+ All Categories
Home > Documents > Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17...

Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17...

Date post: 24-Feb-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
79
Transcript
Page 1: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 2: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 3: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

Number of Applications

Submitted Funded

2A Regional Surface Transportation Improvements 32 12

28 Goods Movement Improvements 11 5

3 Signal Synchronization and Bus Speed Improvements 23 19

4 Transportation Demand Management 9 8

SA Bicycle Improvements 43 16

58 Pedestrian Improvements 36 11

6 Trans it Capital 32 17

7 Transportation Enhancement Activities 21 5

207 93

June 03, 2013

METRO 2013 TIP CALL FOR PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

Inflated T ota I Inflated Total Project Expenses Project Requests

$277,405,382 $130,349,476

$157,532,342 $58,950,121

$63,321 ,365 $47,901 ,837

$10,340,963 $6,999,413

$11 2,679,733 $87,285,206

$82,465,117 $60,981,476

$133,392,013 $77,565,484

$43,512,006 $29,232,273

$880,648,921 $499,265,286

AMOUNT RECOMMENDED Pages Color

$43, 149,002 1 to 11 SALMON

$30, 1 05,000 1 to 4 YELLOW

$33, 179,995 1 to 8 GREEN

$5,661 ,688 1 to 3 PINK

$25,809,916 1 to 15 BLUE

$20,533,084 1 to 12 GOLD

$31 ,515,001 1 to 11 GREY

$5,236,314 1 to 7 WHITE

$195,190,000

Page 4: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 5: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

\) z :;;: z ;li w 0 0 ::;

2

3

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

2A F7117 Redondo & Anaheim Intersection Improvements

2A

2A

CITY OF LONG BEACH

The City of Long Beach proposes to w iden and improve the Redondo Avenue & Anaheim Street

intersection to reduce traffic congestion and enhance multimodal safety.

F7118 Florence Ave. Bridge over San Gabriel River

CITY OF DOWNEY

Replace undivided 4 lane capacity constrained, collision prone, structurally deficient bridge with divided 6 lane capacity-doubled. collision-reduced structurally sound bridge

F7101 Prairie Avenue Mobility Project

CITY OF HAWTHORNE

Intersection widening, s ignal equipment updating, drainage repair and multimodal enhancements including pedestrian features and new bike route

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$742,700

$546,500

$0

$0

$1,289,200

$3,087,940

$3,462,043

$3,3g1,57g

$3,493,978

$3,596,377

$17,031,917

$0

$0

$96,834

$1 ,640,835

$3,362,458

$5,100,127

METRO 2013 TIP CALL FOR PROJECTS PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXI MUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:::LJ C!£:J E::i:J ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro's MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FY15-FY19

$0 $741,600 $494,400 Cill ~ D D G ~ $741,600

$763,920 $0 $0

$0 $0 $0

$0 $0 $0 Total Project Cost fo r this grant $1,236,000

$0 $0 $0

$763,920 $741,600 $494,400

$0 $0 $0 [3 [21 D D G ~ $2,658,660

$0 $944,290 $7,315,595

$0 $g72,770 $7,536,235

$1,002,140 $0 $0 Total Project Cost fo r this grant $16,768,890

$1,031,510 $0 $0

$2,033,650 $1,917,060 $14,851,830

$0 $0 $0 [21 [3 D D G u $5,247,556

$0 $0 $0

$35,385 $35,385 $34,361

$813,844 $813,844 $790,285 Total Project Cost fo r this grant $5,102,852

$1,739,667 $1,739,667 $1,689,310

$2,588,896 $2,588,896 $2,513,956

Regional Surface Transportation Improvements:. Page 1 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 6: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

4 2A F7123 Magnolia Bl Widening (North Side) -Cahuenga Bl FY 15 $154,500

to Vineland

FY 16 $636,600 CITY OF LOS ANGELES

FY 17 $4,374,186

This project will widen the north side of Magnolia FY 18 $3,237,250 Blvd between Cahuenga Blvd and Vineland Ave

FY 19 $0 from the existing 50-foot to 65-foot roadway with

7 -foot wide sidewalk. Total $8,402,536

5 2A F7119 Huntington Drive Multimodal Capacity FY 15 $0

Enhancements

FY 16 $296,284 CITY OF SAN MARINO

FY 17 $1 ,144,950

Reconfigure intersections of Huntington Dr. and FY 18 $0 San Marino Ave. and San Gabriel Blvd. to increase capacity and improve traffic flow and FY 19 $0

pedestrian movements. Total $1,441,234

6 2A F7121 Rancho Vista Blvd Widening FY 15 $0

CITY OF PALMDALE FY 16 $513,420

Single-jurisdictional project to provide for closure FY 17 $80,532

of gaps in the arteria l system. Project will provide FY 18 $5,428,646 roadway widening and street improvements to

FY 19 $1 ,476,248 improve traffic flow.

Total $7,498,846

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$100,425 $100,425 $54,075 G [21 D D u u $10,709,205

$413,790 $413,790 $222,810

$2,843,221 $2,843,221 $1,530,965

$2,104,212 $2,104,213 $1,133,038 Total Project Cost for this grant $8,402,537

$0 $0 $0

$5,461,648 $5,461,649 $2,940,888

$0 $0 $0 D ~ D D G u $11,648,640

$105,304 $105,304 $56,702

$834,131 $834,131 $449,148

$0 $0 $0 Total Project Cost for this grant $1,445,285

$0 $0 $0

$939,435 $939,435 $505,850

$0 $0 $0 [21 ~ D D u [3 $16,522,888

$333,723 $333,723 $179,697

$52,346 $52,346 $28,186

$3,528,619 $3,528,619 $1,900,026 Total Project Cost for this grant $7,498,844

$959,560 $959,560 $516 ,687

$4,874,248 $4,874,248 $2,624,596

Regional Surface Transportation Improvements:. Page 2 of 11 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 7: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

7

8

9

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

2A F7125 Sherman Way Widening between Whitsett Ave to

2A

2A

Hollywood FW>J

CITY OF LOS ANGELES

Widen south side of Sherman Way east of Whitsett Ave to the Hollywood Fwy SB on-ramp to convert shared through-right lane to dedicated through and dedicated right turn only lanes.

F7105 Lyons Avenue/Dock.weiler Drive Extension

CITY OF SANTA CLARITA

Construct extension of Lyons Avenue from Railroad Avenue to future connection with Dockweiler Drive. Project also includes new sidewalks and Class II bike lanes.

F7115 The Old Road-Lake Hughes Rd to Hillcrest Pkwy Phase I

COUNTY OF LOS ANGELES

Reconstruct and widen The Old Road, from Hillcrest Parkway 0. 53 miles North, to Secondary Highway standards, including all appurtenant structures.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$218,600

$95,710

$1 ,184,498

$1,498,808

$0

$0

$0

$10,687,992

$0

$10,687,992

$0

$106,100

$5,465,000

$6,756,000

$19,471,200

$31,798,300

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRAT ION PRINCIPLES FYl S-FY19

$0 $0 $0 G [21 D D G 13 $17,497,114

$0 $0 $0

$142,090 $142,090 $76,510

$62,212 $62,212 $33,498 Total Project Cost for this grant $1,498,808

$769,924 $769,924 $414,574

$974,226 $974,226 $524,582

$0 $0 $0 ~ ~ D D G 13 $23,396,107

$0 $0 $0

$0 $0 $0

$6,756,000 $103,993 $60,524 Total Project Cost for this grant $9,332,210

$0 $5,795,000 $3,372,693

$6,756,000 $5,898,993 $3,433,217

$0 $0 $0 [21 [21 D D G 13 $28,994,952

$0 $0 $0

$0 $2,745,976 $9,193,049

$0 $1,261,120 $4,222,010 Total Project Cost for this grant $24,342,802

$6,954,000 $1,591,749 $5,328,898

$6,954,000 $5,598,845 $18,743,957

Regional Surface Transportation Improvements:. Page 3 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 8: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

10 2A F7131 Century Boulevard Extension between Grape FY 15 $11,791,596

Street and Alameda

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

The project will extend Century Boulevard from FY 18 $0 Grape Street to Tweedy Boulevard w ith a new

FY 19 $0 road, sidewalks, bike lanes, and traffic calming features. Total $11,791,596

11 2A F7109 Soto Street Widening from Multnomah St to FY 15 $0

Mission Rd

FY 16 $6,446,636 CITY OF LOS ANGELES

FY 17 $3,447,322

Solo Street Widening between Multnomah St. and FY 18 $0 North Mission Rd.

FY 19 $0

Total $9,893,958

12 2A F7120 Eastern Avenue and Florence Avenue RSTI FY 15 $0

Project

FY 16 $0 CITY OF BELL GARDENS

FY 17 $47,819

Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound dedicated right turn lane to increase

FY 19 $3,414,704 the intersection capacity in the west bound direclion. Total $3,948,111

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$6,180,000 $4,157,975 $3,687,261 G [21 D D G u $34,893,318

$0 $1,740,391 $1,543,366

$0 $0 $0

$0 $0 $0 Total Project Cost for this grant $11,128,993

$0 $0 $0

$6,180,000 $5,898,366 $5,230,627

$-2,369,000 $0 $0 ~ ~ D D [3 u $40,948,820

$5,449,296 $4,962,502 $2,683,880

$3,447,322 $1,093,000 $591,129

$0 $0 $0 Total Project Cost for this grant $9,330,511

$0 $0 $0

$6,527,618 $6,055,502 $3,275,009

$0 $0 $0 ~ ~ D D G u $43,149,002

$0 $0 $0

$31,082 $31 ,082 $16,736

$118,581 $1,126,000 $606,308 Total Project Cost for this grant $3,384,895

$2,422,382 $1,043,100 $561,669

$2,572,045 $2,200,182 $1,184,713

Regional Surface Transportation Improvements: Page 4 of 11 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 9: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL PROJECT 0 PROJ ::;

PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

13 2A F7116 US 101/Lost Hills Interc hange Improvement FY 15 $22,660,000

Project

FY 16 $0 CITY OF CALABASAS

FY 17 $0

Construct new 4 lane bridge/interchange at US FY 18 $0 1 01 and Lost Hills Rd. to replace current

FY 19 $0 substandard facility. Will include partial cloverleaf

design and new ped/bike facilities. Total $22,660,000

14 2A F7127 Burbank Blvd Widening (southside) -Cahuenga FY 15 $206,000

Blvd to Vineland

FY 16 $1,485,400 CITY OF LOS ANGELES

FY 17 $748,705

This project will widen the south side of Burbank FY 18 $3,265,400 Blvd between Cahuenqa Blvd and Vineland Ave to

FY 19 $4,421,585 Major Highway Starndards w ith a bike route (Class Ill Bikeway). Total $10,127,090

15 2A F7129 Moorpark Street Widening- Woodman Avenue to FY 15 $77,250

Mammoth Avenue

FY 16 $1 ,145,880 CITY OF LOS ANGELES

FY 17 $1 ,661,360

This project will widen Moorpark Street (north half) FY 18 $844,500 from Woodman Ave to Mammoth Ave to eliminate the existing bottleneck condition for westbound FY 19 $0

traffic. Total $3,728,990

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECO MM'DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$12,360,000 $0 $10,300,000 G [21 D D G u $43,149,002

$-7,427,000 $0 $7,427,000

$0 $0 $0

$0 $0 $0

$0 $0 $0 -$4,933,000 $0 $17,727,000

$133,900 $0 $72,100 [3 ~ D D u c::!9 $43,149,002

$965,510 $0 $519,890

$486,658 $0 $262.047

$2,122,510 $0 $1 '142,890

$2,874,030 $0 $1,547,555

$6,582,608 $0 $3,544,482

$50,212 $0 $27,038 ~ ~ D D u c::!9 $43,149,002

$744,822 $0 $401,058

$1,079,884 $0 $581,476

$548,925 $0 $295,575

$0 $0 $0

$2,423,843 $0 $1,305,147

Regional Surface Transportation Improvements:. Page 5 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 10: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

.., ~ ~ c:LJ c::!L] [1LJ ~

z ;;;; z

LOCAL LAND USE & TOTAL CUMULATIVE ;:;

REGIONAL PRO) NEED& LOCAL COST w PROJECT TITLE Initial Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT 0 0 PRO) PROJECT SPONSOR FISCAL PROJECT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D ::;

MODE NUM PROJECT DESCRIPTION YEAR EXPENSE REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

16 2A F7108 Western Ave and Sepulveda Blvd Intersection FY 15 $0 $0 $0 $0 ~ [21 D D Q 13 $43,149,002

Improvements

FY 16 $0 $0 $0 $0 CITY OF TORRANCE

FY 17 $0 $0 $0 $0

Improve LOS and operational improvements to FY 18 $0 $0 $0 $0 regionally significant intersection thru ROW

FY 19 $6,897,209 $4,483,012 $0 $2 ,414 ,197 acquisition, roadway widening, signal upgrades,

and pedestrian/bicycle enhancements Total $6,897,209 $4,483,012 $0 $2,414,197

Provided schedule in application from City does not comply with Metro lapsing policy

17 2A F7122 Eastern Avenue and Garfield Avenue RSTI Project FY 15 $0 $0 $0 $0 [3 [3 D D [3 13 $43,149,002

CITY OF BELL GARDENS FY 16 $0 $0 $0 $0

Re-alignment of the intersection of Garfield Ave. FY 17 $47,819 $31,082 $0 $16,737

and Eastern Ave . fro m the existing "Y" intersection FY 18 $946,544 $615,253 $0 $331,291 into a "T" intersectio n to increase safety, capacity

FY 19 $2,640,347 $1,716,225 $0 $924,122 and operations.

Total $3,634,710 $2,362,560 $0 $1,272,150

18 2A F7126 Mission Rd. Widening - Griffin Ave. to Marengo St. FY 15 $0 $0 $0 $0 ~ [3 D D [3 13 $43,149,002

CITY OF LOS ANGELES FY 16 $0 $0 $0 $0

This project will widen both sides of Mission Road FY 17 $0 $0 $0 $0

from Griffin Avenue to Marengo Street to add an FY 18 $1 ,317,420 $856,323 $0 $461,097 additional through lane in each direction.

FY 19 $5,018,470 $3,262,006 $0 $1,756,464

Total $6,335,890 $4,118,329 $0 $2,217,561

June 03. 2013. 10:03:00AM Regional Surface Transportation Improvements:. Page 6 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 11: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

19 2A F7124 North Spring Street Widening from Rondout Street FY 15 $2,120,42g

to BakerS!

FY 16 $4,877,041 CITY OF LOS ANGELES

FY 17 $5,024,135

Widen to provide four travel lanes, bike lanes, FY 18 $0 parking lane, sidewalk, landscaped median and

FY 19 $0 parkway. Improvements include historical street

lights and green street elements. Total $12,021,605

20 2A F7128 Ventura & Radford Intersection Improvements FY 15 $0

CITY OF LOS ANGELES FY 16 $0

This project will convert the existing driveway on FY 17 $0

the south side of Ventura Blvd ., opposite Radford FY 18 $73,190 Ave., into a new street.

FY 19 $330,315

Total $403,505

21 2A F7111 Fullerton Road Corridor Improvements · LA FY 15 $231,750

County

FY 16 $106,100 COUNTY OF LOS A NGELES

FY 17 $546,500

Widen Fullerton Road from SR-60 EB ramp to FY 18 $6,333,750 Camino Bello south of Colima Road to add one lane in each direction, creating a six-lane arterial. FY 19 $7,127,850

Total $14,345,950

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $2 ,120,429 G D£1 D D G C3 $43,149,002

$3,183,000 $0 $1,694,041

$3,279,000 $0 $1,745,135

$0 $0 $0

$0 $0 $0 -

$6,462,000 $0 $5,559,605

$0 $0 $0 ~ ~ D [3 u C3 $43,149,002

$0 $0 $0

$0 $0 $0

$47,574 $0 $25,616

$214,705 $0 $115,610

$262,279 $0 $141,226

$0 $0 $231,750 ~ ~ D D G C3 $43,149,002

$0 $0 $106,100

$0 $0 $546,500

$3,082,425 $0 $3,251,325

$3,781,238 $0 $3,346,612

$6,863,663 $0 $7,482,287

Regional Surface Transportation Improvements:. Page 7 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013,rpl

Page 12: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

22 2A F7130 Western Ave- Florence to 80th and at Manchester FY 15 $0

CITY OF LOS ANGELES FY 16 $1 ,061,000

Widen east side of Western Ave between FY 17 $327,900

Florence Ave & 80th St to install center left- turn FY 18 $7,314,467 lane and right-turn pocket at the

FY 19 $0 Western/Manchester intersection.

Total $8,703,367

23 2A F7106 Fullerton Road Corridor Improvements · City of FY 15 $955,840

Industry

FY 16 $84,880 CITY OF INDUSTRY

FY 17 $218,600

Widen Fullerton Road from SR-60 EB ramp to FY 18 $999,325 Railroad Street to add one lane in each direction,

FY 19 $2,428,684 creating a six-lane arterial.

