ANNUAL ADMINISTRATIVE REPORT Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010 TO 31-03-2011) Ok"kZ % kZ % kZ % kZ % 2010-2011 (1-4-2010 ls ls ls ls 31-03-2011) DEPARTMENT OF RURAL DEVELOPMENT HIMACHAL PRADESH SHIMLA- 171009 Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] fgekpy fgekpy fgekpy fgekpy izns’k] izns’k] izns’k] izns’k] f’keyk&171009 f’keyk&171009 f’keyk&171009 f’keyk&171009
Transcript
Page 1: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

ANNUAL ADMINISTRATIVE REPORT

Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu

YEAR : 2010-2011

(1-4-2010 TO 31-03-2011)

OOOOkkkk""""kZ % kZ % kZ % kZ % 2010-2011

(1-4-2010 lslslsls 31-03-2011)

DEPARTMENT OF RURAL

DEVELOPMENT HIMACHAL PRADESH

SHIMLA- 171009

Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] Xkzkeh.k fodkl foHkkx] fgekpy fgekpy fgekpy fgekpy izns’k] izns’k] izns’k] izns’k]

f’keyk&171009f’keyk&171009f’keyk&171009f’keyk&171009

Page 2: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

INDEX Sr. No. Page 1. Rural Development & Poverty Alleviation 1- 4

2. Administrative Structure of Rural Development Department 4-5

3. Engineering Staff in the Department 5

4. Staffing Pattern 5-6

5. Functions and Duties of the Department 6-8

6. State Level Monitoring and Evaluation Cell 8

7. Rural Development Programmes / Schemes 9

(i) Community Development 9

(ii) Swaranjayanti Gram Swarozgar Yojana (SGSY) 9-13

(iii) SGSY Special Projects 13-19

(iv) Mahatma Gandhi National Rural Employment Guarantee Act. 19-24

(v) Indira Awas Yojana 25

(vi) Atal Awas Yojana 26

(vii) National Family Benefit Scheme 27

(viii) Matri Shakti Bima Yojana 28

(ix) Watershed Development Projects 29-33

(x) Total Sanitation Campaign 33-37

8. Right to information Act. 37

Page 3: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

1. RURAL DEVELOPMENT AND POVERTY ALLEVIATION

Rural development and poverty alleviation have been the major areas of concern and

thrust for the nation since independence. The Community Development Programme consisting

of various sets of schemes was launched on 2nd October, 1952 throughout the country with the

objective of overall development of rural areas with the active participation of the community.

Community Development Blocks were created and considered pivotal for planning and

implementation of various rural development schemes.

Upto the year 1999, self-employment schemes such as IRDP, TRYSEM, DWCRA,

SITRA, MWS and GKY were being implemented, but w.e.f. 1.4.1999 these schemes were

merged into SGSY. Similarly, JGSY and EAS which were in operation were merged into SGRY

w.e.f.1.4.2002.

^Swaranjayanti Gram Swarozgar Yojana****, (SGSY) has been launched during the year

1999-2000. This yojana lays emphasis on cluster approach instead of individual beneficiary

approach, which would enable the beneficiaries to start with viable projects in a joint manner,

which can yield higher incomes. This approach will also improve the skills of the poor through

an in-built training component, up-gradation of technology, providing adequate backward and

forward linkages, availability of adequate infrastructure and better marketing arrangements.

In order to create additional gainful wage employment for the weaker sections of the

society, employment generation programme Sampooran Grameen Rozgar Yojana (SGRY),

was launched during the year 2002-2003. The scheme focussed on the creation of the rural

infrastructure for more sustained wage employment and rural development, besides, ensuring

food security to the weaker sections of the society. Now the scheme has been merged into

Mahatma Gandhi National Rural Employment Guarantee Scheme in a phased manner from 2-

2-2006.

The Parliament has enacted the Mahatma Gandhi National Rural Employment

Guarantee Act, 2005 in September, 2005. Under the Act, the livelihood security of the

households in rural area has been ensured by providing one hundred day’s of guaranteed

employment in every financial year to every household whose adult members volunteer to do

unskilled manual work. The Act came into force w.e.f. 2nd February, 2006 in the districts

notified by the Government of India. In Himachal Pradesh Chamba and Sirmaur districts were

initially covered. Another two districts namely Kangra and Mandi were covered from 1st April

2007 in Phase-II. Now in the IIIrd Phase all the remaining 8 districts of the state have been

covered under the scheme w.e.f. 1st April, 2008.

Besides, Drought Prone Area Programme / Desert Development Programme /

Integrated Watershed Development Programme, Indira Awas Yojana, Total Sanitation

Campaign Projects, National Family Benefit Scheme etc. are the other centrally sponsored

schemes being implemented in the State. Panchayati Raj Institutions at various levels are being

involved in the planning and execution of poverty alleviation and employment generation

Page 4: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

programmes so that it is ensured that the benefits under these programmes percolate to the

needy at the grass-roots level.

The Development Block is pivotal for the implementation of various rural

development programmes and overall development of families living below the poverty line in

the rural areas.

The district-wise detail of block units is as under:-

S.No. Name of the District Name of the Block

1. Bilaspur 1. Bilaspur

2. Ghumarwin

3. Jhandutta

2. Chamba 1. Chamba

2. Mehla

3. Salooni

4. Tissa

5. Bhattiyat

6. Pangi

7. Bharmour

3. Hamirpur 1. Hamirpur

2. Bijhari

3. Bhoranj

4. Nadaun

5. Sujanpur Tihra

6. Bamsan

4. Kangra 1. Baijnath

2. Bhawarna

3. Panchrukhi

4. Lambagaon

5. Nagrota Surian

6. Nagrota Bagwan

7. Kangra

8. Rait

9. Nurpur

10. Indora

11. Dehra

12. Pragpur

13. Fatehpur

14. Sulah

Page 5: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

15. Dharamshala

5. Kinnaur 1. Pooh

2. Kalpa

3. Nichar

6 Kullu 1. Kullu

2. Banjar

3. Ani

4. Nirmand

5. Naggar at Katrain

7. Lahaul & Spiti 1. Lahaul at Keylong

2. Spiti at Kaza

8. Mandi 1. Mandi Sadar

2. Balh

3. Gohar

4. Drang

5. Seraj

6. Karsog

7. Sundernagar

8. Gopalpur

9. Dharampur

10. Chauntra

9. Shimla 1. Mashobra

2. Theog

3. Narkanda

4. Rampur

5. Chopal

6. Jubbal-Kotkhai

7. Rohru

8. Chhohara

9. Basantpur

10. Nankhari

10. Sirmaur 1. Pachchad

2. Nahan

3. Shillai

4. Sangrah

5. Paonta

6. Rajgarh

Page 6: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

11. Solan 1. Solan

2. Dharampur

3. Nalagarh

4. Kunihar

5. Kandaghat

12. Una 1. Una

2. Amb

3. Gagret

4. Bangana

5. Haroli

2. ADMINISTRATIVE STRUCTURE OF RURAL DEVELOPMENT DEPARTMENT

For the implementation of different rural development programmes, Rural

Development Department has the following administrative structure at various levels:-

STATE LEVEL:-

The Department is functioning under the over all control of the Pr. Secretary

(RD) at the Government level assisted by the Director-cum-Special Secretary (RD), Additional

Director-cum- Additional/Joint Secretary (RD). The following wings are functioning at the State

level:-

(i) State Level Monitoring & Evaluation Cell (SLM&EC)

Deputy Director (RD) is the Programme Officer of the Cell.

(ii) Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA).

Deputy Director (Stats) and Assistant Director (MGNREGA) are the Programme

Officers of the Cell.

(iii) State Level Nodal Agency (Watershed) :-

Project Director (SLNA) is the Programme Officer of the Cell.

(iv) Total Sanitation Campaign (TSC).

Assistant Director (TSC) is the Programme Officer of the Cell.

DISTRICT LEVEL:-

At the district level, District Rural Development Agencies are responsible for the

implementation and monitoring of all rural development programmes. The Deputy

Commissioner-cum-Chief Executive Officer of the District Rural Development Agency is

assisted by the Project Director, Project Officer, Assistant Project Officer (Self Employment),

Assistant Project Officer (Women), Assistant Project Officer (Watershed), Project Economist,

Superintendent, Statistical Investigator, Senior Assistant, Clerks and Peon of the DRDA in the

Page 7: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

execution of various developmental activities. Besides this, at the district level, there is a

Governing body of DRDA under the Chairman of Zila Parishad. This body is responsible for

monitoring of various Rural Development Programmes.

