  • NI Fire Safety Panel ConferenceNI Fire Safety Panel Conference

    New Sports New Sports StadiaStadia BelfastBelfast

    Paul ScottPaul Scott. . Sport NISport NI

    Liam. P. Dornan.Liam. P. Dornan. Belfast Building ControlBelfast Building Control

    8th February 20148th February 2014

    KillyhevlinKillyhevlin HotelHotel

    EnniskillenEnniskillen

  • OverviewOverview

    The The StadiaStadia..

    Why.Why.

    When.When.

    Building Control Process.Building Control Process.

    D.C.A.L.D.C.A.L./Belfast City Council/Belfast City Council/STC/Sport N.I./STC/Sport N.I.

    The End Game.The End Game.

  • The Stadia

    Ravenhill

    Windsor Park

    Casement Park

  • WhyWhyRavenhillRavenhill limited capacity, limited number of covered limited capacity, limited number of covered

    seats, most of the viewing decks were outdated.seats, most of the viewing decks were outdated.

    Windsor Windsor -- restrictions on occupancy levels, limited restrictions on occupancy levels, limited

    capacity, dilapidationcapacity, dilapidation..

    Casement Casement limited number of covered seats that were limited number of covered seats that were

    generally of poor design and in a poor condition, the generally of poor design and in a poor condition, the

    remainder of the venue largely consisted of open remainder of the venue largely consisted of open

    seating.seating.

    Very little opportunity for generating secondary income Very little opportunity for generating secondary income

  • WhenWhen

    RavenhillRavenhill Work to the fitting out of the Grand Work to the fitting out of the Grand

    Stand to be completed by April 2014.Stand to be completed by April 2014.

    Windsor Windsor Work to commence in March 2014 and Work to commence in March 2014 and

    to be completed by September 2015to be completed by September 2015

    Casement Casement Specifications to be finalised. work to Specifications to be finalised. work to

    be completed by 2016 be completed by 2016 ishish

  • RavenhillRavenhill

    Hamiltons/GilbertAsh/HolmesHamiltons/GilbertAsh/Holmes MillarMillar

    Bars/KitchensBars/Kitchens

    Changing facilitiesChanging facilities

    GymGym

    ConcessionsConcessions

    Meeting roomsMeeting rooms

    NevinNevin Spence education centreSpence education centre

  • RavenhillRavenhill

    Former capacity Former capacity --11,000 (5000 covered seats)11,000 (5000 covered seats)

    Proposed capacity Proposed capacity --18,000 (8,000 covered seats)18,000 (8,000 covered seats)

    Enhanced hospitality facilitiesEnhanced hospitality facilities

  • RavenhillRavenhill

  • Existing WindsorExisting Windsor

    Some of the existing structures dates from 1905 and Some of the existing structures dates from 1905 and

    rebuilt 1930rebuilt 1930ss

    Railway stand built 1960Railway stand built 1960s (now demolished)s (now demolished)

    7000 seat North stand built 19807000 seat North stand built 1980ss

    West stand (KOP) West stand (KOP) holding 3,500 built 1990holding 3,500 built 1990ss

  • Proposed WindsorProposed Windsor

    HamiltonsHamiltons/O/OHare Hare McGovernsMcGoverns/Holmes Millar/Holmes Millar

    IFA received IFA received 25m25m

    Refurbish North & West StandsRefurbish North & West Stands

    Rebuilding South & East StandsRebuilding South & East Stands

    IFA , Conference and Community FacilitiesIFA , Conference and Community Facilities

    Approximately 18K seatedApproximately 18K seated

  • Windsor Park/ National Football Windsor Park/ National Football

    StadiumStadium

    Former capacityFormer capacity-- 11,000 (covered seats)11,000 (covered seats)

    Proposed capacityProposed capacity-- 18,000 (covered seats)18,000 (covered seats)

    Enhanced hospitality facilitiesEnhanced hospitality facilities

    Ancillary buildings will facilitate secondary usageAncillary buildings will facilitate secondary usage

