+ All Categories
Home > Documents > October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market...

October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market...

Date post: 11-Jan-2016
Category:
Upload: marjory-morton
View: 212 times
Download: 0 times
Share this document with a friend
10
October 28, 2014 Update to RMS 1
Transcript
Page 1: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

October 28, 2014

Update to RMS

1

Page 2: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

*Reviewed and Discussed: *ERCOT Protocols and Retail Market Guide Requirements

*TDSPs’ Data Processes for IDR vs. AMS Metered Premises

* IDR Data Flow Overview

*AMS Data Flow Overview

*ERCOT provided a report of the number of ESI IDs currently meeting IDR Threshold Requirements

2

Page 3: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

*Pull a list of all competitive BUSIDRRQ ESI IDs where:*esh.stoptime is null (ESI ID record is active)

*losscode <> “T” (ESI ID is connected at a distribution voltage)

*mrecode <> “65” (ESI ID is read by a TDSP)

*status <> “I” (ESI ID is active or de-energized)

*Pull all interval data for identified ESI IDs from 1/1/2002 to present

*Calculate monthly max kW values

*Determine if ESI ID monthly max values exceed a specified threshold by occurring twice in a twelve month period

3

Page 4: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

4

Page 5: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

39.1%70.8%

57.2%

98.4%

0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%90.0%

100.0%

Oct-2

009

Nov-2

009

Dec-2

009Jan

-2010

Feb-20

10Ma

r-2010

Apr-2

010Ma

y-2010

Jun-20

10Jul

-2010

Aug-2

010Sep

-2010

Oct-2

010

Nov-2

010

Dec-2

010Jan

-2011

Feb-20

11Ma

r-2011

Apr-2

011Ma

y-2011

Jun-20

11Jul

-2011

Aug-2

011Sep

-2011

Oct-2

011

Nov-2

011

Dec-2

011Jan

-2012

Feb-20

12Ma

r-2012

Apr-2

012Ma

y-2012

Jun-20

12Jul

-2012

Aug-2

012Sep

-2012

Oct-2

012

Nov-2

012

Dec-2

012Jan

-2013

Feb-20

13Ma

r-2013

Apr-2

013Ma

y-2013

Jun-20

13Jul

-2013

Aug-2

013Sep

-2013

Oct-2

013

Nov-2

013

Dec-2

013Jan

-2014

Feb-20

14Ma

r-2014

Apr-2

014Ma

y-2014

Jun-20

14Jul

-2014

Aug-2

014Sep

-2014

Percent Actual/Percent Interval Data Recorder (IDR)

Actual Data Used in Initial Settlement (all meter types) Total AMS and IDR Load (actual & estimated)

Oct 2009 - OD+8 Sep 2014 - OD+4

5

Page 6: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

42.8%

1.6%0.0%

44.5%

25.8% 26.1%

31.4%27.8%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

Oct-2

009

Nov-2

009

Dec-2

009

Jan-20

10Feb

-2010

Mar-2

010

Apr-2

010

May-2

010

Jun-20

10Jul

-2010

Aug-2

010

Sep-20

10Oc

t-201

0No

v-201

0De

c-201

0Jan

-2011

Feb-20

11Ma

r-201

1Ap

r-201

1Ma

y-201

1Jun

-2011

Jul-20

11Au

g-201

1Sep

-2011

Oct-2

011

Nov-2

011

Dec-2

011

Jan-20

12Feb

-2012

Mar-2

012

Apr-2

012

May-2

012

Jun-20

12Jul

-2012

Aug-2

012

Sep-20

12Oc

t-201

2No

v-201

2De

c-201

2Jan

-2013

Feb-20

13Ma

r-201

3Ap

r-201

3Ma

y-201

3Jun

-2013

Jul-20

13Au

g-201

3Sep

-2013

Oct-2

013

Nov-2

013

Dec-2

013

Jan-20

14Feb

-2014

Mar-2

014

Apr-2

014

May-2

014

Jun-20

14Jul

-2014

Aug-2

014

Sep-20

14

Percent of Load by Meter Type

Non-Interval Data Recorder (NIDR) Advanced Metering System (AMS) Non Opt-In Entity (NOIE) Competitive Interval DataRecorder (COMP_IDR)

6

Page 7: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

*Should the IDR Mandatory Installation Threshold Be Increased, Eliminated or Continue as shown in Protocols Section 18.6?

*Installation and Use of Interval Data Recorder Meters: *18.6.1 Interval Data Recorder Meter Mandatory

Installation Requirements(1) Interval Data Recorder (IDR) Meters are required and shall be installed and utilized for Settlement of Premises having

either:(a) A peak Demand greater than 700 kW (or 700 kVA in CenterPoint

Energy’s service territory); or

(b) Service provided at transmission voltage (above 60 kV).

7

Page 8: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

*http://www.ercot.com/calendar/2014/10/20141020-IDRWORKSHOP

Microsoft Word Document

Responses due to [email protected] NLT Wednesday, November 12, 2014 at 5:00 PM

8

Page 9: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

*RMS/COPS Workshop II - IDR Meter Protocol Requirement Threshold

*December 2nd, 1:30 -  4:00 pm, following the RMS meeting

*http://ercot.webex.com

*Meeting Number:    654 980 612

*Meeting Password:   Workshop2 Audio Dial-In: 1.877.668.4493

*http://www.ercot.com/calendar/2014/12/20141202-IDRWORKSHOP

9

Page 10: October 28, 2014 Update to RMS 1. * Reviewed and Discussed: * ERCOT Protocols and Retail Market Guide Requirements * TDSPs’ Data Processes for IDR vs.

10


Recommended