BLOCK LEVEL:-

At the Block level, the Block Development Officer has the following

administrative setup:-

1. Superintendent

2. Junior Engineers

3. Lady Social Education Organizer

4. Social Education & Block Planning Officer

5. Senior Assistant

6. Senior Assistant (P)

7. Clerk/Steno Typist

8. Panchayat Secretary/ Sahayak

9. Computer Operator

10. Gram Rozgar Sewak

11. Lady Village Development Coordinator

12. Driver

13. Peons

14. Chowkidar/ Sweeper

3. ENGINEERING SERVICES OF THE DEPARTMENT

In order to provide technical guidance for construction works under rural

development programmes, 3 posts of Executive Engineers, 36 posts of Assistant Engineers

and 171 posts of Junior Engineers, 3 posts of Head Draughts-men and 24 posts of Draughts-

men have been created during 1996-97. At the State level. Engineering Cell consisting of

Executive Engineer, Assistant Engineer and 2 Junior Engineers and other ministerial staff has

been functioning. Zonal Offices at Dharamsala, Mandi and Shimla are functioning with the staff

strength of the Executive Engineer, Superintendent, Senior Assistant, Steno-Typist, Clerk,

Driver and Peon.

4. STAFFING PATTERN.

Category wise status of sanctioned, filled-up and vacant posts as on 31.3.2010

is as under:-

S.No Category Posts

Sanctioned

Filled Up Vacant

Posts

1. Deputy Director. 1 1 -

Page 8: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

2. BDO 96 95 1

3. Administrative officer. 1 -- 1

4 Executive Engineer 3 3 --

5 Assistant Engineer (Dev) 36 28 8

6 Supdt.Grade-I 1 1 -

7 Supdt.Grade-II 100 100 -

8 Development Officer (Women Programme)

5 5 -

9 Social Education & Block Planning Officer

80 71 09

10 Panchayat Secretary 1208 787 421

11 J.E’s 171 146 25

12 Senior Assistant 185 185 --

13 Senior Assistant (Progress) 77 77 --

14 Investigator 2 2 -

15 Statistical Assistant 3 -- 3

16 HDM 3 3 -

17 Draughtsman 24 24 --

18 Clerks 215 133 82

19 Steno Typist 37 04 33

20 Jr.Scale Stenographer 02 02 --

21 Sr.Scale Stenographer 01 01 --

22 PA 01 01 -

23 Driver 86 86 --

24 LSEOs 79 79 --

25 LVDCs 176 54 122

26 J.T.M 23 23 -

27 Class-IV 376 304 72

5. FUNCTIONS AND DUTIES OF THE DEPARTMENT

The main functions of the department are as follows:-

• Execution/reporting & implementation of different rural development programmes

in the Pradesh like community development, Housing schemes like IAY & AAY,

Swaranjayanti Gram Swarozgar Yojana, Mahatma Gandhi National Rural

Employment Guarantee Act, SGSY Special Projects. Besides the Watershed

Development Projects (IWDP, DPAP & DDP) the Total Sanitation Campaign etc. are

also being implemented by the department.

Page 9: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

DUTIES

• To perform all the functions of the Department as mentioned above the duties of

various officers of the department are as under:-

Pr. Secretary/Secretary (RD)

• To assist the State Government in policy formulation and overall control and

administration of State Rural Development & Panchayati Raj Departments.

Director-cum-Special Secretary (RD)

• Overall administrative and financial control of Rural Development Department.

Addl./Joint Director (RD) –cum- Addl./Joint Secretary (RD)

• To assist the Pr. Secretary (RD) & Director (RD) in the formulation of policies &

implementation of all the plans/ schemes and overall administration of

Directorate and field level, as per work assigned.

Deputy Director(RD)/Stat.

• To assist the Director (RD) in the implementation of all the Central and State

Plans/Schemes and overall administration of Directorate and field level and to

assist the Pr. Secretary (RD) and Special Secretary (RD) in policy formulation.

Statistical Officer

• To assist the Deputy Director (Stat) in the implementation of various schemes

especially the periodical reporting and monitoring.

Deputy Controller (F&A)

• He is responsible for conducting annual inspection of the Blocks in the Pradesh,

expediting replies and settling audit reports, CAG/PAC paras, attending to the

cases of advice with the assistance of 6 Section Officers (SAS).

Executive Engineer (RD) Hqr.

• To exercise Test Checks and conduct inspections regarding execution of

development works and programmes and is also responsible for monitoring

progress in terms of financial as well as quantitative and qualitative aspects of

the developmental works/programmes and schemes etc. He is also responsible

for preparing the detailed repair estimates, assessment of works, technical

sanction of original and repair works, supervision of work, checking of

estimates, processing of tenders, preparation of agreements, centrally

Page 10: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

sponsored projects etc. He is assisted by one Assistant Engineer / Junior

Engineer/Head Draughtsman / Junior Draughtsman.

Superintendents, Grade-I,II /(CD-II, III, /XEN Branch, Cash, Budget)

1. To supervise all the works relating to concerned administrative section is the

responsibility of Superintendent, Grade-I & II.

2. Deputing all Class-IV and Class-III employees on duties including Drivers and

checking their day to day functioning.

3. To ensure all the dealing hands and diarist are maintaining all required registers

and keep the same updated.

4. To keep careful watch on movement of dak and files between section and higher

authorities.

5. To ensure timely submission of time bound cases/court cases.

6. To ensure that manuals, Rules, instructions, guard files and precedent registers

of the sections are kept up to date.

6. State Level Monitoring and Evaluation Cell

The Government of Himachal Pradesh has constituted a State level Monitoring and

Evaluation Cell during the year, 1999 at State headquarter.

Functions

The functions of the State Level Monitoring and Evaluation Cell are implementation,

monitoring and evaluation of all the Centrally Sponsored Schemes and State Plan Schemes i.e.

SGSY, SGSY Special Project, Indira Awas Yojana, Atal Awas Yojana, National Family Benefit

Scheme, Matri Shakti Bima Yojana, DRDA Administration. Beside it, the cell is responsible for

preparation of Annual Administrative Report.

Sanctioned Staff

(i) Joint Director 1

(ii) Deputy Director (Statistics) 1

(iii) Subject Matter Specialist 2

(iv) Statistical Officer 1

(v) Superintendent Grade-I 1

(vi) Assistant Engineer (Dev.) 1

(vii) Statistical Investigator 4

(viii) Statistical Assistant 5

(ix) Senior Assistant 4

(x) Section officer (Audit) 1

(xi) Accountant/Cashier 1

(xii) Computer operator 1

Page 11: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

(xiii) Jr. Scale Stenographer 1

(xiv) Clerk-cumTypist 3

(xv) Peon-cum-Class-IV 2

This staff is inclusive of existing staff strength in the Statistical Cell of the

Directorate. The administrative expenditure of this Cell is being met out of the 10% funds of

DRDA administration, as per DRDA Guidelines.

7. RURAL DEVELOPMENT PROGRAMMES

The details of the development programmes being implemented in the State are

as under:

(i) COMMUNITY DEVELOPMENT PROGRAMME:-

The present set up of the schemes under Community Development Programme

is based on old community development concept, which aims at the development of

community with the initiative and participation of the community itself. The grant -in-aid is

being provided to the Panchayat Samitis under the heads ‘Social Education’ and ‘General

Education’ for developmental activities in the related fields. Funds are provided to the Blocks

for the construction/ completion of staff residential buildings and Gram Sewak huts. Besides,

the funds are also provided for completion of on-going office buildings. Provision of funds is

made for providing salary of the employees posted at various levels. Grants are also provided

for the promotion / strengthening of Mahila Mandals, incentives / awards to Mahila Mandals

and organisation of awareness camps for non-officials etc. During the year 2010-11, an

amount of Rs.1536.73 lacs was spent on the above set of schemes up to 31st March, 2011.

(ii) SWARNJAYANTI GRAM SWAROZGAR YOJANA (SGSY):-

“SWARANJAYANTI GRAM SWAROZGAR YOJANA” has been launched w.e.f the year

1999-2000. This Yojana is a holistic package covering all aspect of self-employment such as

organisation of the poor into Self Help Groups, Training, Credit, Technology, Infrastructure and

Marketing. The beneficiaries under this scheme are called "Swarozgaries”. The objective of

SGSY is to bring the assisted poor families above the poverty line, by providing them income-

generating assets. This scheme is a credit-cum-subsidy programme. Subsidy under SGSY is

uniform at 30% of the project cost subject to a maximum limit of Rs.7500/-. In respect of SCs /

STs and disabled persons the maximum limit is 50% and Rs.10000/- respectively. For groups

of swarozgaries (SHGs), the subsidy is 50% of the project cost subject to per capita subsidy of

Rs.10, 000/- or Rs.1.25 lacs whichever is less. There will be no monetary limit on subsidy for

irrigation projects.

The focus of SGSY is on the vulnerable groups among the rural poor. Accordingly, the

SC/STs account for 50% of swarozgaries, women for 40%, the disabled for 3% and minority

community for 15%.

Page 12: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

The scheme is being implemented on 75:25 cost sharing basis between Central and

State Governments.

The district wise financial progress during the year 2010-11 (Rs. in lacs)

Credit disbursed to Total Subsidy disbursed to Total Sr.

No.

