NOTICE CONCERNING COPYRIGHT RESTRICTIONS This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used for any commercial purpose. Users may not otherwise copy, reproduce, retransmit, distribute, publish, commercially exploit or otherwise transfer any material. The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Under certain conditions specified in the law, libraries and archives are authorized to furnish a photocopy or other reproduction. One of these specific conditions is that the photocopy or reproduction is not to be "used for any purpose other than private study, scholarship, or research." If a user makes a request for, or later uses, a photocopy or reproduction for purposes in excess of "fair use," that user may be liable for copyright infringement. This institution reserves the right to refuse to accept a copying order if, in its judgment, fulfillment of the order would involve violation of copyright law.
Transcript
Page 1: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

This document may contain copyrighted materials. These materials have been made available for use in research, teaching, and private study, but may not be used for any commercial purpose. Users may not otherwise copy, reproduce, retransmit, distribute, publish, commercially exploit or otherwise transfer any material.

The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material.

Under certain conditions specified in the law, libraries and archives are authorized to furnish a photocopy or other reproduction. One of these specific conditions is that the photocopy or reproduction is not to be "used for any purpose other than private study, scholarship, or research." If a user makes a request for, or later uses, a photocopy or reproduction for purposes in excess of "fair use," that user may be liable for copyright infringement.

This institution reserves the right to refuse to accept a copying order if, in its judgment, fulfillment of the order would involve violation of copyright law.

Page 2: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

METHODS OF COMBATING LOST CIRCULATION DURING DRILLING

AND CASING CEMENTING

S. H. Shryock - D. K. Smith

H a l l i b u r t o n S e r v i c e s

ABSTRACT

The success or f a i l u r e of d r i l l i n g and complet- i n g geothermal w e l l s depends g r e a t l y on a v a i l - a b l e cementing processes. (Fig. 1) The cementing services which might be used require not only t h e selection of temperature stable competent m a t e r i a l s b u t also a complete under- s t and ing o f h o l e p r e p a r a t i o n , c a s i n g running procedures , mud displacement , los t c i r c u l a t i o n and t h e mixing-placing o f t h e cement s l u r r y . (Figs . 2-5).

Many steam f i e l d s are l o c a t e d where t h e forma- t i o n c o n t a i n s poor ly conso l ida t ed sedimentary d e p o s i t s , r u b b l i z e d s h a l e s and f r a c t u r e d vol- c a n i c rock. (F ig . 6 ) These formations a r e f r a g i l e i n t h a t some upheaval may have occurred d i s r u p t i n g t h e s t r u c t u r a l s t a b i l i t y , and, w i th l o w reservoir p r e s s u r e s , make them prime candi- d a t e s f o r l o s t c i r c u l a t i o n problems. Many of t h e geothermal w e l l s have to be d r i l l e d through and/or i n t o t h e s e f r a c t u r e d formations. Loss of d r i l l i n g mud or any other f luid p u t i n t o the ho le u s u a l l y occur s , c r e a t i n g problems which are expensive to e l i m i n a t e . This paper o f f e r s methods which have been demonstrated success- f u l i n combating l o s t c i r c u l a t i o n du r ing d r i l l i n g and c a s i n g cementing.

COMBATING LOST CIRCULATION DURING DRILLING

I f t h e h o l e is be ing d r i l l e d w i t h a 1.15 sp . . g r . mud and t h e rate o f r e t u r n becomes smaller and smaller u n t i l t h e mud loss approaches 100 bb l s per hour, t h e normal procedure i s to add l o s t c i r c u l a t i o n m a t e r i a l s to t h e mud and hope t h a t f u l l r e t u r n s can be achieved. t h i s is unsuccess fu l .

Quite o f t e n

It is decided a cementing s e r v i c e company should be c a l l e d and t h e problem d i scussed . The cement- i n g s e r v i c e company r e p r e s e n t a t i v e i s t o l d what has occur red , how deep t h e h o l e has been d r i l l e d , how long t h e r e has been l o s t c i r c u l a t i o n , and what the temperature o f t h e mud r e t u r n s have been p r i o r to l o s i n g c i r c u l a t i o n .

Normally, t h e w e l l owner is i n a hur ry and chooses to use cement because he b e l i e v e s i t can e l i m i n a t e t h e problem. I t is expected t h a t t he cementing service company w i l l b lend t h e proper materials f o r high temperatures and los t

c i r c u l a t i o n c o n d i t i o n s based on what has been t o l d them.

