NYC Department of Education Building Condition Assessment Survey 2019-2020 X189 Architectural Inspection Inspection Type Last Edited Time In InspectionId P.S./I.S. 189 (@STEENWICK AVE)-X, 3441 STEENWICK AVENUE, BRONX, NY, 10475 School: 4493 2020-03-20 08:07AM 2020-08-22 08:15PM ARCHITECTURAL - SENIOR 4564 2020-03-20 08:21AM 2020-03-26 05:43PM ARCHITECTURAL - ASSOCIATE Asset Data Question Answer Was the Building Fully Accessible for Inspection? No Locker Rooms (no key) Comments on Inaccessible Inspection Principal(s) Information Principal Name Edwardo Calderon Principal Organization I.S. 462 - Bronx (Cornerstone Academy for Social Action Middle School) Meeting with Principal? No Principal Feedback No Feedback from Principal Principal Name James Bellon Principal Organization P.S. / I.S. 189 - Bronx Meeting with Principal? No Principal Feedback No Feedback from Principal Principal Name Shante Chunn Principal Organization X723 SPED - Bronx Meeting with Principal? No Principal Feedback No Feedback from Principal Custodian Peter Mascia Fireman Anthony Vega Building Square Footage 108,000 Comments on the Area (Square Feet) None Comments on the Stories (Floors) plus Basements 4 (No Basement) Comments on the Year Built 2007 Comments on the Student Population 709 Comments on the Staff Population 192 Comments on the Number of Classrooms 49 Weather Fair Facade Photo Corner of Steenwick Avenue and Reeds Mill Lane - West View Page 1 of 32 Print Date: 9/11/2020 Mobile Validity Version 2.0 (P)
Transcript
Page 1: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Inspection Type Last EditedTime InInspectionId

P.S./I.S. 189 (@STEENWICK AVE)-X, 3441 STEENWICK AVENUE, BRONX, NY, 10475School:

4493 2020-03-20 08:07AM 2020-08-22 08:15PMARCHITECTURAL - SENIOR

4564 2020-03-20 08:21AM 2020-03-26 05:43PMARCHITECTURAL - ASSOCIATE

Asset DataQuestion Answer

Was the Building Fully Accessible for Inspection? No

Locker Rooms (no key)Comments on Inaccessible Inspection

Principal(s) Information

Principal Name Edwardo Calderon

Principal Organization I.S. 462 - Bronx (Cornerstone Academy for Social Action Middle

School)

Meeting with Principal? No

Principal Feedback No Feedback from Principal

Principal Name James Bellon

Principal Organization P.S. / I.S. 189 - Bronx

Meeting with Principal? No

Principal Feedback No Feedback from Principal

Principal Name Shante Chunn

Principal Organization X723 SPED - Bronx

Meeting with Principal? No

Principal Feedback No Feedback from Principal

Custodian Peter Mascia

Fireman Anthony Vega

Building Square Footage 108,000

Comments on the Area (Square Feet) None

Comments on the Stories (Floors) plus Basements 4 (No Basement)

Comments on the Year Built 2007

Comments on the Student Population 709

Comments on the Staff Population 192

Comments on the Number of Classrooms 49

Weather Fair

Facade Photo

Corner of Steenwick Avenue and Reeds Mill Lane - West View

Page 1 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 2: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural InspectionMain Entrance Photo

Facade A - Steenwick Avenue

Roof Photo

Roof 1 from Bulkhead - North View

No System UpgradedHave any Systems/Major Building Components been upgraded?

Have there been any New Building Additions? No New Construction

Tandem No Tandem

Leased Space? No

Priority ConditionExist

Last Year?