District Target of credit

mobilization

SHGs Individual SHGs Individual

1 Bilaspur 157.94 177.11 73.79 250.90 43.69 12.39 56.08

2 Chamba 422.63 433.654 169.779 603.433 91.415 28.615 120.03

3 Hamirpur 177.77 249.10 78.91 328.01 58.99 12.73 71.72

4 Kangra 576.20 707.21 190.863 898.073 176.536 33.25 209.786

5 Kinnaur 25.73 33.57 7.27 40.84 9.44 1.67 11.11

6 Kullu 102.64 149.05 26.48 175.53 35.07 2.87 37.94

7 L & Spiti 21.86 9.75 17.81 27.56 2.84 5.89 8.73

8 Mandi 376.59 414.67 131.58 546.25 108.42 21.41 129.83

9 Shimla 288.62 336.79 95.50 432.29 81.63 15.57 97.20

10. Sirmaur 124.76 163.165 44.215 207.38 33.825 8.24 42.065

11. Solan 159.22 151.93 94.42 246.35 44.38 14.79 59.17

12. Una 138.39 209.36 78.80 288.16 42.775 15.555 58.33

Total 2572.35 3035.359 1009.417 4044.776 729.011 172.98 901.991

Page 13: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

District Wise detail of Swarozgaries Assisted in SHGs and Individuals benefitted for the year 2010-11

No. of members in SHGs individual Swarozgaries

assisted Sr. No.

District No. of SHGs formed

SHGs taken up economic activity

Total SC ST Women

Dis-abled

Total SC ST Women

Dis-abled

1 Bilaspur 55 55 439 154 11 355 0 155 72 2 50 0

2 Chamba 140 156 1409 495 325 611 24 662 182 82 54 14

3 Hamirpur 72 77 697 289 8 691 0 165 55 9 59 1

4 Kangra 203 227 2209 863 144 1914 30 338 156 47 83 10

5 Kinnaur 9 14 102 62 40 61 0 18 12 6 4 0

6 Kullu 10 50 427 247 3 202 16 33 15 1 16 0

7 L & Spiti 3 3 36 0 36 36 0 82 0 82 41 0

8 Mandi 164 138 1400 571 9 1008 11 238 140 0 39 11

9 Shimla 222 121 1068 485 0 676 5 199 80 0 37 1

10. Sirmaur 68 56 444 195 9 393 12 99 45 5 28 6

11. Solan 78 53 596 305 15 526 0 183 103 10 56 2

12. Una 76 48 453 123 9 380 5 163 129 7 69 2

Total 1100 998 9280 3789 609 6853 103 2335 989 251 536 47

Page 14: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

District Wise Detail of SHGs formed and assisted since inception of the scheme i.e. 1-4-1999

to 31-3-2011

Sr. No

Districts No. of self help groups formed since inception

No. of self help groups that have taken up economic activities since inception.

1 Bilaspur 626 395

2 Chamba 1520 1112

3 Hamirpur 738 514

4 Kangra 2279 1950

5 Kinnaur 178 84

6 Kullu 1211 411

7 L & Spiti 53 20

8 Mandi 1467 1131

9 Shimla 1169 752

10 Sirmaur 934 564

11 Solan 664 353

12 Una 771 371

Total 11610 7657

Page 15: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Setting up of Rural Self Employment Training Institutes (RESTIs)

Rural Self Employment Training Institutes (RSETIs) have been

established in ten districts of the State for imparting the training to Rural BPL youths in

collaboration with Lead District Banks.

The State Government will provide land, free of cost for these Institutes to

the concerned Lead Banks. The land has been identified in 10 districts. The land has

been transferred in the name of RD Department in 8 districts viz. Bilaspur, Hamirpur,

Kangra,Kullu, Mandi, Solan and Una.

All the RSETIs have been made operational in rental buildings and total 3730

APl/BPL youth have so far been trained. These youth with further credit linked with Banks for

Self Employment.

(iii) SGSY SPECIAL PROJECTS

I. INSTALLATION OF HYDRAMS

The Government of India has approved a Project for Installation of 400

Hydrams under SGSY (Special Projects) Component with a total Project Cost of Rs. 1047.20

lacs, which includes, subsidy of Rs. 770.48 lacs, Rs. 161.40 lacs as loan component and Rs.

115.32 lacs as beneficiaries’ share. The subsidy component is shared by Centre and State

Government on 75:25 sharing basis. For the implementation of this project total funds

Rs.616.80 lacs (Rs 462.60 lacs as central share and Rs 154.20 lacs as state share) have

been released so far, out of which, an expenditure of Rs. 434.60 lacs has been incurred upto

31-03-2010. 217 Hydrams have been installed. Now the Government of India as well as the

Page 16: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

State Government have agreed, in principle, to wind up this project after installation of 333

Hydrams with in the available funds.

District-wise Physical and Financial progress under SGSY Special Projects component “Installation of Hydrams” upto March, 2011

Sr. Item Bilas-

pur

Cham

ba

Hamir-

pur

KangraKinn-

aur

Kullu

L &

Spiti

Mandi

Shiml

a

Sirma

ur

Solan

Una Total

1. Hydrams installed

25 19 1 17 1 5 0 95 6 14 32 2 217

2. Area covered (in hact)

31.05 10.00 -- 80.00 -- -- -- 288.00 -- 0.97 54.00 5.76 470.23

3. Beneficiaries covered

81 35 -- 64 -- -- -- 901 -- 5 54 22 1162

4. Expdt. incurred on procurement

262 Hydrams have been purchased by the HIMURJA @ of Rs. 96000/-per Hydrams (Rs. in lacs)

251.52

5. Expdt. incurred on installation

(Rs. in lacs) 96.80

6. Expdt. incurred on Ropeways

(Rs. in lacs) 86.28

7. Total Expdt. 434.60

Beneficiaries’ contribution

Beneficiaries contribution is in the shape of labour. In case they do not work as labourer only they have to pay the beneficiaries’ contribution.

CONSTRUCTION OF ROPEWAYS:-

Besides above, Rs. 100 lacs have been released to DRDAs Kinnaur, Mandi, Shimla,

Page 17: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Sirmaur and Solan for construction of Ropeways. The progress made so far is as under:-

(Rs. in lacs)

Sr. No.

District Funds released

Ropeways constructed

Span in meters

Exp. incurred

1. Shimla 25.00 1 2100 21.74

2. Mandi 40.00 6 5711 33.08

3. Sirmaur 15.00 7 4000 16.46

4. Solan 15.00 3 3500 10.00

5. Kinnaur 5.00 0 0 5.00

Total 100.00 17 15311 86.28

2. Marketing of Rural Goods

The Government of India has approved a Project titled Marketing of Rural Goods

in Himachal Pradesh under SGSY, (Special Projects) Component with a total Project Cost of

Rs. 914.52 lacs, which includes, subsidy of Rs.769.52 lacs and Rs. 145.00 lacs as loan

component. Centre and State Governments share the subsidy component on a 75:25 sharing

basis. Under this project 50 Himachal Grameen Bhandars and 1 Central Grameen Bhandar

were proposed to be constructed throughout the State initially.

For the implementation of this Project, funds to the tune of Rs. 384.76 lacs

(Rs.288.57 lacs as Central Share and Rs. 96.19 lacs as State Share) have been released so

far.

Upto March, 2011, construction work of 24 Grameen Bhandars has been

completed, construction work at 8 sites is in progress and work on one site is yet to be started.

So far, an expenditure of Rs. 353.56 lacs has been incurred.

3. Gold Mines Project in District Bilaspur

The Government of India has approved a Project titled ‘Gold Mines in Bilaspur

District’ under SGSY (Special Projects) Component with a total Project Cost of Rs. 840.35 lacs,

which includes subsidy of Rs.327.76 lacs, and Rs. 512.59 lacs as loan component. Centre

and State Governments share the subsidy component on 75:25 sharing basis. Under this

project three activities viz., Floriculture, Sericulture and Mushroom Cultivation have been taken

up.

Page 18: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

For the implementation of this Project, funds to the tune of Rs. 262.208 lacs

(196.656 lacs as Central Share and Rs. 65.552 lacs as State Share) have been released so far.

Upto March, 2011, an expenditure of Rs. 277.759 lacs has been incurred. 803

beneficiaries have been assisted under Floriculture, Sericulture and Mushroom cultivation.

4. Milch Livestock Improvement Project in District Solan

The Government of India has approved a Project titled ‘Milch Live Stock

Improvement’, for District Solan under SGSY (Special Projects) Component with total Project

Cost of Rs. 886.95 lacs, which includes subsidy of Rs.715.15 lacs, and Rs. 171.80 lacs as loan

component. Centre and State Governments share the subsidy component on 75:25 sharing

basis. Under this Project activities for the development of Dairy Farm have been taken up. So

far, Rs.572.104 lacs (Rs. 429.084 lacs as Central Share and Rs. 143.02 lacs as State Share)

have been provided to DRDA Solan for the implementation of this project. Out of these

available funds, Rs. 600.456 lacs have been spent upto March, 2011 and 23964 beneficiaries

have covered.

