º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCE LETTER No.W.496/BKKD/028 dt.25/11/2016 Ref: Tender Notice no. : CAO/CN/BNC/072/16 dated 01/08/2016 (BKKD/028) Tender Opened on : 08/09/2016. Dear Sir(s) 1. Your offer for the above work for Rs. 3,60,74,504/‐ (RUPEES THREE CRORE SIXTY LAKH SEVENTY FOUR THOUSAND FIVE HUNDRED AND FOUR ONLY ) is accepted by the competent authority. The accepted schedule of items showing the rates and quantities is enclosed herewith. The completion period of the work is 06 ( SIX ) months from the date of issue of this letter. This Letter of Acceptance constitutes a binding contract between you and the Railway Administration. Please quote UCC in all further correspondence. 2. The Security Deposit (SD) for the contract is Rs. 18,03,725/‐ (RUPEES EIGHTEEN LAKH THREE THOUSAND SEVEN HUNDRED AND TWENTY FIVE ONLY). The Earnest Money Deposit of Rs.3,70,650/- remitted vide TDA A/C No.36043849390 dated 29/08/2016 issued by STATE BANK OF INDIA, HUBLI, by you along with the offer is adjusted towards a part of the SD. The balance SD of Rs.14,33,075/-will be recovered from the running bills of the contract @ 10% of bill amount from each bill. Please note that no interest will accrue on the Security Deposit. 3. A Performance Guarantee (PG) for Rs.18,03,725/‐ (RUPEES EIGHTEEN LAKH THREE THOUSAND SEVEN HUNDRED AND TWENTY FIVE ONLY) is to be submitted by you within 30 (thirty) days from the date of issue of this letter in the forms mentioned in clause 4.0 (b) of Special Conditions of Contract. The PG shall be valid up to 60 days beyond the stipulated date of completion. 4. Please report to Dy. Chief Engineer/II/CN/UBL along with the detailed programme of work. Other conditions, details and milestones are mentioned overleaf. This letter consists of two enclosures as given below. Please acknowledge the receipt of this letter. ENCL: 1. PG Form, Yours faithfully, 2. Schedule of items. (V. SRIDHAR) Dy. Chief Engineer/Works/Construction South Western Railway, Bangalore46 for and on behalf of President of India (Please Turn over) UCC 74213 Name of work: Bagalkot‐Kudachi New B.G Line ‐ Miscellaneous, ancillary and balance left over works between km:16.70 to km:30.00. Value of work : Rs. 3,60,74,504/‐ Completion period : 06 months To Shri A.VENKATESH RAILWAY CONTRACTOR CHANDRASHEKARA APARTMENT 1 ST MAIN, 1 ST CROSS, KALYAN NAGAR, VIDYANAGAR HUBLI - 580031 ùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä SOUTH WESTERN RAILWAY Office of the Chief Administrative Officer (Construction), 18, Millers’ Road, BANGALORE – 560 046
Transcript
Page 1: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

`

      

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ : ACCEPTANCELETTERNo.W.496/BKKD/028dt.25/11/2016

Ref:TenderNoticeno.:CAO/CN/BNC/072/16dated01/08/2016(BKKD/028)TenderOpenedon:08/09/2016.

DearSir(s) 1. Your offer for the abovework for Rs.3,60,74,504/‐(RUPEESTHREECRORESIXTYLAKHSEVENTYFOUR

THOUSANDFIVEHUNDREDANDFOURONLY)isacceptedbythecompetentauthority.Theacceptedscheduleofitems showing the rates and quantities is enclosed herewith. The completion period of thework is 06 ( SIX )monthsfromthedateofissueofthisletter.ThisLetterofAcceptanceconstitutesabindingcontractbetweenyouandtheRailwayAdministration.PleasequoteUCCinallfurthercorrespondence.

2.TheSecurityDeposit(SD)forthecontractisRs.18,03,725/‐(RUPEESEIGHTEENLAKHTHREETHOUSANDSEVEN

HUNDRED AND TWENTY FIVE ONLY). The Earnest Money Deposit of Rs.3,70,650/- remitted vide TDA A/CNo.36043849390 dated 29/08/2016 issued by STATE BANK OF INDIA, HUBLI, by you along with the offer isadjustedtowardsapartoftheSD.ThebalanceSDofRs.14,33,075/-willberecoveredfromtherunningbillsofthecontract@10%ofbillamountfromeachbill.PleasenotethatnointerestwillaccrueontheSecurityDeposit.

3. A Performance Guarantee (PG) for Rs.18,03,725/‐ (RUPEES EIGHTEEN LAKH THREE THOUSAND SEVEN

HUNDREDANDTWENTYFIVEONLY)istobesubmittedbyyouwithin30(thirty)daysfromthedateofissueofthisletterintheformsmentionedinclause4.0(b)ofSpecialConditionsofContract.ThePGshallbevalidupto60daysbeyondthestipulateddateofcompletion.

4. Please report to Dy. Chief Engineer/II/CN/UBL alongwith the detailed programme of work. Other conditions,

details and milestones are mentioned overleaf. This letter consists of two enclosures as given below. Pleaseacknowledgethereceiptofthisletter.

ENCL:1.PGForm, Yoursfaithfully, 2.Scheduleofitems.

(V.SRIDHAR)

Dy.ChiefEngineer/Works/Construction SouthWesternRailway,Bangalore‐46 forandonbehalfofPresidentofIndia

(PleaseTurnover)

UCC 74213 Name of work: Bagalkot‐Kudachi New B.G Line ‐Miscellaneous, ancillary and balance left over worksbetweenkm:16.70tokm:30.00.Value of work : Rs.3,60,74,504/‐Completionperiod:06months

ToShri A.VENKATESH RAILWAY CONTRACTOR CHANDRASHEKARA APARTMENT 1ST MAIN, 1ST CROSS, KALYAN NAGAR, VIDYANAGAR HUBLI - 580031

nùÊIÉhÉ {ÉζSɨɠ®äú±É´Éä  SOUTHWESTERNRAILWAY

OfficeoftheChiefAdministrativeOfficer

(Construction),18,Millers’Road,

BANGALORE–560046

Page 2: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

º´ÉÒEÞòÊiÉ {ÉjÉ ºÉÆJªÉÉ  ACCEPTANCELETTERNo.W.496/BKKD/028dt.25/11/2016Otherconditionsanddetails:1.ExtensionoftimeforsubmissionofPGbeyond30(thirty)daysandupto60(sixty)daysfromthedateofissueofthislettermay

beaccordedbytheContractAgreementsigningAuthority.However,apenalinterestof15%perannumshallbechargedforthedelaybeyond30(thirty)daysonadailybasisi.e.,from31stdayofthedateofissueofLOA.IncaseyoufailtosubmittherequisitePGevenafter60days fromthedateof issueofLOA, thecontractshallbe terminatedduly forfeiting theEMDandotherdues,ifanypayableagainstthecontractandyoushallalsobedebarredfromparticipatinginre‐tenderforthework.ThePGwillbereleasedaftersatisfactorycompletionoftheworkasperthecontractconditions.Ifthecontractisrescinded,theSDshall be forfeited and, the PG shall also be encashed. Further, you will be debarred from participating in the tender forexecutingthebalancework

2. You shall execute an agreement for theworkwithin seven days from the date of receipt of notice by Railways regarding

readinessof theagreement. Thedetailedprogrammeofworktobesubmittedbyyou inconformitywith themilestonesgivenbeloworevenearlier,shallbeasstipulatedinthespecialconditions.Theprogrammeshallindicatethetimescheduleofvarious itemsofworks inthe formofBarChart/PERTChart/CPMChart. Theprogrammeshouldalso includethedetailsoforganization(intermsoflabourandsupervisors),plantandmachineryintendedtobeutilizedfromtimetotimeforexecutionoftheworkwithinthestipulateddateofcompletion.Incaseofnon‐submissionofacceptableprogrammeofworkwithin15daysofissueofthisletter,youareliableforpenalactionincludinglevyingfineuptoRs.50,000/‐.

MILE STONE CHART

‐‐‐‐‐‐‐‐‐‐‐‐‐‐Copyto:CAO/CN,CE/CN/UBL,Dy.FA&CAO/CN/UBL,HQ‐Vigilancebranch/UBL,Ch.OS/Contracts,TheRegionalLabourCommissioner(Central)BUDAcomplex,Opp.MothiTalkies,BELLARY‐583101forinformation.Copyto:Dy.CE/II/CN/UBL,XEN/CN/UBL–forinformationandnecessaryaction.(Encl:1copyofTCminutes&LOAwithcopyofscheduleandconditions).

Sl.No. Activities Stretch TDC 1 Mobilisation 1st Month 2 Miscellaneous, ancillary and

balance left over works Km. 16.70 – 19.00 2nd Month

Km.19.00 – 23.00 3rd Month Km.23.00 – 26.00 4th Month Km.26.00 – 28.00 5th Month Km.28.00 – 30.00 6th Month

Page 3: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SouthWesternRailway(Construction)

Annexure -I

LOA No. W496/BKKD/028 Date : 25/11/2016 of UCC Code :74213

PrintDate:25/11/2016

NameofWork:

Bagalkot‐Kudachi New B.G Line ‐ Miscellaneous, ancillary and balance left over works between km:16.70 tokm:30.00.

NameoftheContractor:A0174‐ A.VENKATESH

ABSTRACT

Sl.No.