Priority

Category

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

Broken Glass Cracked Windows are

Potential Safety Hazard

Windows Facade G at

Corridor near

Room 241

shown, also

Corridor

Windows near

Rooms 201,

302/Stair 3A

and 310

Peter

Mascia

Yes Custodian

Structural Engineer Required

Structural

Condition Type

Condition

Description

Component

Affected

Location

Description

Person(s)

Notified

Person(s)

Title

Photo

Image

No condition recorded

Page 2 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 3: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Accessibility

Accessibility Status Question Response

Is the Primary or secondary entrance on an accessible route? Yes

Is the building a multi-story building? Yes

Are All floors of the building accessible through compliant means? Yes

Accessible classrooms exists on each floor? Yes

Boys and Girls or Unisex accessible toilets exist on at least every other floor? Yes

If the following spaces exist, are they ALL accessible? Art Room, Auditorium,

Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs

Yes

Physical Breakdown Structure Exists Complies Required DeficiencyAudio

Induction

System

Fire

Alarm

Strobe

FUNCTIONAL ACCESSIBILITY

Exterior Routes

YesExterior Entrances & Exits

NoNoExterior H/C Lifts

YesYesExterior Ramps and Railings

Interior Routes

NoNoCorridor and Lobby H/C Lifts

YesYesInterior Corridor Doors And

Hardware

YesInterior Corridors & Lobbies

YesYesInterior Elevators

YesInterior Lobby Doors And Hardware

NoInterior Ramps

Rooms & Spaces

Art Rooms

Yes YesRoom 315

Auditorium

Yes Yes1st Floor Yes Yes

Cafeteria

Yes Yes1st Floor Yes Yes

Classrooms

Yes Yes1st to 4th Floors

Computer Rooms

Yes YesRoom 410

Gymnasium

Yes Yes1st Floor Yes Yes

Library

Yes YesRoom 324

Main Office

Yes YesRoom 108 (SPED 723 @

X189)

Yes YesRoom 122 (P.S. 189)

Yes YesRoom 422 (I.S. 462)

Multi-purpose Room

Yes YesRoom 438 Yes Yes

Nurse's Office

Yes YesRoom 127 (P.S. 189 and

I.S. 462)

Yes YesRoom 225 (SPED 723 @

189X)

Page 3 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 4: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Physical Breakdown Structure Exists Complies Required DeficiencyAudio

Induction

System

Fire

Alarm

Strobe

NoPool

Science Lab

Yes YesRooms 313, 413, 427

Toilet Rooms (boys)

Yes Yes1st to 4th Floors

Toilet Rooms (girls)

Yes Yes1st to 4th Floors

Toilet Rooms (staff)

Yes Yes1st to 4th Floors

Building Template

Inspection

Question Response

Architectural

ATHLETIC FIELDS Does not exist

EXTERIOR Inspected

Does not existAREAWAY

InspectedAWNINGS AND CANOPIES

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCHIMNEY

InspectedCOPING

Condition 3- Fair

METAL:OPEN TRANSVERSE JOINTS WITH DAMAGED

CAULKING

Deficiency

Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom L.F.

Page 4 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 5: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

COPING

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 2 at Facade A

Violations No violations recorded

CAST STONE:OPEN TRANSVERSE JOINTS WITH

DAMAGED CAULKING

Deficiency

Deficiency Location/Instance

75Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 3 at Corner of Facade A and B

Violations No violations recorded

Does not existCORNICE

InspectedDOORS

InspectedDOOR HARDWARE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDOORS AND FRAMES

Condition 3- Fair

METAL:DETERIORATED DOOR AND FRAME - MINOR

DETERIORATION

Deficiency

Deficiency Location/Instance

4Deficiency Quantity

Page 5 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 6: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

DOORS

DOORS AND FRAMES

Quantity Uom EACH

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade H at Stair D (Total doors: 29)

Violations No violations recorded

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedTRANSOM/SIDE LIGHT

Condition 2- Between Good and Fair

METAL:DENTED, MINOR RUSTINGDeficiency

Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade E at Exit 10

Violations No violations recorded

InspectedEXTERIOR SOFFITS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedEXTERIOR WALLS

Masonry, SteelMaterial Type(s)

33,000Replacement Quantity

Replacement Uom S.F.

