systems

• Maintenance / Shops

• Energy Control Center

• Administration

413,000 Gross Square Foot Program that includes

6

Page 7: New fulton state hospital presentation to mental health commission

7

Page 8: New fulton state hospital presentation to mental health commission

8

Page 9: New fulton state hospital presentation to mental health commission

Site conceptStand Alone Boiler Plants for

DESE-School for the Deaf

and DOC-Cremer

Maintain Power Plant,

Dietary, Materials Mgmt and

Maintenance Services Until

Completion of Permanent

Replacements

9

Page 10: New fulton state hospital presentation to mental health commission

Site concept

Service Centers: Dietary,

Materials Management,

ECC, Maintenance

Start: Spring, 2015

10

Begin demolition

Page 11: New fulton state hospital presentation to mental health commission

Site conceptService Centers: Dietary,

Materials Management,

ECC, Maintenance

Complete:

Summer, 2016

Portions of Hospital Under

Construction in Spring,

2016

11

Page 12: New fulton state hospital presentation to mental health commission

Site conceptConstruct Northeast

Quadrant of Hospital

Complete:

December 2017

12

Page 13: New fulton state hospital presentation to mental health commission

Site conceptDemolish Biggs

Spring 2018

13

Page 14: New fulton state hospital presentation to mental health commission

Questions?

14