DepartmentalValueasperTender

Contractor% ScheduleTotal

Schedule

Description

1

A

ItemsofworkscoveredbyUSSOR2011 1,29,07,451.70 ‐24% 98,09,663.29

2

B

ItemsofworkspertainstoEarthwork 18,38,200.00 ‐30% 12,86,740.00

3

C

ItemsofworkspertainstoSupplyofCement

50,73,600.00 ‐15% 43,12,560.00

4

D

ItemsofworkspertainstoConcreteworks

45,60,000.00 ‐15% 38,76,000.00

5

E

ItemsofworkspertainstoSupplyofSteel

5,17,900.00 ‐15% 4,40,215.00

6

F

ItemsofBlankettingofformation,COE&Bridgeapproaches

62,03,400.00 ‐9% 56,45,094.00

7

J

Itemsofmiscellaneousworks 1,22,50,286.00 Indv.Rate 1,01,15,854.00

8

P

Itemsofworkspertainstotracklinkingworks

7,31,400.00 ‐23% 5,63,178.00

9

R

Itemsofworkspertainstotransportation

45,000.00 ‐44% 25,200.00

TotalValue: 3,60,74,504.29

Discount0% 0.00

3,60,74,504.29

NetValue:

(RupeesThreeCroreSixtyLakhSeventyFourThousandFiveHundredandFourONLY)

SignatureofContractorSchedulePageNo: 1of

24SignatureofContractSigningAuthority

Page 4: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

1

013140

Removalofexcavated/slipearth/debris/malbafromthesiteofworkstoanyotherplaceoutsideRailway land/premises, includingall excavations, handling, re‐handling, loading, unloadingandleading, etc. all labour and material as a complete job. Removal of Earth (all kinds ofsoils)/ROCKS,BOULDERSincludingmud/slush,slippedearthincatchwaterdrains,sidedrains,over berms in cutting, water way of bridges, over coping of toe/breast/retaining walls etc.includingcrossingofnallah,railwaytracks,making/repairingapproachroadsifrequired,alllead,lift,ascent,descents,oranyotherobstruction.EarthspoilstobedumpedoutsidethecuttingorrailwayembankmentsasperdirectionofEngineerincharge

Quantity

Rate

Unit

Amount

500.00

140.54

1CUM

70,270.00

(RupeesOneHundredandFortyAndPaiseFiftyFour)

Contractor's%:0Discount:0

2

014081

Cleaningsidedrains incuttingsbythesideof track(KutchaorPucca) includingdisposalof thedebris, soil,muck etc. as directed by the engineer. Note ‐ Rates are for disposal at the end ofcutting.Disposal ofdebris/soil/muckbeyondendof cutting tobepaid forunder relevant leaditem.:leadwithincuttingisupto50m

Quantity

Rate

Unit

Amount

500.00

122.90

1CUM

61,450.00

(RupeesOneHundredandTwentyTwoAndPaiseNinety)

Contractor's%:0Discount:0

3

014082

Cleaningsidedrains incuttingsbythesideof track(KutchaorPucca) includingdisposalof thedebris, soil,muck etc. as directed by the engineer. Note ‐ Rates are for disposal at the end ofcutting.Disposal ofdebris/soil/muckbeyondendof cutting tobepaid forunder relevant leaditem.:leadwithincuttingisover50mand upto200m‐ forevery50morpartthereof

Quantity

Rate

Unit

Amount

500.00

36.70

1CUM

18,350.00

(RupeesThirtySixAndPaiseSeventy)

Contractor's%:0Discount:0

4

014083

Cleaningsidedrains incuttingsbythesideof track(KutchaorPucca) includingdisposalof thedebris, soil,muck etc. as directed by the engineer. Note ‐ Rates are for disposal at the end ofcutting.Disposal ofdebris/soil/muckbeyondendof cutting tobepaid forunder relevant leaditem.:leadwithincuttingexceeds200m‐ forevery100morpartthereof

Quantity

Rate

Unit

Amount

500.00

36.70

1CUM

18,350.00

(RupeesThirtySixAndPaiseSeventy)

Contractor's%:0Discount:0

5

192011

Earthworkinexcavationforfoundationsandfloorsofthebridges,retainingwallsetc.,includingsettingout,dressingofsides,rammingofbottom,gettingouttheexcavatedmaterial,backfillingin layerswithapprovedmaterialandconsolidationof the layersbyrammingandwateringetc.incl.alllift,disposalofsurplussoiluptoaleadof300M,alltypesofshoringandstruttingwithalllabourandmaterialcompleteasperdrawingandtechnicalspecificationasdirectedbyEngineerincharge:Allkindsofsoils

Quantity

Rate

Unit

Amount

4745.00

182.73

1CUM

8,67,053.85

(RupeesOneHundredandEightyTwoAndPaiseSeventyThree)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 2of

24SignatureofContractSigningAuthority

Page 5: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

6

192012

Earthworkinexcavationforfoundationsandfloorsofthebridges,retainingwallsetc.,includingsettingout,dressingofsides,rammingofbottom,gettingouttheexcavatedmaterial,backfillingin layerswithapprovedmaterialandconsolidationof the layersbyrammingandwateringetc.incl.alllift,disposalofsurplussoiluptoaleadof300M,alltypesofshoringandstruttingwithalllabourandmaterialcompleteasperdrawingandtechnicalspecificationasdirectedbyEngineerincharge:Ordinaryrock

Quantity

Rate

Unit

Amount

100.00

237.64

1CUM

23,764.00

(RupeesTwoHundredandThirtySevenAndPaiseSixtyFour)

Contractor's%:0Discount:0

7

192013

Earthworkinexcavationforfoundationsandfloorsofthebridges,retainingwallsetc.,includingsettingout,dressingofsides,rammingofbottom,gettingouttheexcavatedmaterial,backfillingin layerswithapprovedmaterialandconsolidationof the layersbyrammingandwateringetc.incl.alllift,disposalofsurplussoiluptoaleadof300M,alltypesofshoringandstruttingwithalllabourandmaterialcompleteasperdrawingandtechnicalspecificationasdirectedbyEngineerincharge:Hardrock(requiringblasting)

Quantity

Rate

Unit

Amount

150.00

371.16

1CUM

55,674.00

(RupeesThreeHundredandSeventyOneAndPaiseSixteen)

Contractor's%:0Discount:0

8

192030

Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40 mmnominalsize, infoundationandfloors, retainingwallsofbridges includingmechanicalmixing,vibrating, pumping andbailingout waterwhere ever required with allmaterials and labourcomplete but excluding the cost of cement and shuttering as per drawings and technicalspecificationsasdirectedbyEngineer

Quantity

Rate

Unit

Amount

500.00

1,538.08

1CUM

7,69,040.00

(RupeesOneThousandFiveHundredandThirtyEightAndPaiseEight)

Contractor's%:0Discount:0

9

043011

Providing, hoisting and fixing in position upto floor two level M20 Grade precast RCC workincludingsettingincementmortar1:3(1cement:3coarsesand)andfinishingsmoothwith6mmthickcementplaster1:3(1cement:3finesand)onexposedsurfacescompleteincludingcostofcentering, shuttering, finishing, Admixtures in recommended proportion (as per IS:9103) toaccelerate, retard setting of concrete, improve workability without impairing strength anddurability,excludingcostofcementandsteelreinforcement,asperapprovedplan&directionofEngineerincharge.:Instringcourses,bands,coping,bedplates,anchorblocks,plainwindowsills,andthelike

Quantity

Rate

Unit

Amount

100.00

2,876.41

1CUM

2,87,641.00

(RupeesTwoThousandEightHundredandSeventySixAndPaiseFortyOne)

Contractor's%: 0Discount:0

10

061013

Random rubblemasonrywith hard stone in foundation and plinth including levelling upwithconcrete as per specifications, upto plinth levelwith : : Cementmortar 1:6 (1cement: 6coarsesand)

Quantity

Rate

Unit

Amount

1000.00

2,023.44

1CUM

20,23,440.00

(RupeesTwoThousandTwentyThreeAndPaiseFortyFour)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 3of

24SignatureofContractSigningAuthority

Page 6: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

11

061020

Extra for random rubblemasonrywith hard stone in superstructure above plinth level up tofloortwolevel,includinglevellingupwithconcreteasperspecifications,atwindowsills,ceilinglevelandthelike

Quantity

Rate

Unit

Amount

300.00

502.71

1CUM

1,50,813.00

(RupeesFiveHundredandTwoAndPaiseSeventyOne)

Contractor's%:0Discount:0

12

032031

Providing and fixing at or near ground level, Precast M 20 grade cement concrete as perapproved design and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand),including the cost of required centering and shuttering complete but excluding the cost ofcement.(castatsite): inkerbs,edgingetc.

Quantity

Rate

Unit

Amount

200.00

2,399.70

1CUM

4,79,940.00

(RupeesTwoThousandThreeHundredandNinetyNineAndPaiseSeventy)

Contractor's %:0Discount:0

13

222290

Providing Boulder backing behind wing wall, return wall, retaining wall with hand packedboulders&cobbleswithsmaller sizeboulders toward theback includingall lead, lift, labour&other incidentalchargesascompletework inallrespect.Payment forboulder/cobbleswillbedoneextra.