Instance on All Facades Inspected

2- Between Good and FairInstance Condition

Instance Quantity 33,000

Page 6 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 7: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

EXTERIOR WALLS

Instance Quantity Uom S.F.

METAL PANEL:DETERIORATED CONTROL/EXPANSION

JOINTS WITH DAMAGED CAULKING

Deficiency

Roof Plan Reference

Elevation

Elevation Reference Facade B

60Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade B

Violations No violations recorded

Does not existLOADING DOCK

InspectedLOUVER

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedPARAPETS

Masonry, ConcreteMaterial Type(s)

9,000Replacement Quantity

Replacement Uom C.F.

Instance on All Facades Inspected

3- FairInstance Condition

Instance Quantity 9,000

Instance Quantity Uom CF

BRICK:OPEN JOINTSDeficiency

Deficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Page 7 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 8: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

PARAPETS

Potential Action REPOINT

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade L

Violations No violations recorded

CONCRETE:MINOR CRACKS, SPALLINGDeficiency

Deficiency Location/Instance

125Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 3 at Facade A

Violations No violations recorded

BRICK:EFFLORESCENCEDeficiency

Deficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 1Urgency of Action

LEVEL 2Purpose of Action

Page 8 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 9: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

PARAPETS

Deficiency Photo 1

Facade D

Violations No violations recorded

Does not existPLAZA DECK

InspectedROOF

InspectedROOFING

Replacement Quantity 39,000

Replacement Uom S.F.

InspectedLEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedROOF BARRIER

3- FairCondition

RAILINGS/PANELS:DETERIORATED, MINOR RUSTINGDeficiency

Deficiency Location/Instance

50Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 2 at Facade A

Violations No violations recorded

Does not existROOF CAGE

Does not existROOF FENCE

InspectedROOF HATCH/SMOKE HATCH

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedROOFING

Instance on IRMA:All Roofs Inspected

3- FairInstance Condition

Instance Quantity 38,500

Instance Quantity Uom S.F.

Page 9 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 10: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOFING

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 2007

Source of Installation Year Documented

IRMA:FLASHING:BASE FLASHING DETERIORATEDDeficiency

Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 1 at Facade D

Violations No violations recorded

IRMA:ROOFING:LOSS OF GRAVELDeficiency

Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 3

Violations No violations recorded

IRMA:FLASHING:CAP FLASHING DAMAGEDDeficiency

Page 10 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 11: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOFING

Deficiency Location/Instance

125Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Roof 3 at Facade L

Deficiency Photo 2

Roof 1 at Facade D

Violations No violations recorded

Instance on Modified Bitumen:Part of Roof 1(near BH) Inspected

5- PoorInstance Condition

Instance Quantity 500

Instance Quantity Uom S.F.

“Does the roof have major mechanical equipment sitting on Dunnage

Steel less than 18" above the Roofing?"

No

Installation Year 2007

Source of Installation Year Documented

MODIFIED BITUMEN:ROOFING:DELAMINATIONDeficiency

Deficiency Location/Instance

250Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE ROOFING WITH MAJOR EQUIPMENT REMOVAL

PRIORITY 4Urgency of Action

LEVEL 2Purpose of Action

Page 11 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 12: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

ROOF

ROOFING

ROOFING

Deficiency Photo 1

Roof 1 near Bulkhead

Violations No violations recorded

InspectedROOFING DRAINS

2- Between Good and FairCondition

No deficiencies recordedDeficiency

InspectedSPECIALTIES

InspectedBULKHEAD/PENTHOUSE

2- Between Good and FairCondition

BULKHEAD/PENTHOUSE WALLS/INTERIOR:CMU

CRACKS/SPALLING

Deficiency

Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Bulkhead

Violations No violations recorded

Does not existCUPOLA/ SPIRES/ TOWERS

Does not existDORMER

Does not existDUNNAGE STEEL

Does not existROOF/GRAVITY TANK

Does not existSKYLIGHT/ROOF VENT

InspectedSTAIRS/RAMPS: EXTERIOR

InspectedBUILDING CHEEK/FLANK WALLS

Condition 3- Fair

CAST IN PLACE CONCRETE:CRACKS/SPALLING - MINORDeficiency

Page 12 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 13: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

BUILDING CHEEK/FLANK WALLS

Deficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade H at HC Ramp

Violations No violations recorded

InspectedRAILINGS

Condition 3- Fair

RUST - MINORDeficiency

Deficiency Location/Instance

12Deficiency Quantity

Quantity Uom L.F.