Total $4,687,329

24 2A F7107 Hawtho rne Boulevard Corridor Improvement FY 15 $0

Project

FY 16 $0 CITY OF TORRANCE

FY 17 $0

Increase capacity, reduce delay, improve traffic FY 18 $0 and bicycle operations, and enhance pedestria n

FY 19 $3,479,318 safety by adding RT lanes on 4 intersections along Hawthorne Blvd. Total $3,479,318

Provided schedule in application from City does not comply with Metro lapsing policy.

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 [JTI [JTI D D G [3 $43,149,002

$689,650 $0 $371,350

$213,135 $0 $114,765

$4,754,403 $0 $2,560.063

$0 $0 $0 -$5,657,188 $0 $3,046,178

$0 $0 $955,840 ~ [3 D D [3 [3 $43,149,002

$0 $0 $84,880

$0 $0 $218 ,600

$499,662 $0 $499,662

$1,914,378 $0 $514,306

$2,414,040 $0 $2,273,288

$0 $0 $0 [21 [21 D D G [3 $43,149,002

$0 $0 $0

$0 $0 $0

$0 $0 $0

$2,261,557 $0 $1,217 ,761

$2,261,557 $0 $1,217,761

Regional Surface Transportation Improvements:. Page 8 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 13: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

25 2A F7110 Tierra Subida Widening-Phase 3

26 2A

27 2A

CITY OF PALMDALE

The project w ill be the 3rd in 4-phase plan to upgrade arterial and provide for 2020 traffic projections. It will improve sight distance, widen roadway, and reduce traffic delays

F7103 Artesia Boulevard Enha ncements

CITY OF GARDENA

Artesia Boulevard Enha ncements: traffic signal upgrades and synchronization, turn pockets , traffic channelization updates, pavement upgrade, and minor concrete work.

F7104 Crenshaw Boulevard Enhancements

CITY OF GARDENA

Crenshaw Boulevard Enhancements: new turn pockets, improved traffic channelizatio n ,

pavement upgrade, traffic signal improvements/synchronization, and ADA sidewalk improvements.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $0

FY 17 $318,147

FY 18 $3,340,460

FY 19 $5,173,031

Total $8,831,638

FY 15 $0

FY 16 $233,420

FY 17 $2,934,705

FY 18 $0

FY 19 $0

Total $3,168,125

FY 15 $0

FY 16 $141,113

FY 17 $1 ,772,846

FY 18 $0

FY 19 $0

Total $1,913,959

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 [JTI ~ D D G [3 $43,149,002

$0 $0 $0

$215,212 $0 $102,935

$2,210,906 $0 $1,129,555

$3,312,778 $0 $1,860,253

$5,738,896 $0 $3,092,743

$0 $0 $0 [3 ~ D D u [3 $43,149,002

$151,723 $0 $81 ,697

$1,907,285 $0 $1,027 ,420

$0 $0 $0

$0 $0 $0

$2,059,008 $0 $1,109,117

$0 $0 $0 [3 ~ D D G [3 $43,149,002

$-87,267 $0 $228,380

$1,336,739 $0 $436,107

$0 $0 $0

$0 $0 $0

$1,249,472 $0 $664,487

Regional Surface Trans porta lion Improvements:. Page 9 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 14: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

28 2A F7100 Redondo Beach Blvd. Mobility Improvement

29 2A

30 2A

CITY OF LAWNDALE

Traffic signal upgrades, turn pockets, bike lanes, concrete bus pads, [pavement upgrade, landscaped median islands, and minor concrete repairs for ADA compliance

F7102 Redondo Beach Boulevard Enhancements

CITY OF GARDENA

The arterial enhancement project includes traffic signal upgrades and synchronization, addition of turn pockets, updated channelization, pavement upgrade, and minor concrete work.

F7114 Avenue N- 45th Street West to Antelope Valley Freeway

COUNTY OF LOS ANGELES

Widen Avenue N from an existing 2-lane highway

with pavement width of approximately 24 feet to a width of 84 feet between concrete drainage swales.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $99,910

FY 16 $412,729

FY 17 $241,553

FY 18 $2,525,618

FY 19 $3,340,238

Total $6,620,048

FY 15 $0

FY 16 $268,433

FY 17 $3,374,091

FY 18 $0

FY 19 $0

Total $3,642,524

FY 15 $1 ,030,000

FY 16 $2,122,000

FY 17 $1 ,093,000

FY 18 $2,252,000

FY 19 $14,487,500

Total $20,984,500

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$64,890 $0 $35,020 13 13 D D Q 13 $43,149,002

$268,433 $0 $144,296

$157,392 $0 $84,161

$1,641 ,708 $0 $883,910

$2,170,807 $0 $1,169,431

$4,303,230 $0 $2,316,818

$0 $0 $0 ~ ~ D D [3 13 $43,149,002

$174 ,004 $0 $94,429

$2,193,651 $0 $1,180,440

$0 $0 $0

$0 $0 $0

$2,367,655 $0 $1,274,869

$0 $0 $1,030,000 ~ ~ D D G 13 $43,149,002

$0 $0 $2,122,000

$0 $0 $1,093,000

$0 $0 $2 ,252 ,000

$6,954,000 $0 $7,533,500

$6,954,000 $0 $14,030,500

Regional Surface Transportation Improvements: Page 10 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vDnlft 2013.rpl

Page 15: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL PROJECT 0 PROJ ::;

PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

31 2A F7113 Hacienda Blvd/Gale Ave Intersection FY 15 $515,000

Improvements

FY 16 $530,500 COUNTY OF LOS ANGELES

FY 17 $1 ,093,000

Roadway and traffic sig nal improvements at the FY 18 $225,200 intersection of Hacienda Boulevard and Gale Avenue in the uninoorporated Los Angeles County FY 19 $5,563,200

area of Hacienda Heights. Total $7,926,900

32 2A F7112 Avenue 0 ·30th Street West to 10th Street West FY 15 $1 ,030,000

COUNTY OF LOS ANGELES FY 16 $1 ,061,000

Widen Avenue 0 from an existing 2-lane highway FY 17 $1 ,093,000

and a pavement width of approximately 24 feet to FY 18 $2,252,000 a w idth of 84 feet.

FY 19 $11 ,474,100

Total $16,910,100

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $515,000 13 [21 D D ~ ~ $43,149,002

$0 $0 $530,500

$0 $0 $1,093,000

$0 $0 $225,200

$5,273,450 $0 $289,750 -$5,273,450 $0 $2,653,450

$0 $0 $1,030,000 D ~ D D u [3 $43,149,002

$0 $0 $1,061,000

$0 $0 $1,093,000

$0 $0 $2,252,000

$6,954,000 $0 $4,520,100

$6,954,000 $0 $9,956,100

Regional Surface Transportation Improvements: Page 11 of 11 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 16: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 17: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

28 F7200 SR57/60 Confluence:W8 SR60/N8 SR57 Grand

28

28

Off-Ramp lnterchg

CITY OF INDUSTRY

Phase Ill of the SR57160 Confluence Project: Improve westbound SR-60/southbound SR-57 -reconstructs the Grand Ave interchange

F7205 Alameda St. Widening from Anaheim St. to 300ft South ofPCH

CITY OF LOS ANGELES

This 0.7 mile project proposes the improvement of Alameda St. by widening the existing roadway width of 40 feet (2 lanes each direction) to a 70ft. (3 lanes each direction)

F7207 Anaheim Street Widening--Farragut Ave to Dominguez Channel

CITY OF LOS ANGELES

This project will upgrade Anaheim Street from Farragut Avenue to Dominguez Channel to Major Highway standards, widening from 78 to 84 feet, increasing lanes from four to six.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$1 ,895,200

$12,484,787

$6,430,119

$0

$0

$20,81 0,1 06

$8,909,500

$0

$0

$0

$0

$8,909,500

$0

$954,900

$1 ,366,250

$4,222,500

$0

$6,543,650

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$1,228,790 $0 $0 [3 ~ D D G [3 $9,447,781

$8,099,144 $0 $0

$4,171,981 $0 $0

$0 $3,411,780 $4,281,072 Total Project Cost fo r this grant $21,302,775

$0 $6,036,001 $7,573,922

$13,499,915 $9,447,781 $11,854,994

$5,791,175 $0 $0 L2J ~ D D G u $15,321,196

$0 $861,635 $562,555

$0 $1,498,660 $978,465

$0 $3,513,120 $2,293,690 Total Project Cost fo r this grant $9,708,125

$0 $0 $0

$5,791 ,175 $5,873,415 $3,834,710

$0 $0 $0 [21 [21 D D G u $18,462,646

$424,400 $424,400 $462,539

$382,550 $382,550 $416,927

$2,669,859 $2,334,500 $2,544,287 Total Project Cost fo r this grant $6,565,203

$0 $0 $0

$3,476,809 $3,141,450 $3,423,753

Goods Movement Improvements: Page 1 of 4 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 18: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

4

5

6

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

2B F7201 Commerce Goods Movement Atlantic Blvd :

2B

2B

Washington to Como

CITY OF COMMERCE

Project will improve the Washington Blvd & Atlantic Blvd. intersection and traffic flow on Atlantic Blvd. Raised medians and pedestrian improvements will improve vehicle and pedestrian safety.

F7204 Pier B Street Freight Corridor Reconstruction

PORT OF LONG BEACH

The project widens and realigns Pier B St; enhances capacity; improves cargo flow and train operations; provides for pedestrian safety; J-hook flyover provides for emergency access

F7211 Roxford Street and Sepulveda Blvd Widening

CITY OF LOS ANGELES

This project will realign the Roxford Street and Sepulveda Blvd intersection to increase the existing 40-foot turning radius to accommodate safe large truck turning movements.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$108,150

$1 ,029,647

$0

$0

$0

$1,137,797

$18,035,300

$18,620,550

$46,886,421

$15,931,774

$0

$99,474,045

$103,000

$307,690

$2,098,560

$0

$0

$2,509,250

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER· MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S·FY19

$49,286 $0 $0 [JTI [JTI D ~ G 13 $19,150,399

$618,868 $68,965 $48,542

$0 $618,788 $435,545

$0 $0 $0 Total Project Cost for this grant $1,171,840

$0 $0 $0

$668,154 $687,753 $484,087

$0 $0 $0 ~ ~ D D [3 13 $30,105,000

$0 $0 $0

$12,023,000 $0 $0

$10,134,000 $3,490,600 $30,218,719 Total Project Cost for this grant $105,790,445

$0 $7,464,001 $64,617 ,125

$22,157,000 $10,954,601 $94,835,844

$66,950 $0 $36.050 ~ [21 D D G c::::9 $30,105,000

$199,998 $0 $107,692

$1,364,064 $0 $734,496

$0 $0 $0

$0 $0 $0

$1,631,012 $0 $878,238

Goods Movement Improvements: Page 2 of 4 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 19: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

7 2B F7208 Olympic Blvd and Solo St Intersection FY 15 $0

Improvements

FY 16 $321,148 CITY OF LOS ANGELES

FY 17 $546,500

Project increases curb return radii at Olympic/Solo FY 18 $1 ,628,604 intersection to reduce vehicular delays from rig ht

FY 19 $0 turning freight trucks and provide ADA compliant sidewalk and access ramps Total $2,496,252

8 2B F721 0 Slauson Ave. Improvement from Vermont Ave. to FY 15 $154,500

Crenshaw Ave.

FY 16 $397,875 CITY OF LOS ANGELES

FY 17 $737,775

This project will upgrade the Slauson Corridor by FY 18 $2,815,000 adding right tum lane at Crenshaw Blvd.,

FY 19 $2,665,700 increasing curb retu m radii, installing new signalization equipment at key intersections, Total $6,770,850 replacing failing AC pavement, provide street lighting, and installing ADA compliant curb ramps throughout the alignment.

9 2B F7209 Slauson Avenue Goods Movement FY 15 $0

CITY OF LOS ANGELES FY 16 $307,793

Upgrade signals, sidewalks, lighting, s ignage, and FY 17 $317,076

bus stops (only north side of Slauson), plus install FY 18 $3,051,351 controlled pedestrian crossing at the B lue Line

FY 19 $3,140,778 Slauson station

Total $6,816,998

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D G 13 $30,105,000

$208,746 $0 $112,401

$355,225 $0 $191 ,275

$1,058,592 $0 $570,012

$0 $0 $0 -$1,622,563 $0 $873,688

$51,500 $0 $103,000 ~ ~ D D u [3 $30,105,000

$212,200 $0 $185,675

$382,550 $0 $355,225

$1,914,200 $0 $900,800

$1,854,400 $0 $811 ,300

$4,414,850 $0 $2,356,000

$0 $0 $0 13 ~ D D G [3 $30,105,000

$200,065 $0 $107,728

$206,099 $0 $110 ,977

$1,983,378 $0 $1,067,973

$2,041,505 $0 $1,099,272

$4,431 ,047 $0 $2,385,950

Goods Movement Improvements: Page 3 of 4 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 20: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

10

11

PROJECT TITLE

PROJ PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

2B F7203 Manchester and La Cienega Geometric

2B

Improvements

CITY OF INGLEWOOD

Enhance goods movement by increasing turn radii, signal modifications, improve traffic flow. Improvements will benefit the operations, safety

and efficiency of the intersections .

F7206 Branford Street Widening ·· Laurel Canyon Blvd to Amboy

CITY OF LOS ANGELES

The project w ill improve Branford Street by adding

one additional westbound lane between Laurel Canyon Blvd and Amboy Ave. Right-of-way acquisition is required.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT EXPENSE

$0

$0

$0

$74,879

$779,428 ---$854,307

$51,500

$254,640

$285,273

$618,174

$0

$1,209,587

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D Q 13 $30,105,000

$0 $0 $0

$0 $0 $0

$0 $0 $74,879

$471,365 $0 $308,062

$471,365 $0 $382,941

$33,475 $0 $18,025 [3 ~ D D u [3 $30,105,000

$165,516 $0 $89,124

$185,427 $0 $99.846

$401,813 $0 $216,361

$0 $0 $0

$786,231 $0 $423,356

Goods Movement Improvements: Page 4 of 4 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 21: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

3 F731 0 South Bay Forum Traffic Signal Corridors Project

3

3

COUNTY OF LOS ANGELES

The design and construction of traffic s ignal synchronization, intersection operational improvements, and ITS components on arterials in the South Bay area of Los Angeles County.

F7305 Gateway Cities Forum Traffic Signal Corridors Project, Phase

COUNTY OF LOS ANGELES

The design and construction of traffic s ignal synchronization and intelligent transportation system improvemernts on arterials in the Gateway Cities area of Los Angeles County.

F7316 Artesia Corridor ATCS Enhancement Project

CITY OF LONG BEACH

The project will incorporate the corridor into the City's Adaptive Traffic Control System, install ITS components for managing vehicle traffic, bicycle, pedestrian and trans it.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$0

$861,390

$5,708,075

$6,569,465

$0

$0

$0

$553,992

$4,733,356

$5,287,348

$0

$0

$8,744

$276,996

$2,869,684

$3,155,424

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 [3 ~ D ~ [3 [3 $3,062,041

$0 $0 $0

$0 $0 $0

$516,834 $1,203,651 $802,434 Total Project Cost fo r this grant $5,103,402

$3,424,845 $1,858,390 $1,238,927

$3,941 ,679 $3,062,041 $2,041,361

$0 $0 $0 LE1 ~ D [3 G [3 $6,300,522

$0 $0 $0

$0 $0 $0

$443,194 $1,273,007 $318,252 Total Project Cost fo r this grant $4,048,101

$3,786,685 $1,965,474 $491,368

$4,229,879 $3,238,481 $809,620

$0 $0 $0 [21 ~ D [3 G [3 $8,127,559

$0 $196,035 $130,690

$5,465 $176,924 $117 ,949

$16,890 $1,454,078 $969,386 Total Project Cost fo r this grant $3,045,062

$1,875,262 $0 $0

$1,897,617 $1,827,037 $1,218,025

Signal Synchronization and Bus Speed Improvements: Page 1 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 22: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

4 3 F7307 San Gabriel Valley Forum Traffic Signal Corridor FY 15 $0

Project

FY 16 $0 COUNTY OF LOS A NGELES

FY 17 $0

The design and construction of traffic s ignal FY 18 $709,605 synchronization, intersection operational

FY 19 $5,057,065 improvements, and ITS components on arterials in the San Gabriel Valley area of LA County. Total $5,766,670

5 3 F7303 Network-wide Signal Synch with VID & Arteria l FY 15 $36,050

Performance Me

FY 16 $286,470 CITY OF CULVER CITY

FY 17 $923,585

Upgrades along reg ional arterials: network-wide FY 18 $0 signal sync and upgrade of 16 intersections w/ adv

FY 19 $0 detection capabilities and performance measurement system for planned ATCS real-time Total $1,246,105 ops

6 3 F7314 Santa Fe Avenue Synchronization Enhancement FY 15 $0

Project

FY 16 $9,549 CITY OF LONG BEACH

FY 17 $280,901

The project consists of signal sync, installation of FY 18 $2,932,104 ITS components for managing vehicle traffic , bike

FY 19 $0 imp, and inclusion of the corridor into the City's ATCS Total $3,222,554

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ [21 D D ~ ~ $11,751,953

$0 $0 $0

$0 $0 $0

$567,684 $1,424,705 $356,176 Total Project Cost for this grant $4,530,492

$4,045,652 $2,199,689 $549,922

$4,613,336 $3,624,394 $906,098

$28,840 $30,000 $7,500 [3 ~ D D G ~ $12,741,470

$229,176 $471,084 $117,771

$738,868 $488,433 $122,108

$0 $0 $0 Total Project Cost for this grant $1,236,896

$0 $0 $0

$996,884 $989,517 $247,379

$0 $0 $0 ~ [3 D ~ G ~ $14,661,667

$0 $212,200 $141,466

$0 $191,275 $127,517

$1,938,972 $1,516,722 $1,011 ,148 Total Project Cost for this grant $3,200,328

$0 $0 $0

$1,938,972 $1,920,197 $1,280,131

Signal Synchronization and Bus Speed Improvements: Page 2 of 8 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 23: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

7 3 F7317 Pasadena Area Rapid Transit System - Transit FY 15 $0

Signal Priority

FY 16 $0 CITY OF PASADEN.A

FY 17 $0

This project provides Transit Signal Priority for the FY 18 $192,456 Pasadena Area Rapid Transit System (ARTS)

FY 19 $1 ,265,767 along routes wtth the highest ridership and greatest signal delay. Total $1,458,223

8 3 F7308 East Los Angeles Traffic Signal Corridor Project . FY 15 $0

COUNTY OF LOS ANGELES FY 16 $0

Traffic signal synchronization on Eastern Ave and FY 17 $0

fiber optic construction on Eastern Ave, Cesar FY 18 $516,834 Chavez Ave, Ramona Bl, and Atlantic B l in the

FY 19 $3,660,122 unincorporated East Los Angeles area .