Quantity

Rate

Unit

Amount

300.00

178.76

1CUM

53,628.00

(RupeesOneHundredandSeventyEightAndPaiseSeventySix)

Contractor's%:0Discount:0

14

221050

Providingand layingPitchingwith stonebouldersweighingnot less than 35kgeachwith thevoidsfilledwithspallsonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnicalspecifications(Filtermediatobepaidseparatelyunderthe relevantitem)

Quantity

Rate

Unit

Amount

702.00

950.84

1CUM

6,67,489.68

(RupeesNineHundredandFiftyAndPaiseEightyFour)

Contractor's%:0Discount:0

15

222010

Providingand layingFlooringwith rubble stone , laidover15 cm thickCC1:2:4and thevoidsfilledwithCC1:2:4completewiththejointspointedwith1:2CementsandmortarasperdrawingandTechnicalspecifications.Paymentforcementtobedoneseparately.Voidsintherubblestonetobetakenas35%ofthegrossvolumeofthestonelayer.(Baseconcretetobepaidextra)

Quantity

Rate

Unit

Amount

240.00

1,544.90

1CUM

3,70,776.00

(RupeesOneThousandFiveHundredandFortyFourAndPaiseNinety)

Contractor's%:0Discount:0

16

222160

Providingweep holes bymaking suitable opening or drilling in existing Brickmasonry/Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extendingthroughthefullwidthofthestructurecomplete

Quantity

Rate

Unit

Amount

600.00

459.23

1METRE

2,75,538.00

(RupeesFourHundredandFiftyNineAndPaiseTwentyThree)

Contractor's% :0Discount:0

SignatureofContractorSchedulePageNo: 4of

24SignatureofContractSigningAuthority

Page 7: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

17

222240

Providingcast insitubridgenumberplaquesasperRailwaydrawing incementconcrete1:2:4mixusing20mmhardstoneaggregateembeddedin30mmnotchinBridgeparapetcopingdulyengraving the letterand figuresandanarrow indicating thedirectionof flowand finishing thetopexposedsurfacewithcementmortar1:3,paintinglettersandfigureswithtwocoatsofblackenamelpaintontwocoatsofwhitebackgroundwithalllabour,tools,cement,paintetc.withallleadandlifts

Quantity

Rate

Unit

Amount

120.00

536.26

1EACH

64,351.20

(RupeesFiveHundredandThirtySixAndPaiseTwentySix)

Contractor's%:0Discount:0

18

222360

SurfaceprotectionofUndersideofBridgeDecks,Girders, InsideofBoxGirders,Railings,etc.ofBridges and Piers and Substructures which are not in River Bed by cleaning and drying thesurface; repairing local defects, e.g. honeycombswith a paste of cement admixedwith 5% byweightofcementofPolymerbondingagent,applying(@0.30litrepersquaremetre)acoat(DFTof 100‐150 micron) of a translucent brown coloured modified phenolic resin based singlecomponenthighperformancepolymericwaterproofingcompound(sp.gr.0.87,rosincontentnilandasolidcontentofminimum0.47%),applying(@0.25litrepersquaremetre)atopcoatofamodified phenolic resin based single component waterproofing compound of grey or othershades(sp.gr.0.85)beforethebasecoatbecomestack‐free;permittingthecoatingstocureanddry naturally; the 2‐coat system shall be impermeable under a water head of 20.0 metres,completeasperspecification

Quantity

Rate

Unit

Amount

6000.00

263.80

1SQM

15,82,800.00

(RupeesTwoHundredandSixtyThreeAndPaiseEighty)

Contractor's%:0Discount:0

19

222230

Painting theHFLanddangerlevelmarks,yearofHFLonbridgeabutmentsandpierswithreadymixedpaintasperstandardintwocoatsoveronecoatofprimerwithallmaterials,labour,tools,scaffolding,allleadandliftetcincludingwritingcomplete

Quantity

Rate

Unit

Amount

78.00

121.35

1EACHMARK

9,465.30

(RupeesOneHundredandTwentyOneAndPaiseThirtyFive)

Contractor's%:0 Discount:0

20

231010

Preparation of subgrade by excavating earth upto 22.5cm depth, dressing to camber andconsolidating with power road roller of 8 to 12 tonne capacity including making good theundulationsetc.anddisposalofsurplusearthwithleadupto50metres

Quantity

Rate

Unit

Amount

2000.00

49.66

1SQM

99,320.00

(RupeesFortyNineAndPaiseSixtySix)

Contractor's%:0Discount:0

21

231020

Consolidation of subgradewith power road roller of 8 to 12 tonne capacity includingmakinggoodtheundulationsetc.withearthorquarryspoilsetc.andre‐rollingthesubgrade

Quantity

Rate

Unit

Amount

2000.00

1.31

1SQM

2,620.00

(RupeesOneAndPaiseThirtyOne)

Contractor's%:0Discount:0

22

231043

Providingandlayingwaterboundmacadamwithspecifiedstoneaggregate,stonescreeningandbinding material including screening, sorting, spreading to template and consolidation withpowerroadrollerof8to10tonnecapacityetc.complete. :Basecoursewith53mmto22.4mmsizeincludingstonescreening11.2mmsize

Quantity

Rate

Unit

Amount

500.00

1,215.82

1CUM

6,07,910.00

(RupeesOneThousandTwoHundredandFifteenAndPaiseEightyTwo)

Contractor's%:0 Discount:0

SignatureofContractorSchedulePageNo: 5of

24SignatureofContractSigningAuthority

Page 8: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

23

114041

Pointingonstoneworkwithcementmortar1:3(1cement:3finesand):Flush/Ruledpointing

Quantity

Rate

Unit

Amount

2200.00

84.82

1SQM

1,86,604.00

(RupeesEightyFourAndPaiseEightyTwo)

Contractor's%:0Discount:0

24

021520

HiringofTruckwithcoveredbodyof2MTcapacityforoneshiftof8hoursrunningupto80kmincluding driver, cleaner together with fuel and other consumable stores etc. for transport ofdifferentengineeringmaterials.

Quantity

Rate

Unit

Amount

60.00

2,175.49

1DAY

1,30,529.40

(RupeesTwoThousandOneHundredandSeventyFiveAndPaiseFortyNine)

Contractor's%:0Discount:0

25

252020

Moorum

Quantity

Rate

Unit

Amount

1000.00

86.25

1CUM

86,250.00

(RupeesEightySixAndPaiseTwentyFive)

Contractor's%:0Discount:0

26

231070

Providing and laying 4 cm thick moorum surfacing (Consolidated Thickness) on platforms,pathways, etc including spreading watering and consolidation with 3 T Roller or light powerrollercomplete

Quantity

Rate

Unit

Amount

500.00

22.17

1SQM

11,085.00

(RupeesTwentyTwoAndPaiseSeventeen)

Contractor's%:0Discount:0

27

252120

Coarsesand(MinimumzoneIII)

Quantity

Rate

Unit

Amount

500.00

920.00

1CUM

4,60,000.00

(RupeesNineHundredandTwenty)

Contractor's%:0Discount:0

28

234011

2.5cmthickbitumasticsheetwithhotbitumenofapprovedqualityusingstonechippings(60%12.5mmnominalsizeand40%10mmnominalsize)@1.65cumper100sqmandcoarsesandat1.65cumper100sqmofroadsurfaceandwithbitumen@56kg/cumofstonechippingsand@128kg/cum,ofsandoveratackcoatwithhotstraightrunbitumenincludingconsolidationwithroad roller of 8 to 10 tonne etc. complete, (tack coat to be paid separately) : : With pavingbitumen80/100heatedandthenmixedwithsolventattherateof70gramsperkg.ofasphalt

Quantity

Rate

Unit

Amount

2000.00

183.66

1SQM

3,67,320.00

(RupeesOneHundredandEightyThreeAndPaiseSixtySix)

Contractor's%:0 Discount:0

29

237050

Supplying and laying precast Kerb Stone of concrete M25 Grade 30cmX 20 cm (In Section /including chamfering as per design if any) including fixing in 1:6 cement sand mortar andpointingwith1:2 cementmortar (1cement:2 Sandordinary) including all excavation/refilling,rammingandotherincidentalworksasrequired.

Quantity

Rate

Unit

Amount

500.00

391.42

1METRE

1,95,710.00

(RupeesThreeHundredandNinetyOneAndPaiseFortyTwo)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 6of

24SignatureofContractSigningAuthority

Page 9: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

30

092062

Providing and laying plain cement concrete flooring of specified thickness with mix designconcrete over firm, well prepared and well compacted bed including provision of designedexpansionjoint&finishingmanuallyormechanicaltrowelling&vacuumdewateringcomplete.Expansionjointtobepaidforseparately.:M‐25

Quantity

Rate

Unit

Amount

500.00

2,885.17

1CUM

14,42,585.00

(RupeesTwoThousandEightHundredandEightyFiveAndPaiseSeventeen)

Contractor's%:0Discount:0

31

095012

Providingand fixing Istquality ceramic tiles conforming toGroupB‐III (CeramicWallTiles)ofIS:15622of manufacturersapprovedbyrailwayinallcolours,shades,anddesignasapprovedbytheEngineer‐in‐Charge inskirting,risersofstepsanddadoover12mmthickbedofcementmortor1:3(11cement:3coarsesand)includingpointinginwhitecementmixedwithpigmentofmatchingshadecomplete.:200x300mm

Quantity

Rate

Unit

Amount

40.00

623.39

1SQM

24,935.60

(RupeesSixHundredandTwentyThreeAndPaiseThirtyNine)

