    Permission granted for ISA Houston Section Website

    Dynamic Simulation :

    Project and ApplicationSuccesses

    Stan Hamilton Howard Jemison,

    PhDOperations Trainer OTS ConsultantOPTI Upgrader Team IPS Houston

  • 8/13/2019 Ofc Communication

    2/11

    Permission granted for ISA Houston Section Website 2

    Introduction

    OPTI Canada Long Lake Upgrader Project

    Processes diluted bitumen (Dilbit) from NEXENs SAGD oil sandsproduction

    Produces high quality synthetic crude

    (39oAPI premium sweet crude)

    Phase #1 expected production

    70,000 b/d with 4 more phases planned

    Located in Fort McMurray, Alberta

    Commissioning of Units well under way first oil by Sept, 08

    Expect 50% capacity by Jan 2009

  • 8/13/2019 Ofc Communication

    3/11

    Permission granted for ISA Houston Section Website 3

  • 8/13/2019 Ofc Communication

    4/11

    Permission granted for ISA Houston Section Website 4

    SAGO PROCESSIn the SAGO process. the upper weIJs/eilm 1n1O he deposl..t.ere h.;ses through the oil sands and healS thetlitumen .The hea ted bi tumen /lows withthe eon

  • 8/13/2019 Ofc Communication

    5/11

    Permission granted for ISA Houston Section Website 5

    OPTI Canada Objectives

    Train operators with limited experience

    Shorten startup

    Develop an ongoing training program

    Improve operator response to abnormal conditions

    Familiarize operators with new unit operations

    Familiarize operators with DCS and SIS

    Familiarize operators with operating procedures

  • 8/13/2019 Ofc Communication

    6/11

    Permission granted for ISA Houston Section Website 6

    OTS Project Scope

    Process models

    OrCrude Unit (OPTI owned process)

    Hydrocracker Unit

    Gasification Unit

    Sulphur Recovery Unit

    Air Separation Unit

    DCS

    Emerson DeltaV operator consoles

    Emerson DeltaV SimulatePro controls configuration

    SIS logic translated into DeltaV controls

  • 8/13/2019 Ofc Communication

    7/11

    Permission granted for ISA Houston Section Website 7

    OPTI CanadaTraining System Architecture

    SIM4ME TCP/IP network

    DeltaV Control Network

    VIRTUALCONTROLSDeltaVSimulatePro)

    OPERATORMONITORS

    INSTRUCTOR STATION Operator Consolefor Instructor

    Printer

    contains trainer toolsand remote functions)SIMULATIONCOMPUTERS

    contains controldatabases andgraphics)

    contains processmodels)

    SIMULATOR ROOM COMPUTER RACK

    DeltaVWorkstationsASNs and OSNs)

    KVM Switch

  • 8/13/2019 Ofc Communication

    8/11

    Permission granted for ISA Houston Section Website 8

    OPTI Training Program

    Trained 26 Panel operators

    Trained 60 Field Operators (BMS)

    Full competency training which includes 160 hours ofSimulation Training for all Panel Operators

    Competency training for Field Operators on BMS

    Simulation Training for Panel Operators make up 40%of over-all training designed to train anyone with verylittle related experience

    Process Engineers have also spent time on theSimulator to become familiar with expected outcome.

  • 8/13/2019 Ofc Communication

    9/11

    Permission granted for ISA Houston Section Website 9

    Why was OPTI OTS successful?

    OTS part of overall OPTI training program

    Dedicated trainers

    Designed training lesson plans to enable successionplanning for Trainers

    System kept current with process and controlschanges

    Training is a requirement

    Training is performed as a shift

    Operators practice, practice, practice

    Experience incorporated into OTS

  • 8/13/2019 Ofc Communication

    10/11

    Permission granted for ISA Houston Section Website 10

    Additional benefits of OTS

    Checkout of DCS and SIS controls

    Validation of engineering design

    Checkout and improvement of DCS graphics

    Validation and refinement of operating procedures

    Evaluate control and ESD strategies

    Test alarm management

  • 8/13/2019 Ofc Communication

    11/11

    Permission granted for ISA Houston Section Website 11

    Questions?

    Thank You!!!