The d r i l l s t r i n g has been round-tr ipped t o remove the b i t and t h e cementing s e r v i c e company h a s t h e i r equipment ready t o mix and p l a c e t h e cement s l u r r y i n t h e ho le . The cement- i n g composi t ion s e l e c t e d f o r t h i s job is API Class G Cement, con ta in ing 40% sil ica f l o u r and 0.4% r e t a r d e r i n o r d e r to be able to d r i l l o u t i n 12 hours. The cement s l u r r y i s mixed a t a specific g r a v i t y of 1.86 and d i sp laced . Because it has n o t been p o s s i b l e t o f i l l the ho le , the displacement is c u t s h o r t to reduce the amount 'of mud contaminat ing t h e cement. The d r i l l pipe is t h e n p u l l e d high enough to be sure it i s above t h e cement and it is decided to w a i t 4 hours before t r y i n g t o f i l l the hole . a l l O w s t h e cement s l u r r y time t o t h i c k e n and become inore r e s i s t a n t t o flow when sub jec t ed t o a n i n c r e a s e d h y d r o s t a t i c head.

Th i s

A f t e r w a i t i n g 4 hours , an a t t empt is made to f i l l t h e h o l e ; pumping 15% more than r e q u i r e d wi thou t g e t t i n g r e t u r n s . made whether t o w a i t l onge r or do a. second job.

The d e c i s i o n t h e n has t o be

Normal practice i n geothermal w e l l los t c i r c u l a - t i o n cement p lug jobs is t o do a . s e c o n d j o b when unable t o f i l l the h o l e fol lowing t h e f i r s t job. Should t h e second j o b be done t h e same a s t h e first? L o g i s t i c s may s t r o n g l y i n f l u e n c e this d e c i s i o n as it depends g r e a t l y on what is a v a i l - able. The answer u s u a l l y is to do t h e second job i n a similar manner, only w a i t i n g longer f o r t h e cement t o set. E igh t hours fol lowing t h e second j o b , t h e h o l e i s f i l l e d and t h e d r i l l p i p e lowered t o t a g hard cement. The d r i l l p ipe is t r i p p e d o u t of t h e ho le to p i c k up t h e b i t and run t o b o t t o m . Once d r i l l i n g has resumed, it is l e a r n e d j u s t how t r eache rous lost c i r c u l a - t i o n i n geothermal w e l l s can be. r e t u r n s w i l l be los t wi th in 25 meters or l e s s ' o f where it had occur red before.

A l l too o f t e n

More and more, i t is being l ea rned t h a t l o s t - c i r c u l a t i o n i n a g e o t h e r m a l w e l l is caused by

d r i l l i n g i n t o f r a c t u r e d or broken rock. W e c a n ' t see t h e s e f r a c t u r e s and canno t p r e d i c t t h e i r size. I t is g e n e r a l l y accep ted t h a t if

-71 -

Page 3: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Shryock and Smith

they a r e l a r g e enough to be adequa te ly s e a l e d w i t h cernent i t requires lots o f cement, and o f t e n m u l t i p l e j obs , each r e q u i r i n g 18-24 hours .

When cement has proven unsuccess fu l as a cu re €o r lost c i r c u l a t i o n du r ing d r i l l i n g or i t t akes more than one job, i t is t i m e to c o n s i d e r a new approach.

Th i s would invo lve pumping a n o t h e r material i n t o t h e ho le ahead o f t h e cement. One such m a t e r i a l i s H a l l i b u r t o n ' s Flo-Chekm chemical. The pro- cedure would then be to pump some water through t h e open-ended d r i l l pipe as n e a r t h e l o s t c i r c u l a t i o n zone as possible, fo l lowing it w i t h 25-50 b b l s o f Flo-Chekm chemical. A 5-10 bbl s p a c e r o f f r e s h wa te r shou ld fo l low t h e Flo-Chekm chemical, t hen 20-40 bbls of cement s l u r r y . Displace w i t h water u n t i l t h e Flo-Chek chemical has been d i s p l a c e d from t h e d r i l l pipe. If t h e h o l e i s on a vacuum reduce t h e pump rate, wa&ching t h e pump p r e s s u r e t o see whe-n any p res su re i n c r e a s e occurs. If a p r e s s u r e bu i ld - up occurs , pump enough water to f i n i s h dis- p l a c i n g then p u l l t h e d r i l l pipe above t h e cement and c i r c u l a t e a t a l o w p r e s s u r e to f i l l t h e hole . If r e t u r n s are ob ta ined , t h e cement needs 8-10 hours t o harden.

Probably t h e b i g g e s t advantage to u s i n g Flo-Chekm chemical has been the r e d u c t i o n i n t h e number of jobs. Using Flo-Chek chemical and cement i s a new v a r i a t i o n on methods t o combat l o s t c i r c u l a t i o n du r ing d r i l l i n g , a l though it still requires t i m e and t r i p p i n g t h e d r i l l pipe.

A t h i r d method i s suggested, which h a s been used s e v e r a l times wi th good success .