Contractor's%:0Discount:0

32

095025

ProvidingandfixingceramictilesconformingtoIS:15622ofmanufacturersapprovedbyrailwayinallcolours,shades,designandabrasionresistanceclassasapprovedbytheEngineer‐in‐Chargein floors and landings over 20mm thick bed of cement mortar 1:3 (1cement: 3coarse sand)includingpointinginwhitecementmixedwithpigmentofmatchingshadecomplete:OfGroupB‐I‐aofIS:15622(Vitrifiedtiles)ofsizeupto400x400mm

Quantity

Rate

Unit

Amount

40.00

916.26

1SQM

36,650.40

(RupeesNineHundredandSixteenAndPaiseTwentySix)

Contractor's%:0 Discount:0

33

099062

Extra for providing edge moulding to 16mm to 20mm thick marble/granite stone counters,vanities etc includingmachine polishing to edge to give high gloss finish etc. complete as perdesignapprovedbytheEngineer‐in‐Charge:Granitework

Quantity

Rate

Unit

Amount

40.00

147.74

1METRE

5,909.60

(RupeesOneHundredandFortySevenAndPaiseSeventyFour)

Contractor's%:0Discount:0

34

099072

Extraforcuttinggrooveupto5mmwideand6mmdeepfordripcourse:In Granitework

Quantity

Rate

Unit

Amount

40.00

184.48

1SQM

7,379.20

(RupeesOneHundredandEightyFourAndPaiseFortyEight)

Contractor's%:0Discount:0

35

094061

Providing & fixing Precast Chequered tiles conforming to IS:13801:1993,manufactured undermechanical vibration& hydraulic pressingmachine in double layer; top layer of 10 to 12mmthicknessofDolomitePowder,gradedchips, fibreandUVstabilised ironoxideLanexesscolourandbottom layerof1:3CCmixedwith galvanised steel fibreof approvedquality, jointedwithneat cement slurrymixedwithpigment tomatch shadeof tiles including rubbingandcleaningetc. completeon20mmthickbedof cementmortar1:4 of sizes : : 250mmx250mmx25mmthick

Quantity

Rate

Unit

Amount

400.00

558.22

1SQM

2,23,288.00

(RupeesFiveHundredandFiftyEightAndPaiseTwentyTwo)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 7of

24SignatureofContractSigningAuthority

Page 10: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'A'

USSOR2011ITEMS

Sl.No.

DescriptionofItems

CODE

36

098021

Supplying and laying interlocking pre‐cast CC block pavers of approved design factorymanufacturedofspecifiedgradecementconcreteonpassengerplatform,footpaths,circulatingarea, etc, including setting in position over 25mm thick bedding layer of find sand, filling thejointswithfinesand,levellingincludingcompactionasperIS15658.:60mmthickblocksofM30gradeforlighttraffic

Quantity

Rate

Unit

Amount

400.00

507.52

1SQM

2,03,008.00

(RupeesFiveHundredandSevenAndPaiseFiftyTwo)

Contractor's%:0Discount:0

37

172020

Supplying, erecting and fixing precast concrete reinforced bench with back rest. Bench shallconsist of 2 nos. L shaped base support in natural cement colour of thickness 100 mm, backheight1000mm,frontheight450mm,basewidth620mmand5nos.reinforcedconcreteplanksinredcolourandsizeof1500x100x50mmand1no.reinforcedconcreteplankof150x200x50mm;manufacturedbyusingM‐30gradeconcrete&reinforcedsuitably;allpartstobejoinedwithgalvanisednutsandboltsofsuitablesize.Allboltstobesealedafterassembly.Completejobto be done as per directions of Engineer Incharge

Quantity

Rate

Unit

Amount

33.00

8,342.59

1EACH

2,75,305.47

(RupeesEightThousandThreeHundredandFortyTwoAndPaiseFiftyNine)

Contractor's%:0Discount:0

38

021510

HiringofJCBMachine(ingoodworkingcondition)forlevelinganddressingground/dismantlingstructures including disposal of debris through dumpers etc. with contractors labour, JCBmachine,machineoperator,fuel,etc.ThecontractorshallarrangeroadpermitforvehicleforalltheStatesofoperation,asper instructionsofengineer in‐chargeandvehicle shallnotbemorethanthreeyearsold.Paymentshallbemadeforactualworkinghoursatsite.

Quantity

Rate

Unit

Amount

800.00

864.01

1HOUR

6,91,208.00

(RupeesEightHundredandSixtyFourAndPaiseOne)

Contractor's%:0Discount:0

1,29,07,451.70

(No.ofItems38ONLY)

ScheduleADepartmentalValue:

-30,97,788.41

BELLOW‐24%

98,09,663.29

ScheduleATotal:

RupeesinWords(RupeesNinetyEightLakhNineThousandSixHundredandSixtyThreeAndPaiseTwentyNine

SignatureofContractorSchedulePageNo: 8of

24SignatureofContractSigningAuthority

Page 11: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'B'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

EW03‐101

Earthwork in cutting in all soils: Earthwork for excavation in cuttings for all kinds of soils inconnectionwithmaking formation/sidedrains/catchwaterdrains/bridges/trolley refuges etc.,as per required cross section, L‐ section&profile including removing all trees, bushes, debris,constructions, etc., from the sitewith contractor`s equipment,machinery, labour, consumablesetc.,aspertechnicalspecifications&specialconditions,includingremovingcutspoilsandtakingtoembankment/outsiderailway landsoastoclearthesitewithall leads& lifts,asdirectedbyEngineer‐in‐charge.Note: i) Payment shall be based on cross section measurement only.ii)The term 'all soils'mentionedabove include loosesoil,ordinarysoil (workablewithspade),hard soil including stiff clay, moorum, shingle, soft laterite etc., requiring close application ofpicks to loosen and small boulders measuring not more than 300 mm in any direction.(iii) No extra payment for lead etc., is admisible.(iv)Only75percentpaymentforthequantityexecutedispayableinaparticularbillinitially.15percent of the balance amount shall be released after the L section and profile are perfectlyreachedand handedover toRailways. Remaining10percent shall be releasedonly after theformation in the full block sectionor identified length is completed in all respects andhandedover.

Quantity

Rate

Unit

Amount

6000.00

61.20

1cu.m

2,57,040.00

(RupeesSixtyOneAndPaiseTwenty)

Contractor's%:‐30Discount:0

2

EW03‐102

Earthwork in cutting in Soft Rock : Earthwork for excavation in cuttings in soft rock stratacomprisingdisintegrated rocks of lime stone, sand stone, hard laterite etc., removablewithoutblasting in connectionwithmaking formation/side drains/catchwater drains/ bridges/trolleyrefuges etc., as per required cross section, L‐ section & profile including removing all trees,bushes,debris,constructions,etc.,fromthesitewithcontractor`sequipment,machinery,labour,consumables etc.,as per technical specifications & special conditions, including removing cutspoilsandtakingtoembankment/outsiderailwaylandsoastoclearthesitewithallleads&lifts,as directed by Engineer‐in‐charge.Note: i) Payment shall be based on cross section measurement only.ii) Soft rock means rock which does not require blasting and which can be excavated bycontinuous operation of excavators/picks/bars etc.(iii) No extra payment for lead etc., is admisible.(iv)Only75percentpaymentforthequantityexecutedinaparticularbillispayableinitially.15percent of the balance amount shall be released after the L section and profile are perfectlyreachedandtheformationishandedovertoRailways. Remaining10percentshallbereleasedonlyaftertheformationinthefullblocksectionoridentifiedlengthiscompletedinallrespectsandhandedover.

Quantity

Rate

Unit

Amount

2500.00

78.00

1cu.m

1,36,500.00

(RupeesSeventyEight)

Contractor's%:‐30Discount:0

SignatureofContractorSchedulePageNo: 9of

24SignatureofContractSigningAuthority

Page 12: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'B'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

3

EW03‐201

Earth work in filling with cut spoils: Earthwork in embankments for making formation withRailwaysusablecutspoilsexcavatedfromcuttingsinspeciofiedlayersnotexceeding300mminthickness with lead and lifts including rehandling, transportation, unloading & spreading inlayers, benching of slopes, sectioning to profile including removing all trees, bushes, debris,constructions,etc.,fromthesitewithcontractor`svehicles,machinery,labour,consumablesetc.,complete as per technical specifications & special conditions and as directed by Engineer‐in‐charge.Note: i) Payment shall be based on cross section measurement only(ii) The rate includes testing of cut spoil for parameters to assess the suitability for use inembankments which shall be done for every 10000 cum and/or for every change of layercharacteristics.(iii) No extra payment for lead etc., is admisible.(iv)Only75percentpaymentforthequantityexecutedinaparticularbillispayableinitially.15percent of the balance amount shall be released after the L section and profile are perfectlyreachedandtheformationishandedovertoRailways. Remaining10percentshallbereleasedonlyaftertheformationinthefullblocksectionoridentifiedlengthiscompletedinallrespectsand handed over.(v) Formationwidth at top shall bemadewith 500mm extra on either side initially and aftercompactionbecut to standardprofile.Noextrapayment shallbemade for thispurpose. If theextrawidthasaboveisnotmadeatanysinglelocationoflessthan100mlength,paymentsdueshall be reduced by 5 percent for that entire 100 m stretch.(vi)For leadsupto500mfromthespotofrelease,acceptedratesshallapply.For leadsbeyond500mandupto1km,5percentextraovertheacceptedratesshallbepaid.Forallleadsbeyond1kmandirrespectiveofanyextentfurther,another5percentovertheacceptedratesshallbepaidandnothercompensationwillbeeligible.

