New Hope Road Multi-Use Path
Bobby Croom, PE, PTOE
City of Goldsboro
Funding• $900,000 Federal and
State Funds for Preliminary Engineering, Design, and Construction.
• Typically, a 20% match by the City, however NCDOT is providing the local match in this case.
Pre-Construction• Environmental
Documentation
• FHWA, USACE, NMFS, US EPA, US FWS, NCHPO, NCDCM, NCDWR, NCWRC
• Design
• ROW Acquisition/Certification
• Utility Relocation
Red (???) Cockaded Woodpecker
Male Red Cockaded Woodpecker
Construction – April 25, 2016
Construction
Construction
Questions?
New Hope Road Multi-Use PathFundingSlide Number 3Pre-ConstructionRed (???) Cockaded Woodpecker�Male Red Cockaded WoodpeckerConstruction – April 25, 2016ConstructionConstructionQuestions?