5. Rural Development through Diversification in Agriculture project in district

Mandi.

The Government of India has approved a Project titled ‘Rural Development

through Diversification in Agriculture’ under SGSY (Special Projects) Component with total

Project Cost of Rs. 1385.32 lacs, which includes subsidy of Rs.1204.00 lacs, and Rs. 181.32

lacs as loan component.

So far Rs.963.20 lacs have been provided to DRDA Mandi for implementation of

this project. Out of which, an expenditure of Rs. 873.30 lacs has been incurred upto March,

2011. Under ‘Cultivation of Medicinal plants, Aromatic plants, Flowers and Orchids’

components of this project, 10 Poly - houses have been constructed. One tissue culture

laboratory at Chauntra has been established and one oil extraction unit at Sauli Khud has

also been constructed. Under ‘Sericulture’ component 3 technical service stations and 3

nurseries have been established. Under ‘Innovative Practices in Animal Husbandry’ component

of the project, 105 non-AI centres have been converted into AI centers.

6. ‘Self Reliance through Sericulture and Dairy Development’ project in district

Hamirpur

The Government of India has approved a Project titled ‘Self Reliance through

Sericulture and Dairy Development’ for District Hamirpur under SGSY (Special Projects)

Component with a total Project Cost of Rs. 1499.981 lacs, which includes subsidy of Rs. 980.98

lacs, and Rs. 519.00 lacs as loan component. Centre and State Governments share the

subsidy component on 75:25 sharing basis. Under this Project Sericulture and Dairy

Development activities have been taken up. So far, Rs. 902.187 lacs have been provided to

DRDA Hamirpur for the implementation of this project. Up to March, 2011, an expenditure of

Rs. 848.11 lacs has been incurred. Under ‘Sericultur’ component of the project, 100 Self Help

Page 19: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Groups have been provided assistance. Under ‘Dairy Development’ component fodder seeds

and mineral mixture have also been distributed to the farmers, besides organizing training

camps.

.

7- ‘Green Gold’ project in district Chamba

The Government of India has approved a Project titled ‘Green Gold’ for District Chamba

under SGSY ‘Special Projects’ Component with a total Project Cost of Rs.1488.73 lacs, which

includes subsidy of Rs.1361.23 lacs, Rs. 127.50 lacs as loan component and beneficiaries’

share. Centre and State Governments share the subsidy component on 75:25 sharing basis.

Under this Project, the following activities have been taken: -

1. Cultivation of Medicinal plants, Aromatic plants, Flowers and Orchids

2. Cultivation of Off-Season vegetables

3. Cultivation of Mushroom

4. Improved Dairy Management

So far, Rs. 1281.005 lacs have been provided to DRDA Chamba for the implementation

of this project, out of which Rs. 1005.72 lacs have been spent up to March 2011. ‘Under

Cultivation of Medicinal plants, Aromatic plants, Flowers and Orchids’ component of the project,

seven nurseries have been established and 200 SHGs have been trained. Under ‘Cultivation of

Off Season Vegetables’ components six nurseries have been established and fertilizers, seeds

and chemicals etc. have been provided to the farmers. Under ‘Cultivation of Mushrooms

component, 550 SHGs have been imparted training. Under ‘Improved Dairy Management’

component of the project, various trainings and workshops have been organised and fodder

seeds have been provided to 339 SHGs.

8. Intensive Dairy Development Project in District Kangra

The Government of India has approved a Project titled ‘Intensive Dairy Development

Project for District Kangra’ under SGSY ‘Special Projects’ Component with total Project Cost of

Rs 1301.25 lacs, which includes subsidy of Rs.1151.40 lacs, Rs. 149.85 lacs as loan

component and beneficiaries’ share. Centre and State Governments share the subsidy

component on 75:25 sharing basis. Under this Project, ‘Dairy Development’ activity has been

taken up.

For the implementation of this project, funds to the tune of Rs.921.12 lacs

(Rs.690.84 lacs as Central Share and Rs.230.28 lacs as State Share) have been released so

far. Out of which, Rs.751.85 lacs have been spent upto March, 2011.

9. Cultivation, Value-addition, Processing and Marketing of Medicinal and Aromatic Plants (State specific)

The Government of India has approved a Project titled ‘Cultivation, Value- Addition

Processing and Marketing of Medicinal and Aromatic Plants in Himachal Pradesh’ under

SGSY ‘Special Projects’ component. The details of the project are as under:-

Page 20: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Date of sanction 25.9.2006 Project period 5 years Total cost Rs. 1448.35 lacs

Central share Rs. 1086.25 lacs State share Rs. 362.10 lacs Grants received

Centre Rs. 225.46 lacs State Rs. 75.15 lacs Total Rs. 300.61 lacs Beneficiary to be covered 18750 Nos.

Beneficiaries covered: -This project is being implemented through Environment, Science &

Technology Department. The BPL beneficiaries of 24 Development Blocks viz Mashobra,

Rampur, Chirgaon, Paonta, Pachchad, Banjar, Kullu, Kalpa, Pooh, Amb, Solan, Rajgarh,

Ghumarwin, Bilaspur Sadar, Bamsan, Bijhri, Baijnath, Panchrukhi, Fatehpur, Kaza, Keylong,

Tissa, Bharmour and Salooni have so far been covered.

Activity:- To uplift rural BPL beneficiaries by providing medicinal and flower plants, for

which, details are under:-

1. Aconitum 2. Heterophyllim 3. Atis 4. Geranium 5. Tinospora Cordifolla 6. Rose marinus 7. Lavender 8. Glycirrhiza glabra

Expenditure as on 31-3-2011 = 167.75 lacs

Total 9.22 lacs plants of aforementioned species have been distributed amongst 3873

farmers. Total 1494 Poly-houses have been established and 5023 farmers have been imparted

training in 101 camps. Subsidy has been disbursed to 1477 farmers amounting to Rs. 14.77

lacs so far 4181 farmers have been registered under this project.

10. Skill Development Project being implemented through HIMCON (State Specific)

Total Project cost : Rs. 117.00 Lacs Project Period : 2 years

Target group : 1700 Rural BPL youth

Funding pattern Between : 75:25 Centre and State Govt. Trades Identified : Pharmaceutical, Textile, Heavy Engineering, Light Engineering, Tourism

and Hydropower. Placement Guarantee : 75%

The GOI has released the 1st instalment amounting to Rs. 21.94 lacs on

8th December, 2009 and the State Government has also released its state matching

Page 21: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

share of Rs. 7.313 lacs. Thus total available funds for the implementation of this project

are Rs. 29.253 lacs. Total 435 youth have so far been enrolled out of which 300 have

been imparted training and 297 have been given placement.

11. Skill Development Project being implemented through ITFT Education Group

Chandigarh in R/O District, Hamirpur.

Total Project cost : Rs. 226.68 Lacs Project Period : 1 Year

Central Share 75% : Rs. 170.01 Lacs

ITFT Share 25% : Rs. 56.67 Lacs

Target group : 2000 Rural BPL youth

Trades Identified : Communication, Computers, Customer care,

Front Office Management, Hospitality, Hotel

Management, Beauty and Health, Manufacturing

and ITES/BPO.

Area of Operation : District Hamirpur. If requisite No. of Rural BPL

youth are not available in District Hamirpur in that

event Rural BPL youth from Una and Bilaspur

will be covered.

The GOI has released the 1st instalment amounting to Rs. 42.50 lacs on 22nd

February, 2010. Under this Project Total 552 youth have been enrolled and completed

training out of which 499 have been given placement.

12. Rural Haat Project (State Specific)

The Government of India has sanctioned a project under SGSY for setting

up of Village, District and State Haats. This project has been sanctioned in order to

provide marketing facilities to the rural BPL artisans for selling their products at all

levels. The cost of Haats is as under :-

Village Haat = 15.00 lacs Distrist Haat = 150.00 lacs State Haat = 300.00 lacs

Village Haat:- In each districts 3 Village Haats and 1 District Haat are proposed to be

constructed. The Government of India has released Rs. 202.50 lacs for construction of 36

Village Haats @ Rs. 16.875 lacs each. The State Government has also released its state

matching share of Rs. 67.50 lacs @ 5.625 lacs for each Village Haats. The sites have been

selected by all the DRDAs and construction work is in progress.

Page 22: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

District Haat:- The proposals in respect of districts Kinnaur, Mandi, Shimla and Solan have

been forwarded to Government of India and communication regarding approval is yet to be

received.

State Haat:- The process of finalization of land is in progress.

(iv) (MAHATMA GANDHI NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME

The Mahatma Gandhi National Rural Employment Guarantee Act was notified by

the Government of India on September, 2005 and was made effective w.e.f. 2nd February

2006. In the first phase, the Mahatma Gandhi National Rural Employment Guarantee

scheme (MGNREGS) was introduced in District Chamba and Sirmaur on 2nd February,

2006. In the second phase, MGNREGS was started in District Kangra and Mandi w.e.f. 1-4-

2007. Now in the third phase, all the remaining 8 districts of the State have been covered

under the scheme w.e.f. 1.4.2008.

