NORTHWEST DISTRICT Alvin Stump Northwest District Engineer September 18, 2020
Transcript
Page 1: NORTHWEST DISTRICT

NORTHWEST DISTRICT

Alvin Stump Northwest District Engineer

September 18, 2020

Page 2: NORTHWEST DISTRICT

Current Construction Projects

US 93; Carrow-Stephens Construct 4 lane divided Highway H823201C Contract: $31,314,751.60

Pierce Ferry Rd; Lloyd St to 13th St Roadway Widening & Intersection T009501C Contract: $ 1,742,759.37

US 93; Eleventh St to Windy Point Rd Shoulder widening H865801C Contract: $ 12,227,249.80

Acoma Blvd at Pima Dr. Pedestrian Highway Beacon T020201C Contract: $304,000

Page 3: NORTHWEST DISTRICT

US 93 Carrow Stephens

Presenter
Presentation Notes
Our schedule for today
Page 4: NORTHWEST DISTRICT

Pierce Ferry Rd to Lloyd St to 13th St

Page 5: NORTHWEST DISTRICT

Upcoming Construction Projects

SR 68; Old Kingman Hwy to Union Pass Safety Improvements F016401C Contract: $999,999.00

SR 69 at Spring Lane Install traffic signal F026901C Contract: $ 569,280.75

SR 95; 7th St to Aviation Way Construct raised median F020901C Contract: $533,976.26

SR 95; Aztec Rd to S Bullhead City Pkwy Construct raised medians F014601C Contract: 1,748,305.00

US 93; Windy Point Rd to Mineral Park Rd Shoulder Widening H865901C Contract : $7,377,460.17

SR 89 at Rd 1 North Install traffic signal and turn lane HX24701C Advertisement: ±October 2020

I-40; Mackenzie Wash to Griffith Wash Bridge Decks: Replace / Rehab F016201C Bid: $5,992,093.80

Page 6: NORTHWEST DISTRICT

Upcoming Preservation Projects Pineveta Draw EB #1175 and WB #1176 Scour Retrofit & Deck Replacement F016301D Program: $650,000

E. Seligman TI OP, EB & WB Bridge Deck Replacement F016101D Program:$ 6,500,000

Dugas Rd at Ash Creek Bridge Scour Protection F024601D Program: $ 270,000

Anvil Rock Rd TI UP Bridge Deck Replacement F025401D Program: $3,421,000

Page 7: NORTHWEST DISTRICT

Future Expansion Projects

I-40 / US 93 (W. Kingman TI) TBD: $55.5 Million

US 93; Tegner to Wickenburg Ranch (Project B) TBD: $41 Million Wickenburg Ranch to SR 89 (Project A) Adv September $9.5 Million

I-17; Anthem to Sunset Point TBD: $320 Million Awarded $90 Million INFRA Grant

SR 69; Prescott Lakes Parkway to Frontier Village TBD: $10 Million

Page 8: NORTHWEST DISTRICT

SR 95 and Kiowa Update

Page 9: NORTHWEST DISTRICT

Questions or Comments ?

Presenter
Presentation Notes
Our schedule for today