Quantity

Rate

Unit

Amount

2000.00

52.50

1cu.m

73,500.00

(RupeesFiftyTwoAndPaiseFifty)

Contractor's%:‐30Discount:0

4

EW03‐301

Mechanical compaction of earth work: Mechanical compaction of embankment, approaches tobridgesetc.,inspecifiedlayersusingspecifiedcapacityvibratorypowerrollersaspertypeofsoil,to achieve specifieddrydensityof earth/othermaterial using contractor`s power rollers, toolsand plants, consumables, labour, watering etc., all complete as per specification & specialconditions and as directed by Engineer‐in‐charge.Note: If anyother rollerorotherequipment isused for compaction,payment for thecompletelayershallbereducedby20percentoftheacceptedrateformechanicalcompaction.

Quantity

Rate

Unit

Amount

68000.00

10.50

1cu.m

4,99,800.00

(RupeesTenAndPaiseFifty)

Contractor's%:‐30Discount:0

5

EW03‐103

Earthwork in cutting in Hard Rock requiring blasting: Earthwork for excavation in cuttings inhard rock strata by blasting using explosives in connection with making formation/ sidedrains/catchwaterdrains/bridges/trolleyrefugesetc.,asperrequiredcrosssection,L‐section&profile including removing all trees, bushes, debris, constructions, etc., from the site withcontractor`s equipment, machinery, labour, consumables etc.,as per technical specifications &special conditions including removing cut spoils and taking to embankment / outside railwayland so as to clear the site with all leads & lifts, as directed by Engineer‐in‐charge.Note: i) Payment shall be based on cross section measurement only.

SignatureofContractorSchedulePageNo: 10of

24SignatureofContractSigningAuthority

Page 13: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'B'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

ii) Hard rock requiring blasting means rock which require blasting and which cannot beexcavated by excavators/ picks/ bars etc.(iii) No extra payment for lead etc., is admissible.

Quantity

Rate

Unit

Amount

1200.00

235.00

1cu.m

1,97,400.00

(RupeesTwoHundredandThirtyFive)

Contractor's%:‐30Discount:0

6

DD03‐103

Design of high bank/deep cutting slope based on slope stability analysis as specified byRDSO/theoritical methods, for railway cuttings/ embankment more than 6m in height/depthbasedonthematerialavailableincutting/embankments,includingcollectingrequirednumberofsoilsamplesandconductingrequiredlaboratorytestsasperRDSOspecificationssoastofindoutsoil parameters required in slope stablity analysis,working out design slope based onmanualmethod/computer software including furnishing detailed calculations in a report form withcontractor's men, material, machinery etc and as directed by Engineer‐in‐charge.Note:Recommended slopesdesigns shall be from reputeddesigners and shall includedetailedcalculationstobesubmitedin3copies.

Quantity

Rate

Unit

Amount

10.00

17,500.00

1CS

1,22,500.00

(RupeesSeventeenThousandFiveHundred)

Contractor's%:‐30Discount:0

12,86,740.00

(No.ofItems6ONLY)

ScheduleBDepartmentalValue:

0.00

12,86,740.00

ScheduleBTotal:

RupeesinWords(RupeesTwelveLakhEightySixThousandSevenHundredandFortyAndPaiseTwelveONLY)

SignatureofContractorSchedulePageNo: 11of

24SignatureofContractSigningAuthority

Page 14: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'C'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

CE1‐01A

SupplyofOrdinaryPortland cementof43 /53grade conforming to IS8112/ IS12269 (uptodate)and/orPortlandPozzolanaCementconformingtoIS/1489(uptodate),atsiteofworktotheextentofthequantitiesrequiredforvariousitemsofworksinscheduleitemsincludingallcostofloading, unloading,leading, transporting, stacking, storing including making proper storagearrangementsandallconsumables,machinery,vehicles,labouretc.,completeandasdirectedbythe Engineer‐in‐charge.(a) Ordinary Portland Cement (43/53 Grade)NOTE :1) Use of Portland Pozzolona cement shall be restricted strictly to the permittedconstruction items only. Pozzolana cement shall not be used in PSC construction.2) Admixtures such as super plasticizers will be permitted based on specific designs forpermitted construction itemswith the approval of the DY.Chief Engineer‐in‐charge. However,admixturesproposedshallbesuppliedfreeofcostbytheContractorandnocompensationwillbepayable.3.33Gradecementshallnotbeusedinrailwayconstructionworks.

Quantity

Rate

Unit

Amount

800.00

6,342.00

1T

43,12,560.00

(RupeesSixThousandThreeHundredandFortyTwo)

Contractor's%:‐15Discount:0

43,12,560.00

(No.ofItems1ONLY)

ScheduleCDepartmentalValue:

0.00

43,12,560.00

ScheduleCTotal:

RupeesinWords(Rupees FortyThreeLakhTwelveThousandFiveHundredandSixtyAndPaiseFortyThreeONLY)

SignatureofContractorSchedulePageNo: 12of

24SignatureofContractSigningAuthority

Page 15: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'D'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

BRPC1

Plain Cement Concrete (M15 to M30 design mix) Cast‐in‐situ work (cement will be paidseparately)withContractorsallmaterials including40mmorbelowgradedhardcrushedstoneaggregate,sand,admixture,water,etc.,ofapprovedqualityinfoundations,abutments,piers,wingwalls,returnwallsetc.,ofbridgesandotherstructuresasrequired,includingfixingandremovalofcontractorsshutter/ formwork/supports,vibrating/compacting,providingweepholeswithcontractors AC pipes 75 to 100mm dia wherever necessary, providing normal/approvedexpansion joints with necessary materials as per design/drawings, curing of concrete,pumping/bailingoutofwaterwherevernecessarywithContractorsownpump,power,fueletc;,finishingthesurfaceswhereverrequired,etc.,complete,withalllead,lift,transport,consumables,labour,toolsandplant,materials,etc.,asperapproveddrawings/specification/conditionsandasdirected by the Engineer‐in‐charge.NOTES:(1) Single ratewill apply for allmixes (M15,M20,M25 andM30) irrespective of proportion ofmaterials used (per cubic metre ( cum) of concrete).(2) All concrete shall beweigh batched,machinemixed, compactedwithmechanical vibratorsandshouldconformtoIRSConcreteBridgeCodeandrelevantISCodes/Specificationsandotherrelevant specifications as prescribed. Weigh batching is mandatory for all PCC, RCC and PSCworks.(3)Ratesshallincludeallmaterials,operations,etc., completeexceptforCement,whichwillbepaidforseparately.Steelsincludingfabrication,ifused,andexcavationsforfoundationswillbepaid under relevant SSR or other schedules separately.(4)Shutteringandsupporting formworkshallbeofgoodqualitymaterialsonly. ForPSC/RCCgirders/slabs/beams/columns, only rigid plate steel shutters shall be used.(5) Mix design with requirement of all tests shall be arranged by the Contractor at his cost.(6) Admixtures as required/ as per designs shall be arranged by the Contractor at his cost.(7)Allmaterial and concrete tests as required shall be arranged by the contractor at his cost.(8)Rateincludesplacingofconcreteinpositionforallheightsbymanual/concretepump/craneetc.,

Quantity

Rate

Unit

Amount

1600.00

2,500.00

1CUM

34,00,000.00

(RupeesTwoThousandFiveHundred)

Contractor's%:‐15Discount:0

2

BRRC1

Reinforced Cement Concrete (M20 to M40 design mix) work (Cement & Steel will be paidseparately),withContractorsallmaterialsincluding20mmgradedhardcrushedstoneaggregate,sand, admixture, water etc., of approved quality in foundations including below ground level,abutments, piers, pile caps, bed blocks, trestle beams, girders, pedestals, retaining walls,boxes/slabsforflattopbridges,deckslabs,girders,kerbwalls,diaphrams,crossframesetc.,ongirderbridgesandotherstructuresofanydesign/shapeasrequired,aboveorbelowgroundlevelofanysizeandshape,includingfixingandremovalofcontractorsshutters/formwork/supports,vibrating/compacting, and providing weep holes with AC pipes 75mm to 100mm dia andnormal/approvedexpansionjointswithnecessarymaterialsasperdesigns/drawingswherevernecessary,curingofconcrete,pumping/bailingoutofwaterwherevernecessarywithContractorsownpump,power,fueletc.,finishingthesurfaceswhereverrequiredetc.,completeandincludinghandling, uncoiling, cutting, bending, cranking, tying M.S./Tor Rods/wires/other steel to formreinforcementwithContractorsgalvanizsedbindingwireofsize18/20SWG(0.90mm)toIS280,etc., fixing in position reinforcement gauge complete as required with all lead, lift, transport,materials,consumables,labour,toolsandplant,etc.,andincluding2coatsofcementpaintingasper approved drawings/specifications/ conditions and as directed by the Engineer‐in‐charge.PlantproducedReady‐mixconcreteshallbeusedonlywiththespecificapprovaloftheDy.ChiefEngineer.