1. SALIENT FEATURE

The salient feature of the scheme is to provide for the enhancement of livelihood

security of the households in rural areas of the State by providing 100 day’s of guaranteed

wage employment in every financial year to every household whose adult members

volunteer to do unskilled manual work.

2. ELIGIBILITY

The Mahatma Gandhi National Rural Employment Guarantee Scheme is open to

all rural households in the areas notified by the Government of India. The entitlement of

100 days of guaranteed employment in a financial year is in terms of a household. This

entitlement of 100 days per year can be shared within the household.

All adult members of the household, who have been registered, can apply for

work. To get registered, they have to:-

a. Be local residents ‘local’ implies residing within the Gram Panchayat.

b. Be willing to do un-skilled manual work.

c. Apply as a household at the local Gram Panchayat.

3. APPLICATION FOR REGISTRATION AND ISSUANCE OF JOB CARDS

The application for registration can be submitted on plain paper or on the

prescribed application format available at Gram Panchayat/Block level or even an oral

request for registration can be made. The application should contain the names of those

adult members of the household, who are willing to do un-skilled manual work and

Page 23: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

particulars such as age, sex and SC/ST status etc. After verification, all particulars are

entered in the Registration Register by the concerned Gram Panchayat. Every

household is assigned a registration number.

Job cards to every registered household are issued by the Gram Panchayat. The

job cards are issued within a fortnight of the application for registration. Photographs of

adult members, who are applicants are attached to the job cards. The cost of job card

and photographs is borne as part of the programme funds. The job card is valid for a

period of 5 years.

4. APPLICATION FOR WORK AND ALLOCATION OF EMPLOYMENT Applications for work can be submitted to the Gram Panchayat as well as

to the Block Programme Officer. Applications should be given in writing / verbally

and a dated receipt for the application for work must be issued to the applicant.

The applications for work must be for at least 14 days of continuous of work.

Applicants, who are provided work are to be intimated by means of letter

sent to them at the address given in the job card and also by a public notice

displayed at the offices of the Gram Panchayat. The wage employment to the

applicant is to be provided within 15 days of the date of receipt of application.

5. PERMISSIBLE WORKS

As per schedule 1 of the Act, the focus of the scheme is on the following works

in their order of priority:-

(i) Water Conservation and Water Harvesting works;

(ii) Drought proofing works (including afforestation and tree plantation).

(iii) Irrigation canals including micro and minor irrigation works;

(iv) Provision of irrigation facility, horticulture plantation and land development facilities on land owned by the households belonging to the Scheduled Castes and Scheduled Tribes or to Below Poverty Line families or to Marginal or Small Farmers or to beneficiaries of land reforms or to the beneficiaries under the Indira Awas Yojana of the Government of India;

(v) Renovation of traditional water bodies including desiliting of tanks ;

(vi) Land development works;

(vii) Flood control and protection works including drainage in water logged areas;

(viii) Rural connectivity to provide all-weather access; and

(ix) Construction of Bharat Nirman Rajiv Gandhi Sewa Kendra ;

(x) Any other work, which may be notified by the Government of India in consultation with the State Government.

6. FUNDING PATTERN

Page 24: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

The following costs are borne by the Government of India:-

(a) The entire cost of wages for unskilled manual workers.

(b) 75 percent of the cost of material and wages for skilled and semi-skilled workers.

(c) Administrative expenses.

The following costs are borne by the State Government:-

(a) 25 percent of the cost of material and wages for skilled and semi- skilled

workers. (b) Un-employment allowance. (c) Administrative expenses of State Employment Guarantee Council.

7. CRITERIA FOR ALLOCATION/RELEASE OF FUNDS

The District-wise labour budget for the next Financial Year containing the details

of anticipated demand for funds is submitted to Government of India for approval. An

empowered committee under the Secretary, Ministry of Rural Development,

Government of India appraise and approve the district labour budgets in consultation

with the State Secretaries (RD).

8. PAYMENT OF WAGES

(a) Every person working under the scheme is entitled for the wages at the minimum

wage rate fixed by the State Government.

(b) Equal wages are to be paid to both men and women workers.

(c) Workers are entitled to being paid on weekly basis and in any case within a

fortnight of the date, on which, the work was done (MGNREGA section -3 (3))

(d) The wages to the MGNREGA workers are being paid on the basis of the work

done by them based on schedule of rates.

9. PAYMENT OF UNEMPLOYMENT ALLOWANCE

(i) If an applicant under the scheme is not provided such employment within 15

days of receipt of his application seeking employment or from the date on which

the employment has been sought in the case of advance application, whichever

is earlier, he shall be entitled to a daily unemployment allowance, which will be

one fourth of the wage-rate for the first thirty days, during the financial year and

one half of the wage rate for the remaining period of the financial year.

(ii) The payment of unemployment allowance is the liability of the State

Government.

(iii) The liability of the State Government to pay unemployment allowance to a household during any financial year will cease as soon as:- (a) The applicant is directed by the Gram Panchayat or the Programme

Officer to report for work ; or

Page 25: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

(b) The period for which employment is sought comes to an end and no

member of the household of the applicant had turned up for employment

; or

(c) The adult members of the household of the applicant have received in

total at least 100 days of work within the financial year ; or

(d) The household of the applicant has earned as much from the wages and

unemployment allowance taken together which is equal to the wages

for 100 days of work during the financial year.

10. PREPARATION OF SHELF OF PROJECTS

The Gram Sabha recommends the permissible works to be taken up under the

scheme and these works are compiled at the Gram Panchayat level and submitted to the

Block Programme Officer (MGNREGA). The Block Development Officers have been

designated as Block Programme Officers (MGNREGA). The Block Programme Officers

(MGNREGA) consolidate the Gram Panchayat proposals and works recommended by the

Panchayat Samiti into a Block Plan and after the approval of the Panchayat Samiti,

forward it to the District Programme Coordinator (MGNREGA).The Deputy

Commissioners have been designated as District Programme Coordinator (MGNREGA).

The District Programme Coordinator (MGNREGA) consolidate the Block Plans and

proposals from other implementing agencies and get these approved from the Zila

Parishad. After the approval of the Zila Parishad, the administrative approval and financial

sanction are accorded by the District Programme Coordinator (MGNREGA). Minimum 50

percent of the works in terms of cost are to be executed by the Gram Panchayats.

Receipt and payment account for the year 2010-11 (State Employment Guarantee Fund Account)

Page 26: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

(Rs. In lacs)

Receipt Amount Payment Amount

Opening balance

48,47,371 Name of the district

Advance to the Districts

Central share 656,18,08,000 Chamba 71,24,03,600

State share 56,10,68,562 Sirmaur 40,01,26,600

Miscellaneous Receipts (interest income)

99,73,570 Kangra 141,53,66,700

Mandi 161,72,00,000

Bilaspur 19,06,66,700

Hamirpur 29,43,33,300

Kullu 40,92,22,200

Kinnaur 4,69,71,800

L & Spiti 2,52,79,162

Shimla 39,98,55,600

Solan 37,25,55,600

Una 27,27,77,800

Total 615,67,59,062

Closing balance

98,09,38,441

Grand Total 713,76,97,503 G. Total 713,76,97,503

Page 27: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

District wise major achievements under MGNREGA during the year 2010-11(Rs. In Lacs)

Chamba Sirmour Kangra Mandi Bilaspur Hamirp

ur

Kinnaur Kullu L &

Spiti

Shimla Solan Una Total

1111 No. of HHs issued Job Cards 93543 68048 225623 192486 51187 74282 12761 81084 5345 105112 72423 68055 1049949

2222 No. of HHs demanded employment 52975 31103 106787 114956 11634 20245 4951 29257 3706 34403 19702 16730 446449

3333 No. of HHs provided employment 52975 30929 106272 114299 11634 20024 4918 29257 3706 33395 19702 16730 443841

4444 Total Mandays generated (In lacs) 29.98 16.72 53.63 52.36 4.88 9.86 2.17 13.04 1.48 13.40 11.28 10.26 219.06

5555 Mandays generated by SC/ST 15.77 7.12 17.35 20.76 1.54 3.99 2.17 4.63 1.48 4.64 4.96 5.44 89.85

6666 Average mandyas generated by

SC/ST

53 43 32 40 32 40 100 36 100 35 44 53 41

7777 Mandays generated by women 9.81 2.13 27.09 34.56 2.49 6.58 1.32 5.50 0.86 6.21 4.35 5 105.90

8888 %age of mandays generated by

women

33 13 51 66 51 67 61 42 58 48 39 49 48

9999 Households completed 100 days

employment

2540 2189 4257 4108 629 1650 140 708 65 1231 1510 2887 21914

10101010 Average persondays per households 57 54 50 46 42 49 44 45 40 40 57 61 49

11111111 Total works taken up 8517 6457 14369 11295 2150 3879 536 3810 284 4445 3056 2533 61331

12121212 No. of completed works 5288 3805 7120 5030 1390 2060 314 2452 122 2593 1898 1615 33687

13131313 No. of works in progress 3229 2652 7249 6265 760 1819 222 1358 162 1852 1158 918 27644

14141414 Funds released (Rs. In lac)

15151515 Opening balance (Rs. In lac) 3006.91 437.87 2779.47 2201.15 196.71 318.05 97.24 86.99 97.74 529.13 259.08 253.59 10263.93