Th i s method invo lves t h e use of l a r g e volumes of f r e s h water, 10% calcium c h l o r i d e b r i n e , and Flo-Chek= chemical. Again, assuming w e have t h e same c o n d i t i o n s as p r e v i o u s l y dis- cussed, t h e procedure would be to f l u s h through t h e d r i l l pipe, wi th t h e b i t n e a r t h e loss zone o r bottom of t h e ho le , u s ing f r e s h water. Con- t i n u e pumping through t h e d r i l l p ipe 10-20 b b l s of 10% CaCl2 b r i n e fol lowed by 5 b b l s of f r e s h water, 20-40 b b l s of Flo-Chek chemical , followed by 30-50 b b l s o f f r e s h water, then mud. Main- t a i n pumping u n t i l a volume l a r q e enough to f i l l t he ho le has been pumped. I f no r e t u r n s have su r faced , pump an a d d i t i o n a l 15% volume. I f you o b t a i n r e t u r n s , resume d r i l l i n g . I f no t , do a second j o b ? u s t l i k e t h e f i r s t . Some jobs have r e q u i r e d t w o or more sequences where t h e 10 b b l s o f 10% CaC12 b r i n e , 5 b b l s o f f r e s h water , 20 b b l s of Flo-Chek chemical and 30 b b l s of f r e s h wa te r a r e r epea ted 2 t o 3 t i m e s , one behind t h e o t h e r .

The major f e a t u r e of this method is to b r i n g t h e 10% CaCl2 b r i n e and Flo-Chek t o g e t h e r i n the lo s t c i r c u l a t i o n tone , e f f e c t i n g a permanent s e a l with- o u t having to t r i p t h e d r i l l pipe or w a i t on cement. O f prime importance to t h e success o f

t he job is t h e f l u s h i n g o f t he lost c i r c u l a t i o n zone w i t h f r e s h water, then the immediate place- ment o f t h e CaC12 b r i n e and Flo-Chekm chemical.

S ince t h e d i scove ry o f Plo-Chekm chemical , t h e r e have been many v a r i a t i o n s i n t h e methods o f c u r i n g los t c i r c u l a t i o n . Some choose to run 2-3 s t a g e s o f cement and Flo-Chek chemical. O the r s run 3-4 s t a g e s o f CaCIZ b r i n e and Flo-Chek chemical, t hen cap it w i t h cement. I t i s e v i d e n t t h e r e could be a tremendous cost s a v i n g s i f t r i p p i n g t h e d r i l l pipe and wa i t ing on cement t i m e cou ld be e l imina ted . (Figure 7)

WING CEMENTING OPERATIONS (Fig. 1)

I n cementing c a s i n g , t h e o b j e c t i v e is to provide a complete f i l l up of cement i n t h e c a s i n g h o l e annulus to resist s p e c i f i c environmental con- d i t i o n s and anchor t h e c a s i n g s f i r m l y to t h e ground and to each o t h e r . The hardened m a t e r i a l should be a homogeneous, dense, impermeable body and ma in ta in that c o n d i t i o n for t h e l i f e o f t h e w e l l . I n geothermal w e l l s , t h e cement s h e a t h must p r o t e c t t h e c a s i n g a g a i n s t p o s s i b l e corros- i o n by thermal b r i n e s and h e l p p r e v e n t the uncon- t r o l l e d f l o w of thermal water and steam o u t s i d e t h e cas ing .

The main c o n s i d e r a t i o n i n des ign ing a c a s i n g program f o r steam wells i s for t h e c a s i n g to resist l o n g i t u d i n a l , t e n s i l e , and compressive f o r c e s and t h e collapse and b u r s t i n g forces t o which they may be sub jec t ed . I t was no ted i n e a r l y w e l l s that collapse or t e n s i o n f a i l u r e s o f t e n occurred 'when the c a s i n g w a s n o t properly cemented i n t h e h o l e and to t h e s u r f a c e . (Fig 81

I t appeared that c o l l a p s e f a i l u r e was caused by h e a t expansion of und i sp laced d r i l l i n g f l u i d , o r f r e e water t h a t had separated from the cement s l u r r y . a n d become confined i n pockets i n t h e annu la r space between c a s i n g s . I n more r e c e n t w e l l s , fewer f a i l u r e s have been r e p o r t e d i n a completely cemented w e l l b r e where special care has been t a k e n to e l i m i n a t e free water.