Total $4,176,956

9 3 F7309 Tweedy Boulevard and Signal Synchronization FY 15 $0

Project

FY 16 $180,370 CITY OF SOUTH GATE

FY 17 $1 ,898,541

Interconnect and coordinate 18 traffic signals o n FY 18 $33,780 Tweedy Blvd. from A lameda St. and Atlantic Ave.,

FY 19 $0 including synchronization, equipment upgrades, and operational imp rovements. Total $2,112,691

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 G G D D [21 ~ $15,819,314

$0 $0 $0

$0 $0 $0

$153,947 $455,057 $11 3,816 Total Project Cost for this grant $1,447,191

$1,012,526 $702,590 $175,72R

$1,166,473 $1,157,647 $289,544

$0 $0 $0 ~ ~ D D G u $18,562,901

$0 $0 $0

$0 $0 $0

$413,467 $1,078,470 $269,617 Total Project Cost for this grant $3,429,483

$2,928,098 $1,665,117 $416 ,279

$3,341,565 $2,743,587 $685,896

$0 $0 $0 ~ [21 D D G u $19,880,113

$144,296 $0 $0

$1,518,833 $0 $0

$27,024 $517,780 $129,445 Total Project Cost for this grant $1,646,515

$0 $799,432 $199,858

$1,690,153 $1,317,212 $329,303

Signal Synchronization and Bus Speed Improvements: Page 3 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 24: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

10 3 F7311 Downey Citywide Transit Priority System Program FY 15 $0

CITY OF DOWNEY FY 16 $0

Implementation of a Citywide Transit Signal FY 17 $0

Priority system alter ing traffic signal timing FY 18 $213,940 including the closure of signal system

FY 19 $2,155,740 communications gaps, retiming and evaluations, and dynamic schedule messaging boards at bus stops.

Total $2,369,680

11 3 F7306 Foothill Boulevard Traffic Signal Corridor Project FY 15 $0

COUNTY OF LOS ANGELES FY 16 $0

The design and construction of traffic s ignal FY 17 $0

synchronization, wireless communications. and FY 18 $491,118 CCTV cameras on Foothill Boulevard in the Arroyo

FY 19 $4,170,474 Verdugo area.

Total $4,661,592

12 3 F7321 Glendale Regional Arterial Traffic Performance FY 15 $177,160

Measurement System

FY 16 $180,370 CITY OF GLENDALE

FY 17 $157,392

Upgrade communication and system detection FY 18 $162,144 along various corridors and implement new arterial

FY 19 $0 performance measure system within the City of Glendale for data sharing. Total $677,066

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ CE1 D D G u $21,172,328

$0 $0 $0

$0 $31 ,835 $12,688

$162,144 $495,440 $197,452 Total Project Cost for this grant $1,807,213

$1,687,504 $764,940 $304,858

$1,849,648 $1,292,215 $514,998

$0 $0 $0 ~ ~ D D G ~ $24,100,659

$0 $0 $0

$0 $0 $0

$392,895 $1,151,091 $287,773 Total Project Cost for this grant $3,660,414

$3,336,379 $1,777,240 $444,310

$3,729,274 $2,928,331 $732,083

$142,140 $0 $0 ~ [21 D D G ~ $24,631,528

$145,357 $409,546 $109,597

$121,323 $121,323 $32,466

$124,986 $0 $0 Total Project Cost for this grant $672,932

$0 $0 $0

$533,806 $530,869 $142,063

Signal Synchronization and Bus Speed Improvements: Page 4 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 25: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

13

14

15

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

3 F7322 Broadway Intersection Improvements- Traffic

3

3

Signal Modifications

CITY OF CARSON

Modify five signalized intersections - update outdated signal cabinets, controllers, s ignal standards, improve signal timing, lighting, signal hardware and add bike detection.

F7300 Diamond Bar Adaptive Traffic Control System Project

CITY OF DIAMOND BAR

Install a n Adaptive Traffic Control System (ATCS) to adjust signal timing to optimize traffic flow, based on real-time traffic conditions.

F7312 Huntington Park Signal Synchronization & Bus Speed I mproveme

CITY OF HUNTINGTON PARK

The project improves the operation & efficiency by sync int along Santa Fe Av, Pacific Av , Miles Av, and State St, reconfig traffic lanes for dual turning lanes, and ITS notification

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$68,965

$754,170

$0

$0 ---$823,135

$0

$0

$174,880

$1 ,621,440

$0

$1,796,320

$0

$117,751

$403,289

$1 ,195,187

$0

$1,716,227

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D [21 u $25,160,166

$44,827 $257,027 $138,399

$490,210 $271 ,611 $146,252

$0 $0 $0 Total Project Cost for this grant $813,289

$0 $0 $0

$535,037 $528,638 $284,651

$0 $0 $0 D ~ D D ~ u $26,567,026

$0 $454,108 $113,527

$139,904 $218,600 $54,650

$1,297,152 $734,152 $183,538 Total Project Cost for this grant $1,758,575

$0 $0 $0

$1,437,056 $1,406,860 $351,715

$0 $0 $0 ~ ~ D D G u $27,503,953

$65,762 $0 $0

$233,518 $0 $0

$1,060,778 $368,294 $97,901 Total Project Cost for this grant $1,185,984

$0 $568,633 $151,156

$1,360,058 $936,927 $249,057

Signal Synchronization and Bus Speed Improvements: Page 5 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 26: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

16 3 F7318 Adaptive Traffic Control Network -Phase II FY 15 $0

CITY OF PASADENA FY 16 $0

The City of Pasadena is looking into expanding FY 17 $0

the Adaptive Traffic Control Network to additional FY 18 $253,035 key major arterials within the City.

FY 19 $1 ,835,184

Total $2,088,219

17 3 F7301 Intelligent Transportation Systems (ITS) Phase VI FY 15 $0

CITY OF SANTA CLARITA FY 16 $0

ITS Phase VI will re-time 174 traffic signals, add FY 17 $382,550

18 1TS system detectio ns, and add a fiber optic FY 18 $1 ,294,900 communication loop closing an existing gap.

FY 19 $1 ,640,356

Total $3,317,806

18 3 F7320 Santa Monica Signal Sync Improvements FY 15 $0

CITY OF SANTA MONICA FY 16 $636,600

Enhance the existing TMS w ith installation of FY 17 $0

additional adv ITS detection technologies which FY 18 $0 w ill facilitate detection of vehicles and bicycles

FY 19 $0

Total $636,600

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 G [21 D ~ [21 u $29,161,366

$0 $0 $0

$0 $0 $0

$202,428 $651,509 $162,877 Total Project Cost for this grant $2,071,766

$1,468,147 $1,005,904 $251,476

$1,670,575 $1,657,413 $414,353

$0 $0 $0 [3 ~ D D [3 u $31,105,125

$0 $0 $0

$306,040 $0 $0

$1,035,920 $682,409 $170,603 Total Project Cost for this grant $2,429,699

$1,312,285 $1,261,350 $315,337

$2,654,245 $1,943,759 $485,940

$0 $0 $0 ~ [3 D D [21 u $31,645,605

$509,280 $0 $0

$0 $0 $0

$0 $540,480 $135,120 Total Project Cost for this grant $675,600

$0 $0 $0

$509,280 $540,480 $135,120

Signal Synchronization and Bus Speed Improvements: Page 6 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 27: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

19 3 F7319 Intelligent Transportation Systems (ITS)· Phase V FY 15 $0

CITY OF INGLEWOOD FY 16 $0

6.1 miles of fiber-optics, CCTV, C hangeable FY 17 $0

Message Signs and controller improvements FY 18 $474,046 along various regional arterial streets. Signal

FY 19 $2,900,977 synchronization for 39 intersections.

Total $3,375,023

20 3 F7304 North County ITS-Palmdale Extension FY 15 $0

CITY OF PALMDALE FY 16 $71,392

This project will prov ide funding to expand the FY 17 $285,184

existing ITS infrastructure along Avenue R and FY 18 $1 ,808,846 Avenue S while maintaining compatibility and

FY 19 $3,113,109 functionality among existing systems.

Total $5,278,531

21 3 F7302 Santa Clarita Transit Signal Priority (TSP) FY 15 $0

CITY OF SANTA CLARITA FY 16 $0

Deploy Transit Serv,ice Priority system on McBean FY 17 $136,625

Parkway and BouqUlet Canyon Road/Railroad FY 18 $626,255 Avenue corridors to increase transit operation

FY 19 $0 efficiency and travel time savings.

Total $762,880

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 G [21 D ~ G 13 $33,179,995

$0 $0 $0

$0 $0 $0

$379,237 $603,150 $150,806 Total Project Cost for this grant $1,918,034

$2,320,716 $931,240 $232,838

$2,699,953 $1,534,390 $383,644

$0 $0 $0 [3 ~ D D G [3 $33,179,995

$0 $0 $71 ,392

$0 $0 $285,184

$1,587,410 $0 $221 ,436

$2,650,353 $0 $462,756

$4,237,763 $0 $1,040,768

$0 $0 $0 [21 ~ D D G u $33,179,995

$0 $0 $0

$109,300 $0 $27,325

$501,004 $0 $125,252

$0 $0 $0

$610,304 $0 $152,577

Signal Synchronization and Bus Speed Improvements: Page 7 of 8 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 28: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

22

23

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

3 F7313 Long Beach's Metro Blue L ine Signal Prioritization

3

CITY OF LONG BEACH

Enhancement of Metro Blue Line Corridor from DTLB to NCL via Sig na l Prioritization, ITS

features, physical safety enhancement features, ped improvements a nd other system upgrades.

F7315 Long Beach's lntermodai/Multi-Jurisdictional TMC Integration

CITY OF LONG BEACH

Establish modern citywide intermodal ITS

foundation via integration of City, port, transit, airport, police & fire TMCs to improve event

response and exchange of arterial- level traffic signal control data.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT EXPENSE

$772,500

$795,750

$0

$0

$0

$1,568,250

$618,000

$636,600

$0

$0

$0

$1,254,600

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$618,000 $0 $154,500 13 D£1 D D u 13 $33,179,995

$636,600 $0 $159,150

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,254,600 $0 $313,650

$494,400 $0 $123,600 ~ ~ D [3 [3 13 $33,179,995

$509,280 $0 $127,320

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,003,680 $0 $250,920

Signal Synchronization and Bus Speed Improvements: Page 8 of 8 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 29: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

4 F7700 Willowbrook Interactive Information Kiosks

4

4

COUNTY OF LOS ANGELES

Install e lectronic smart mobility information kiosks at three locations in the uninoorporated Willowbrook area to provide transit, neighborhood, and cultural information.

F7702 Downtown Huntington Park "i-Park" System Implementation

CITY OF HUNTINGTON PARK

Development of a parking management system for downtown. Installation of a technology smart public parking network. Usage of both dynamic and static parking guidance signage that will reduce congestion in the downtown area of the city.

F7704 Multi-modal Wayfinding: Congestion Reduction/Station Access

CITY OF SANTA MONICA

Install multi-modal wayfinding signs focusing on city-wide access to t hree Expo Line stations, including parking guidance signage to reduce downtown congestion.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$0

$0

$110,358

$176,158 ---$286,516

$0

$0

$174,880

$0

$596,199

$771,079

$1 ,519,250

$0

$0

$0

$0

$1,519,250

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ ~ D D G u $143,258

$0 $0 $0

$0 $0 $0

$55,184 $55,184 $55,174 Total Project Cost for this grant $286,516

$88,074 $88,074 $88,084

$143,258 $143,258 $143,258

$0 $0 $0 [21 CEl D D u u $689,232

$0 $0 $0

$84,161 $84,161 $36,069

$0 $0 $0 Total Project Cost for this grant $779,963

$461,813 $461,813 $197,920

$545,974 $545,974 $233,989

$1,215,400 $0 $0 [21 CEl D D G u $1,978,371

$0 $364,263 $91,066

$0 $570,537 $142,634

$0 $354,339 $88,585 Total Project Cost for this grant $1,611,424

$0 $0 $0

$1,215,400 $1,289,139 $322,285

Transportation Demand Management: Page 1 of 3 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 30: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

4

5

6

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

4 F7703 Experience LA 3.0--Mobility in the Cloud

4

4

COUNTY OF LOS A NGELES

Experience LA 3.0-"Mobility in the Cloud" is a countywide project i ntegrating regional mobility via a digital events and destinations platform using cloud and mobile technologies.

F7707 Last Mile Folding Bike Incentive Program

CITY OF LOS ANGELES

Provide financial incentive to transit riders (1800) toward the purchase of collapsible or electric bikes to use in conjunction with bus and rail systems. This program will address the first/last mile connection issue in the downtown area.

F7701 East Los Angeles Demonstration Bicycle Sharing Program

COUNTY OF LOS A NGELES

Integrate bicycle and public transit service by installing 15 bicycle stations with 150 bikes at transit stops and act ivity nodes. Bike stations will be located near the East LA Civic Center and the Atlantic Gold Line Stations, including ELAC.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$404,893

$241,643

$213,026

$51,796

$44,283 ---$955,641

$164,800

$169,760

$174,880

$180,160

$185,440

$875,040

$0

$0

$0

$114,008

$1,412,531

$1,526,539

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$323,914 $0 $0 G [21 D D G 13 $2,757,375

$193,314 $465,975 $116 ,494

$170,421 $170,421 $42,605

$41,437 $71 ,833 $17,959 Total Project Cost for this grant $973,756

$35,426 $70,775 $17,694

$764,512 $779,004 $194,752

$0 $0 $0 [3 ~ D D u 13 $3,451,945

$169,760 $169,760 $47,019

$174,880 $174,880 $48,437

$180,160 $180,160 $49,900 Total Project Cost for this grant $886,948

$185,440 $169,770 $47,022

$710,240 $694,570 $192,378

$0 $0 $0 ~ [3 D D G u $4,367,200

$0 $0 $0

$0 $0 $0

$91,206 $91 ,206 $60,804 Total Project Cost for this grant $1,525,425

$824,049 $824,049 $549,366

$915,255 $915,255 $610,170

Transportation Demand Management: Page 2 of 3 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 31: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

7

8

9

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

4 F7708 Interactive Bicycle Board Demo Project

4

4

CITY OF LOS ANGELES

This project will install a total of 12 interactive monitors throughout the City of Los Angeles for cyclists. Monitors will display this mode's level of use, thereby encouraging greater use of the mode and reducing VMT.

F7709 Glendale Regional Bike Parking Network

CITY OF GLENDALE

This project will provide 2 high capacity bike parking facilities with wayfinding signage for users within the City of Glendale.