Potential Action MAINTENANCE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade H at HC Ramp

Violations No violations recorded

InspectedSTAIRS/RAMPS

Condition 3- Fair

CONCRETE:CRACKS/SPALLING - MINORDeficiency

Page 13 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 14: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

STAIRS/RAMPS: EXTERIOR

STAIRS/RAMPS

Deficiency Location/Instance

15Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Facade B at Exit 1

Deficiency Photo 2

Facade H at HC Ramp

Violations No violations recorded

InspectedWINDOWS

7,500Replacement Quantity

Replacement Uom S.F.

InspectedEXTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedLINTELS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWINDOWS

Material Type(s) Aluminum

Instance on Aluminum - Other:All Facades Inspected

2- Between Good and FairInstance Condition

Instance Quantity 7,500

Instance Quantity Uom S.F.

Installation Year 2007

Source of Installation Year Documented

ALUMINUM - OTHER:BROKEN PANEDeficiency

Page 14 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 15: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

EXTERIOR

WINDOWS

WINDOWS

Roof Plan Reference

Elevation

Elevation Reference Facade C, G and M

50Deficiency Quantity

Quantity Uom S.F.

Potential Action MAINTENANCE

PRIORITY 5Urgency of Action

LEVEL 6Purpose of Action

Deficiency Photo 1

Facade G at Corridor near Room 241 shown, also Corridor

Windows near Rooms 201, 302/Stair 3A, 310 and in Room 410

Deficiency Photo 2

Facade M at Room 410

Violations No violations recorded

INTERIOR Inspected

AUDITORIUM

Instance on 1st Floor (330 seats) Inspected

Ceiling

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed H/C Lift

Instance on 1st Floor (330 seats) Does not exist

Page 15 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 16: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

AUDITORIUM

Fixed Seating

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

DAMAGED/BROKEN/INOPERABLEDeficiency

Seat F/101, 102, G/112, K/15Deficiency Location/Instance

4Deficiency Quantity

Quantity Uom EACH

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Seat G/112

Violations No violations recorded

DAMAGED/BROKEN/INOPERABLEDeficiency

Seat G/114, H/101, J/113Deficiency Location/Instance

3Deficiency Quantity

Quantity Uom EACH

Potential Action REPLACE

PRIORITY 5Urgency of Action

LEVEL 6Purpose of Action

Deficiency Photo 1

Seat G/114

Violations No violations recorded

Floor Finish

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

SHEET VINYL:DETERIORATED SUBSTRATEDeficiency

Near seat C/114Deficiency Location/Instance

10Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 16 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 17: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

AUDITORIUM

Floor Finish

Deficiency Photo 1

Near seat C/114

Violations No violations recorded

Sliding-folding Partition

Instance on 1st Floor (330 seats) Does not exist

Stage

Instance on 1st Floor (330 seats) Inspected

Stage

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtain Rigging

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage Curtains

Instance on 1st Floor (330 seats) Inspected

3- FairInstance Condition

WORN/DETERIORATEDDeficiency

Stage Right, Stage LeftDeficiency Location/Instance

200Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Stage Right

Deficiency Photo 2

Stage Left

Violations No violations recorded

Walls

Page 17 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 18: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

AUDITORIUM

Walls

Instance on 1st Floor (330 seats) Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on 1st Floor (330 seats) Does not exist

CAFETERIA

Instance on 1st Floor Inspected

Ceiling

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on 1st Floor Does not exist

Floor Finish

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

VINYL TILES:DETERIORATED SUBSTRATEDeficiency

Near Exit 9, Near the windowsDeficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Near Exit 9

