NORTHWEST DISTRICT
Alvin Stump Northwest District Engineer
September 18, 2020
Current Construction Projects
US 93; Carrow-Stephens Construct 4 lane divided Highway H823201C Contract: $31,314,751.60
Pierce Ferry Rd; Lloyd St to 13th St Roadway Widening & Intersection T009501C Contract: $ 1,742,759.37
US 93; Eleventh St to Windy Point Rd Shoulder widening H865801C Contract: $ 12,227,249.80
Acoma Blvd at Pima Dr. Pedestrian Highway Beacon T020201C Contract: $304,000
US 93 Carrow Stephens
Pierce Ferry Rd to Lloyd St to 13th St
Upcoming Construction Projects
SR 68; Old Kingman Hwy to Union Pass Safety Improvements F016401C Contract: $999,999.00
SR 69 at Spring Lane Install traffic signal F026901C Contract: $ 569,280.75
SR 95; 7th St to Aviation Way Construct raised median F020901C Contract: $533,976.26
SR 95; Aztec Rd to S Bullhead City Pkwy Construct raised medians F014601C Contract: 1,748,305.00
US 93; Windy Point Rd to Mineral Park Rd Shoulder Widening H865901C Contract : $7,377,460.17
SR 89 at Rd 1 North Install traffic signal and turn lane HX24701C Advertisement: ±October 2020
I-40; Mackenzie Wash to Griffith Wash Bridge Decks: Replace / Rehab F016201C Bid: $5,992,093.80
Upcoming Preservation Projects Pineveta Draw EB #1175 and WB #1176 Scour Retrofit & Deck Replacement F016301D Program: $650,000
E. Seligman TI OP, EB & WB Bridge Deck Replacement F016101D Program:$ 6,500,000
Dugas Rd at Ash Creek Bridge Scour Protection F024601D Program: $ 270,000
Anvil Rock Rd TI UP Bridge Deck Replacement F025401D Program: $3,421,000
Future Expansion Projects
I-40 / US 93 (W. Kingman TI) TBD: $55.5 Million
US 93; Tegner to Wickenburg Ranch (Project B) TBD: $41 Million Wickenburg Ranch to SR 89 (Project A) Adv September $9.5 Million
I-17; Anthem to Sunset Point TBD: $320 Million Awarded $90 Million INFRA Grant
SR 69; Prescott Lakes Parkway to Frontier Village TBD: $10 Million
SR 95 and Kiowa Update