F7705 Bicycle Friendly Business Program

CITY OF LOS ANGELES

This project includes the development implementation and management of a Bicycle Friendly Business Program in Los Angeles to accompany the previously funded Bicycle Corral Program.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$148,320

$120,954

$124,602

$128,364

$132,126 ---$654,366

$1 ,921,259

$458,352

$0

$0

$0

$2,379,611

$470,916

$215,595

$222,098

$228,803

$235,509

$1,372,921

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM 'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$24,720 $0 $0 ~ [21 D D G u $4,914,412

$120,954 $0 $0

$124,602 $26,232 $0

$128,364 $256,728 $0 Total Project Cost for this grant $663,046

$132,126 $264,252 $115,834

$530,766 $547,212 $115,834

$905,679 $0 $0 ~ ~ D D ~ u $5,661,688

$157,028 $0 $0

$0 $0 $0

$0 $747,276 $913,337 Total Project Cost for this grant $1,660,613

$0 $0 $0

$1,062,707 $747,276 $913,337

$209,296 $0 $261,620 [3 [3 D D G u $5,661,688

$215,595 $0 $0

$222,098 $0 $0

$228,803 $0 $0

$235,509 $0 $0

$1,111,301 $0 $261,620

Transportation Demand Management: Page 3 of 3 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 32: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 33: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

5A F7508 Vincent Community Bikeway Access

SA

SA

COUNTY OF LOS ANGELES

Install bike paths along the Big Dalton Wash and bike lanes and routes to oonnect to the existing and proposed bikeways in the surrounding areas.

F7521 Bicycle Transportation Plan Implementation -Phase II

CITY OF REDONDO BEACH

Implement Phase II of the 2009 Metro Call for Projects Bicycle Transportation Plan Implementation Proj ect, w ith emphasis on road diets and transitions.

F7506 Chandler Bikeway Extension

CITY OF BURBANK

This project would e xtend the Chandler Bikeway from its eastern terminus at Mariposa to the San Fernando Bikeway, closing the gap between the two regionally signifiicant Bikeways.

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$0

$0

$337,800

$3,940,600

$4,278,400

$1 ,802,500

$0

$0

$0

$0

$1,802,500

$0

$0

$0

$957,100

$2,486,055

$3,443,155

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE &

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES

$0 $0 $0 D G D D [3 $0 $0 $0

$0 $0 $0

$155,388 $164,959 $41 ,240 Total Project Cost fo r this grant $4,282,258

$3,270,698 $3,260,847 $815,212

$3,426,086 $3,425,806 $856,452

$1,442,000 $0 $0 L2J ~ D D ~ $0 $233,420 $58,355

$0 $0 $0

$0 $1,328,680 $332,170 Total Project Cost fo r this grant $1,952,625

$0 $0 $0

$1,442,000 $1,562,100 $390,525

$0 $0 $0 [21 ~ D D ~ $0 $0 $0

$0 $0 $0

$765,680 $743,160 $185,790 Total Project Cost for this grant $3,299,105

$1,988,844 $1,896,124 $474,031

$2,754,524 $2,639,284 $659,821

~ TOTAL CUMULATIVE SCORE AMOUNT

RECOM'D FYl S-FY19

[3 $3,425,806

OJ $4,987,906

09 $7,627,190

Subject to special condition of approval that the project cannot preclude the use of the Chandler ROW as a future transit corridor.

June 03. 2013. 10:03:00AM Bicycle Improvements: Page 1 o/15 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 34: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

4 SA F7502 Pico Rivera Regional Bikeway Project FY 15 $0

CITY OF PICO RIVERA FY 16 $212,200

Install Bike Lanes on Mines Avenue, Rosemead FY 17 $273,250

Blvd and Dunlap Crossing Road. Construct new FY 18 $1 ,570,770 bike bridge over the San Gabriel River and

FY 19 $1 ,672,027 construct Bus Stop Turnout on Paramount Blvd.

Total $3,728,247

5 SA F7507 Ballona Creek Bike Path Connectivity Project at FY 1S $384,190

Higuera Bridge

FY 16 $395,753 CITY OF CULVER CITY

FY 17 $0

This project will increase bicycle connectivity by FY 18 $0 constructing a new ramp to the Ballona Creek

FY 19 $0 Bike Path at Higuera Street and adding

associated wayfinding signage. Total $779,943

6 SA F7S16 Mulholland Highway Gap C losure FY 15 $517,717

CITY OF CALABASAS FY 16 $0

Mulholland Highway/Old Topanga Canyon Road FY 17 $0

Bicycle Gap C losure FY 18 $0

FY 19 $0

Total $517,717

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 G [21 D D G 13 $9,936,129

$148,540 $0 $0

$191,275 $0 $0

$1,099.539 $3S4,690 $1S2,054 Total Project Cost for this grant $3,298,773

$1,170,186 $1,954,249 $837,780

$2,609,540 $2,308,939 $989,834

$288,040 $0 $0 ~ ~ D D ~ ~ $10,551,754

$296,709 $230,927 $77,086

$0 $0 $0

$0 $384,698 $128,416 Total Project Cost for this grant $821,127

$0 $0 $0

$584,749 $615,625 $205,502

$414,173 $0 $0 ~ ~ D D [3 ~ $10,987,464

$0 $63,950 $15,987

$0 $0 $0

$0 $371,760 $92,940 Total Project Cost for this grant $544,637

$0 $0 $0

$414,173 $435,710 $108,927

Bicycle Improvements: Page 2 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 35: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

7 SA F7S19 Whittier Greenway Trail East Extension FY 15 $423,382

CITY OF WHITTIER FY 16 $2,897,700

Bicycle/pedestrian trail and trailhead extending FY 17 $0

Whittier Greenway Trail 2.3 miles east from Mills FY 18 $0 Avenue to First Avenue w ithin an active rail corridor. FY 19 $0

Total $3,321,082

8 SA F7S12 West Athens and West Carson Community FY 1S $0

Bikeways

FY 16 $0 COUNTY OF LOS A NGELES

FY 17 $0

Design and constructio n of 3.0 miles of Class II FY 18 $300,642 bicycle lanes, 0.6S m iles of Class Ill bicycle route,

FY 19 $1 ,469,844 and 1.1 miles of bicycle boulevard.

Total $1,770,486

9 SA F7S22 Delta Avenue Bicycle Boulevard in the C ity of FY 15 $209,329

Long Beach

FY 16 $1 ,1S7,607 CITY OF LONG BEACH

FY 17 $6,943

Delta Avenue Bicycle Boulevard from 10th Street FY 18 $0 to Wardlow Road in the City of Long Beach.

FY 19 $0

Total $1,373,879

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$338,705 $0 $0 ~ [21 D D u ~ $13,445,854

$2,303,601 $307,032 $78,864

$0 $0 $0

$0 $2,1S1,3S8 $SS2,600 Total Project Cost for this grant $3,089,854

$0 $0 $0

$2,642,306 $2,458,390 $631,464

$0 $0 $0 ~ ~ D D ~ ~ $14,516,424

$0 $0 $0

$0 $0 $0

$240,514 $176,332 $44,083 Total Project Cost for this grant $1,338,213

$1 '175,875 $894,238 $223,560

$1,416,389 $1,070,570 $267,643

$146,530 $0 $0 [21 ~ D D u u $15,532,338

$810,32S $150,940 $64,689

$4,859 $0 $0

$0 $864,974 $370,704 Total Project Cost for this grant $1,451,307

$0 $0 $0

$961,714 $1,015,914 $435,393

Bicycle Improvements: Page 3 ol15 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.11)1

Page 36: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

10

11

12

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

5A F7523 Rosemead/South El Monte Regional Bicycle

SA

SA

Connector Project

CITY OF ROSEMEA D

Rosemead and Soulh El Monte Bicycle Improvements including Class II Bike Lanes, Bicycle Portals to the Rio Hondo Bike Path, and Bicycle Parking at the Rosemead Civic Center.

F7S24 La Verne Regional Commuter Bicycle Gap Closure Project

CITY OF LA VERNE

Provide bicycle lanes a nd paths to improve regional connectivity and create an integrated and well-connected bicycle network for the northeastern San Gabriel Valley.

F7517 Bicycle Facility Improvements

CITY OF ARCADIA

Design and construct Class II & Ill bike facilities, signal/intersection modifications, and other bike

amenities along multiple corridors connecting to Gold Line Arcadia Station.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$74,270

$1 ,072,347

$101,464

$0

$1,248,081

$0

$600,526

$917,455

$0

$0

$1,517,981

$0

$1 ,067,517

$619,222

$0

$0

$1,686,739

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ [21 D D G u $16,456,059

$53,050 $0 $0

$766,307 $0 $0

$S3,761 $73,190 $31,367 Total Project Cost for this grant $1,319,603

$0 $850,531 $364,515

$873,118 $923,721 $395,882

$0 $0 $0 ~ ~ D D G u $17,578,525

$489,121 $0 $0

$786,295 $0 $0

$0 $428,521 $186,440 Total Project Cost for this grant $1,610,827

$-233,049 $693,945 $301,921

$1,042,367 $1,122,466 $488,361

$0 $0 $0 ~ ~ D D G u $18,735,072

$747,261 $0 $0

$433,455 $0 $0

$0 $118,230 $50,670 Total Project Cost for this grant $1,652,210

$0 $1,038,317 $444,993

$1,180,716 $1,156,547 $495,663

Bicycle Improvements: Page 4 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 37: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

13

14

15

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

SA F7SOO Hawthorne Boulevard Class II Bicycle Lanes

SA

SA

CITY OF LAWNDALE

This project proposes five foot, exclusive bicycles lanes on Hawthorne Blvd. It includes s ignage and bicycle parking areas.

F7S26 Las Tunas Drive Bicycle Improvements

CITY OF TEMPLE CITY

Construct and install class II bicycle lanes and associated improvements including striping, on-street improvements and bicycle parking facilities.

F7S14 Expo Bicycle Path Extension

CITY OF SANTA MONICA

Extension of the Expo bike path to SMC on 17th St, & westward along Michigan Ave: includes intersection improvements, markings, wayfinding, landscape & roadway reconfiguration.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 1S

FY 16

FY 17

FY 18

FY 19

Total

FY 1S

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$18,540

$204,773

$0

$0

$0 ---$223,313

$0

$S,120,270

$1 ,318,609

$0

$0

$6,438,879

$0

$0

$0

$1 ,857,900

$98S,1SO

$2,843,050

METRO 2013 TIP CALL FO R PRO JECTS

PRELIMINARY PROJECT RECOMMENDATIO NS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$15,450 $0 $0 G CE1 D D G u $18,921,914

$161,060 $1S,91S $3,979

$0 $0 $0

$0 $170,927 $42,732 Total Project Cost for this grant $233,553

$0 $0 $0

$176,510 $186,842 $46,711

$0 $0 $0 ~ ~ D D [3 u $21,643,782

$2,S46,464 $2,164,494 $2,187,801

$6SS,734 $5S7,374 $S63.376

$0 $0 $0 Total Project Cost for this grant $5,473,045

$0 $0 $0

$3,202,198 $2,721,868 $2,751,177

$0 $0 $0 ~ ~ D D G u $23,571 ' 116

$0 $0 $0

$0 $0 $0

$1,486,320 $1,466,052 $366,513 Total Project Cost for this grant $2,409,168

$788,120 $461,282 $11S,321

$2,274,440 $1,927,334 $481,834

Bicycle Improvements: Page 5 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 38: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

16 SA F7S39 Bicycle Friendly Street Treatments (3) FY 15 $618,000

CITY OF LOS ANGELES FY 16 $0

This project designs and constructs a package of FY 17 $2,623,200

Bicycle Friendly Street (BFS) roundabout FY 18 $0 treatments as 12 locations identified for BFS treatments in the 2010 Bicycle Plan. FY 19 $0

Total $3,241,200

17 SA F7S20 El Monte Regional Bicycle Commuter Access FY 1S $0

Improvements

FY 16 $0 CITY OF EL MONTE

FY 17 $1 ,190,49S

Project creates direct bike connections between FY 18 $225,200 the El Monte Bus Station and the Rio Hondo bike path and bike access to local employment centers FY 19 $0

& destinations in El Monte's CBD. Total $1,415,69S

18 SA F7S1S Norwalk Blvd. Bicycle, Pedestrian and Transit FY 15 $766,320

Improvements

FY 16 $897,606 CITY OF ARTESIA

FY 17 $0

Installation of bike lanes, bicycle detection, FY 18 $0 median islands and pedestrian/transit amenities

FY 19 $0 on Norwalk Bl. between Artesia Bl. and Flora Vista St. w ithin the City of Artesia. Total $1,663,926

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$494,400 $0 $0 G [21 D D u 13 $25,809,916

$0 $0 $0

$2,098,560 $437,200 $109,300

$0 $1,801,600 $450,400 Total Project Cost for this grant $2,798,500

$0 $0 $0

$2,592,960 $2,238,800 $559,700

$0 $0 $0 ~ ~ D D G 13 $25,809,916

$0 $0 $0

$971,89S $0 $218 ,600

$14,908 $0 $210,292

$0 $0 $0

$986,803 $0 $428,892

$613,056 $0 $153,264 ~ [21 D D u 13 $25,809,916

$718,08S $0 $179,S21

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,331,141 $0 $332,785

Bicycle Improvements: Page 6 ol15 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.11)1

Page 39: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

19

20

21

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

SA F7528 Washington Blvd Road Diet Project

SA

SA

CITY OF PASADENA

Washington Blvd Road Diet - reduction of 2 lanes to 1 lane of traffic in each direction, install painted median, pedestrian curb extensions, 2 bike lanes, parking

F7540 Walnut/52nd Bike Blvd Design & Con st. in City of Long Beach

CITY OF LONG BEACH

The City of Long Beach proposes to construct a 3.65 mile long Bicycle Boulevard along Walnut and 52nd Streets in North Long Beach with a connection to the LA River bike trail.

F7501 35th Street West Gateway

CITY OF LANCASTER

35th Street West Gateway will provide six miles of enhanced pedestrian and bicycle facilities on 35th Street West, Lancaster Blvd, Avenues J-8, K, and K-8

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$0

$119,638

$885,186

$1,004,824

$233,226

$1 ,012,876

$507,185

$0

$0

$1,753,287

$0

$0

$201,726

$3,983,155

$0

$4,184,881

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ [21 D D G u $25,809,916

$0 $0 $0

$0 $0 $0

$94,348 $0 $25,290

$709,551 $0 $175,635

$803,899 $0 $200,925

$131,566 $0 $101 ,661 ~ ~ D D G u $25,809,916

$730,962 $0 $281,913

$382,396 $0 $124,789

$0 $0 $0

$0 $0 $0

$1,244,924 $0 $508,363

$0 $0 $0 ~ [21 D D G [3 $25,809,916

$0 $0 $0

$0 $0 $201,726

$3,352,778 $0 $630,378

$0 $0 $0

$3,352,778 $0 $832,104

Bicycle Improvements: Page 7 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 40: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

22 SA F7511 Valinda Community Bikeway Access FY 15 $0

Improvements

FY 16 $0 COUNTY OF LOS A NGELES

FY 17 $0

Design and constructio n of 1.9 miles of Class I FY 18 $732,S76 bike path, 0.8 miles of Class II bike lanes and 2.0

FY 19 $3,491,488 miles of Class Ill bike route in the unincorporated

community of Valinda. Total $4,224,064

23 SA F7S18 Los Angeles River Bike Path Gap Closures FY 1S $139,031

CITY OF LONG BEACH FY 16 $969,383

The City of Long Beach proposes to construct FY 17 $0

bicycle system gap closures to provide improved FY 18 $0 access to the Los Angeles River Bike Path from

FY 19 $0 key locations.

Total $1,108,414

24 SA F7S34 Los Angeles River B ikeway · Reseda Section FY 15 $579,890

CITY OF LOS ANGELES FY 16 $0

Design and constructio n of Class I bike path FY 17 $3,483,391

including two underpasses and associated FY 18 $0 retaining structures, railing, access gates, sign age

FY 19 $0 and striping and lighting system.

Total $4,063,281

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D G [3 $25,809,916

$0 $0 $0

$0 $0 $0

$S86,060 $0 $146,S1S

$2,793,190 $0 $698,298 -$3,379,250 $0 $844,813

$111,226 $0 $0 ~ ~ D D u [3 $25,809,916

$775,506 $0 $0

$0 $0 $147,S98

$0 $0 $398,962

$0 $0 $427,125

$886,732 $0 $973,685

$463,500 $0 $116 ,390 ~ ~ D D u [3 $25,809,916

$0 $0 $0

$2,787,150 $0 $696,241

$0 $0 $0

$0 $0 $0

$3,250,650 $0 $812,631

Bicycle Improvements: Page 8 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 41: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

25 SA F7S1 0 E. Pasadena & E. San Gabriel Bikeway Access FY 15 $0

Improvements

FY 16 $0 COUNTY OF LOS A NGELES

FY 17 $0

Install approximately 12.7 miles of bike paths, bike FY 18 $337,800 lanes and bike routes in the East Pasadena and East San Gabriel communities. FY 19 $3,940,600

Total $4,278,400

26 SA F7S33 Bicycle Friendly Street Treatments (4) FY 1S $618,000

CITY OF LOS ANGELES FY 16 $0

This project designs and constructs a package of FY 17 $2,623,200

Bicycle Friendly Street (BFS) roundabout FY 18 $0 treatments as 12 locations identified for BFS treatments in the 2010 Bicycle Plan. FY 19 $0

Total $3,241,200

27 SA F7S09 South Whittier Community Bikeway Access FY 15 $0

Improvements

FY 16 $0 COUNTY OF LOS A NGELES

FY 17 $0

This project will construcl C lass I, Class II and FY 18 $S63,000 C lass Ill bike lanes, several at-grade c rossings,

FY 19 $3,7S1,487 and bicycle parking in various streets within the unincorporated community of South Whittier. Total $4,314,487

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D G [3 $25,809,916

$0 $0 $0

$0 $0 $0

$144,128 $0 $193,672

$3,282,288 $0 $658,312 -$3,426,416 $0 $851,984

$494,400 $0 $123,600 ~ ~ D D u [3 $25,809,916

$0 $0 $0

$2,098,560 $0 $S24,640

$0 $0 $0

$0 $0 $0

$2,592,960 $0 $648,240

$0 $0 $0 [3 [2] D D G [3 $25,809,916

$0 $0 $0

$0 $0 $0

$4S0,400 $0 $112 ,600

$3,001,190 $0 $7S0,297

$3,451,590 $0 $862,897

Bicycle Improvements: Page 9 ol15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 42: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE

PRO) PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

28 SA F7513 17th StreeVMemorial Park Station Bike Center

29 SA

30 SA

(Mobility Hub)

CITY OF SANTA MONICA

Mobility hub at Expo LRT station w ith standard

and secure commuter bicycle parking, lockers, showers, maintenarnce facility, and media-based information kiosk with some relail.