Violations No violations recorded

Sliding-folding Partition

Instance on 1st Floor Does not exist

Stage

Instance on 1st Floor Does not exist

Walls

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Window Curtains/Shades/Blinds

Instance on 1st Floor Does not exist

InspectedCLASSROOMS/CORRIDORS/ADMIN SPACES

InspectedCeiling

Condition 2- Between Good and Fair

GYPSUM BOARD:DAMAGED/DETERIORATEDDeficiency

Page 18 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 19: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Ceiling

Main Entrance VestibuleDeficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Main Entrance Vestibule

Violations No violations recorded

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

Room 405, 406, 410, 427Deficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Room 410

Deficiency Photo 2

Corridor near Room 406

Violations No violations recorded

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

VINYL TILES:DETERIORATED SUBSTRATEDeficiency

Corridor near Room 117Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

Page 19 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 20: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

CLASSROOMS/CORRIDORS/ADMIN SPACES

Floor Finish

LEVEL 3Purpose of Action

Deficiency Photo 1

Corridor near Room 117

Violations No violations recorded

Does not existSpecialties

InspectedWalls

Condition 2- Between Good and Fair

GYPSUM BOARD:DETERIORATEDDeficiency

Corridor near Room 402, 404Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Corridor near Room 404

Violations No violations recorded

GYMNASIUM

Instance on 1st Floor Inspected

Ceiling

Instance on 1st Floor Does not exist

Door(s)

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on 1st Floor Inspected

3- FairInstance Condition

WOOD:DAMAGED/DETERIORATEDDeficiency

North side, South SideDeficiency Location/Instance

300Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

Page 20 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 21: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

GYMNASIUM

Floor Finish

LEVEL 2Purpose of Action

Deficiency Photo 1

North side

Violations No violations recorded

Seating

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Sliding-folding Partition

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Stage

Instance on 1st Floor Does not exist

Walls

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

MASONRY:CRACKS/SPALLINGDeficiency

South SideDeficiency Location/Instance

30Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

South Side

Violations No violations recorded

WALL PADDING:DETERIORATEDDeficiency

North sideDeficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 21 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 22: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

GYMNASIUM

Walls

Deficiency Photo 1

North side

Violations No violations recorded

Window Curtains/Shades/Blinds

Instance on 1st Floor Does not exist

InspectedINTERIOR DOOR HARDWARE

Condition 3- Fair

No deficiencies recordedDeficiency

InspectedINTERIOR GUARDS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

KITCHEN

Instance on 1st Floor Inspected

Ceiling

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Walls

Instance on 1st Floor Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

LIBRARY

Instance on Room 324 Inspected

Built-in Furnishing

Instance on Room 324 Does not exist

Ceiling

Instance on Room 324 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Door(s)

Instance on Room 324 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Floor Finish

Instance on Room 324 Inspected

2- Between Good and FairInstance Condition

Page 22 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 23: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

LIBRARY

Floor Finish

No deficiencies recordedDeficiency

Walls

Instance on Room 324 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

LOCKER ROOM

Instance on 4th Floor - Boys Inaccessible

Instance on 4th Floor - Girls Inaccessible

MULTI-PURPOSE ROOM

Instance on Room 438 Inspected

Ceiling

Instance on Room 438 Inspected

2- Between Good and FairInstance Condition

ACOUSTIC TILES:DAMAGED/MISSINGDeficiency

Center of RoomDeficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Center of Room

Deficiency Photo 2

Center of Room

Violations No violations recorded

Door(s)

Instance on Room 438 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Fixed Equipment

Instance on Room 438 Does not exist

Floor Finish

Instance on Room 438 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Sliding-folding Partition

Instance on Room 438 Does not exist

Stage

Page 23 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 24: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