SignatureofContractorSchedulePageNo: 13of

24SignatureofContractSigningAuthority

Page 16: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'D'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

NOTES:(1)Singleratewillapplyforallmixes(M20,M25,M30,M35andM40)irrespectiveofproportionofmaterialsused(percubicmetre(cum)ofconcrete).Rateisforsitemixedconcrete.Forplantproduced Ready‐mix concrete, an extra payment of Rs.500/‐ per cum will be applicable.(2) All concrete shall beweigh batched,machinemixed, compactedwithmechanical vibratorsandshouldconformtoIRSConcreteBridgeCodeandrelevantISCodes/Specificationsandotherrelevant specifications as prescribed. Weigh batching is mandatory for all PCC, RCC and PSCworks.(3)Ratesshall includeallmaterials,operations,etc., completeexceptforCementandSteelandexcavationforfoundationsandsubstructure,ifrequired,whichwillbepaidforseparatelyunderrelevant SSR/other schedules. Similarly, neoprene bearing pads, expansion joints and steelladders attached to the PSC girder/slab will also be paid for separately.(4)Shutteringandsupporting formworkshallbeofgoodqualitymaterialsonly. ForPSC/RCCgirders/slabs/beams/columns, only rigid plate steel shutters shall be used.(5) Mix design with requirement of all tests shall be arranged by the Contractor at his cost.(6)Admixtures,bindingwires,clamps/anchorsetc.,asrequired/asperdesignsshallbearrangedby the Contractor at his cost.(7)75%ofthevalueoftheworkcompletedwillbepaidinitiallyandremaining25%willbepaidafterall testsconnectedwithconcrete includingmaterialsand7dayscubetestsarecompletedandresultsareaccepted.Anyconcretewhichisnotpassingthedesign/codalrequirementsshallbe summarily rejected.(8)Ratesincludecostoflaunching,liftingandplacingofslabs/girdersonbearingsifrequired.(9)Thisitemwillapplyforallstandard/specialdesignsrequiredintheworkwheresuchdesignis not specially provided for in any other schedule/item.(10)Rateincludesplacingofconcreteinpositionforallheightsbymanual/concretepump/craneetc.,

Quantity

Rate

Unit

Amount

100.00

3,600.00

1CUM

3,06,000.00

(RupeesThreeThousandSixHundred)

Contractor's%:‐15Discount:0

3

BRGL1A

SupplyandlayingofRCCHumepipesofdia900mm/1200mmofNP4/RDSOdesignssuitableforalltypesofRailwayloadingstandardsincludingprovidinglevellingcourse,jointing,compactionas per approved drawings with contractor's fixing materials, collars, aggregates and all othermaterials as required with all lead, lift, transport, consumables, labour, tools and plant, etc.,completeasdirectedbytheEngineer‐in‐charge.(perrunningmetrelengthofpipetobequoted).(a) Laying with 900mm pipeNOTES:(1)Ratesincludeallmaterials,operationsetc.,completeexceptcementusedwhichwillbepaidfor separately.(2) Contractor shall produce design/ test reports to prove the suitability of the Hume Pipe.DecisionregardingstandardofpipetobeusedbytheEngineer‐in‐chargeisfinalandbindingonthe contractor.(3)Ratesincludelocaltransportwithinthesectiononly.Transportfromfactoryuptothe

SignatureofContractorSchedulePageNo: 14of

24SignatureofContractSigningAuthority

Page 17: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'D'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

section/officeoftheEngineer‐in‐chargewillbepaidunderrelevantSSRitems.

Quantity

Rate

Unit

Amount

40.00

5,000.00

1RM

1,70,000.00

(RupeesFiveThousand)

Contractor's%:‐15Discount:0

38,76,000.00

(No.ofItems3ONLY)

ScheduleDDepartmentalValue:

0.00

38,76,000.00

ScheduleDTotal:

RupeesinWords(RupeesThirtyEightLakhSeventySixThousandAndPaiseThirtyEightONLY)

SignatureofContractorSchedulePageNo: 15of

24SignatureofContractSigningAuthority

Page 18: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'E'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

ST02‐001

SupplyofHighYieldStrengthDeformedreinforcementsteelbars/Fe415/Fe415D/Fe415S/Fe 500D / Fe 500S / Fe 550 / Fe 550D / Fe 600 conforming to IS 1786:2008 (with latestamendment) at site of work to the extent actually required for the work including all cost ofloading, unloading, leading, transporting, stacking, storing, labour, consumables, machinery,vehicles etc., complete and as directed by the Engineer‐in‐charge.NOTE: (1) The rate quoted for this item is applicable for Fe500, Fe550 and Fe 600 and theirvariantsviz.Fe500D,Fe500SandFe550D.IfFe415gradeoritsvariantsFe415DorFe415Sare used, they will be paid at a reduction of Rs.2000/‐ per MT from agreed rates.(2) Stage payment for supply of steel shall be limited to 75% of the agreed rates subject toproduction of Bank Guarantee/ Indemnity Bond as specified, Test certificates, Insurance,limitation in quantity supplied at a time, conditions for stacking/storing/ preserving at site.However,thispaymentwillberestrictedtoamaximumof30%oftheSchedulequantityatanypoint of time.(3)Paymentforreinforcementrodswillbemadeasperactualusedincludingoverlaps,cranks,bends, etc., if any, as per approved drawing and as per Special Conditions for use of steel.However, no payment will be made for any wastage. Quantity will be calculated for nominaldiameter of the bars using standard weights per running metre or as per actual weightswhichever is less.(4)Bindingwire, clampingmaterialsetc.,used inconstruction shallnotbe treatedassupplyitemsunderthisscheduleandshallbegovernedbytheScheduleandSpecialConditionsunderthe relevant items of concreting etc., and no extra payment shall be made.(5) Reinforcement steel shall be supplied and used as per approved drawings and as perinstructionsoftheEngineer‐in‐charge

Quantity

Rate

Unit

Amount

10.00

51,790.00

1T

4,40,215.00

(RupeesFiftyOneThousandSevenHundredandNinety)

Contractor's%:‐15Discount:0

4,40,215.00

(No.ofItems1ONLY)

ScheduleEDepartmentalValue:

0.00

4,40,215.00

ScheduleETotal:

RupeesinWords(RupeesFourLakhFortyThousandTwoHundredandFifteenAndPaiseFortyFourONLY)

SignatureofContractorSchedulePageNo: 16of

24SignatureofContractSigningAuthority

Page 19: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'F'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

EW03‐202

EarthworkinfillingwithCOE:Earthworkinembankmentinmakingformationwithcontractorsownearthofapprovedqualityinspecifiedlayersnotexceeding300mmthicknessfromapprovedearth quarries outside railway limits in all soils with loading, unloading, all lead and lifts,rehandling,transportation,spreadinginlayers,benchingofslopes,sectioningtoprofile,clearingofdebris/garbage/vegetation/shrubsetc., in therailwayalignmentusingcontractor'svehicles,machinery, labour, consumables etc., as per technical specification& special conditions and asdirected by Engineer‐in‐charge.Note: (i) Payment shall be made based on cross section measurement only.(ii)Therateincludesallcharges,taxes,royalty,seignorageetc.,andforpretestingofsoilqualityatquarryforevery20000cumorchangeoflayerandtestingatsiteforevery5000cumorchangeof layer for assessing the suitability of the soil for use in embankments and all other tests asspecified in the specifications.(iii) No extra payment for lead etc., is admisible.(iv)Only75percentpaymentforthequantityexecutedinaparticularbillispayableinitially.15percent of the balance amount shall be released after the L section and profile are prefectlyreachedand the formation ishandedover toRailways.Remaining10percentshallbereleasedonlyaftertheformationinthefullblocksectionoridentitifedlengthiscompletedinallrespectsand handed over.(v) Only soils of category I or II or III or IV as per clause 15 of Technical Specifications ispermitted. Payment for category IIIwill be reduced by 5 percent and for cateogory IVwill bereducedby10percentoftheacceptedrates.AcceptedratesapplytosoilwithPIupto7.ForPIbeyond 7 and upto 20, a further reduction of 10 percent in accepted rates shall apply. Use ofcategory V soil as per clause 15 of Technical Specifications is banned.(vi) Formationwidth at top shall bemadewith 500mmextra on either side initially and aftercompactionbecut to standardprofile.Noextrapayment shallbemade for thispurpose. If theextrawidthisnotmadeatanysinglelocationof lessthan100mlength,paymentsdueshallbereducedby5%forthatentire100mstretch.

Quantity

Rate

Unit

Amount

49000.00

126.60

1cu.m

56,45,094.00

(RupeesOneHundredandTwentySixAndPaiseSixty)

Contractor's%:‐9Discount:0

56,45,094.00

(No.ofItems1ONLY)

ScheduleFDepartmentalValue:

0.00

56,45,094.00

ScheduleFTotal:

RupeesinWords(RupeesFiftySixLakhFortyFiveThousandNinetyFourAndPaiseFiftySixONLY)

SignatureofContractorSchedulePageNo: 17of

24SignatureofContractSigningAuthority

Page 20: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'J'

NONVETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

052290

Supply, leading, loadingandunloadinggraniteboundarystonesof size200x200x600mmfixing50Mtrs.apartrightangletotherailwayalignmentandroaddiversionsofLc'swithcorrectgivenmeasurementwithCC1:3:6mixwith40mmsizegradedgranitemetal totheoverallsize450x450x450mmincludingstonesize.Boundarystonefixed450mmbelowGLand150mmaboveGL.Thestonesshouldbepaintedwith2coatsofenamelpaintdulyprovidingletters""SWR""facingthecentrelineofalignmentandnumberingtombewrittenwithblackenamelpaintatthetopofthe stone etc., complete as directed by the engineer in charge.Note:Therateinclusiveofcontractor'sboundarystone,metal,sand,cement,labour,leadandliftpainting,excavationinallkindsofsoilsandcutting,etc.,completewithallconsumables.