F7S38 Los Angeles Libraries and Parks Bicycle Parking Program

CITY OF LOS ANGELES

This project will provide bicycle parking at city

owned locations that are easily accessible by bike but do not currently have quality bike parking o n their properties.

F7S03 Santa Clara River T1rail Extension to Sand Canyon

Road

CITY OF SANTA CLARITA

Enhance the City's comprehensive bicycle

network in the Canyon Country area by constructing a 0.6 m ile extension of the Santa C lara R iver C lass I bike path to Sand Canyon

Road.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $0

FY 17 $2,186,000

FY 18 $0

FY 19 $0

Total $2,186,000

FY 15 $366,268

FY 16 $242,545

FY 17 $249,860

FY 18 $257,404

FY 19 $264,947

Total $1,381,024

FY 1S $0

FY 16 $0

FY 17 $0

FY 18 $384,529

FY 19 $3,401,051

Total $3,785,580

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 13 [21 D D G [3 $25,809,916

$0 $0 $0

$1,748,800 $0 $437,200

$0 $0 $0

$0 $0 $0

$1,748,800 $0 $437,200

$104,648 $0 $261,620 [3 ~ D D u [3 $25,809,916

$242,545 $0 $0

$249,860 $0 $0

$257,404 $0 $0

$264,947 $0 $0

$1,119,404 $0 $261,620

$0 $0 $0 [3 ~ D D u [3 $25,809,916

$0 $0 $0

$0 $0 $0

$269,170 $0 $115,3S9

$2,380,736 $0 $1,020,315

$2,649,906 $0 $1,135,674

Bicycle lmprovemenls: Page 10 of 15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 43: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

31 SA F7527 Orange Grove Boulevard Road Diet Project FY 15 $0

CITY OF PASADENA FY 16 $344,294

Install two bike lanes by reducing 4 traffic lanes to FY 17 $2,487,122

one in each direction , install painted median, curb FY 18 $0 extensions, a traffic signal and parking on both

FY 19 $0 sides of the street.

Total $2,831,416

32 SA F7S36 Balboa Park Bikeway Lighting Improvements FY 15 $0

CITY OF LOS ANGELES FY 16 $0

Design and constructio n of Pedestrian Lighting FY 17 $147,555

System along the Bike Path on Balboa Blvd. a nd FY 18 $1 ,536,g9o Victory Blvd.

FY 19 $0

Total $1,684,545

33 SA F7541 Downtown Bicycle Service Center FY 15 $481,525

CITY OF LOS ANGELES FY 16 $496,018

The project w ill include the development, FY 17 $781,495

implementation, and management of a Bicycle FY 18 $S26,40S Service Center in Downtown Los Angeles .

FY 19 $S41,832

Total $2,827,275

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D u 13 $25,809,916

$287,849 $0 $56,445

$1,976,909 $0 $510 ,212

$0 $0 $0

$0 $0 $0 -

$2,264,758 $0 $566,657

$0 $0 $0 [3 ~ D D [3 [3 $25,809,916

$0 $0 $0

$118,044 $0 $29,511

$1,229,592 $0 $307,398

$0 $0 $0

$1,347,636 $0 $336,909

$481,S25 $0 $0 c::3 [B D D G [3 $25,809,916

$496,018 $0 $0

$180,345 $0 $601,150

$S26,40S $0 $0

$S41,832 $0 $0

$2,226,125 $0 $601,150

Bicycle Improvements: Page 11 of 15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 44: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE

PROJ PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

34 SA F752S Montebello Bicycle Improvement Project

35 SA

36 SA

CITY OF MONTEBELLO

Construct and install class two (2) bicycle lanes and associated improvements, including median

islands as well as perform a "road diet" to accommodate bicycle lane installation.

F7S29 Glendale "Missing Link" Bike Path

CITY OF GLENDALE

A 1.2 mile proposed Class I bicycle path will be constructed adjace111t to Glendale Avenue,

connecting the northern portion of Glendale to Downtown Glendale.

F7543 Bike Corrals in LADOT Parking Centers

CITY OF LOS ANGELES

This project would install bicycle corrals in LADOT

owned and operated parking lots and provide bicycle repair stands and information kiosks to assist users.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $0

FY 17 $1S9,S78

FY 18 $397,478

FY 19 $4,637,1S9

Total $5,194,215

FY 1S $253,380

FY 16 $2,073,194

FY 17 $0

FY 18 $0

FY 19 $0

Total $2,326,574

FY 15 $181,692

FY 16 $31,193

FY 17 $32,134

FY 18 $S29,670

FY 19 $34,075

Total $808,764

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED & LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 13 ~ D D G 13 $25,809,916

$0 $0 $0

$106,021 $0 $S3,SS7

$26S,387 $0 $132,091

$3,091,412 $0 $1 ,S4S,747

$3,462,820 $0 $1,731,395

$150,380 $0 $103,000 ~ ~ D D u 13 $25,809,916

$1 ,689,112 $0 $384,082

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,839,492 $0 $487,082

$30,282 $0 $151,410 ~ ~ D D G [3 $25,809,916

$31 ,193 $0 $0

$32,134 $0 $0

$S29,670 $0 $0

$34,07S $0 $0

$657,354 $0 $151,410

Bicycle Improvements: Page 12 of 15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013 .rpl

Page 45: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

37

38

39

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

SA F7504 2013 Bikeways/Madrona Avenue

SA

SA

CITY OF TORRANCE

The proposed project involves the design and conslructionlinstallation of a 112 mile Class I Bike Path for bicydists and a supporting sidewalk for pedestrian travel, wilh amenities

F7S37 LA River-Metro Orange Line Bike Paths Ramp Connection

CITY OF LOS ANGELES

Los Angeles River -Metro Orange Line Connection Bike Ramp, provides a connection between the L.A River Bike Path and the newly completed Metro Orange Line

F7S31 Bike Safe Roadway Grates-Phase II

CITY OF LOS ANGELES

Project will upgrade approximately 700 local ions of unsafe roadway grates to improve bike safety and promote cycling usage. Project will NOT construct new bike path facilities.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$0

$0

$1 ,242,448

$1,242,448

$579,890

$0

$3,483,391

$0

$0

$4,063,281

$0

$0

$0

$405,360

$1 ,900,760

$2,306,120

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM 'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 ~ D D Q ~ $25,809,916

$0 $0 $0

$0 $0 $0

$0 $0 $0

$993,958 $0 $248,490

$993,958 $0 $248,490

$463,500 $0 $116 ,390 [3 ~ D D [3 ~ $25,809,916

$0 $0 $0

$2,787,150 $0 $696,241

$0 $0 $0

$0 $0 $0

$3,250,650 $0 $812,631

$0 $0 $0 [3 ~ D D G [3 $25,809,916

$0 $0 $0

$-437,200 $0 $437,200

$405,360 $0 $0

$1,900,760 $0 $0

$1,868,920 $0 $437,200

Bicycle Improvements: Page 13 of 15 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 46: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE

PROJ PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

40 SA F7532 Taylor Yard Bikeway Connection

41 5A

42 5A

CITY OF LOS ANGELES

This project will invo lve the design and construction of a Class I (bike path) bikeway

between the Taylor Yard Central Maintenance Facili ty and Future Street.

F7545 LA Employee City E Bike Fleet and Public C harging Stations

CITY OF LOS ANGELES

This project will deve lop an electric bicycle fleet

for City employees a nd establish a pilot project to develop public accessible electric bike charging

stations.

F7505 Citywide Bike Paths

CITY OF CERRITOS

The project proposes to install Class II/I II bike paths w ithin City of Cerritos arterial roads and connect to existing b ike paths that are adjacent to the City's boundaries.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $463,500

FY 16 $0

FY 17 $2,787,150

FY 18 $0

FY 19 $0

Total $3,250,650

FY 15 $403,760

FY 16 $267,372

FY 17 $275,436

FY 18 $283,752

FY 19 $292,068

Total $1,522,388

FY 15 $412,000

FY 16 $0

FY 17 $0

FY 18 $0

FY 19 $0

Total $412,000

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$370,800 $0 $92,700 13 ~ D D Q ~ $25,809,916

$0 $0 $0

$2,229,720 $0 $557 ,430

$0 $0 $0

$0 $0 $0

$2,600,520 $0 $650,130

$115,360 $0 $288,400 [3 [3 D D u ~ $25,809,916

$267,372 $0 $0

$275,436 $0 $0

$283,752 $0 $0

$292,068 $0 $0

$1,233,988 $0 $288,400

$329,600 $0 $82,400 [3 ~ D D G [3 $25,809,916

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$329,600 $0 $82,400

Bicycle Improvements: Page 14 of 15 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 47: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

43 SA F7535 Taylor Yard Bicycle/Pedestrian Bridge Construction

CITY OF LOS ANGELES

Taylor Yard Bicycle/Pedestrian Bridge Construction

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $506,628

FY 17 $6,883,714

FY 18 $0

FY 19 $0

Total $7,390,342

~ LOCAL REGIONAL

Initial Metro•s MATCH to SIGNIFICANCE AMOUNT AMOUNT Metro's & INTER-MODAL

REQUESTED RECOMM' DED Grant INTEGRATION

$0 $0 $0 D $506,628 $0 $0

$6,883,714 $0 $0

$0 $0 $0

$0 $0 $0

$7,390,342 $0 $0

This project is ineligible to compete in the 2013 Call for Projects due to lack of local match and exceeding funding cap requirements.

June 03. 2013. 10:03:00AM Bicycle lmprovemenls: Page 15 of 15

~ c:LJ c::!L] [1LJ ~ PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

TRANS. SYSTEM POLICIES/ RECOM'D

PRINCIPLES FYl 5-FY19

D D D 0 [3 $25,809,916

L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 48: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 49: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

58 F7618 Las Tunas Dr Improvements and Safety

58

58

Enhancement Project-PED

CITY OF TEMPLE CITY

Construct and install distinctive pedest rian features including sidewalks, crosswalks, landscaping and public art.

F7600 Alhambra Ped Improvement/Walking Viability Project on Valley

CITY OF ALHAMBRA

Pedestrian infrastructure improvements to encourage walking as a viable form of transportation and improve connectivity between transit areas

F7620 Fernwood Avenue Pedestrian Transit Access and Connectivity

CITY OF LYNWOOD

Pedestrian Improvements to improve transit accessibility between Civic Center and Metro Green Line Long Beach Station from Bullis Road to Long Beach AverJue along Fernwood Avenue.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$7,789,658

$0

$0

$0

$7,789,658

$113,300

$854,529

$0

$0

$0

$967,829

$260,862

$1 ,580,891

$1 ,196,523

$0

$0

$3,038,276

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ ~ D D [3 [3 $2,910,046

$3,183,000 $2,910,046 $4,682,039

$0 $0 $0

$0 $0 $0 Total Project Cost fo r this grant $7,592,085

$0 $0 $0

$3,183,000 $2,910,046 $4,682,039

$56,341 $0 $0 [3 ~ D D u u $3,574,802

$570,047 $0 $0

$0 $59,787 $32,662

$0 $604,969 $330,502 Total Project Cost fo r this grant $1,027,920

$0 $0 $0

$626,388 $664,756 $363,164

$74,725 $0 $0 [21 ~ D D G u $6,170,573

$1,350,190 $0 $0

$1,005,753 $0 $0

$0 $1,013,400 $256,207 Total Project Cost fo r this grant $3,252,031

$0 $1,582,371 $400,053

$2,430,668 $2,595,771 $656,260

Pedestrian Improvements: Page 1 of 12 L:\2013 Caii\Crys'<!t Reports\Rainbo.vOraft 2013.rpl

Page 50: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

4 56 F7624 Walk Pico! A Catalyst for Community Vitality & FY 15 $0

Connectivity

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

Pedestrian/bike-friendly improvements on Pico FY 18 $285,891 Blvd. and Tennessee Ave. to strengthe n

FY 19 $2,023,730 community vitality a nd connectivity to bus stops

and the Expo/Sepulveda & Westwood rail stops. Total $2,309,621

5 56 F761 0 Aviation/LAX Green Line Station Pedestrian FY 15 $293,738

Improvements

FY 16 $1 ,531,047 COUNTY OF LOS A NGELES

FY 17 $0

The project includes improvements on corridors FY 18 $0 near the Metro Aviation Station including

FY 19 $0 pedestrian and bicycle facilities, wayfinding signs, landscaping and traffic calming. Total $1,824,785

6 56 F7622 LAN I - West Boulevard Community Linkages FY 15 $0

Project

FY 16 $0 CITY OF LOS ANGELES

FY 17 $163,950

This project will increase pedestrian safety , FY 18 $168,900 access and multi-modal connectivity to the

FY 19 $1 ,390,800 Florence/West Boulevard Station on Metro's Crenshaw/LAX Transit Corridor Light Rail Line. Total $1,723,650

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER· MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S·FY19

$0 $0 $0 G [21 D D ~ u $8,011,567

$0 $0 $0

$0 $222,010 $55,503

$228,713 $0 $0 Total Project Cost for this grant $2,301,243

$1,618,984 $1,618,984 $404,746

$1,847,697 $1,840,994 $460,249

$234,990 $0 $0 [3 ~ D D [3 u $9,598,903

$1,224,839 $0 $0

$0 $249,364 $62,341

$0 $0 $0 Total Project Cost for this grant $1,984,170

$0 $1,337,972 $334,493

$1,459,829 $1,587,336 $396,834

$0 $0 $0 [3 ~ D D G u $10,977,675

$0 $0 $0

$132,800 $132,800 $33,200

$136,809 $136,809 $34,202 Total Project Cost for this grant $1,723,465

$1,109,163 $1,109,163 $277,291

$1,378,772 $1,378,772 $344,693

Pedestrian Improvements: Page 2 of 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.11)1

Page 51: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

7 56 F7636 Broadway Streetscape Implementation (8th-9th) FY 15 $1,411,821

CITY OF LOS ANGELES FY 16 $1,454,313

Install curb extensions, widen sidewalks, improve FY 17 $0

street and ped lighting, add streeVtransit furniture, FY 18 $0 crosswalk enhancements, and decorative edge

FY 19 $0 band paving along historic Broadway.

Total $2,866,134

8 56 F7609 Hawthorne/Lennox Green Line Station Pedestrian FY 15 $338,724

Improvements

FY 16 $1 ,765,524 COUNTY OF LOS A NGELES

FY 17 $0

The project includes improvements to major FY 18 $0 corridors near the Haw1horne/Lennox Station including pedestrian and bicycle facilities, FY 19 $0

wayfinding signs, landscaping and bus shelters. Total $2,104,248

9 56 F7612 Long Beach Boulevard Pedestrian Improvements FY 15 $0

CITY OF SOUTH GATE FY 16 $195,364

Construct pedestrian lig hting, enhanced FY 17 $815,794

crosswalks, sidewalks, curb ramps, seating and FY 18 $840,425 transit stop enhancements, bicycle racks, and a

FY 19 $0 park let.

Total $1,851,583

June 03. 2013, 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$1,129,457 $0 $0 G G D D G u $13,361,914

$1,163,450 $425,758 $106,440

$0 $1,958,481 $489,620

$0 $0 $0 Total Project Cost for this grant $2,980,299

$0 $0 $0

$2,292,907 $2,384,239 $596,060

$270,979 $0 $0 ~ ~ D D G u $15,148,415

$1,412,419 $0 $0

$0 $287,553 $71 ,889

$0 $1,498,948 $374,737 Total Project Cost for this grant $2,233,127

$0 $0 $0

$1,683,398 $1,786,501 $446,626

$0 $0 $0 G [21 D D G u $16,629,679

$156,290 $156,290 $39,072

$652,635 $652,635 $163,159

$672,339 $672,339 $168,085 Total Project Cost for this grant $1,851,580

$0 $0 $0

$1,481,264 $1,481,264 $370,316

Pedestrian Improvements: Page 3 of 12 L:\2013 Caii\Crys'<!t Reports\Rainbo.vOraft 2013.rpl

Page 52: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

10 56 F7615 Market Street Pedestria n and Streetscape FY 15 $0

Enhancements

FY 16 $1 ,511,624 CITY OF LONG BEACH

FY 17 $3,098.475

Implement a complete street with sidewalk FY 18 $0 w idening, bicycle facilities, transit stop

FY 19 $0 enhancements and sustainable design features to

complement community revitalization. Total $4,610,099

11 56 F7628 Watts Streetscape Improvements Phase 2 FY 15 $0

CITY OF LOS ANGELES FY 16 $0

Enhance 103rd Street with street trees, street FY 17 $0

furniture, pedestrian lig hting, crosswalk FY 18 $130,616 treatments, access ramps, and way-finding

FY 19 $734,806 sign age.