11116666 Release of last year received during

the current year (Rs. In lac)

-- -- - - -- -- 35.00 -- - -- -- -- 35.00

17171717 Centre + State share (Rs. In lacs) 7124.04 4001.27 14153.67 16172.00 1906.67 2943.33 469.72 4092.22 252.79 3998.56 3752.56 2727.78 61567.59

18181818 Miscellaneous (Rs. In lacs) 11.25 92.02 56.60 28.61 1.52 27.49 9.25 79.33 11.65 24.71 0.97 0.00 343.40

19191919 Total funds available (Rs. In lacs) 10142.20 4531.16 16989.74 18401.76 2104.90 3288.87 611.21 4258.54 362.18 4552.40 3985.61 2981.37 72209.92

20202020 Expenditure on wages (Rs. In lacs) 4037.31 1954.38 6103.35 7141.81 588.22 1103.04 292.39 1608.60 184.37 1919.57 1540.84 1139.92 27613.80

21212121 Expenditure on material (along with

skilled Labour) (Rs. In lacs)

2666.13 1478.86 4365.21 5600.76 453.27 950.12 138.50 896.02 53.51 1211.47 1374.20 666.22 19854.27

22222222 Administrative expenditure (Rs. In

lacs)

262.05 144.06 493.48 754.48 68.31 99.49 15.17 166.06 24.26 160.07 163.79 104.83 2456.05

23232323 Total Expenditure (Rs. In lacs) 6965.49 3577.30 10962.04 13497.05 1109.80 2152.65 446 .06 2670.68 262.14 3291.11 3078.83 1910.97 49924.12

22224444 Percentage of expenditure 69 79 65 73 53 65 73 63 72 72 77 64 69

22225555 Wage on wage ratio 60:40 57:43 58:42 54:46 56:44 54:46 68:32 64:36 77:23 61:39 53:47 63:37 58:42

No. of saving account opened

In banks 58215 38068 329907 148498 15939 27529 5690 39154 4619 50452 30234 25349 773654

22226666

In Post office 9472 1059 15901 17612 1851 2652 785 1828 1079 5326 399 1296 59260

Page 28: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Total 67687 39127 345808 166110 17790 30181 6475 40982 5698 55778 30633 26645 832914

Page 29: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

V. INDIRA AWAS YOJANA(IAY)

Indira Awas Yojana is a Centrally Sponsored scheme. Under this scheme, assistance of

Rs.48500/- per beneficiary is being given to BPL families for the construction of new house.

Gram Sabha does the selection of beneficiaries under this scheme.

The targets and funds are allocated under IAY as under:-

SC/STs 60% of total allocation Others 40%, of total allocation Disabled 3% (amongst SC/ST and Others) Minority 15%. (amongst SC/ST and Others)

This scheme is being financed by Central and State Governments on a 75:25

sharing basis.

District wise physical and financial progress during the year 2010-11 is as under:-

Sr. No. District Target

Achievement ( No. of houses constructed)

Expenditure (Rs. in lacs)

1 Bilaspur 246 212 119.675

2 Chamba 604 660 323.006

3 Hamirpur 278 278 138.118

4 Kangra 1272 1362 663.368

5 Kinnaur 143 131 77.67

6 Kullu 317 317 153.745

7 L & Spiti 107 211 47.10

8 Mandi 772 584 388.77

9 Shimla 475 436 238.36

10. Sirmaur 434 518 236.087

11. Solan 541 540 262.335

12. Una 604 675 330.778

Total 5793 5924 2979.01

Note; Apart from 5793 targeted houses, 568 houses were of spill over and the achievement is including spill over.

Page 30: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

VI. Atal Awas Yojna(AAY)

This is a state plan housing scheme which is being implemented on the pattern of Indira

Awas Yojana.

Physical and financial progress during the year 2010-11, is as under:-

Sr. No. District Target Houses constructed

Expenditure (Rs. in lacs)

Houses under construction

1 Bilaspur 195 195 97.26 23

2 Chamba 355 398 209.886 195

3 Hamirpur 296 316 143.56 0

4 Kangra 982 1055 477.019 2

5 Kinnaur 29 80 26.19 48

6 Kullu 264 264 128.04 0

7 L & Spiti 66 82 29.47 48

8 Mandi 611 649 290.76 88

9 Shimla 469 539 240.86 0

10. Sirmaur 294 322 148.185 28

11. Solan 273 273 132.405 0

12. Una 304 304 147.595 25

Total 4138 4477 2071.23 457

Note: Apart from 4138 targeted houses, 796 houses were of spill over and the achievement is including

spillover.

Page 31: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

VII. NATIONAL FAMILY BENEFIT SCHEME(NFBS)

In case of the death of a breadwinner of a family living below the poverty line, financial

assistance of Rs.10, 000/- per family is provided to bereaved family under this scheme.

District wise physical and financial progress during the year 2010-11 is as under:-

Sr. No. District Families assisted (in Nos.)

Amount disbursed (Rs. in lacs)

1 Bilaspur 114 11.40

2 Chamba 253 25.30

3 Hamirpur 126 12.60

4 Kangra 517 51.70

5 Kinnaur 19 1.90

6 Kullu 83 8.30

7 L & Spiti 15 1.50

8 Mandi 252 25.20

9 Shimla 239 23.90

10. Sirmaur 60 6.00

11. Solan 111 11.10

12. Una 113 11.30

Total 1902 190.20

Page 32: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

VIII Matri Shakti Bima Yojana

‘Matri Shakti Bima Yojana’ scheme covers all women living below the poverty line

within the age group of 10-75 years. The scheme provides relief to family members/ insured

women in case of their death or disability arising due to any kind of accident, surgical

operations like sterilization, mishap at time of child birth/delivery drowning washing away in

floods, landslide, insect bite & snakebite etc. The scheme also gives benefit to a married

woman in case of accidental death of her husband. Under this scheme, women are given

assistance @ Rs. 50000/- in cases of the incidents of 100% disability & partial disability.

During the year 2010-11 Finance department has released Rs. 240.00 lacs, against which

252 cases have been sanctioned. The district-wise details are as under:-

Sr. No. District Cases sanctioned (in Nos.)

Amount disbursed (Rs. in lacs)

1 Bilaspur 24 23.00

2 Chamba 26 25.00

3 Hamirpur 18 16.00

4 Kangra 31 31.00

5 Kinnaur 7 7.00

6 Kullu 9 9.00

7 L & Spiti 0 1.00

8 Mandi 48 46.00

9 Shimla 63 59.00

10. Sirmaur 17 16.00

11. Solan 4 2.00

12. Una 5 5.00

Page 33: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Total 252 240.00

IX WATERSHED DEVELOPMENT PROGRAMME:- ( A) Integrated Wastelands Development Programme is being implemented in 9 districts of

the State viz: Chamba, Hamirpur, Kangra, Kullu, Development Blocks Nichar and Kalpa of

district Kinnaur, Mandi, Shimla Sirmour and Development Block Kandaghat, Solan and

Nalagarh of district Solan on watershed approach basis since 1995-96. Total 67 projects

comprising of 873 micro-watersheds have been sanctioned under IWDP till date. These projects

were funded 100% by the Central Government upto 31.3.2000. Since 1.4.2000 these projects

are being funded on sharing basis @ Rs. 5500:500 per hectare between Central & State

Governments respectively.

The Detail of funds released, expenditure incurred & area treated for the year 2010-11 is as under:

Sr No.