Quantity

Rate

Unit

Amount

100.00

300.00

1NOS

30,000.00

(RupeesThreeHundred)

Contractor's%:0Discount:0

2

225860

Providing speed brakers of 3.66M width along the lengthof the Road on either side approach of Level crossingsas shown in the Drg No.GM/W/ SC/SK/219 with CC 124mix using Contractors 20mm metal and cement etc., including all operations such as mixingconcreteandspreadingon the roadat the location indicatedby theEngineer to theshapeandlengthwith all contractor`smaterial, tools, plantwith all lead and lift complete to theRailwaydrawingandspecificationsandasdirectedbytheEngineerincharge.(UCCcode73837)

Quantity

Rate

Unit

Amount

60.00

1,500.00

1EACH

90,000.00

(RupeesOneThousandFiveHundred)

Contractor's%:0Discount:0

3

225859

Fabrication,supplyingandfixinggangtoolboxofsize2.20x(0.79X1.20)x1.07mandmadebycontractor'sMSsheet16SWGwithMSanglesatcornersincludingtwocoatsofpaintandlockingarrangementsitincludesweldingrevettingtransportationcompleteandfixingasdirectedbyEngineer‐in‐charge.

Quantity

Rate

Unit

Amount

4.00

3,000.00

1EACH

12,000.00

(RupeesThreeThousand)

Contractor's%:0Discount:0

4

141224

Fabricationanderectionofheightgauge for theroadapproachesofRUBclearspan11musingISMC400x75 for vertical posts andhorizontal beamwith contractor`sbolts andnutsmakingholes and two brackets to hold horizontal beam one each on vertical post with contractor`sangles, erecting thevertical post ina foundationofCC1:3:6 of size0.6 x0.6 x1.50m incluidngsupplyofcementcoarseandfineaggregatesearthworkexcavationwithlabourtoolsandplantingworkwithonecoatofredoxideprimerandtwocoatsofreflectivepaintofapprovedqualitywithallleadandliftcompleteasdirectedbytheEngineer‐in‐chargeasperRDSOdrawing.

Quantity

Rate

Unit

Amount

120.00

62,000.00

1T

74,40,000.00

(RupeesSixtyTwoThousand)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 18of

24SignatureofContractSigningAuthority

Page 21: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'J'

NONVETTEDITEMS

Sl.No.

DescriptionofItems

CODE

5

065520

LeadinganddumpingofRailways50mmstoneballastfromstackscollectedoneithersideofBGformation/ at yards/ at topof cuttings/ toeof banks, including crossingof tracks, if required,spreading the ballast on the formation, levelling uniformly to specified thickness, boxing,profilingtheballast(afterlinkingtheBGtrack),tospecifiedBGballastprofile,withallleadsandlifts,usingcontractor'sownmentools,plantsmachineryetccomplete(paymentwillbedoneasper stack measurement)a)Leadupto150m

Quantity

Rate

Unit

Amount

7431.60

65.00

1CUM

4,83,054.00

(RupeesSixtyFive)

Contractor's%:0Discount:0

6

225858

Manufacturing and supplying for trolleyrefugeindicatorboardsmadeoutofMSsheet16mmgaugeofsize240mmdiaand50x50x6mmangle welded tothe MS sheet duly painting with 2coatsready mixed yellow paint over one coatof red oxide primer and lettering with black paint indicating the R both on sides,paintingthe post with two coats of ready made mix enamel paint over one coat primer with allcontractors labour,materials, consumables,tools and plant equipment all leads and lift etc as per approved type plan and completeas per specifications and as directed by theEngineerincharge.

Quantity

Rate

Unit

Amount

112.00

400.00

1EACH

44,800.00

(RupeesFourHundred)

Contractor's%:0Discount:0

7

142312

ManufacturingsupplyingandfixingofindicatorBoardsmadeoutof2mmthickAluminumalloysheetconfirmingtoIS:737insizeandshapeetc.asperannexure8/4ofpa807ofIRPWMwithback supporting of 25x25x3mm angle Iron. The entire face of the sign shall be covered andbonded with yellow high intensity encapsulated lens type Retro‐Reflective sheeting with heatlampvacummachineonly.Thesymboles,bordersandlettersshallbemadebyscreenprintingorasdirecteddulypaintingon thebacksideof theboardwithgreypaintand fixing theboard toContractor`s MS angle of required height with proper bolts and nuts/welding includingtransporting of boards to site, fixing the same by embedding in concrete base as per Drg.No.B/GL/646dulyexcavatingthepit,refillingcompletewithallcontractor`smaterials,labour,tools,plant, fuel,consumables,curingetcall leadsand liftsandasdirectedbytheEngineer inchargeandasperspecifications.TheIndicatorboardsshouldconfirmtothespecificationslaiddownbyRDSO/LucknowforEngineeringindicatorsandasperrelevantParas/AnnexuresofIRPermanentWay manual/Railway drawings. (a) Termination Boards for Passanger/Goodstrains,T/P,T/G,symbols of size 1000mm dia circular shape. Passanger/Goods trains,T/P,T/G,symbols of size 1000mm dia circular shape.

Quantity

Rate

Unit

Amount

12.00

3,000.00

1EACH

36,000.00

(RupeesThreeThousand)

Contractor's%:0Discount:0

8

225299

SpeedIndicatorBoardsofsize1000mmequilateraltrianglewith speedfiguresas instructedbyEngineerincharge.

Quantity

Rate

Unit

Amount

4.00

3,000.00

1EACH

12,000.00

(RupeesThreeThousand)

Contractor's%:0Discount :0

SignatureofContractorSchedulePageNo: 19of

24SignatureofContractSigningAuthority

Page 22: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'J'

NONVETTEDITEMS

Sl.No.

DescriptionofItems

CODE

9

225298

Fabrication and errection of Railway released Rails/steel from dismantled structures, etc.,includingtransportingthematerialfromstacksatnominatedplacesandre‐handlingbycrossingthe tracks if required including shaping the dismantled members, welding / bolting theconnections,etc., completeasper specificationsand toapproveddesignanddrawing includingroughingupandcleaning thepaintedsurfacesandpaintingwith2coatsofAluminumpaint toIS.2339‐63 after errection including patch paint with all contractor`s materials, labour,equipment,toolsandplantwithallleadandliftupto10mfromlaunchinggroundetc.,completeasdirectedbytheEngineer‐in‐charge.

Quantity

Rate

Unit

Amount

13.00

8,000.00

1TONNE

1,04,000.00

(RupeesEightThousand)

Contractor's%:0Discount:0

10

225403

Supplyingandfixingofpolishedgranitebenchesofsize2.00mx0.45masperPlanNo.B/GL/615including earth work excavation and fixing in CC 136 with all contrctors materials, lead, lift,labour, toolsandplantsetc., completeandasdirectedby theengineer ‐in ‐charge( Inclusiveofcostofcement).(Ucccode73837Sch;Jitemno:1)

Quantity

Rate

Unit

Amount

40.00

10,000.00

1EACH

4,00,000.00

(RupeesTenThousand)

Contractor's%:0Discount:0

11

020432

Providing cantilever type water sinks on platforms as per approved drawings with allcontractor'smaterialswithstockbricksmasonryusinginCM1:6mix,plasteringwithCM1:6mix,cladingwithapprovedquality& colourpolishedgranite slabs/tiles fixing inCM1:3mix forallexposed surfaces, all around the sinks and top surfaces, including providing RCC slab 1:2:4 of100mmthickforcantilevertypesinkasshownintheapproveddrawing,UPVCpipe110mmdia.with6Kg/sqmpressure for drainagepipe andwater supply lines/valves embeded in the sinkwall,PVCgratings,4Nos.watertapsapprovedquality&designandmasonrysumpofsize300X300X200mmwithRCCcoveringslabatPFlevelwithcontractor'slabours,lead,liftetccomplete,inclusiveofcostofcementandsteelandasdirectedbytheEngineerin‐charge.Note:Paymentforpipelines/valveswillbepaidseperatelyunderreleventitemofSchedule‐ A.

Quantity

Rate

Unit

Amount

20.00

15,000.00

1SET

3,00,000.00

(RupeesFifteenThousand)

Contractor's%:0Discount:0

12

225301

CautionIndicatorBoardsofsize1400x400mm.

Quantity

Rate

Unit

Amount

4.00

3,000.00

1EACH

12,000.00

(RupeesThreeThousand)

Contractor's%:0Discount:0

13

205982

CessrepairsofRailwaybankorfillingofraincutsbyContractor'sownearthwatering,rammingand dressing to proper slope as per direction of Engineer‐in‐charge for all leads and lifts,(measurementwillbebaseduponcrosssections

Quantity

Rate

Unit

Amount

14400.00

75.00

1CUM

10,80,000.00

(RupeesSeventyFive)

Contractor's%:0Discount:0

SignatureofContractorSchedulePageNo: 20of

24SignatureofContractSigningAuthority

Page 23: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'J'

NONVETTEDITEMS

Sl.No.