Total $865,422

12 56 F7623 Fashion District Streetscape - Phase 3 FY 15 $0

CITY OF LOS ANGELES FY 16 $0

New sidewalk "stepping-stone" 10 panels, FY 17 $0

enhanced crosswalks, street trees, FY 18 $333,296 landscape/irrigation, ped directional sig nage &

FY 19 $1 ,974,936 lighting, new street trees, & sidewalk construction.

Total $2,308,232

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 c::JTI [21 D D G u $19,863,516

$833,716 $833,716 $357,307

$2,400,121 $2,400,121 $1,028,623

$0 $0 $0 Total Project Cost for this grant $4,619,767

$0 $0 $0

$3,233,837 $3,233,837 $1,385,930

$0 $0 $0 G ~ D D ~ u $20,533,084

$0 $98.461 $24,615

$0 $0 $0

$104,493 $571,107 $142,777 Total Project Cost for this grant $836,960

$587,845 $0 $0

$692,338 $669,568 $167,392

$0 $0 $0 G c::JTI D D [3 u $20,533,084

$0 $0 $0

$0 $0 $0

$266,637 $0 $66,659

$1,579,949 $0 $394,987

$1,846,586 $0 $461,646

Pedestrian Improvements: Page 4 of 12 L:\2013 Caii\Crys'<!t Reports\Rainbo.vOraft 2013.rpl

Page 53: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

13 56 F7629 Avenue 26 to Gold L ine Cypress Station Ped FY 15 $0

Connection

FY 16 $0 CITY OF LOS ANGELES

FY 17 $273,250

Design/construct pedestrian improvements, street FY 18 $765,680 trees, street furniture, pedestrian lighting, and

FY 19 $1 ,819,630 traffic calming elements on Avenue 26 - Pasadena Ave to San Fernando Rd. Total $2,858,560

14 56 F7634 Florence Avenue Pedestrian Improvement Project FY 15 $0

CITY OF BELL FY 16 $0

Comprehensive improvement of Florence Avenue FY 17 $0

in the C ity of Bell, including transportation FY 18 $230,530 enhancements and pedestrian improvements to

FY 19 $1 ,864,389 increase safety, efficiency, and aesthetics.

Total $2,094,919

15 56 F7626 LAN I -Santa Monica Boulevard Improvement FY 15 $0

Project

FY 16 $0 CITY OF LOS ANGELES

FY 17 $178,251

This project will imp'lement a series of streetscape FY 18 $183,631 improvements on Santa Monica Boulevard

FY 19 $1 ,615,452 designed to increase pedestrian safety, stimulate revitalization and promote transit use. Total $1,977,334

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 [J£1 [21 D D ~ u $20,533,084

$0 $0 $0

$218,600 $0 $54,650

$612,544 $0 $153,136

$1,455,704 $0 $363,926 -$2,286,848 $0 $571,712

$0 $0 $0 [3 ~ D D [3 u $20,533,084

$0 $0 $0

$0 $0 $0

$0 $0 $230,530

$1,681,342 $0 $183,Q48

$1,681,342 $0 $413,578

$0 $0 $0 ~ [3 D D G u $20,533,084

$0 $0 $0

$142,600 $0 $35,650

$146,905 $0 $36,727

$1,292,363 $0 $323,090

$1,581,868 $0 $395,467

Pedestrian Improvements: Page 5 of 12 L:\2013 Caii\Crys'<!t Reports\Rainbo.vOraft 2013.rpl

Page 54: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

16 56 F7630 Beverly Blvd. Vermont to Commonwealth FY 15 $0

CITY OF LOS ANGELES FY 16 $0

Design and constructio n of pedestrian FY 17 $0

improvements providing linkages to major transit FY 18 $230,830 along Beverly Bl between Vermont Ave and

FY 19 $1 ,269,105 Commonwealth Ave.

Total $1,499,935

17 56 F7614 Long Beach Pacific Electric Right-of-Way FY 15 $587,030

Greenbelt

FY 16 $2,175,432 CITY OF LONG BEACH

FY 17 $784,070

Conversion of a 2.1 mile portion of the former FY 18 $0 Pacific Electric Right of Way (PE ROW) into a

FY 19 $0 greenbelt including an active pedestrian and bicycle path and passive open space. Total $3,546,532

18 56 F7617 Compton Creek Safe Pedestrian Project FY 15 $1 ,323,815

CITY OF COMPTON FY 16 $909,105

To provide an aesthetically pleasing. safe and FY 17 $0

efficient pedestrian route for students and FY 18 $0 residents of Compton along an approximately

FY 19 $0 three miles stretch of the Compton Creek.

Total $2,232,920

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 G [21 D D u u $20,533,084

$0 $0 $0

$0 $0 $0

$184,664 $0 $46,166

$1,015,284 $0 $253,821 -$1,199,948 $0 $299,987

$500,318 $0 $86,712 [3 [3 D D [3 c::!9 $20,533,084

$1,753,096 $0 $422,336

$239.640 $0 $544,430

$-321,395 $0 $321 ,395

$-38,232 $0 $38,232

$2,133,427 $0 $1,413,105

$1,059.052 $0 $264,763 ~ [3 D D G c::!9 $20,533,084

$727,284 $0 $181,821

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,786,336 $0 $446,584

Pedestrian Improvements: Page 6 of 12 L:\2013 Caii\Crys'<!t Reports\Rainbo.vOraft 2013.rpl

Page 55: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

19 56 F7613 Downtown Pedestrian Circulation Enhancement

20 56

21 56

Project

CITY OF DOWNEY

Project will provide a more pedestrian-friendly environment including curb extensions, augmented sidewalk and improvements in the downtown Downey Central Business District.

F7633 Olympic Boulevard Streetscape (Crenshaw to Western)

CITY OF LOS ANGELES

This project creates a safe, accessible , and pleasant pedestrian environment by retrofitting sidewalks and curb ramps, adding trees, lighting and other pedestrian features.

F7604 Crenshaw/LAX West B lvd Station Pedestrian Enhancements

CITY OF INGLEWOOD

The purpose of proposed Pedestrian Improvements to the West Boulevard Station, which is along the Crenshaw/LAX LRT Transit Corridor, will improve the pedestrian movement at station

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $168,900

FY 19 $1 ,564,650

Total $1,733,550

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $242,090

FY 19 $2,068,815

Total $2,310,905

FY 15 $332,452

FY 16 $2,135,624

FY 17 $0

FY 18 $0

FY 19 $0

Total $2,468,076

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 13 [21 D D Q 13 $20,533,084

$0 $0 $0

$0 $0 $0

$135,120 $0 $33,780

$1,251 ,720 $0 $312 ,930

$1,386,840 $0 $346,710

$0 $0 $0 ~ ~ D D G 13 $20,533,084

$0 $0 $0

$0 $0 $0

$184,214 $0 $57,876

$1,664,788 $0 $404,027

$1,849,002 $0 $461,903

$91,884 $0 $240 ,568 [21 ~ D D G 13 $20,533,084

$1,887,816 $0 $247 ,808

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,979,700 $0 $488,376

Pedestrian Improvements: Page 7 of 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 56: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PRO) PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

22 56 F7611 Pedestrian Lighting to Enhance 17th St. Expo

23 56

24 56

Station Access

CITY OF SANTA MONICA

Pedestrian lighting for safe 17th St. aocess after dark for students & residents to/from Expo 17th St. Station to Santa Monica College and along Colorado Ave to Lincoln Blvd.

F7631 Exposition Light Railway Greenway Improvement Project

CITY OF LOS ANGELES

The Exposition Light Railway Greenway Improvement Project is to provide 2000 ft of pedestrian access li nking the Expo Westwood Station, Big Blue Bus lines, and local facilities.

F7606 Golden Valley Road Pedestrian Improvements

CITY OF SANTA CLARITA

Construct pedestrian improvements on Golden Valley Road and Sierra Highway includ ing a sidewalk and parl<w.ay buffer to improve access and aesthetics to a highly utilized bus stop.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $242,050

FY 16 $1 ,294,420

FY 17 $1 ,109,395

FY 18 $0

FY 19 $0

Total $2,645,865

FY 15 $195,700

FY 16 $429,705

FY 17 $442,665

FY 18 $22,520

FY 19 $0

Total $1,090,590

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $999,685

FY 19 $0

Total $999,685

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$193,640 $0 $48,410 [J£1 [3 D D [21 13 $20,533,084

$1 '102,379 $0 $192,041

$816,471 $0 $292,924

$0 $0 $0

$0 $0 $0

$2,112,490 $0 $533,375

$92,700 $0 $103,000 ~ ~ D D [3 [3 $20,533,084

$344,825 $0 $84,880

$388,015 $0 $54,650

$22,520 $0 $0

$0 $0 $0

$848,060 $0 $242,530

$0 $0 $0 [3 ~ D D G [3 $20,533,084

$0 $0 $0

$0 $0 $0

$499,843 $0 $499,843

$0 $0 $0

$499,843 $0 $499,843

Pedestrian Improvements: Page 8 of 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 57: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

25 56 F7607 Cudahy Citywide Pedestrian Improvement Project FY 15 $0

CITY OF CUDAHY FY 16 $26,525

Upgrade existing pedestrian crosswalks (9), Install FY 17 $173,240

new pedestrian crosswalk; Build new (4) & FY 18 $2,088,111 upgrade existing (48) wheelchair ramps; Install

FY 19 $0 pedestrian lighting & bus shelters.

Total $2,287,876

26 56 F7616 Grant Avenue Pedestrian Improvements FY 15 $515,000

CITY OF REDONDO BEACH FY 16 $0

Create an accessible path on Grant Avenue, FY 17 $0

connecting Redondo Beach residents to the South FY 18 $0 Bay regional transit center and regional activity

FY 19 $0 centers.

Total $515,000

27 56 F7602 12th Street West Streetscape Improvements FY 15 $0

CITY OF LANCASTER FY 16 $196,184

Improvements along 12th Street West from FY 17 $2,905,205

Avenue J-8 to Avenue K-8, to include sidewalk FY 18 $0 gap closures, roundabouts, street landscaping,

FY 19 $0 road diets, bulbouts, and bikelanes.

Total $3,101,389

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 [J£1 [21 D D ~ 13 $20,533,084

$21,215 $0 $5,310

$138,571 $0 $34,670

$1,670,224 $0 $417,887

$0 $0 $0 -

$1,830,010 $0 $457,867

$412,000 $0 $103,000 D ~ D D u 13 $20,533,084

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$412,000 $0 $103,000

$0 $0 $0 ~ ~ D D u [3 $20,533,084

$0 $0 $196,184

$2,485,845 $0 $419 ,360

$0 $0 $0

$0 $0 $0

$2,485,845 $0 $615,544

Pedestrian Improvements: Page 9 of 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 58: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

28

29

30

PROJECT TITLE

PROJ PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

56 F7605 Pedestrian Enhancements at Newhall Avenue

56

56

Railroad Crossing

CITY OF SANTA CLARITA

Construct pedestrian improvements on Newhall

Avenue at the railroad crossing to enhance pedestrian connectivity to Newhall Metrolink

Station and Downtown Newhall.

F7625 Orange Line Pierce College Sta Bike-Ped Access Improvements

CITY OF LOS ANGELES

To install missing sidewalks in Victory Bl between Winnetka Ave immediately leading to Pierce College and link the Orange Line bikelane to the bikelane in Oxnard St along Winnetka.

F7608 Downtown Village Complete S!reet Project

CITY OF LA CANADA FLINTRIDGE

Construct w idened s idewalks, bulb-outs, LED

street lights, xwalk beacons, enhanced crosswalks, bike sharrows and racks, bollards, trees, transit amenit ies & wayfinding signs.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT EXPENSE

$0

$0

$0

$892,982

$0 ---$892,982

$0

$0

$0

$168,900

$1 ,660,268

$1,829,168

$0

$392,570

$2,426,460

$1 ,080,960

$0

$3,899,990

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D u 1:3 $20,533,084

$0 $0 $0

$0 $0 $0

$714,385 $0 $178,597

$0 $0 $0

$714,385 $0 $178,597

$0 $0 $0 D [3 D D u 1:3 $20,533,084

$0 $0 $0

$0 $0 $0

$135,120 $0 $33,780

$1,328,214 $0 $332,054

$1,463,334 $0 $365,834

$0 $0 $0 ~ [B D D [3 ~ $20,533,084

$314,056 $0 $78,514

$1,914,936 $0 $511 ,524

$891,792 $0 $189,168

$0 $0 $0

$3,120,784 $0 $779,206

Pedestrian Improvements: Page 10 al 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 59: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

31 56 F7621 lnterjur isdictional Pedestrian Improvements FY 15 $0

CITY OF SOUTH EL MONTE FY 16 $136,869

The project improves the viability, and safety of FY 17 $1,458,062

this inter-jurisdictional juncture along Santa Anita FY 18 $1 ,730,662 Ave that is the concourse to all arterial roads in the San Gabriel Valley . FY 19 $0

Total $3,325,593

32 56 F7627 Washington Boulevard Corridor Pedestrian FY 15 $0

Improvements

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

This Washington 81 Proj is located just south of FY 18 $489,810 downtown LA and includes bus stop

FY 19 $1 ,350,235 improvements, decorative paving, signage, bicycle parking, street furniture, and landscaping. Total $1,840,045

33 56 F7601 Kanan Road!Thousand Oaks Boulevard FY 15 $185,190

Intersection Pedestrian Plan

FY 16 $1 ,082,746 CITY OF AGOURA HILLS

FY 17 $0

Improve pedestrian access. as well as bicycle FY 18 $0 facilities, in the general area of the Kanan Road

FY 19 $0 and Thousand Oaks Boulevard intersection in the C ity of Agoura Hills. Total $1,267,936

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D u I::J9 $20,533,084

$109,283 $0 $27,586

$1,209,951 $0 $248,111

$1,339.940 $0 $390,722

$0 $0 $0 -$2,659,174 $0 $666,419

$0 $0 $0 D ~ D D [3 I::J9 $20,533,084

$0 $0 $0

$0 $0 $0

$391,848 $0 $97,962

$1,080,188 $0 $270,047

$1,472,036 $0 $368,009

$185,190 $0 $0 13 [21 D D G [3 $20,533,084

$815,310 $0 $267,437

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,000,500 $0 $267,437

Pedestrian Improvements: Page 11 of 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 60: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

34

35

36

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

56 F7619 East Colorado Boulevard Pedestrian

56

56

Enhancements

CITY OF PASADEN.A

Installation of pedestrian scale street lights, decorative crosswalks, bus benches and trash receptacles in Pasadena, to increase safety and enhance pedestrian improvement

F7603 Downtown Beverly H ills Pedestrian Improvements Project

CITY OF BEVERLY HILLS

Construction of mid block sidewalk bulb-outs and crosswalk signals on 3 highly pedestria n-traveled blocks in the business area improving accessibility & safety near a subway stop.

F7635 PCH-Aviation Blvd Beautification Project - Ped Phase 1

CITY OF HERMOSA BEACH

This project will imp rove and promote mobility

options through the construction of aesthetically pleasing streetscape and pedestrian improvements.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$530,500

$1,114,860

$0

$0

$1,645,360

$0

$0

$76,510

$686,860

$0

$763,370

$0

$0

$0

$3,378,000

$0

$3,378,000

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 ~ D D Q 1:3 $20,533,084

$339,520 $0 $190,980

$896,260 $0 $218,600

$0 $0 $0

$0 $0 $0

$1,235,780 $0 $409,580

$0 $0 $0 [3 L3 D D D 1:3 $20,533,084

$0 $0 $0

$0 $0 $76,510

$382,840 $0 $304,020

$0 $0 $0

$382,840 $0 $380,530

$0 $0 $0 L3 ~ D D G 1:3 $20,533,084

$0 $0 $0

$0 $0 $0

$2,702,400 $0 $675,600

$0 $0 $0

$2,702,400 $0 $675,600

Pedestrian Improvements: Page 12 al 12 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 61: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

6 F7 404 Vista Canyon Regional Transit Center

6

6

CITY OF SANTA CLARITA

The Vista Canyon Regional Transit Center (VCRTC) would result in the construction of a new seven-bay bus transfer station.