FIELD STUDIES

After r e p e a t e d l y having (I) a loss o f r e t u r n s , and ( 2 ) subsequent c a s i n g o r l i n e r f a i l u r e s , two geothermal operators examined records o f p rev ious jobs i n an a t t empt to i d e n t i f y what might be caus ing t h e s e problems. The most s i g n i f i c a n t and o u t s t a n d i n g i t e m found i n these s t u d i e s was t h e i n d i c a t i o n o f a n i n c r e a s e i n pump p r e s s u r e a t t h e cementing u n i t d u r i n g t h e displacement o f t h e cement. A f t e r f i n d i n g this on a number of p r e s s u r e c h a r t s recorded du r ing t h e cementing jobs , i t w a s dec ided t o obse rve some a c t u a l jobs to t r y and determine what might be t h e reason f o r t h e s e p r e s s u r e i n c r e a s e s and subsequent loss of re t u r n s .

On t h e l i n e r j obs , t h e i n c r e a s e u s u a l l y occurred about t h e t i m e t h e cement s l u r r y reached t h e l i n e r l a p or shoe of t h e l a s t cemented c a s i n g . Whenever

-72-

Page 4: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Shryock and Smith

t h e p re s su re exceeded 1.5-2 t i m e s t h e mud c i r c u l a t i n g p r e s s u r e , los t c i r c u l a t i o n oc- cu r red . On c a s i n g jobs , the i n c r e a s e might occur anytime a f t e r t h e cement s l u r r y reached t h e shoe. Observing t h e r e t u r n s where cement r e t u r n s to the s u r f a c e occur red , i t w a s no t i ced t ha t some marble s i z e c u t t i n g s were coning w i t h a f a i r l y l a r g e volume of thickened mud or mud contaminated cement. On one job, i n t h e Imperial Val ley of Ca l i - f o r n i a , the mud r e t u r n s were so t h i c k t h e y would n o t f low o u t of t h e p i t c h i n g n i p p l e t o t h e p i t . through t h e rotary table, having t h e appearance o f tree bark.

The r e t u r n s came r i g h t up

The r e s u l t s of t h e s e s t u d i e s convinced the w e l l owners t h a t t h e fo l lowing i t e m s be given e x t r a special a t t e n t i o n :

Hole Condit ions: W a s there slough- i n g , l o s t c i r c u l a t i o n , h i g h temp- e r a t u r e anomalies, caverns, h igh p r e s s u r e gas or water, s t u c k pipe, wash o u t s , etc.? What d e p t h d i d t h e s e occur? What corrective measures were taken? How much t i m e w a s s p e n t i n c l e a n i n g c u t t i n g s o u t of the hole af ter r each ing T.D.?

Casing Running Procedures: When running cas ing , do n o t exceed 400 meters per hour. a t t a c h a head t o the c a s i n g a l r e a d y i n the h o l e , and circulate for 15 minutes. This is t o clean the mud and w a l l cake away from the collars and c e n t r a l i z e r s . After the c a s i n g has reached b o t t o m , c i r c u l a t e and reciprocate a t least two ho le , vol- umes prior t o cementing.

I f the mud .v i scos i ty and t empera tu re has n o t s t a b i l i z e d , c i r c u l a t e some more.

S top eve ry 2 h r s . ,

-

F i n a l Prognosis : P r i o r t o mixing and pumping the cement s l u r r y , determine the maximum pump p r e s s u r e and do n o t exceed same. Although the d e n s i t y of t h e cement is always g r e a t e r t han t h a t o f t h e mud, t h e pump p res su re . necessary t o c i r c u l a t e t h e ho le w i t h mud can h e l p e s t a b l i s h and determine what t h e m a x i m u m p r e s s - u r e should be du r ing t h e job. If t h e h o l e w i l l c i r c u l a t e w i t h mud a t 6-10 BPM a t 800 psi , t hen i t should c i r c u - l a te w i t h cement a t a m a x i m u m p r e s s u r e o f 1200-1600 p s i w i t h a 1000 meter column.

There are many f a c t o r s a f f e c t i n g cas ing cement- i n g success . The basic o p e r a t i o n invo lves a t l e a s t t w o parties, and most o f t e n t h r e e . The s e r v i c e company p rov ides t h e pumping equipment and bulk cementing m a t e r i a l s , The w e l l owner

p rov ides t h e h o l e i n t h e e a r t h known as t he w e l l , he wants c a s i n g p rope r ly cemented i n . A d r i l l i n g c o n t r a c t o r cus tomar i ly has in - s t r u c t i o n s provided by t h e w e l l owner on what is to be done. P r i o r t o performing t h e cementing job , it i s s t r o n g l y recommended t h a t the t h r e e parties meet and d i s c u s s t h e cementing j o b and what shou ld be done by whom.