MULTI-PURPOSE ROOM

Stage

Instance on Room 438 Does not exist

Walls

Instance on Room 438 Inspected

2- Between Good and FairInstance Condition

WALL PADDING:DETERIORATEDDeficiency

Center of RoomDeficiency Location/Instance

80Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Center of Room

Violations No violations recorded

GYPSUM BOARD:DETERIORATEDDeficiency

Rear of RoomDeficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Rear of Room

Violations No violations recorded

Window Curtains/Shades/Blinds

Instance on Room 438 Does not exist

Does not existPOOLS

Does not existSCIENCE DEMO ROOM

SCIENCE LAB

Instance on Rooms 313, 413, 427 Inspected

NoAlternative Use

Fixed Equipment

Instance on Rooms 313, 413, 427 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

SCIENCE PREP ROOM

Instance on Rooms 311, 415 Inspected

NoAlternative Use

Page 24 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 25: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

SCIENCE PREP ROOM

Fixed Equipment

Instance on Rooms 311, 415 Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Does not existSHOWER ROOM

InspectedSTAIRS/RAMPS: INTERIOR

Do Letter Stair Signs Exist? Yes

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existPartition

InspectedRailings

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStairs and Landings

Condition 2- Between Good and Fair

CONCRETE:CRACKS/SPALLING - MAJORDeficiency

Stair A/4Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Stair A/4

Violations No violations recorded

InspectedWalls

Condition 2- Between Good and Fair

MASONRY:CRACKS/SPALLINGDeficiency

Stair A/3, 4Deficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Page 25 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 26: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

STAIRS/RAMPS: INTERIOR

Walls

Stair A/4

Violations No violations recorded

InspectedSTRUCTURAL

InspectedCOLUMNS/BEAMS/BEARING WALLS

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFLOOR STRUCTURE

Condition 2- Between Good and Fair

CONCRETE SLAB ON GRADE:MINOR CRACKSDeficiency

1st FloorDeficiency Location/Instance

125Deficiency Quantity

Quantity Uom S.F.

Potential Action REPAIR

PRIORITY 3Urgency of Action

LEVEL 5Purpose of Action

Deficiency Photo 1

Room 113 shown, also Rooms 105, 112, 116 and 134

Violations No violations recorded

InspectedFOUNDATION WALLS

Material Type(s) Concrete

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedROOF STRUCTURE

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existVAULTS-BUNKERS

InspectedTOILET ROOMS - STAFF

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existStalls

InspectedWalls

Condition 1- Good

No deficiencies recordedDeficiency

InspectedTOILET ROOMS - STUDENTS

InspectedCeiling

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Page 26 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 27: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

INTERIOR

TOILET ROOMS - STUDENTS

InspectedDoor(s)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedFloor Finish

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedWalls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

LIFE SAFETY Inspected

Does not existF.D. HOLDING AREA

Does not existSTEEL STAIRS

SITE Inspected

Does not existCONTAINERIZATION

InspectedDRAINAGE SYSTEM FOR ASPHALT

InspectedCatch Basins/Manhole - Surrounded by Asphalt

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Asphalt Covering

InspectedDRAINAGE SYSTEM FOR CONCRETE

InspectedCatch Basins/Manhole - Surrounded by Concrete

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Concrete Covering

InspectedDRAINAGE SYSTEM FOR SOIL

InspectedCatch Basins/Manhole - Surrounded by Soil

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existCulverts - Soil Covering

Does not existDRINKING FOUNTAINS

InspectedFENCES

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

Does not existIRRIGATION SYSTEM

InspectedPAVING

InspectedDOT Sidewalk

Does not existAsphalt

InspectedConcrete

3- FairCondition

DAMAGED/DETERIORATED/MISSING SECTIONSDeficiency

Reed Mill LaneDeficiency Location/Instance

75Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Page 27 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 28: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

SITE

PAVING

DOT Sidewalk

Concrete

Deficiency Photo 1

Reed Mill Lane

Violations No violations recorded

HEAVINGDeficiency

Steenwick AvenueDeficiency Location/Instance

100Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Steenwick Avenue

Violations No violations recorded

Does not existPavers

InspectedSite Sidewalks & Walkways

InspectedAsphalt

2- Between Good and FairCondition

CRACKS - MAJORDeficiency

Exit to Steenwick AvenueDeficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Exit to Steenwick Avenue

