    Stadium Construction

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    2/12

    2

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    3/12

    3

    Modular and orward-looking.

    In ast-paced times with limited resources, the requirements which modern stadiums and arenas have

    to ulll are undergoing change. NUSSLIs modular concept generates well-proven solutions, unparalleled

    in terms o fexibility and cost. The experience gained rom wide-ranging stadium projects worldwide

    makes us a oresighted and reliable partner. We see ourselves as a supplier and advisor always keeping an

    eye on costs, unction, quality and deadlines. By virtue o detailed project preparation, proven logistics and

    extensive assembly know-how, we deliver cost-eective and sustainable results.

    NUSSLI oers auxiliary grandstands or complete, modular-style stadiums and arenas with or without

    roong or rent or sale. Hire-purchase or leasing options are also available. And it goes without saying

    that our solutions are tailored to customers individual requirements.

    Cover picture: BRITA Arena, Wiesbaden (DE)

    adidas Arena, FIFA Football World Championship 2006, Berlin (DE)

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    4/12

    4

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    5/12

    5

    Stadium construction:

    fexible and cost-ecient.

    NUSSLI modular stadium construction meets the highest standards o architecture, saety and unctiona-

    lity. We combine a wide variety o construction systems with traditional construction methods. Stadiums

    and arenas using this construction method can be adapted to suit new requirements time and again.

    They are technically well thought-out and versatile. They can be installed in next to no time and

    dismantled just as ast ater the event. We provide solutions or permanent and temporary, modular-style

    stadiums and arenas even or out-o-the-ordinary sites, such as beaches.

    Our services:

    Modular stadiums and arenas

    Temporary stadiums and arenas

    Tubular steel grandstands

    Facility buildings

    Animation BRITA Arena, Wiesbaden (DE)

    System section with lines o sight, survey

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    6/12

    6

    Stadium expansion: ast and sae.

    The capacity o existing stadiums is oten insufcient or major events NUSSLI expands or adapts existing

    capacity and structures quickly and cost-eectively. The extended structure can be dismantled again just as

    quickly once the event is over. We comply with the strictest saety guidelines, such as those issued by FIFA

    or other associations.

    Our services:

    Modular stadium expansion

    Interim stadium expansion

    Auxiliary grandstands and roofng

    Facility buildings

    Extension o Khalia Tennis Arena, 2008, Doha (QA)

    Extension o Gersag Stadium, 2009, Emmen (CH) // Photo: www.cl.ch

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    7/12

    7

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    8/12

    8

    A system oering compelling advantages.

    Cost advantage: Stadiums and arenas built or extended in modular style oer decisive advantages over

    those built using the traditional method o construction. The prime actors are cost savings and time

    savings. Modules can be used or a limited period o time and thereore no costs are incurred due to

    potential overcapacity. The standardization shortens planning and building processes.

    Fast and fexible: Steel-based modular structures or expansions beat any other system when it comes

    to installation speed. With a lead time o only a ew weeks, NUSSLI can come up with a solution tailored

    to your needs and can adapt the event venue to the respective requirements.

    Animation FIFA-compliant stadium construction or 22,000 seats

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    9/12

    9

    Convincing arguments.

    Experience is all the more valuable i it is at your command in a relatively new discipline. Our pioneering

    work in the feld o modular stadium construction places solutions at our fngertips to ulfll every indi-

    vidual customer requirement efciently, cost-eectively and on schedule. We are backed not only by our

    experience but also by the global network o partnerships, ensuring ast response time coupled with slicklogistics.

    As a general contractor, we also assume overall responsibility or a stadium project on request providing

    a one-stop, turnkey solution. This includes time schedules, costs, unction and quality.

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    10/12

    10

    An impressive perormance record.

    Our list o reerences and numerous international awards are a testament to the confdence which

    companies, organizations, event organizers and associations place in our expertise in the feld o

    temporary and modular construction. They all make high demands on quality, reliability and cost

    efciency. That is why they count on NUSSLI.

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    11/12

    11

    Page 10 from left to right, from top to bottom:

    South grandstand SV Sandhausen, Sandhausen (DE)

    Extension of main grandstand SV Wacker Burghausen,

    Burghausen (DE)Team locker room BRITA Arena, Wiesbaden (DE)

    Tennis Masters, Seiersberg (AT)

    Grandstand SC Magna, Wiener Neustadt (AT)

    South grandstand FC Energie Cottbus, Cottbus (DE)

    North grandstand FC St. Pauli from 1910 R.A., Hamburg (DE)

    Page 11 from left to right, from top to bottom:

    Cricket World Championship 2007, Barbados (BB)Swiss Open 2007, Gstaad (CH)

    9th Stadium, UEFA Euro 2008, Liestal (CH)

    Beachvolleyball Arena, Olympic and Paralympic Summer Games 2000, Sydney (AU)

    South Grandstand TuS Koblenz, Koblenz (DE)

    Reverse: A1 Beachvolleyball Grand Slam 2009, Klagenfurt (AT)

  • 8/3/2019 NUSSLI Brochure Stadia Construction en Final

    12/12

    nussli.com

    StB10/2009en//Inototherw

    isespecifed,allphotos:NUSSLI

    Member companies in:

    Switzerland (Headquarters), Germany, Austria,

    Italy, Spain, United Kingdom, USA

    In addition, we are represented by our partners and our own sales

    and project ofces around the world.