CEMENT AND ADDITIVES

The basic composition c u r r e n t l y a v a i l a b l e f o r cementing c a s i n g where temperatures i n excess o f 100°C e x i s t is API C l a s s G , ASTM Type 11, or a n e q u i v a l e n t p o r t l a n d cement with 30-80% silica f l o u r . Formulations are p repa red from ,

t h i s . b a s i c stock to meet requirements d i c t a t e d by w e l l cond i t ions , There are some 15 d i f f e r e n t t ypes o f a d d i t i v e s such as a c c e l e r a t o r s , r e t a r d e r s , d i s p e r s a n t s , f l u i d loss and b r idg ing a g e n t s commonly used i n geothermal well cement- ing. (Table 1) a d d i t i v e s t o add t o t h e b a s i c composition, it must be decided what is though t necessary to accomplish t h e job s u c c e s s f u l l y .

To de tenn ine which of t hese

The first basic need is s u f f i c i e n t f l u i d l i f e , which i s d e s c r i b e d as th i cken ing t i m e , t o p l a c e t h e cement s l u r r y i n h o l e or casing-hole annulus . Remember, this cementing composi t ion is mixed a t atmospheric c o n d i t i o n s and t h e n subjected t o h i g h e r temperatures and p r e s s u r e s i n - t h e hole . To o b t a i n t h e d e s i r e d th i cken ing time a t these h igh b o t t o m h o l e c i r c u l a t i n g temperatures , it requires a retarder be dry blended w i t h t h e cement.

It is o f t e n necessa ry t o u s e a low d e n s i t y cement s l u r r y con ta in ing b r i d g i n g agen t s to c o n t r o l l o s t c i r c u l a t i o n . S l u r r y d e n s i t y r educ t ion normally i s accomplished by adding more water . r a t i n g o u t of t h e s l u r r y , b e n t o n i t e (ge l ) is inc luded i n t h e composition.

To keep t h i s water from sepa-

Bridging a g e n t s used i n geothermal cementing compositions are e i t h e r perlites or high s t r e n g t h micro spheres . The per l i te product i s normally used a t a c o n c e n t r a t i o n o f 1 cubic f o o t per sack o f cement. The b a s i c p e r l i t e cement mix for geothermal w e l l s i n c l u d e s :

94 # 1 sack

8-10#

38X 40%

2 . 8 # 3%

0.5-1.0# 0.5-1.00

0-1 .O% 0-1.08

1 cub ic f t .

Th i s s l u r r y is mixed t o have

Cement

P e r l i t e

S i l i c a Flour

Ben ton i t e

CFR-2 Dispersant

Re ta rde r

a downhole d e n s i t y o f 1.7 kg/l . t o e a s i l y p a s s through t h e mixing-pumping equipment, y e t w i l l b r idge most formation rock f r a c t u r e s .

The perli te particles a r e s i z e d

I t i s imperative t h i s s l u r r y be mixed

73-

Page 5: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Shryock and Smith

with t h e c o r r e c t q u a n t i t y o f mixing wa te r , 1 .3 cubic f e e t per 94# sack o f cement. P e r l i t e s adso rb wa te r under p r e s s u r e and, i f i n s u f f i c i e n t amounts of water a r e used, t h e s l u r r y may become too t h i c k to pump p r i o r to f i n i s h i n g the job. Using too much water can cause problems, n o t d u r i n g t h e j o b b u t once t h e w e l l has been completed and on product ion. Water which s e p a r a t e s away from t h e cement s l u r r y i s called " f r e e water." Th i s f r e e water may become t r apped and, as i t h e a t s u p , d e v e l o p s p r e s s u r e as a r e s u l t o f expansion a t t h e rate of 90 psi p e r deg ree C.

Casing and l i n e r collapse f a i l u r e s though t to have been caused from t h e presence of f r e e water t h a t e x i s t s i n s e v e r a l geothermal w e l l s i n t h e world. The newest, and p o s s i b l y t h e b e s t , cementing composi t ion to be developed f o r geothermal w e l l c a s i n g and l i n e r cementing uses what is d e s c r i b e d as h i g h s t r e n g t h micro- spheres (HSMS). I t h a s been very s u c c e s s f u l l y used i n t h e Cerro P r i e t o F i e l d s and i n o t h e r f i e l d s f u r t h e r no r th . Los t c i r c u l a t i o n and t h e n e c e s s i t y for e x c e s s cement has been g r e a t l y reduced. Cement bond l o g s have i n d i c a t e d improved bonding o v e r most o f t hese i n t e r v a l s which once caused so much d i f f i c u l t y . These f i e l d r e s u l t s s u p p o r t t h e l a b o r a t o r y o b s e r v a t i o n t h a t t h e s e type s l u r r i e s possess a n i n h e r e n t a b i l i t y to combat l o s t c i r c u l a t i o n problems by forming an e f f i c i e n t , i m o b i l e , f i l t e r cake that is r e s i s t a n t t o flow when p l a c e d a c r o s s a permeable ma t r ix . T h i s a b i l i t y , coupled w i t h good compressive s t r e n g t h development, forms a low-density s l u r r y having e x c e l l e n t thennal i n s u l a t i o n properties (D0.172 BTU/ hr-ft-OF).