Name of project

Funds Released during the year 2010-11 (Rs in Lakhs)

Expenditure during the year (Rs in

Lakhs)

Physical Achievement during the year (in ha)

Centre State Total 1 2 3 4 5 6 7

Integrated Wastelands Development Programme: 1. Chamba-II 41.43 0 41.43 19.086 218 2. Chamba-III 49.810 0 49.810 4.432 25

3. Chamba-IV 201.04 18.72 219.760 173.181 4135 4. Chamba-V 135.231 12.36 147.591 3.47 25

5. Chamba-VI 78.160 7.50 85.66 43.452 866 6. Hamirpur-II 0 0 0 0 0 7. Hamirpur-III 0 0 0 0.91 0

Page 34: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

8. Hamirpur-IV 0 0 0 2.300 0 9. Hamirpur-V 0 0 0 0.090 0 10. Hamirpur-VI 16.960 2.080 19.040 39.03 652 11. Hamirpur-VII 36.31 3.75 40.06 40.660 847.24 12. Hamirpur-VIII 35.10 3.38 38.48 53.90 910

13. Kangra-II 0 0 0 0 0 14. Kangra-III 0 0 0 18.988 290

15. Kangra-IV 33.271 3.134 36.405 49.15 33 16. Kangra-V 24.305 2.500 26.805 11.884 728.50 17. Kangra-VI 0 0 0 24.660 391

18. Kangra-VII 32.932 3.750 36.682 27.387 449 19. Kangra-VIII 40.285 3.750 44.035 57.989 1097.74

20. Kangra-IX 0 0 0 13.386 244 21. Kangra-X 0 0 0 28.743 349 22. Kangra-XI 0 0 0 30.687 536

23. Kangra-XII 42.314 4.071 46.385 14.318 260.50 24. Kangra-XIII 20.932 2.073 23.005 13.803 132

25. Kangra-XIV 12.909 3.522 16.431 21.164 379 26. Kangra-XV 0 6.440 6.440 49.756 936 27. Kangra-XVI 0 0 0 32.590 518 28. Kangra-XVII 0 0 0 39.034 604 29. Kangra-XVIII 68.190 6.504 74.694 20.327 307

30. Kinnaur-I 0 0 0 0 0 31. Kinnaur-II 0 0 0 0.680 10 32. Kinnaur-III 99.940 8.040 107.980 42.150 2418 33. Kullu-I 0 0 0 0.420 0 34. Kullu-II 0 0 0 49.250 1268 35. Kullu-III 0 0 0 28.880 299

36. Kullu-IV 23.200 2.500 25.700 31.800 441 37 Kullu-V 25.660 2.540 28.200 55.010 915 38. Mandi-I 0 0 0 0 0 39 Mandi-II 35.593 3.030 38.623 63.510 1075 40 Mandi-III 79.742 7.590 87.332 73.270 1655

41 Mandi-IV 0 0 0 52.860 713 42 Mandi-V 0 0 0 60.830 650 43 Mandi-VI 88.860 8.370 97.230 33.790 522

44 Mandi-VII 91.872 8.700 100.572 37.930 676 45 Shimla-I 0 0 0 0 0

46 Shimla-II 59.164 6.210 65.374 28.110 583 47 Shimla-III 90.970 9.00 99.970 6.780 134

48 Shimla-IV 0 0 0 50.110 1043 49 Shimla-V 0 0 0 42.690 881

50 Shimla-VI 0 0 0 52.440 1091 51 Shimla-VII 0 0 0 12.320 246

52 Shimla-VIII 0 0 0 27.211 565 53 Shimla-IX 0 0 0 17.790 367 54 Sirmour-I 0 0 0 0 0 55 Sirmour-II 0 0 0 12.580 24.20 56 Sirmour-III 0 0 0 18.960 223.05

57 Sirmour-IV 0 0 0 14.490 149.84 58 Sirmour-V 39.180 3.750 42.930 68.220 2343.36 59 Sirmour-VI 36.680 3.750 40.430 81.140 2608.50 60 Solan-II 0 0 0 0 0 61 Solan-III 0 0 0 16.645 184

Page 35: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

62 Solan-IV 0 0 0 10.00 137 63 Solan-V 0 3.750 3.750 54.311 873 1540.04 150.764 1690.804 1878.554 37027.93

(B) DROUGHT PRONE AREA PROGRAMME ( DPAP):

Drought Prone Area Programme is being implemented in 3 district of the state viz Bilaspur, Una

and Development Blocks Kunihar and Dharampur of district Solan. Upto the year 1998-99, the

programme was being funded by Central and State Governments on 50:50 sharing basis but from

1.4.1999 the Government of India have changed the funding pattern from 50:50 to 75:25.between

central and state level respectively.

Under this programme, 412 micro watersheds have been sanctioned by the GOI till date.

The detail of funds released, expenditure incurred and area treated is as under:-

Sr No.

Name of project Funds Released during the year 2010-11 (Rs in Lakhs)

Expenditure during the year (Rs in

Lakhs)

Physical Achievement

during the year (in ha)

Centre State Total

1 2 3 4 5 6 7 Drought Prone Area Programme: 1. Bilaspur 5th Batch 0 0 0 2.033 1 2. Bilaspur 6th Batch 136.994 5.302 142.296 46.818 669 3. Bilaspur 7th Batch 106.969 26.657 133.626 4.544 63

4. Bilaspur 8th Batch 81.599 27.199 108.798 18.049 242 5. Bilaspur Hariyali 1st 0 0 0 3.284 36 6. Bilaspur Hariyali 2nd 77.727 0 77.727 4.399 55 7. Bilaspur Hariyali 3rd 89.672 0 89.672 0.821 0 8. Bilaspur Hariyali 4th 89.884 0 89.884 29.940 472

Page 36: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

9. Solan 1st batch 0 0 0 0 0 10. Solan 2nd batch 0 0 0 0 0 11. Solan 5th Batch 0 0 0 0 0 12. Solan 6th Batch 66.187 22.063 88.25 10.271 156 13. Solan 7th Batch 16.852 5.617 22.469 25.680 335

14. Solan 8th Batch 55.168 18.389 73.557 18.757 261 15. Solan Hariyali 1st 42.232 14.08 56.312 16.275 255

16. Solan Hariyali 2nd 0 17.719 17.719 72.256 1186 17. Solan Hariyali 3rd 0 22.046 22.046 88.930 1554 18. Solan Hariyali 4th 0 0 0 44.656 798

19. Una 6th Batch 219.28 73.09 292.37 21.289 149 20. Una 7th Batch 133.30 44.43 177.73 95.690 1748

21. Una 8th Batch 163.90 54.63 218.53 125.040 2259 22. Una Hariyali 1st 103.39 34.46 137.85 67.950 1044 23. Una Hariyali 2nd 127.45 42.48 169.93 42.450 637

24. Una Hariyali 3rd 142.45 47.48 189.93 27.360 464 25. Una Hariyali 4th 150.27 50.09 200.36 27.355 412

1803.324 505.732 2309.056 793.847 12796

( C ) DESERT DEVELOPMENT PROGRAMME (DDP):

The Desert Development Programme (DDP) is being implemented in district Lahaul

Spiti & Pooh block of district Kinnaur. Under DDP, 552 Micro Watersheds have been

sanctioned by GOI till date.

The detail of funds released, expenditure incurred and area treated during the year 2010-

11 is as under:-

Sr No.

Name of project Funds Released during the year 2010-11 (Rs in Lakhs)

Expenditure during the year (Rs in

Lakhs)

Physical Achievement

during the year (in ha)

Centre State Total 1 2 3 4 5 6 7

Page 37: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Desert Development Programme: 1. L & Spiti 5th Batch 102.19 0 102.19 20.500 146.96 2. L & Spiti 6th Batch 224.63 0 224.63 40.540 397.57 3. L & Spiti 7th Batch 0 0 0 95.630 697.84 4. L & Spiti 8th Batch 0 0 0 42.240 303.38

5. L & Spiti Hariyali 1st

TANDI 0 0 0 0 0

6. L & Spiti Hariyali 1st 0 0 0 11.570 92.46 7. L & Spiti Hariyali 2nd 150.26 51.75 202.01 12.920 102.04 8. L & Spiti Hariyali 3rd 175.37 60.53 235.90 38.780 453.45

9. L & Spiti Hariyali 4th 0 0 0 11.390 6.20 10. Kinnaur 6th Batch 71.17 0 71.17 3.830 0 11. Kinnaur 7th Batch 230.20 12.00 242.20 0 0 12. Kinnaur 8th Batch 198.48 55.00 253.48 61.530 942 13. Kinnaur Hariyali 1st 96 0 96.00 0 0 14. Kinnaur Hariyali 2nd 0 0 0 33.350 452

15. Kinnaur Hariyali 3rd 125.08 0 125.08 1.890 0 16. Kinnaur Hariyali 4th 0 0 0 15.400 255 Total 1373.38 179.28 1552.66 389.57 3848.90

(D) INTEGRATED WATERSHED MANAGEMENT PROGRAMME (IWMP) :

The GOI has launched new guidelines namely “Common Guidelines for Watershed

Development Project”’. which have been made applicable to all Watershed Development Projects

w.e.f. 1-4-08.The GOI has sanctioned 36 new projects under IWMP with a total cost of Rs 305.75

crore for treatment of 203832 hectare area during 2009-10 and other 44 projects with a total

outlay of Rs. 356.47 crore for treatment of 237,650 ha area for all the all the districts of the state

during the year 2010-11. Under these projects cost norms have been received to Rs. 15000/- ha

from Rs. 6000/- application to the earlier projects and funded pattern has been revised in the ratio

of 90:10 sharing basis between Central and State Government respectively. The Government of

India has released 14% balance funds of 1st installment of (20%) for Rs. 38.52 crore under all

projects sanctioned against which the State Government has released matching state share for

Page 38: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Rs. 4.04 crore except District Lahaul Spiti & Kinnaur. Beside this the Government of India has

also released 6% funds of 1st installment (20%) of Central share for Rs. 19.24 crore under IWMP

projects sanctioned by Government of India during 2010-11. The matching state share under

these projects is being released.