DescriptionofItems

CODE

14

225889

Providingtheservicesofmanpowerhavingcomputerworkingknowledgetocarryoutworkslikedrawing, computation, writeup etc., using computer software like AuotCad,MS Office, etc.between0800hrs.and20.00hrs.oftheday.withallexpensesoftransportation,accommodation,food, consumables etc., with all ascents, descents, taxes, octroi, cess, fees, duties, withcontractor'stoolsandplants,materials, consumables, labour,crew,machinerieswith allleadandliftetc.,completeasperspecialconditions/specifications/regulationsandasdirectedby the Engineer‐in‐ChargeNOTE 1) The person engaged for providing the services shall be conversant with Computerworking knowledge in above softwares.2)Theratequotedisapplicableperpersonperday.

Quantity

Rate

Unit

Amount

180.00

400.00

1DAY

72,000.00

(RupeesFourHundred)

Contractor's%:0Discount:0

1,01,15,854.00

(No.ofItems14ONLY)

ScheduleJDepartmentalValue:

0.00

1,01,15,854.00

ScheduleJTotal:

RupeesinWords(RupeesOneCroreOneLakhFifteenThousandEightHundredandFiftyFourAndPaiseTenONLY)

SignatureofContractorSchedulePageNo: 21of

24SignatureofContractSigningAuthority

Page 24: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'P'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

PWNB‐052

(i)CastingandsupplyingofprecastR.C.C.hectometrepostaspertherelevantdrawingwithoutrail trafficblockdulycastingwithM25gradecementconcretewith contractor's reinforcementsteel, 20 mm graded granite coarse aggregate, fine aggregate, cement etc. using vibrators;(ii) Transporting to the site of fixing;(iii)Fixingbyexcavatinginalltypesofsoilsapitofsize300mmX300mmX450mm,concretingwithalevellingbasecoursewithC.C.1:3:6mix,fillingtheentiretrenchwithM25gradecementconcrete with contractor's supply of cement (OPC 53 grade), 20 mm graded granite coarseaggregate, fine aggregate etc. duly embedding the precast post, compacting the concrete withvibrator and;(iv) Painting the required information (including distance) with contractors enamel paint ofretro‐reflective typeof approvedquality andcolour in aprofessionalmannerwith font size asdirecteddulymeasuringthedistance(toanaccuracyof10cm)betweenthelocationofthepostand the centre line of the nearest station or any other nearer location as directed.Allof theaboveshallbeexecutedwithcontractor's skilledpersonnel, toolsandplant,vehicles,machinery, fuel, consumables, loading, unloadingwith all incidental charges and in all kindsofweather conditions and site conditions including crossing of tracks wherever required dulyobserving all safety precautions and including all lead, ascent, descent, taxes, duties, cess,surcharges, fees etc. completely as per the special conditions / specifications / regulations, asdirected by the Engineer‐in‐Charge and as per the note(s) below.Notes:1.Therateincludesmeasurementofthedistance(toanaccuracyof10cm)betweenthelocationof the post and the centre line of the nearest station or anyother nearer location as directed;2. The post shall be firmly fixed so that it shall not get unintentionally disturbed during tracklinking/tamping/othermaintenanceoperations.

Quantity

Rate

Unit

Amount

300.00

1,190.00

1NUMBER

2,74,890.00

(RupeesOneThousandOneHundredandNinety)

Contractor's%:‐23Discount:0

2

PWNB‐051

(i)ManufacturingandsupplyingPre‐castR.C.C.kilometrepost/LWRPost/GangBoardPost/GradientPost/anyotherpost800mmwide1050mmhighand64mmthick(actualheightandprofile varies as per the specified drawing for the requiredR.C.C. post) duly castingwithM25grade cement concrete with contractor's reinforcement steel, 20 mm graded granite coarseaggregate, fine aggregate, cement etc. using vibrators;(ii) Transporting to the site of fixing;(iii)Fixingthepostwithoutrailtrafficblockdulyexcavatinginalltypesofsoilsapitofsize300mmX300mmX600mm,concretingwithalevellingbasecourseofC.C.1:3:6mixandfillingtheentire trench with M25 grade cement concrete with contractor's supply of cement (OPC 53grade),20mmgradedgranitecoarseaggregate, fineaggregateetc.dulyembeddingtheprecastpost and compacting the concrete with vibrator and;

SignatureofContractorSchedulePageNo: 22of

24SignatureofContractSigningAuthority

Page 25: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'P'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

(iv)Painting the required informationwith contractorsenamelpaintof retro‐reflective typeofapprovedqualityandcolourinaprofessionalmannerwithfontsizeasdirecteddulymeasuring(whereverapplicableanddirected)thedistance(toanaccuracyof10cm)betweenthelocationofthe post and the centre line of the nearest station or any other nearer location as directed.Allof theaboveshallbeexecutedwithcontractor's skilledpersonnel, toolsandplant,vehicles,machinery, fuel, consumables, loading, unloadingwith all incidental charges and in all kindsofweather conditions and site conditions including crossing of tracks wherever required dulyobserving all safety precautions and including all lead, ascent, descent, taxes, duties, cess,surcharges, fees etc. completely as per the special conditions / specifications / regulations, asdirected by the Engineer‐in‐Charge and as per the note(s) below.Notes:1.Theheightofthepostandthedepthofpitgivenareapproximate.Theactualheightvaries(lessthanormorethanthatspecifiedaboveuptoamaximumof40%)fordifferentpostsmentionedabove and hence the depth of the pit. The rate is the same for all;2. The rate includes measurement (wherever applicable and directed) of the distance (to anaccuracyof10cm)betweenthelocationofthepostandthecentrelineoftheneareststationorany other nearer location as directed;3. The post shall be firmly fixed so that it shall not get unintentionally disturbed during tracklinking/tamping/othermaintenanceoperations.

Quantity

Rate

Unit

Amount

260.00

1,440.00

1NUMBER

2,88,288.00

(RupeesOneThousandFourHundredandForty)

Contractor's%:‐23Discount:0

5,63,178.00

(No.ofItems2ONLY)

SchedulePDepartmentalValue:

0.00

5,63,178.00

SchedulePTotal:

RupeesinWords(RupeesFiveLakhSixtyThreeThousandOneHundredandSeventyEightAndPaiseFiftySixONLY)

SignatureofContractorSchedulePageNo: 23of

24SignatureofContractSigningAuthority

Page 26: Office nùÊIÉhÉ {ÉζSÉ¨É ®äú±É´Éä Chief (Construction ... Loa... · South Western Railway, Bangalore‐46 for and on behalf of President of India (Please Turn over)

SOUTH WESTERN RAILWAY   (CONSTRUCTION)

Annexure - II

Tender Ref No :- BKKD/028

Notice Date :-

01/08/2016

Dept:ENGINEERING

Project:11535‐BAGALKOT‐KUDACHINEWBGLINE(142KMS)

Agency:A0174‐A.VENKATESH

Name of the Work :Bagalkot‐KudachiNewB.GLine‐ Miscellaneous,ancillaryandbalanceleftoverworksbetweenkm:16.70tokm:30.00.

ScheduleofItemsLOANo.W496/BKKD/028Date25/11/2016ofUCC74213

Schedule'R'

VETTEDITEMS

Sl.No.

DescriptionofItems

CODE

1

PWTR‐

TransportationofPWay fittings, fasteningsandothermaterials like fishplates, fishbolts andnuts,ERclips,liners,woodensleepers,fittingsofguardrail,cementconcreteslabs,levelcrossingslabs from anywhere in India including collecting small quantities of materials from variousscatteredlocationsinmidsection/yards/LCs/anyotherlocationoverIndianRailwaystoanyspecifiedlocationoftheprojectortoPWaydepotbycontractorsroadvehicleincludinghandling,re‐handling including multiple loading and multiple unloading (away from running track) asrequired, stacking/arranging them ina systematicandcountablemanneron the formationatspecifiedlocation(s)inyard/midsectionorinPWaydepotoratanyotherlocationasdirectedwith contractor's skilled personnel, tools and plant, vehicles, machinery, fuel, consumables,loading, unloading with all incidental charges and in all kinds of weather conditions and siteconditionsincludingcrossingoftrackswhereverrequireddulyobservingallsafetyincludingalllead,ascent,descent,taxes,duties,cess,octroi,feeetc.completelyasperthespecialconditions/specifications/regulations,asdirectedbytheEngineer‐in‐Chargeandasperthenote(s)below.Notes:1.Thisitemhas2sub‐items.Forsub‐item(a),theunitisMTandassuchtheratedoesnotdependuponthedistance.Sub‐item(b)isforpaymentoverandabovesub‐item(a).Forpaymentinsub‐item (b), sub‐item (a) will be paid for weight of materials transported and the lead over andabove 50 km will be considered for arriving at the quantity of sub‐item (b);2. For the purpose of payment, the shortest feasible road route will be considered unlessotherwise warranted with prior approval of Dy. Chief Engineer. The decision of railways inassessing the distance and feasibility of the route is final and binding on the contractor;3.Incaseofanydamagetomaterialswhileloading/unloading/stacking/arrangingthem,thecost of damaged materials, as decided by the Engineer‐in‐Charge, will be recovered.(a) for a lead from more than 0 km and less than 50 km

Quantity

Rate

Unit

Amount

50.00

900.00

1MT

25,200.00

(RupeesNineHundred)

Contractor's%:‐44Discount:0

25,200.00

(No.ofItems1ONLY)

ScheduleRDepartmentalValue:

0.00

25,200.00

ScheduleRTotal:

RupeesinWords(RupeesTwentyFiveThousandTwoHundredAndPaiseTwentyFiveONLY)

SignatureofContractorSchedulePageNo: 24of

24SignatureofContractSigningAuthority