  • Existing Casement ParkExisting Casement Park

    Existing stand built in the 1940sExisting stand built in the 1940s

    Open terraces built in the 1980sOpen terraces built in the 1980s

  • New Casement ParkNew Casement Park

    Populous/Heron Bros/Buckingham Populous/Heron Bros/Buckingham

    PAD meetings (STG/SNI/BC/PSNIPAD meetings (STG/SNI/BC/PSNI))

    Planning Permission granted on 19Planning Permission granted on 19thth December 2013December 2013

  • Casement ParkCasement Park

    Former CapacityFormer Capacity-- 32,000 (1500 covered seats)32,000 (1500 covered seats)

    Proposed capacityProposed capacity-- 38,000 (30,000 covered seats)38,000 (30,000 covered seats)

  • Casement ParkCasement Park

  • Casement ParkCasement Park

  • Belfast Building Control Belfast Building Control

    PSCPSC

    Tender/Value engineeringTender/Value engineering

    ApplicationsApplications

    Assessment as works progressAssessment as works progress

    Design meetingsDesign meetings

    Site meetingsSite meetings

    InspectionsInspections

  • Belfast Building Control

    Red/Green Guide

    Accommodation

    Access/Structure/Fire Safety/Energy/Stairs

    FSF/Numbers/AFDS/TD/Place of relative safety

    FSE

  • DesignationDesignationAll 3 venues were and will be All 3 venues were and will be DesignatedDesignated under under

    the provision of the Safety of Sports Grounds the provision of the Safety of Sports Grounds

    OrderOrder

    They will therefore require a They will therefore require a Safety CertificateSafety Certificate

    from the District Councilfrom the District Council

    A Safety Certificate will state the safe capacity for A Safety Certificate will state the safe capacity for

    the venue/parts of the venue and contain the venue/parts of the venue and contain terms terms

    and conditionsand conditions designed to ensure the designed to ensure the

    reasonable safety of spectatorsreasonable safety of spectators

    The The terms and conditionsterms and conditions will be based on the will be based on the

    contents of the contents of the Red GuideRed Guide//Green GuideGreen Guide

  • Safety Technical Groups Safety Technical Groups

    ((STGsSTGs))Sport NI were asked to convene a Safety Sport NI were asked to convene a Safety

    Technical Group for each of the proposed Technical Group for each of the proposed

    stadiums.stadiums.

    Each Group were to receive the drawings and Each Group were to receive the drawings and

    related documents for the respective Design related documents for the respective Design

    Teams and to provide comment re safety and Teams and to provide comment re safety and

    operational matters to DCAL on the original operational matters to DCAL on the original

    submission and subsequent amendmentssubmission and subsequent amendments

    Interim and Final Reports were to be issued to Interim and Final Reports were to be issued to

    DCALDCAL

  • Members of the Members of the STGsSTGs

    Sport NISport NI

    Belfast City CouncilBelfast City Council

    PSNIPSNI

    NIFRSNIFRS

    NIASNIAS

    The Safety Officer responsible for the respective The Safety Officer responsible for the respective

    venuevenue

    Others (e.g. the Security Adviser to the IFA)Others (e.g. the Security Adviser to the IFA)

  • Exiting/Emergency Exiting Exiting/Emergency Exiting

    RequirementsRequirements

    Spectators should be able to reach a Spectators should be able to reach a place of reasonable place of reasonable

    safetysafety within 8 minuteswithin 8 minutes

    This could be outside of the stadium or in a This could be outside of the stadium or in a Free flowingFree flowing

    Fire sterileFire sterile exit routeexit route

    It does not include the pitchIt does not include the pitch

    The proposals involved/ will involve mathematical The proposals involved/ will involve mathematical

    projections and modellingprojections and modelling

  • Legislative RequirementsLegislative Requirements

    Fire Safety LegislationFire Safety Legislation

    Safety of Sports Grounds LegislationSafety of Sports Grounds Legislation

  • ChallengesChallenges

    Exiting arrangementsExiting arrangements

    Transport arrangementsTransport arrangements

    Safety Management arrangementsSafety Management arrangements

  • The End Game

    Biggest investment in Sports Stadia ever.

    Jobs

    State of the art facilities

    Benefits of modern building techniques

    Increase in management of people/crowds

    Public Safety