F7 422 Pasadena Replacement and Added Capacity of Clean Fuel Buses

CITY OF PASADEN.A

Replace two (2) aging vehicles and six (6) vehicles with added capacity to accommodate Gold Line Foothill Extension projected ridership with eight (8) 32-ft c lean fuel vehicles.

F7400 Clean Fuel Bus Replacements

CITY OF MONTEREY PARK

Replace three (3) Spirit diesel buses, 1 Metrolink CNG cutaway, and 1 Dial-A-Ride gasoline cutaway with five (5) clean fuel equivalent vehicles.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$267,800

$3,819,600

$0

$0

$0

$4,087,400

$0

$0

$3,753,362

$0

$0

$3,753,362

$224,540

$0

$1 ,362,971

$0

$0

$1,587,511

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$184,782 $576,800 $259,142 ~ ~ D D G [3 $2,808,507

$2,635,524 $2,231,707 $1,002,651

$0 $0 $0

$0 $0 $0 Total Project Cost fo r this grant $4,070,300

$0 $0 $0

$2,820,306 $2,808,507 $1,261 ,793

$0 $741,600 $260,562 [3 CEl D D 13 u $4,920,407

$0 $742,700 $260,949

$2,777,488 $627,600 $220,508

$0 $0 $0 Total Project Cost fo r this grant $2,853,919

$0 $0 $0

$2,777,488 $2,111,900 $742,019

$173,040 $309,000 $82,934 [3 CEl D D 13 u $6,151,129

$0 $424,400 $11 3,906

$1,078,791 $497,322 $133,477

$0 $0 $0 Total Project Cost fo r this grant $1,561,039

$0 $0 $0

$1,251 ,831 $1,230,722 $330,317

Transit Capital: Page 1 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 62: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

4

5

6

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

6 F7 410 Florence-Firestone/Walnut Park Transit Vehicles

6

6

COUNTY OF LOS A NGELES

The procurement of two (2) 35-ft clean fuel vehicles to replace existing 25-ft gasoline-powered vehicles to relieve overcrowding on the Florence-Firestone/Walnut Park shuttle service.

F7414 Clean Fuel Buses for the Baldwin Park Transit Service

CITY OF BALDWIN PARK

Baldwin Park will replace five of its aging diesel vehicles with five (5) 32-ft clean fuel buses for its fixed roule service.

F7413 Bus Replacement

CITY OF CALABASAS

Purchase two (2) 32-ft clean fuel cutaway shuttles to replace two existing older vehicles for the city's transit routes.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$0

$5,630

$1 ,170,590

$1,176,220

$0

$0

$0

$2,201,330

$45,549

$2,246,879

$274,634

$0

$0

$0

$0

$274,634

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM 'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $32g,eoo $g0,272 ~ ~ D D G u $6,848,103

$0 $367,374 $100,619

$0 $0 $0

$0 $0 $0 Total Project Cost for this grant $887,865

$923,723 $0 $0

$923,723 $696,974 $190,891

$0 $329,600 $185,400 ~ ~ D D [3 u $7,998,584

$0 $424,400 $238,725

$0 $396,481 $223,021

$1,436,934 $0 $0 Total Project Cost for this grant $1,797,627

$0 $0 $0

$1,436,934 $1,150,481 $647,146

$219,707 $219,708 $54,927 ~ ~ D D G u $8,218,292

$0 $0 $0

$0 $0 $0

$0 $0 $0 Total Project Cost for this grant $274,635

$0 $0 $0

$219,707 $219,708 $54,927

Transit Capital: Page 2 of 11 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 63: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

7

8

9

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

6 F7406 Avalon Clean Fuel Fleet Replacement Project

6

6

CITY OF AVALON

The City of Avalon will replace three existing 30-ft gasoline-powered trolley vehicles with three (3) 22-ft electric vehicles.

F7405 Purchase of Alternative Fuel Replacement Buses

CITY OF GARDENA

Procurement of five (5) 40-ft clean fuel buses to replace 5 existing 40-ft gasoline/electric hybrid buses.

F7423 Downtown Bus Maintenance Facility

CITY OF LOS ANGELES

Construct a city bus maintenance facility located on Commercial Street in Downtown Los Angeles. Facility will include fueling, maintenance and inspection, storage, layover, and administratio n building.

June 03. 2013, 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$1 ,236,000

$0

$0

$0

$0

$1,236,000

$0

$0

$2,845,626

$0

$0

$2,845,626

$32,756,846

$0

$0

$5,630,000

$0

$38,386,846

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$988,800 $309,000 $77,250 ~ [21 D D G 13 $9,239,072

$0 $318,300 $79,575

$0 $393,480 $98,370

$0 $0 $0 Total Project Cost for this grant $1,275,975

$0 $0 $0

$988,800 $1,020,780 $255,195

$0 $309,000 $77,250 ~ ~ D D u 13 $11,383,772

$0 $742,700 $185,675

$2,276,500 $1,093,000 $273,250

$0 $0 $0 Total Project Cost for this grant $2,680,875

$0 $0 $0

$2,276,500 $2,144,700 $536,175

$0 $0 $0 ~ ~ D D G 13 $16,019,772

$0 $0 $0

$0 $0 $0

$4,504,000 $0 $0 Total Project Cost for this grant $5,795,000

$0 $4,636,000 $1,159,000

$4,504,000 $4,636,000 $1,159,000

Transit Capital: Page 3 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013,rpl

Page 64: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL PROJECT 0 PROJ ::;

PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

10 6 F7430 Purchase of Alternative Fuel Buses for Glendale FY 15 $1 ,641,717

Beeline

FY 16 $0 CITY OF GLENDALE

FY 17 $1 ,161,422

Purchase of five (5) replacement 40-ft clean fuel FY 18 $0 buses for the Glendale Beeline Transit System .

FY 19 $0

Total $2,803,139

11 6 F7402 LBT Clean Fuel Bus Replacement Project FY 15 $0

LONG BEACH TRANSIT FY 16 $0

Replace five existing 40-ft with five (5) 40-ft FY 17 $0

alternative clean fuel buses for the Long Beach FY 18 $2,674,250 Transit system.

FY 19 $0

Total $2,674,250

12 6 F7407 City of La Canada-Flintridge Bus Replacement FY 15 $463,500

Project

FY 16 $0 CITY OF LA CANADA FLINTRIDGE

FY 17 $0

Procure one (1) 35-ft clean fuel bus to replace an FY 18 $0 existing 29-ft vehicle for route expansion.

FY 19 $0

Total $463,500

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$1,313,374 $309,000 $77,250 G CE1 D D G u $18,017,511

$0 $424,400 $106,100

$929,137 $1,264,339 $316 ,085

$0 $0 $0 Total Project Cost for this grant $2,497,174

$0 $0 $0

$2,242,511 $1,997,739 $499,435

$0 $0 $0 [3 [3 D D G u $20,119,916

$0 $0 $0

$0 $0 $0

$2,139,400 $900,800 $225,200 Total Project Cost for this grant $2,628,006

$0 $1,201,605 $300,401

$2,139,400 $2,102,405 $525,601

$370,800 $343,497 $85,874 [21 [21 D D G u $20,463,413

$0 $0 $0

$0 $0 $0

$0 $0 $0 Total Project Cost for this grant $429,371

$0 $0 $0

$370,800 $343,497 $85,874

Transit Capital: Page 4 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 65: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

.., ~ ~ c:LJ c::!L] [1LJ ~

z ;;;; z

LOCAL ;:; REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE w PROJECT TITLE Initial Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT 0 0 PRO) PROJECT SPONSOR FISCAL PROJECT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D ::;

MODE NUM PROJECT DESCRIPTION YEAR EXPENSE REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

13 6 F7424 Purchase DASH Replacement Clean Fuel FY 15 $0 $0 $0 $0 [JTI CE1 D D G u $23,430,103

Vehicles

FY 16 $0 $0 $0 $0 CITY OF LOS ANGELES

FY 17 $0 $0 $0 $0

Purchase of nine (9) total vehicles lor existing FY 18 $9,525,960 $7,620,768 $1,807,138 $451,785 Total Project Cost for this grant $3,708,363 DASH routes. Six (6) 30-11 clean fuel buses w ill

FY 19 $0 $0 $1,159,552 $289,888 replace existing vehicles on routes serving the Leimert Slauson, Boyle Heights, and Northridge Total $9,525,960 $7,620,768 $2,966,690 $741,673 areas. Three (3) 35-11 clean fuel buses are lor service expansion that will be deployed in the Chesterfield Square area in South Los Angeles.

14 6 F7408 Burbank Transit Vehicle Replacement FY 15 $3,803,589 $3,042,871 $723,195 $180,799 ~ ~ D D [3 ~ $25,574,041

CITY OF BURBANK FY 16 $0 $0 $542,310 $135,578

The City of Burbank. seeks to procure s ix (6) 35-ft FY 17 $0 $0 $878,433 $219 ,609

alternative clean fuel buses to replace six existing FY 18 $0 $0 $0 $0 Total Project Cost for this grant $2,679,924 30-11 buses lor service expansion.

FY 19 $0 $0 $0 $0

Total $3,803,589 $3,042,871 $2,143,938 $535,986

15 6 F7412 Los Angeles County/USC Medical Center Transit FY 15 $0 $0 $0 $0 [3 [21 D D G ~ $25,855,749

Vehicle

FY 16 $0 $0 $281,708 $88,961 COUNTY OF LOS A NGELES

FY 17 $0 $0 $0 $0

The County will purchase one (1) 30-ft clean fuel FY 18 $5,630 $0 $0 $0 Total Project Cost for this grant $370,669 vehicle for a new shuttle service that will serve the

FY 19 $417,240 $321,043 $0 $0 Los Angeles County/USC Medical Center area.

Total $422,870 $321,o43 $281,708 $88,961

June 03. 2013. 10:03:00AM Transit Capital: Page 5 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 66: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

16 6 F7401 Culver CityBus Clean Fuel Bus Replacement FY 15 $12,652,520

CITY OF CULVER CITY FY 16 $0

Purchase of ten (10) 40-ft alternative clean fuel FY 17 $0

vehicles to replace ten existing 40-ft buses that FY 18 $0 w ill reach their useful life in 2017.

FY 19 $0

Total $12,652,520

17 6 F7420 El Monte Clean Fuel Bus Replacement FY 15 $10,300

CITY OF EL MONTE FY 16 $2,875,310

Procurement of six (6) 32-ft clean fuel buses to FY 17 $0

replace six existing 32-ft buses that are at the end FY 18 $0 of their useful I We.

FY 19 $0

Total $2,885,610

18 6 F7418 PV Transit Clean FI.Jlel Buses FY 15 $1 ,145,179

CITY OF ROLLING HIL LS ESTATES FY 16 $0

The Palos Verdes Peninsula Transit Authority FY 17 $0

(PVPTA) is proposing to purchase three FY 18 $0 replacement buses for operation of Route

FY 19 $0 225-226.

Total $1,145,179

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$10,122,016 $0 $0 c::JTI [21 D D G u $30,063,823

$0 $0 $0

$0 $0 $0

$0 $1,690,231 $422,557 Total Project Cost for this grant $5,260,092

$0 $2,517,843 $629,461

$1 0,122,016 $4,208,074 $1,052,018

$-558,054 $0 $0 ~ ~ D D [3 u $31,515,001

$2,421 ,626 $0 $0

$0 $349.346 $196.507

$0 $1,101,832 $619,781 Total Project Cost for this grant $2,267,466

$0 $0 $0

$1,863,572 $1,451,178 $816,288

$755.818 $0 $389.361 ~ ~ D D [3 ~ $31,515,001

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$755,818 $0 $389,361

Transit Capital: Page 6 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 67: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

19 6 F7 427 Vermont Ave. Bus Stop Improvements -FY 15 $0

Exposition to Wilshire

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

Installation of transit stop improvements to include FY 18 $191,420 pedestrian lighting, enhanced pavement, street

FY 19 $2,120,970 furniture, and other amenities on Vermont Ave -Exposition Bland Wilshire Bl. Total $2,312,390

20 6 F7428 Western Ave. Bus Stop Improvements-FY 15 $0

Exposition to Wilshire

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

Installation of transit stop improvements to include FY 18 $191,420 pedestrian lighting, enhanced pavement, street

FY 19 $2,120,970 furniture, and other amenities on Western Ave -Exposition Bland Wilshire Bl. Total $2,312,390

21 6 F7409 Replace 40-ft Buses with Alternative Fuel Buses FY 15 $4,320,850

CITY OF SANTA MONICA FY 16 $0

Replace 2002 NAB I 40-ft transit vehicles that have FY 17 $0

exceeded their usef•ul life w ith new 60-ft alternative FY 18 $0 fuel vehicles for fixed route service.

FY 19 $0

Total $4,320,850

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM'DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D G [3 $31,515,001

$0 $0 $0

$0 $0 $0

$153,136 $0 $38,284

$1,696,776 $0 $424,194 -$1,849,912 $0 $462,478

$0 $0 $0 ~ ~ D D [3 [3 $31,515,001

$0 $0 $0

$0 $0 $0

$153,136 $0 $38,284

$1,696,776 $0 $424,194

$1,849,912 $0 $462,478

$3,413.472 $0 $907.378 ~ ~ D D G [3 $31,515,001

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$3,413,472 $0 $907,378

Transit Capital: Page 7 of 11 L:\2013 Caii\Crys'<!l Reports\RainboovOraft 2013.rpl

Page 68: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; MODE NUM PROJECT DESCRIPTION YEAR EXPENSE

22 6 F7426 Central City Community Bus Stop Improvements FY 15 $0

CITY OF LOS ANGELES FY 16 $0

The project will provide transit-<>riented FY 17 $257,402

streetscape improvements to several transit bus FY 18 $0 stops on major corridors w ithin the Westlake, Pico

FY 19 $1,465,556 Union a nd Temple/Beaudry neighborhoods.

Total $1,722,958

23 6 F7431 Pasadena Transit Operations and Maintenance FY 15 $2,724,350

Facility

FY 16 $11 ,835,455 CITY OF PASADENA

FY 17 $0

The City of Pasadena will construct a Transit FY 18 $0 Operations and Maintenance Facility to support

FY 19 $0 the operations of the Pasadena ARTS fixed route and Dial-A-Ride services. Total $14,559,805

24 6 F7419 Bellflower Regional Park & Ride Lot for the FY 15 $0

Gateway Cities

FY 16 $0 CITY OF BELLFLOWER

FY 17 $0

Convert an existing private parking lotto a public FY 18 $2,184,440 regional transit park and ride lot with 210 parking

FY 19 $611,952 spaces, bicycle lock ers, and two bus layover bays.

Total $2,796,392

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D Q 13 $31,515,001

$0 $0 $0

$205,921 $0 $51 ,480

$0 $0 $0

$1,172,444 $0 $293,111 -$1,378,365 $0 $344,591

$849,750 $0 $1,874,600 ~ ~ D D [3 [3 $31,515,001

$10,838,11 5 $0 $997,340

$0 $0 $0

$0 $0 $0

$0 $0 $0

$11,687,865 $0 $2,871,940

$0 $0 $0 ~ ~ D D [3 [3 $31,515,001

$0 $0 $0

$0 $0 $0

$1,418,760 $0 $765,680

$148,352 $0 $463,600

$1,567,112 $0 $1,229,280

Transit Capital: Page 8 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 69: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PRO) PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

25 6 F7421 El Monte Station Multi-Modal Transit Access

26 6

27 6

Improvements

CITY OF EL MONTE

An addition of a bus-only lane, a longer bus queuing lane, wider sidewalks, and bus stop improvements along San Anita Avenue directly serving the Metro El Monte Station.

F7429 Western Ave Bus Stop Improvements -Florence Ave to Manchester Ave

CITY OF LOS ANGELES

Installation of improvements/amenities at trans it stops on Western Ave - Florence Ave to Manchester Ave.

F7416 City of Bell Replacement Buses

CITY OF BELL

Purchase six transit vehicles for the City's dial-a-r ide and fixed route service.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $1 ,389,910

FY 17 $1 ,793,518

FY 18 $0

FY 19 $0

Total $3,183,428

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $101,340

FY 19 $1 ,054,690

Total $1,156,030

FY 15 $488,873

FY 16 $0

FY 17 $0

FY 18 $0

FY 19 $0

Total $488,873

METRO 2013 TIP CALL FOR PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 13 [21 D D G ~ $31,515,001

$954,706 $0 $435,204

$1,400,038 $0 $393,480

$0 $0 $0

$0 $0 $0

$2,354,744 $0 $828,684

$0 $0 $0 [3 ~ D D u ~ $31,515,001

$0 $0 $0

$0 $0 $0

$81,072 $0 $20,268

$843,752 $0 $210 ,938

$924,824 $0 $231,206

$391,098 $0 $97,775 13 [21 D D G [3 $31,515,001

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$391,098 $0 $97,775

Transit Capital: Page 9 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 70: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

28

29

30

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

6 F7417 Malibu Bus Stop Improvements along PCH Phase

6

6

II

CITY OF MALIBU

Install improvements to existing MTA bus stops along Pacific Coast Highway to promote transit use and improve safety for transit riders, pedestrians and bicyclists.

