+ All Categories
Home > Documents > Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured...

Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured...

Date post: 21-Mar-2018
Category:
Upload: ngonhan
View: 216 times
Download: 3 times
Share this document with a friend
10
Equipment Manufacturer 350-1502 Off the Grid
Transcript
Page 1: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

Equipment Manufacturer

350-1502

Off the Grid

Page 2: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

Equipment Manufacturer

350-1502

Off the Grid

Page 3: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

TRANSFER

STATION

W/ STEP

0.5 1.0

05'

Meters2.0 3.0

10'

SPIRAL

CLIMBER

HOPSCOTCH

CLIMBER

RUMBLE

SEAT

SLIDE

90°

GLIDE

SLIDE

24" (610mm) RISE

FUNNEL

ADVENTURE

TUBE

HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

ACCESSIBLE

DRIVER

PANEL

(ground)

NUVO

SWIRL

ROOF

36"

0,92M

60"

1,53M

LEG

LIFT

THE

GRID

CRATER

ARCH

39'

[11.90M]

28'

[8.54M]

6'-4"

[1.92M]

6'-3"

[1.90M]

6'-6"

[1.97M]

6'-2"

[1.88M]

6'-3"

[1.92M]

6'-4"

[1.93M]

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

OFF

TH

E G

RID

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1502C 1/4"=1'-0"

M. MERTZ

20-DEC-17

26'7" x 15'3" x 12'7"8,1M x 4,65M x 3,84M

39'0" x 28'0"11,90M x 8,54M

899 SqFt.83,52 SqM.

111 Ft.33,83M

8 Ft.2,44M

35 5-12

17

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 6

3

6

4

2

3

2

3

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

Page 4: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

0.5 1.0

05'

Meters2.0 3.0

10'

36"

0,92M

60"

1,53M

39'

[11.90M]

28'

[8.54M]

6'-4"

[1.92M]

6'-3"

[1.90M]

6'-6"

[1.97M]

6'-2"

[1.88M]

6'-3"

[1.92M]

6'-4"

[1.93M]

7

8

9

10

11

12

13

14

15

16

17

18

19

20

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

USER CAPACITY: AGE GROUP:

AREA: PERIMETER:

EQUIPMENT SIZE:

USE ZONE:

FALL HEIGHT:

CPSC #325ASTM F1487-

OFF

TH

E G

RID

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1502C 1/4"=1'-0"

M. MERTZ

20-DEC-17

26'7" x 15'3" x 12'7"8,1M x 4,65M x 3,84M

39'0" x 28'0"11,90M x 8,54M

899 SqFt.83,52 SqM.

111 Ft.33,83M

8 Ft.2,44M

35 5-12

17

Total Elevated Play Activities:

Total Ground-Level Play Activities:

AccessibleElevatedActivities

AccessibleGround-Level

Activities

AccessibleGround-LevelPlay Types

Required

Provided

AD

A S

CH

EDU

LE 6

3

6

4

2

3

2

3

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

Page 5: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

DATE:

SCALE:

DRAWN BY:

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

(112"

(144"

Page 6: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

T

R

A

N

S

F

E

R

S

T

A

T

I

O

N

1

3

6

"

1

3

6

"

1

4

8

"

1

4

8

"

1

4

8

"

1

4

8

"

1

6

0

"

1

6

0

"

1

6

0

"

1

6

0

"

48"

36"

36"

36"

1

4

8

"

G

Z

72"

9"17"9"

39"

39" 100"

92"

36"36"72"

37"

17"

42"

16"

19"

2"

16"

32"

136"

100"

172"

213"

18"

16"

75"

26"

11"

26"

24"

6"

TRANSFER

STATION

W/ STEP

SPIRAL

CLIMBER

HOPSCOTCH

CLIMBER

RUMBLE

SEAT

SLIDE

90°

GLIDE

SLIDE

24" (610mm) RISE

FUNNEL

ADVENTURE

TUBE

HORIZONTAL

LOOP LADDER

W/ ACCESS

LADDER

THE

GRID

CRATER

ARCH

BPaper Size

DATE:

SCALE:PROJECT NO:

*PLAYGROUND SUPERVISION REQUIRED

DRAWN BY:

FOOTING LEGEND

1

1

2

"

1

8

5

0

Z

Z

C

H

1

4

4

"

G

Z

SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)

SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)

CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)

(ZZCH1850 INDICATES PART NUMBER)

GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)

COMPONENT FOOTING (DETAIL 3)

OFF

TH

E G

RID

CA

TA

LO

G P

RE

-D

ES

IG

N

350-1502C 1/4"=1'-0"

M. MERTZ

20-DEC-17

PLAYWORLD SYSTEMS, INC.