-

The HSMS Geothermal S l u r r y inc ludes :

94 # 1 sack Cement

38# 40% S i l i c a F lou r

3.8# 4 % Benton i t e (Gel)

Si)# HSMS Bridging Agent

5#

1.0# CFR-2 Dispe r san t

L i m e ----

0.5# H a S a e 2 2 A F l u i d Loss Addi t ive

0-1.0# HR-7 Re ta rde r

This s l u r r y is mixed to have a downhole d e n s i t y of 1.38 kg / l .

S e t t l i n g of t h e s l u r r y from t h e s u r f a c e o r having f r e e water break o u t nea r t h e s u r f a c e may al low t h e t i eback s t r i n g , which u l t i m a t e l y becomes the product ion s t r i n g , to move around a s it may be loose and unsupported f o r 10-50 meters.

The t i eback cas ing cement most popu la r ly used i n c l u d e s :

94 n 1 sack Cement

38# 40% S i l i c a F l o u r

2.8# 3% Ben ton i t e (Gel) 0.7#

0-1.0# 1% HR-7 Retarder

CFR-2 (Di spe r san t ) 0.75%

This s l u r r y i s mixed to a d e n s i t y of 1.94 kg/ l .

CONCLUSIONS

The s u c c e s s o f u s ing other methods rather than cement p lug back jobs t o combat l o s t c i r c u l a - t i o n d u r i n g d r i l l i n g cannot be overlooked. s av ings by n o t having t o round t r i p t h e d r i l l p i p e and w a i t i n g on cement time can be s e v e r a l thousand d o l l a r s .

The

Each area which has t r i e d t h e Flo-Chek@ Serv ice for l o s t c i r c u l a t i o n c o n t r o l and improving pri- mary c a s i n g cementing has followed t h e b a s i c method g iven i n this paper.

A review o f t h e primary c a s i n g or l i n e r cement- i n g s t e p s inc lude :

The h o l e has to be i n t h e best possible c o n d i t i o n prior t o running casing.

The cas ing m u s t be run s l o w enough t o h e l p p reven t f r a c t u r i n g t h e exposed formations. .

It is necessary t o s t a g e , c i r c u l a t e , and r e c i p r o c a t e w h i l e running c a s i n g f o r 15 minutes eve ry 2 hours to c l e a n t h e d e b r i s and mud cake away from t h e c e n t r a l i z e r s , collars and s c r a t c h e r s .

Once t h e cas ing is i n p o s i t i o n t o cement, c i r c u l a t e a t least t w o ( 2 ) ho le volumes while r e c i p r o c a t i n g t h e cas ing to c l e a n t h e h o l e f u r t h e r and t o cond i t ion t h e mud.

Check t o be s u r e you have t h e c o r r e c t amount of materials, equipment, and manpower t o perform the job.

B e s u r e t h e r e i s an adequate volume of s u i t a b l e cement mixing wa te r a c c e s s i b l e to the cement mixing- pumping u n i t s .

E s t a b l i s h a maximum pump p r e s s u r e n o t t o be exceeded. --- Mix and pump t h e f l u s h , s p a c e r , Flo-Chek'" chemical, cement s l u r r y , p lugs , and displacement f l u i d s i n

- 7 4 -

Page 6: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Shryock and Smith

t h e i r correct sequence a t the m a x i m u m rate p o s s i b l e wi thou t exceeding the predetermined maximum pump p r e s s u r e .

(9 ) Once the p lug h a s bumped, check the floats. If they are n o t ho ld ing , close i n t h e head b u t monitor t h e i n s i d e cas ing p r e s s u r e and bleed it off whenever it b u i l d s up t o more t h a n 200 psi ove r t h e equali- z a t i o n p res su re .

(10) W a i t a t least 20 hours for t h e cement t o harden prior t o d i s t u r b i n g it.

REFERENCES

1. Messenger, Joseph U. : "Lost C i r c u l a t i o n , 'I PennWell Books, Tulsa, OK.

2.' Smith, Dwight K.: SPE Monograph.

3. Howard, G. C., and P. P. S c o t t , Jr.: "An Analys i s and t h e Con t ro l of Lost Circu- l a t i o n , " Trans. AIME, 1951, p. 171.

4 . Lummus, J. L. : "A New Look a t Lost C i r c u l a t i o n , 'I Petroleum Engineer, (Nov. 19671, pp. 69-70, 72-3.

5. Goins, W. C. Jr. : "How t o Combat C i r c u l a t i o n Loss," O i l & G a s Jou rna l (June 9 , 1952) pp. 71-92.

6. Ga l lus , J. P., Pyle , D. E., and Watters, L. T.: "Performance of O i l W e l l Cement- i n g Compositions i n Geothermal Wells," SPE 7591 p resen ted a t t h e 53rd Annual F a l l Meeting i n Houston, TX.