F7411 County of LosAnge'les Dial-A-Ride Vehicles

COUNTY OF LOS ANGELES

16 gasoline-fueled, llow-floor minivans for three Dial-A-Ride services.

F7425 Wilshire Blvd. Corridor BRT Bus Stop Improvements

CITY OF LOS ANGELES

Develop a pedestrian and public transit friendly corridor along Wilshire Blvd from Centinela Ave to Western Ave, excluding the portion of Wilshire Blvd located in Beverly Hills.

June 03, 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$105,060

$757,554

$0

$0

$0 ---$862,614

$0

$0

$8,198

$914,875

$0

$923,073

$0

$0

$0

$180,160

$2,712,060

$2,892,220

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ N EED & LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BEN EFIT TO M ATCH EFFECTIVEN ESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant IN TEGRAT ION PRINCIPLES FYl S-FY19

$56,650 $0 $48,410 13 [21 D D Q 13 $31,515,001

$577,184 $0 $180,370

$0 $0 $0

$0 $0 $0

$0 $0 $0

$633,834 $0 $228,780

$0 $0 $0 [3 ~ D D G [3 $31,515,001

$0 $0 $0

$0 $0 $8,198

$716,136 $0 $198,739

$0 $0 $0

$716,136 $0 $206,937

$0 $0 $0 [3 [3 D D G [3 $31,515,001

$0 $0 $0

$0 $0 $0

$144,128 $0 $36,032

$2,169,648 $0 $542,412

$2,313,776 $0 $578,444

Transit Capital: Page 1 0 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 71: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

31

32

PROJECT TITLE

PROJ PROJECT SPONSOR MODE NUM PROJECT DESCRIPTION

6 F7415 Compressed Natura l Gas Refueling Station and

6

Transit Parking

CITY OF BALDWIN PARK

A proposal to constnuct a compressed natural gas refueling station in the City of Baldwin Park for local & regional transit providers w ithin the San

Gabriel Valley mid-valley region.

F7403 Park and Ride Facility at the SIE Corner Rosecrans & Wadkins

CITY OF GARDENA

New park and ride facility at S/E Comer of

Rosecrans Boulevard and Wadkins Avenue.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT EXPENSE

$0

$140,052

$838,331

$439,365

$0

$1,417,748

$0

$0

$0

$0

$2,472,147

$2,472,147

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM'DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 C2TI D D u 13 $31,515,001

$140,052 $0 $0

$798,983 $0 $39,348

$-109,943 $0 $549,308

$0 $0 $0

$829,Q92 $0 $588,656

$0 $0 $0 [3 [3 D D u [3 $31,515,001

$0 $0 $0

$0 $0 $0

$0 $0 $480,802

$1,977,254 $0 $0

$1,977,254 $0 $480,802

Transil Capital: Page 11 of 11 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 72: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound
Page 73: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

2

3

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

7 F7807 Expo Station 41h Street Streetscape

7

7

Improvements to Downtown

CITY OF SANTA MONICA

Streetscape enhancements for first mile/last mile connections that will improve biking, walking and transit use along 4th Street corridor to the Downtown Civic Center from Santa Monica Expo station.

F7806 Vermont Avenue Streetscape Improvement Project

COUNTY OF LOS ANGELES

Landscape and streetscape improvements near the Metro Green Line Vermont Station consisting of concrete pavers, trees, decorative crosswalks, and flow-through filtration planters.

F7814 LADOT Streets for People: Parklets and Plazas

CITY OF LOS ANGELES

This citywide effort aims to support inter-modal connectivity by providing pedestrian-first spaces along corridor linkages that facilitate firsUiast mile solutions.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$0

$0

$0

$0

$2,897,500

$2,897,500

$0

$0

$0

$201,396

$1 ,191,974

$1,393,370

$515,000

$0

$0

$0

$0

$515,000

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 ~ [3 D D [3 [3 $1,612,700

$0 $0 $0

$0 $0 $0

$0 $337,800 $84,450 Total Project Cost fo r this grant $2,015,875

$2,318,000 $1,274,900 $318,725

$2,318,000 $1,612,700 $403,175

$0 $0 $0 [3 ~ D D ~ [3 $2,377,654

$0 $0 $0

$0 $62,301 $15,575

$161,117 $662,088 $165,522 Total Project Cost fo r this grant $956,192

$953,579 $40,565 $10,141

$1,114,696 $764,954 $191,238

$412,000 $0 $0 [21 ~ D D G u $2,814,854

$0 $0 $0

$0 $437,200 $109,300

$0 $0 $0 Total Project Cost fo r this grant $546,500

$0 $0 $0

$412,000 $437,200 $109,300

Transportation Enhancement Activities: Page 1 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 74: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

4

5

6

PROJECT TITLE

PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

7 F7817 Vermont Ave Stormwater Capture & Greenstreet

7

7

Transit Project

CITY OF LOS ANGELES

Environmental enhancements (stormwater BMPs and planting for complete streets) for a major transportation corridor in a neighborhood transected by ped, bus, light rail and freeways

F7812 Las Tunas Drive Complete Streets Improvement Project

CITY OF TEMPLE CITY

Construct and install community identity and distinctive transportation enhancement features such as medians, gateway treatments, wayfinding signage and landscaping.

F781 0 Artesia Streetscape Improvements

CITY OF LONG BEACH

The City of Long Beach proposes to enhance the Artesia Boulevard streetscape through transit, pedestrian, bicyde, and intersection improvements.

June 03. 2013. 10:03:00AM

FISCAL

YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial

PROJECT

EXPENSE

$1 ,245,724

$3,172,053

$732,766

$42,720

$57,950

$5,251,213

$0

$2,599,046

$669,359

$0

$0

$3,268,405

$2,060,474

$2,379,758

$0

$0

$0

$4,440,232

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Init ial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM 'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$53,890 $721,000 $1,127,718 c::JTI [21 D D G u $3,960,254

$499,701 $424,400 $663,805

$359,518 $0 $0

$42,720 $0 $0 Total Project Cost for this grant $2,936,923

$57,950 $0 $0

$1,013,779 $1,145,400 $1,791,523

$0 $257,500 $11 5,689 ~ ~ D D [3 [3 $5,236,314

$1,273,200 $1,018,560 $457,614

$327,900 $0 $0

$0 $0 $0 Total Project Cost for this grant $1,849,363

$0 $0 $0

$1,601,100 $1,276,060 $573,303

$749,263 $0 $1,311,211 c::JTI ~ D D G u $5,236,314

$2,379,758 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$3,129,021 $0 $1,311,211

Transportation Enhancement Activities: Page 2 of7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 75: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE Initial w 0

PROJECT SPONSOR FISCAL 0 PROJ PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

7 7 F7818 Expo/Bundy Station Multi-Modal Connectivity FY 15 $0

Enhancements

FY 16 $0 CITY OF LOS ANGELES

FY 17 $0

Pedestrian/bike-friendly routes to the Expo/Bundy FY 18 $217,318 station through traffic calming , safety

FY 19 $1 ,514,813 improvements and p lacemaking.

Total $1,732,131

8 7 F7813 LANI- Virgil Village Complete Street Project FY 15 $0

CITY OF LOS ANGELES FY 16 $0

The project will transform Virgil Ave by FY 17 $103,534

implementing complete streets strategies FY 18 $106,660 designed to improve the transit experience, safety

FY 19 $938,268 and access for pedestrians, users and cyclists.

Total $1,148,462

9 7 F7804 Fremont Ave Traffic Calming FY 15 $705,550

CITY OF SOUTH PASADENA FY 16 $0

Provide needed traffic calming on Fremont Ave to FY 17 $0

reduce speeds and vehicle conflicts while adding FY 18 $0 pedestrian and bicycle enhancements.

FY 19 $0

Total $705,550

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 [JTI [21 D D G u $5,236,314

$0 $0 $0

$0 $0 $0

$173,854 $0 $43,464

$1,211,850 $0 $302,963 -$1,385,704 $0 $346,427

$0 $0 $0 ~ ~ D D u [3 $5,236,314

$0 $0 $0

$70,307 $0 $33,227

$72,430 $0 $34,230

$637,856 $0 $300,413

$780,593 $0 $367,870

$564,440 $0 $141,110 ~ [21 D D G [3 $5,236,314

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$564,440 $0 $141,110

Transportation Enhancement Activities: Page 3 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 76: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

10

11

12

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

7 F7808 Long Beach Boulevard Beautification Project

7

7

CITY OF SOUTH GATE

Construct concrete raised center median with drought tolerant planting and irrigation and install bike sharrows.

F7809 Azusa Santa Fe Depot Historic Rehab and Bicycle Reuse

CITY OF AZUSA

The project is the historic rehab and reuse of the Azusa Historic Santa Fe Depot for a transit store and bike station at the Azusa-Alameda Metro Gold Line Station

F7802 Sand Canyon Road and Lost Canyon Road Roundabout

CITY OF SANTA CLARITA

Construct roundabout at the intersection of Sand Canyon Road and Lost Canyon Road. The project will also feature landscaping and four splitter islands with decorat ive crosswalks.

June 03. 2013. 10:03:00AM

FISCAL YEAR

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

FY 15

FY 16

FY 17

FY 18

FY 19

Total

Initial PROJECT EXPENSE

$0

$196,816

$799,256

$823,388

$0

$1,819,460

$0

$561,447

$559,979

$0

$0

$1,121,426

$0

$0

$0

$202,680

$1 ,535,055

$1,737,735

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D u I::J9 $5,236,314

$157,452 $0 $39,363

$639,405 $0 $159,851

$658,710 $0 $164,678

$0 $0 $0

$1,455,567 $0 $363,892

$0 $0 $0 D ~ D D G I::J9 $5,236,314

$455,347 $0 $106,100

$441,607 $0 $118 ,372

$0 $0 $0

$0 $0 $0

$896,954 $0 $224,472

$0 $0 $0 c::3 [B D D [3 [3 $5,236,314

$0 $0 $0

$0 $0 $0

$141,876 $0 $60,804

$1,074,538 $0 $460,517

$1,216,414 $0 $521,321

Transportation Enhancement Activities: Page 4 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 77: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

13 7 F7800 15th Street West Corridor FY 15 $0

CITY OF LANCASTER FY 16 $120,532

Enhance streetscape within existing rig ht of way, FY 17 $1,458,958

to include landscaping , painted buffered and FY 18 $0 green bike lanes, transit stop upgrades, road

FY 19 $0 diets, and bulbouts.

Total $1,579,490

14 7 F7803 Historic Pacific Electric Railroad Bridge Railroad FY 15 $0

to Pedestrian Conversion

FY 16 $0 CITY OF TORRANCE

FY 17 $130,022

Historic Pacific Electric Railroad Bridge, Railroad FY 18 $0 to Pedestrian Conversion will transform a historic bridge into a beautiful , safe and practical FY 19 $1 ,347,373

pedestrian overpass/pocket park. Total $1,477,395

15 7 F7816 Pico Green Street Project FY 15 $296,640

CITY OF LOS ANGELES FY 16 $946,667

The project w ill transform Pica Blvd into a green FY 17 $264,856

street for stormwater management and aesthetic FY 18 $0 improvements to mitigate the effects of

FY 19 $0 transportation.

Total $1,508,163

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [3 D D G 13 $5,236,314

$0 $0 $120,532

$1,266,500 $0 $192,459

$0 $0 $0

$0 $0 $0 -

$1,266,500 $0 $312,991

$0 $0 $0 [3 ~ D D u 13 $5,236,314

$0 $0 $0

$-150,112 $0 $280,134

$0 $0 $0

$1,347,373 $0 $0

$1,197,261 $0 $280,134

$67,403 $0 $229,237 ~ [3 D D D [3 $5,236,314

$734,467 $0 $212,200

$264,856 $0 $0

$0 $0 $0

$0 $0 $0

$1,066,726 $0 $441,437

Transportation Enhancement Activities: Page 5 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 78: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:; w 0 0 ::;

PROJECT TITLE PROJ PROJECT SPONSOR

MODE NUM PROJECT DESCRIPTION

16 7 F7820 Florence Avenue Enha ncement Project

17 7

18 7

CITY OF BELL

Comprehensive improvements to Florence Avenue in the City of Bell, consisting of transportation and pedestrian amenities to improve safety, efficiency, and aesthetics.

F7811 Spring Street Improvements Project

CITY OF LONG BEACH

The proposed project scope of work includes pedestrian improvements in existing street and frontage road medians , parkways and major intersections.

F7815 Oakridge Estate Historic Park Pedestrian Access Improvements

CITY OF LOS ANGELES

Construct missing concrete sidewalk, curb, gutter, new street trees, street furniture, and a signalized pedestrian crossing for access to Oakridge Estate Historic Park.

June 03. 2013. 10:03:00AM

Initial FISCAL PROJECT YEAR EXPENSE

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $304,428

FY 19 $2,462,031

Total $2,766,459

FY 15 $4,579,306

FY 16 $0

FY 17 $0

FY 18 $0

FY 19 $0

Total $4,579,306

FY 15 $0

FY 16 $0

FY 17 $0

FY 18 $162,144

FY 19 $1 ,108,004

Total $1,270,148

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN WHOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ LOCAL REGIONAL PRO) NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE

Initial Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT AMOUNT AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D

REQUESTED RECOMM' DED Grant INTEGRATION PRINCIPLES FYl 5-FY19

$0 $0 $0 13 D£1 D D u 13 $5,236,314

$0 $0 $0

$0 $0 $0

$0 $0 $304,428

$2,220,304 $0 $241,727

$2,220,304 $0 $546,155

$3,205,513 $0 $1,373,792 [3 ~ D D u 13 $5,236,314

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$3,205,513 $0 $1,373,792

$0 $0 $0 ~ [3 D D G [3 $5,236,314

$0 $0 $0

$0 $0 $0

$129,715 $0 $32,429

$886,403 $0 $221,601

$1,016,118 $0 $254,030

Transportation Enhancement Activities: Page 6 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl

Page 79: Number of Applicationsmedia.metro.net/projects_studies/call_projects/...CITY OF BELL GARDENS FY 17 $47,819 Conslruct two (2) west bound left turn lanes wilh a FY 18 $485,588 west bound

.., z ;;;; z ;:;

PROJECT TITLE w Initial 0

PROJECT SPONSOR 0 PROJ FISCAL PROJECT ::; PROJECT DESCRIPTION YEAR EXPENSE MODE NUM

19 7 F7821 PCH-Aviation 81vd Beautification Project - TEA FY 15 $0

Phase I

FY 16 $0 CITY OF HERMOSA BEACH

FY 17 $0

This project will imp rove, promote and enhance FY 18 $1 ,689,000 mobility options through the construction of transit

FY 19 $0 adjacent parklets, new bus shelters and traffic

calming street medians. Total $1,689,000

20 7 F7801 Magic Mountain Parkway Median Installation and FY 15 $0

Landscaping

FY 16 $0 CITY OF SANTA CLARITA

FY 17 $0

Construct 3,300 feet of raised landscape median FY 18 $70,938 on Magic Mountain Parkway to improve the

FY 19 $851,423 aesthetic quality of this roadway for all users.

Total $922,361

21 7 F7805 Monrovia Historic Depot Restoration FY 15 $1 ,689,200

CITY OF MONROVIA FY 16 $0

Rehabilitation and restoration of the historic FY 17 $0

Monrovia Depot. FY 18 $0

FY 19 $0

Total $1,689,200

June 03. 2013. 10:03:00AM

METRO 2013 TIP CALL FO R PROJECTS

PRELIMINARY PROJECT RECOMMENDATIONS

INFLATED IN W HOLE DOLLARS

MAXIMUM EVALUATION CRITERIA POINTS AVAILABLE

~ ~ c:LJ c::!L] [1LJ ~ Initial

LOCAL REGIONAL PROJ NEED& LOCAL COST LAND USE & TOTAL CUMULATIVE Metro•s MATCH to SIGNIFICANCE BENEFIT TO MATCH EFFECTIVENESS SUSTAINABILITY SCORE AMOUNT

AMOUNT

REQUESTED

AMOUNT Metro's & INTER-MODAL TRANS. SYSTEM POLICIES/ RECOM'D RECOMM' DED Grant INTEGRATION PRINCIPLES FYl S-FY19

$0 $0 $0 13 [21 D D G 1:3 $5,236,314

$0 $0 $0

$0 $0 $0

$1,351,200 $0 $337 ,800

$0 $0 $0 -$1,351,200 $0 $337,800

$0 $0 $0 [3 ~ D D G [3 $5,236,314

$0 $0 $0

$0 $0 $0

$53,204 $0 $17,734

$638,479 $0 $212,944

$691,683 $0 $230,678

$1,328,700 $0 $360,500 ~ ~ D D D [3 $5,236,314

$0 $0 $0

$0 $0 $0

$0 $0 $0

$0 $0 $0

$1,328,700 $0 $360,500

Transportation Enhancement Activities: Page 7 of 7 L:\2013 Caii\Crys'<!l Reports\Rainbo.vOraft 2013.rpl


Recommended