1000 Buffalo Road

Lewisburg, PA

17837-9795 USA

Page 7: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

Posts

ZZCH0028 21 3.5in OD x 136in STEEL POST W/ RIVETED CAP

ZZCH0038 42 3.5in OD x 148in STEEL POST W/ RIVETED CAP

ZZCH0038GZ 13 3.5in OD x 148in GROUND ZERO POST

ZZCH0049 44 3.5in OD x 160in STEEL POST W/O CAP

Decks & Kick Plates

ZZCH0616 15 SQUARE COATED DECK ASSEMBLY

ZZCH0636 16 DOUBLE SLIDE COATED DECK ASSEMBLY

ADA Items

ZZCH2007 17 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

ZZUN2019 18 APPROACH STEP FOR TRANSFER STATION

Slides

ZZCH2737 19 RUMBLE SEAT (60in DECK)

ZZCH3129 110 90 DEGREE GLIDE SLIDE (36in DECK)

Activity Panels

ZZCH4406 111 ACCESSIBLE DRIVING PANEL

Crawl Tubes

ZZCH5628 112 FUNNEL ADVENTURE TUBE 2ft RISE

Climbers

ZZCH8160 113 SPIRAL CLIMBER (60in DECK)

ZZCH8270 114 HOPSCOTCH CLIMBER (60in DECK)

Ground Zer0 Climbers

ZZCH8408 115 THE GRID

ZZCH8457 116 THE CRATER ARCH

Overhead Events

ZZCH5770 117 LEG LIFT

ZZCH5780 118 6ft HORIZONTAL LOOP LADDER

ZZCH5970 119 OVERHEAD EVENT ACCESS LADDER (36in DECK)

Roofs & Arches

ZZCH9868 120 NUVO SWIRL ROOF

Additional Tool & Maintenance Kits

ZZCHGUID 121 CHALLENGER GUIDELINES

ZZUN9910 122 SURFACING WARNING LABEL KIT

ZZUN9930 123 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

Part No. Description

Design Number: 350-1502C - Bill Of Material

Off the Grid

Ref.No. Quantity

Friday, September 29, 2017 Page of1 1 Playworld.com

Page 8: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

CertifiedZZCH00281 3.5in OD x 136in STEEL POST W/ RIVETED CAP

2 87.02 117 0 2.00 0.25 0

CertifiedZZCH00382 3.5in OD x 148in STEEL POST W/ RIVETED CAP

4 188.44 253 0 4.00 0.50 0

CertifiedZZCH0038GZ3 3.5in OD x 148in GROUND ZERO POST1 47.01 63 0 1.00 0.18 0

CertifiedZZCH00494 3.5in OD x 160in STEEL POST W/O CAP4 199.64 254 0 4.00 0.50 0

CertifiedZZCH06165 SQUARE COATED DECK ASSEMBLY 1 54.86 174 3 1.00 0.00 0

CertifiedZZCH06366 DOUBLE SLIDE COATED DECK ASSEMBLY1 63.86 185 3 1.00 0.00 0

CertifiedZZCH20077 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)

1 148.40 310 2 2.00 0.09 0

CertifiedZZUN20198 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0

CertifiedZZCH27379 RUMBLE SEAT (60in DECK)1 201.86 762 4 3.00 0.06 1

CertifiedZZCH312910 90 DEGREE GLIDE SLIDE (36in DECK)1 96.73 418 2 2.00 0.03 1

CertifiedZZCH440611 ACCESSIBLE DRIVING PANEL 1 24.07 202 1 0.50 0.00 1

CertifiedZZCH562812 FUNNEL ADVENTURE TUBE 2ft RISE1 138.56 992 4 2.00 0.00 1

CertifiedZZCH816013 SPIRAL CLIMBER (60in DECK)1 92.33 207 2 1.00 0.03 1

CertifiedZZCH827014 HOPSCOTCH CLIMBER (60in DECK)1 77.90 154 2 2.00 0.06 1

CertifiedZZCH840815 THE GRID 1 103.67 219 3 0.75 0.00 1

CertifiedZZCH845716 THE CRATER ARCH 1 79.50 407 2 1.00 0.03 1

CertifiedZZCH577017 LEG LIFT 1 6.76 30 1 0.50 0.00 1

CertifiedZZCH578018 6ft HORIZONTAL LOOP LADDER 1 55.72 124 4 1.00 0.00 1

CertifiedZZCH597019 OVERHEAD EVENT ACCESS LADDER (36in DECK)

1 25.12 71 1 1.50 0.06 0

CertifiedZZCH986820 NUVO SWIRL ROOF 1 80.33 482 0 1.00 0.00 0

N/AZZCHGUID21 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0

CertifiedZZUN991022 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993023 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 90

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1502C - Compliance and Technical Data

Off the Grid

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

250 472 5,586 35 32.75 1.831,807.66 10Totals:

Friday, September 29, 2017 Page of1 3 Playworld.com

Page 9: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1502C - Compliance and Technical Data

Off the Grid

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

Friday, September 29, 2017 Page of2 3 Playworld.com

6 Metric Tons212 Kg113 Kg813.45 Kg 1.39 m3

Page 10: Off the Grid Equipment Manufacturer 350-1502. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1502C - Compliance and Technical Data

Off the Grid

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1502C, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Friday, September 29, 2017 Page of3 3 Playworld.com


Recommended