7. Ga l lus , J. P., Pyle, D. E . , and Moran, L. K.: "Phys ica l and Chemical Proper- t i e s of Cement Exposed t o Geothermal Dry Steam," SPE 7876 p resen ted a t t h e 1979 SPE Meeting i n Houston, TX.

8. C la rk , C. R., and Carter, L. G . : "Mud Displacement wi th Cement S l u r r i e s , J. Pe t . Tech. ( Ju ly 1973) 775-783.

9 . Haut, R. C . , and Cook, R. J.: "Primary Cementing, The Mud Displacement P rocess , " SPE 8253, 1979 F a l l Meeting i n L a s Vegas, Nevada.

-75-

Page 7: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

TYPICAL PRIMARY CEMENTING JOB

1-Plug container-,. :.

2 - B u I k rn a t e r la I &'stOia g e: u n It ._ . .'!- ' . .

Job completed Job In progress

FIGURE 1

-76-

Page 8: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Geothermal Steam Well" Northern Italy

With Intermediate String

Surface Casing

17%'' - 20" hole Set @ 328 feet I

Intermediate Casing

1 33/8" - 16" hole Set @ 13000 - 16000 feet J-55 - 68 ppf

Production Casing

Set @ 3200 - 4000 feet 9%" - 12'"'' hole

J-55 - 40 ppf

Cap Rock

8l/2I1 open hole 5000 - 6000 feet

BHST 530 - 570°F

4 ~ Without Intermediate String

Surface Casing

17'/4" - 20" hole Set @ 328 feet

No Intermediate String

Production String

1 33/8't - 16" hole Set @ 2600 - 3000 feet J-55 - 68 ppf

Open Hole

3000 to 4-5000 feet 1 2 '/4"

Production Casing Cement API Class G Type

(425 Cement) 40-80°/0 Silica Flour

plus Retarder

From Advancement in Cementation Techniqges in the Italian Geothermal Wells by Cigni, Ugo, Fabbri, Fulio, Grovannoni. Anselmo - Larderello. Italy

- 7 7 -

Page 9: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

imperial Valley Wel ls Current

Surface Casing

16" - 20" hole Set to -c 100 feet

Intermediate Casing

I 33/8" - I ~ ' / z ' ' hole Set = 1200 feet

Production Casing

95.8" - 1 21/4'f hole Set 2 8000 feet or deeper

6HST"F 450" - 550°F

G Cement Flour

API Class G Cement 1 cu f t Perlite 3% Ben~onite Friction Reducer Fluid Loss Agent Retarder

Stage Cement Tool (2-3 stages) location based on fracture gradient

API Class G Cement 1 cu f t Perlite 3*20 Bentonite 40% Silica Flour Friction Reducer Fluid Loss Agent Retarder (8asic ce~en t ing co~posit ion used on both stages of production st ring)

Note - All slurries should be mixed with 0% free water.

FIGURE 3

-78-

Page 10: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Conductor Casing 20" - 26" hole Set at 100-150 feet

Surface Casing

133/~'f - 17W' hole Buttress thread Set at 2000 - 2500 ft K-55 - 61 ppf

Production Liner

9%" - 12%" hole Buttress thread

Set at 5000 - 5800 ft 36-40ppf .

Open Hole

8 3 i 4 to 7000 - 10,000 feet BHST 450-525°F

Northern California G e y s e r s Area

Intermediate

API Class G Cement 35% Silica Flour 1 cu ft Perlite 3% Bentonite Friction Reducer .

7

Liner - Lead Slurry

API Class G Cement 40% Silica Flour 1 cu ft Perlite 3% Bentonite Friction Reducer Retarder

Tail In Slurry

API Class G Cement 40°/0 Silica Flour Friction Reducer Retarder

Note - Liner top sometimes squeezed tie back string usually 10V4". All slurries mixed with 0% free water. Preflushes used on all strings.

F I G U R E 4

-79-

Page 11: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Con d u c t o r Casing

20" - 26" hole

Set 100 - 300 feet H-40 - 94 ppf

Surface Casing

7 33/~" - 17 YZ" hole K-55 - 67 ppf Buttress thread Set f;rr 3000 - 3200 fee

Baja California, Mexico Cerro Prieto Field

~ e o ~ ~ e r ~ a l C o ~ p ~ e t i o n

Expanding Well Head

API Class G Cement 40% Silica Flour Cement Friction Reducer

40% Silica Flour Cement Friction Reducer Fluid Loss Agent - Retarder

Stage Tool - Location based on fracture gradient

1st Stage - API Class G Cement

0.