X Total Sanitation Campaign (TSC)

The department of Rural Development is implementing Total Sanitation

Campaign Project in all the districts of the State to ensure effective and sustainable

sanitation in the rural areas. The State Govt. has approved a new strategy which aims

at introduction of a holistic concept of sanitation, to have a demand oriented, outcome

based approach, to generate awareness of a ‘need’ for sanitation amongst people

individually and as a community, involvement and ownership of the community, local

bodies undertaking responsibility for sustainable delivery of services, identifying

appropriate institutional arrangements for delivery of services including partnership with

NGOs/ CBOs and address inter-departmental co-ordination, emphasize on monitoring

and evaluation to determine success and outcomes. A key component of this State

Sanitation Strategy is various Reward Schemes which have been instituted to ensure

wholesome involvement of the community in the sanitation campaign. The District -wise

physical and financial progress under the scheme for the year 2010-11 are as under:-

Physical Achievement during 4/2010 to 3/2011

Page 39: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

COMPONENT-WISE EXPENDITURE DURING FINANCIAL YEAR 2010-11 Rs. in lacs

IHHL Sanitary Complex

School Toilet

Anganwadi Toilet

Start-up Administration IEC SL

no District

Exp Exp Exp Exp Exp Exp Exp

1 BILASPUR 0.00 50.21 47.05 6.10 0.00 10.45 5.05

2 CHAMBA 55.30 96.68 224.06 0.48 0.00 3.13 0.00

3 HAMIRPUR 90.48 13.28 51.91 3.20 0.00 4.20 34.50

4 KANGRA 27.00 3.70 330.85 0.15 0.00 33.30 140.76

Sr.No. District Name

IHHL (BPL)

IHHL (APL)

IHHL Total

Sanitary Comp

School Toilets

AnganwadiToilets

SLWM Total

Schools covered

1 BILASPUR 1000 3385 4385 22 249 134 0 147

2 CHAMBA 31610 18910 50520 39 615 53 0 533

3 HAMIRPUR 0 0 0 9 154 10 68 60

4 KANGRA 14073 87073 101146 3 760 2103 1 760

5 KINNAUR 0 0 0 12 0 7 0 0

6 KULLU 381 0 381 15 498 445 6 329

7 LAHAUL & SPITI

472 195 667 0 30 0 0 30

8 MANDI 0 2687 2687 54 1017 31 0 374

9 SHIMLA 2663 3668 6331 16 657 118 0 434

10 SIRMAUR 4441 24061 28502 5 1204 205 75 738

11 SOLAN 2968 7770 10738 118 663 784 0 663

12 UNA 240 10974 11214 17 582 510 0 604

Total 57848 158723 216571 310 6429 4400 150 4672

Page 40: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

5 KINNAUR 0.00 10.13 9.13 0.05 0.00 0.00 14.80

6 KULLU 150.01 26.63 60.84 2.94 0.00 5.23 16.52

7 LAHAUL &

SPITI 0.00 6.67 5.85 0.00 0.00 0.00 1.00

8 MANDI 45.90 31.78 201.55 7.55 0.00 25.82 14.45

9 SHIMLA 70.95 34.50 131.40 19.35 0.00 2.46 20.00

10 SIRMAUR 254.57 63.00 35.80 9.60 0.00 14.76 22.42

11 SOLAN 0.00 59.00 0.40 7.35 0.00 10.78 13.59

12 UNA 0.00 22.80 178.72 24.69 0.00 13.92 14.29

STATE

TOTAL 694.21 418.38 1277.56 81.46 0.00 124.05 297.38

Mahila Mandal Protsahan Yojana :

Mahila Mandal Protsahan Yojana was launched during 1998-99 with a view to

strengthen the Mahila Mandals and to ensure their involvement in the process of

development. Now this scheme has been totally linked with TSC and a sum of Rs.

182.50 lacs has been allocated during 2010-11 to provide incentives to those Mahila

Mandals who have performed good work under the Sanitation in village/ward and Gram

Panchayat area as per scheme guidelines.

Nirmal Gram Puraskar:

To give a fillip to the Total Sanitation Campaign (TSC), Government of India launched

the Nirmal Gram Purskar (NGP) in October, 2003 and gave away the first awards in 2005. NGP

seeks to recognize the efforts made by PRIs and Institutions who have contributed significantly

towards ensuring full sanitation coverage in their area of operation. TSC lays strong emphasis

Page 41: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

on IEC, capacity building and hygiene education fro effective behavior change with the

involvement of PRIs, CBOs, NGOs etc. The main objectives of NGP are:-

1. To bring sanitation to the forefront of social and political discourse for development in

rural areas.

2. To develop open defecation free and clean villages that will act as models for others to

emulate.

3. To give incentive to PRIs to sustain the initiatives taken by them to eliminate the practice

of ODF.

4. To increase social mobilization in TSC implementation, by recognizing the catalytic role

played by organizations in attaining universal sanitation coverage.

The detail of last year’s winners of NGP from State of Himachal Pradesh is as under :-

Year Number of GPs won NGP Prize money distributed

2007 22 GPs Rs. 26.00 lacs 2008 245 GPs and 1 Block Rs. 363.00 lacs 2009 253 GPs Rs.364.50 lacs 2010 168 GPs Rs. 261.50 lacs

State Reward Schemes: 1. Maharishi Valmiki Sampooran Swachchhta Puraskar (MVSSP)

To boost the sanitation campaign in Himachal Pradesh a competition based State

Reward Scheme i.e. Maharishi Valmiki Sampooran Swachchhta Puraskar has been launched

by the State Government and winner ODF GPs are rewarded at the State level award

distribution function scheduled to be held together with State level Independence Day function

on 15th August every year. Under this scheme, Rs. 147.00 lakh have been distributed to 104

winner ODF GPs on 15th August,2010 . The incentive pattern under this scheme is as under :-

• Block level cleanest GP- 1.00 lakh

• District level cleanest GP- 3.00 lakh(2 GPs can get prize if distinct

has more than 300 GPs)

• Division level cleanest GP- 5.00 lakh

• State level cleanest GP- 10.00 lakh

2. School Sanitation Reward Scheme ( for Elementary Schools)

A new State Reward scheme under School Sanitation has been launched by the State

on 3rd December, 2009. Under this scheme, the cleanest Government Primary and Middle

Schools will be rewarded at District and Block level. This competition based scheme will take

place from 31st December for summer and winter closing schools till the 15th April every year

and the rewards will be given on District level Himachal Day function. The First Prize for

cleanest Primary and Middle School at District level would comprise of a Certificate of

Page 42: OkkfkZd iz’kklfud izfrosnu OkkfkZd iz’kklfud izfrosnu …hprural.nic.in/annual_eng.pdf · Okkf"kZd iz’kklfud izfrosnu Okkf"kZd iz’kklfud izfrosnu YEAR : 2010-2011 (1-4-2010

Appreciation, memento and a cash prize of Rs.50,000/- and the First prize at Block level would

be Rs.20,000/- alongwith a certificate of appreciation and memento. Second Prize (only at

Block level) would comprise of Rs.10,000/-. During the year 2010-11, an amount of Rs. 58.20

lakh have been allocated to districts as award money to winner schools.

8. Right to Information Act.

In pursuance to section - 4 of the Right to Information Act, 2005 the

following officers have been designated to provide information:-

A. GOVERNMENT / SECRETARIAT LEVEL

Sr. No.

Official designation of the officer/official

Telephone No.

Designated as

1. Secretary (RD) 2621897(o) Appellate Authority

2. Special Secretary (RD) /Joint Secretary (RD)

2623820(o) 2623822(o) 2623830(o)

State Public Information Officer

3. Section Officer/Supdt. 2625484(o) State Assistant Public Information Officer

B. DEPARTMENT LEVEL

Sr. No. Official designation of the officer/official

Telephone No. Designated as

1. Director (RD) 2623820(o) Public Information Officer 2. Joint Director (RD)

Dy. Director (RD) 2623822(o) 2623830(o)

Public Information Officer

3. Superintendent CD-II Superintendent (Budget)

2623819(o) Ext.-214(o) 2623819(o) 2623819(o) Ext.-231(o)

Assistant Public Information Officer

C. DISTRICT / BLOCK LEVEL

1. All the ADC/ADM-cum-Project Director, DRDA, in Himachal Pradesh

Public Information Officer

2. All the Project Officer, DRDA, in Himachal Pradesh Assistant Public Information Officer

3. All the BDOs/SE&BPO/Superintendent in the each Block

Assistant Public Information Officer

All information pertaining to Rural Development Department is available at

www.hprural.nic.in