Violations No violations recorded

InspectedConcrete

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Page 28 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 29: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

SITE

PAVING

Site Sidewalks & Walkways

Does not existPavers

InspectedStudent Non-Use

Gravel Exists? No

Does not existAsphalt

InspectedConcrete

2- Between Good and FairCondition

CRACKS - MAJORDeficiency

Exit to Reed Mill LaneDeficiency Location/Instance

20Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Exit to Reed Mill Lane

Violations No violations recorded

Does not existPavers

InspectedStudent Use

Gravel Exists? No

InspectedAsphalt

4- Between Fair and PoorCondition

CRACKS - MAJORDeficiency

SchoolyardDeficiency Location/Instance

600Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Schoolyard

Violations No violations recorded

InspectedConcrete

2- Between Good and FairCondition

No deficiencies recordedDeficiency

Does not existPavers

InspectedPLAYGROUNDS

SchoolyardInstance

Benches

Page 29 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 30: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

SITE

PLAYGROUNDS

Benches

Instance on Schoolyard Does not exist

Fence

Instance on Schoolyard Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Pavement

Instance on Schoolyard Does not exist

Play Equipment

Instance on Schoolyard Inspected

2- Between Good and FairInstance Condition

No deficiencies recordedDeficiency

Safety Surfacing

Instance on Schoolyard Inspected

2- Between Good and FairInstance Condition

DETERIORATED/MISSINGDeficiency

Near the Play EquipmentDeficiency Location/Instance

40Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Near the Play Equipment

Violations No violations recorded

Unpaved Area

Instance on Schoolyard Does not exist

Does not existPLAYING SURFACE

InspectedRETAINING WALLS

Condition 3- Fair

Are there any Retaining Walls 6' OR higher facing public street/sidewalk? No

CAST IN PLACE CONCRETE:CRACKS/SPALLING - MAJORDeficiency

Rear of SchoolDeficiency Location/Instance

60Deficiency Quantity

Quantity Uom S.F.

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Page 30 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 31: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

SITE

RETAINING WALLS

Rear of School

Violations No violations recorded

InspectedSEATING

InspectedBenches

Does not existConcrete

InspectedMetal/Wood/Plastic

3- FairCondition

DAMAGED/DETERIORATEDDeficiency

SchoolyardDeficiency Location/Instance

1Deficiency Quantity

Quantity Uom EACH

Potential Action REPLACE

PRIORITY 3Urgency of Action

LEVEL 2Purpose of Action

Deficiency Photo 1

Schoolyard

Violations No violations recorded

Does not existBleachers

InspectedSITE WALLS (NOT RETAINING WALLS)

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedSTAIRS/RAMPS: EXTERIOR

InspectedRailings

Condition 3- Fair

MISSINGDeficiency

SchoolyardDeficiency Location/Instance

8Deficiency Quantity

Quantity Uom L.F.

Potential Action REPLACE

PRIORITY 5Urgency of Action

LEVEL 6Purpose of Action

Deficiency Photo 1

Schoolyard

Violations No violations recorded

InspectedSite Cheek/flank Walls

Condition 2- Between Good and Fair

No deficiencies recordedDeficiency

InspectedStairs/ramps

Condition 2- Between Good and Fair

Page 31 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)

Page 32: NYC Department of Education Building Condition Assessment … · 2019. 7. 3. · Principal Feedback The Principal’s questionnaire was returned with following comments 1- The Heating

NYC Department of Education

Building Condition Assessment Survey 2019-2020

X189Architectural Inspection

Question Response

SITE

STAIRS/RAMPS: EXTERIOR

Stairs/ramps

No deficiencies recordedDeficiency

Page 32 of 32 Print Date: 9/11/2020Mobile Validity Version 2.0 (P)


Recommended