,&

I;. 140% Silica Flour

6- a . .a

~ n t e r ~ e ~ i a t e Casing

9 s 3'' - 1 Z1/.,'' hole

Hydrjl SEU Set ! r l 6000 - 6500 feet

N-80 * 43.5 ppf

P r o ~ u c ~ i o n Liner (Mech. Hanger)

7" set in 8'12'' hole Hydril SEU 9780 feel

BHST - 600-650°F

Fitler Additive Friction Reducer ~ e n ~ o n i ~ e Fluid Loss Agent

I

Friction Reducer Fluid Loss Agent Retarder

API Class G Cement 40% Silica Flour Fitter Additive Friction Reducer Bentonite Fluid Loss Agent

Note - Flushes ahead of cement slurry on surface and intermediate strings.

FIGURE 5

80-

Page 12: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

I \ -

F I G U R E 6

TYPES

Natura l f r a c t u r e s and f a u l t s So lu t ion c a v i t i e s and caverns Extended vugs - honeycomb Unconsolidated sand and g rave l s Highly permeable formations Pressure s e n s i t i v e bedding planes F rac tu res induced by pressure surges

SOLUTION

Locate i n t e r v a l Apply c o r r e c t i v e measures

-81-

Page 13: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and
Page 14: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

Hot water, steam

FXGUFE 8

CASING BUCKLING OF UNSUPPORTED PIPE W I T H HEATING

-83-

Page 15: NOTICE CONCERNING COPYRIGHT RESTRICTIONS · 2012. 9. 11. · AND CASING CEMENTING S. H. Shryock - D. K. Smith Halliburton Services ABSTRACT The success or failure of drilling and

TABLE 1 S ~ ~ ~ A R Y OF OILWELL C E ~ E ~ T ~ ~ G A~DIYIVES'

Use Chemical Comoosition Benelit T V D ~ of Cement Type 31 Additive Accelerators

~-

Reducing WOC time Setting surface pipe Setting cement plugs Comba~ing lost circula~ion

Accelerated setting High early strength

Ail APl Classes Pozzolans Diacel systems

Calcium chloride Sodium chloride Gypsum Sodium silicate Dispersants Sea water

Retarders Increasing thickening time for placement

Reducing slurry viscosity

Lignosul fonates Organic acids CMHEC ~odir ied lignosulfonates

increased pumping time Better flow properties

AP1 Classes, D,E, G, and H

Pozzolans Diacel systems

Weight-reducing additives

Reducing weight Combatting lost circulation

Bentonite-a t tapulgi t e Gilsonite ~ia~omaceous earth Perlite Pozzolans

Lighter weight Economy Better fillup Lower density

Alt APl Classes Pozzolans Diacel systems

~ e a ~ - w e j g ~ t additives Comba~tjng high pressure Increasing slurry weight

Hematite Ilmenite Barite Sand Dispersants

_I-

Higher density API Classes 0, E, G, and H

Additives for con~ro~ling lost circulation

Bri~gjng increasing fillup Combatting lost circulation

G~lsonile Walnut hulls Cellophane flakes Gypsum cement Bentonite-djesei oil Nylon fibers

Bridged fractures Lighter fluid cofumns Squeezed fractured zones Minimized lost c~rcul~t ion

Aft API Classes Pozzolans Diacel systems

FiltraIjon-con~ro~ additives

Squeeze cementjng Setting long liners Cementing in water- sensitive formations

Polymers Dispersants CMHEC Latex

Reduced dehydra~jon Lower volume of cement Better fillup

AIJ API Classes Pozzolans Oiacef systems

Dispersants Reducing hydraulic

Densi~ing cement slurries

Improving flow properties

horsepower

for plugging

Organic acids Polymers Sodium chforide Lignosulfonates

Thinner slurries Decreased fluid loss Better mud removal Better placement

All API Classes Pozzolans Diacel systems

Special cements or additives

Salt Primary cementing Sodium chloride Better bonding to salt, shales, sands

Stabilized strength Lower permeability

Better bonding Greater strength

All API Classes

Silica flour High-temperature cementing Silicon dioxide All API Classes

Mud Kit' inhibitor Neutralizing mud-treating chemicals

Tracing flow patterns Locating leaks

Hig~.[emp6ralure cementing

Paraformaldehyde API Classes A, €3, C. G, and H

Radioactive tracers

Sc 46 Aft API Classes

Pozzolan lime Siljca-lime reactions Lighter weight Economy

Lighter weight

Higher strength Faster setting

Higher strength Faster setting

Better bonding Controlled filtration

Silica lime

Gypsum cement

Silica-lime reactions

Calcium sulfate Hemihydrate

Dealing with special conditions

Oealing with special conditions

Dealing with special conditions

Hydromite Gypsum with resin

Liquid or powdered latex

API Classes A, 8, G, and H

Latex cement


Recommended